20-105 Refrigeration Machine Schedule (8-1-23).xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Y1DZ--NRM - CON - 561A4-18-101 Replace Central Chillers -Construction Federal contract opportunity
Solicitation number
36C24223B0035
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

This document contains a refrigeration machine schedule and details for a federal contract opportunity to replace central chillers. The refrigeration machine schedule lists two water-cooled centrifugal chillers to be installed at a medical center, providing 700 and 1000 ton capacities. It specifies efficiency requirements and includes notes on controls integration, power connection, variable frequency drives, piping configurations, and marine waterboxes. The related federal contract opportunity is solicited by the Department of Veterans Affairs for project 561A4-18-101 to replace central chillers at a Veterans Health Administration facility. The solicitation number and opportunity type are provided.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DZ--NRM - CON - 561A4-18-101 Replace Central Chillers -Construction, newest first.
File Type Posted
Sherlock 802 with Opitional Strobe.pdf PDF
36C24223B0035 0004.docx DOCX document
36C24223B0035 0003.docx DOCX document
CEI085065 - LYONS VA - POWER SYSTEM STUDY 6-1-09.pdf PDF
561A4-18-101 Replace Central Chillers RFI for Construction - with updates.pdf PDF
Roof Pictures.pdf PDF
36C24223B0035 0002.docx DOCX document
561A4-18-101 Replace Central Chillers RFI for Construction.pdf PDF
S04 - Site Visit Sign In.pdf PDF
36C24223B0035 0001.docx DOCX document
S02 - Wage Determination 07-03.pdf PDF
Contract Drawings.pdf PDF
Contract Specifications.pdf PDF
S02 - Buy American Certificate.pdf PDF
36C24223B0035_2.docx DOCX document
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHILLER

REFRIGERATION MACHINE SCHEDULE
MARKLOCATIONSYSTEM AND/OR SERVICETYPECAPACITYMIN. FULL LOAD EFFICIENCY (FL)MIN. INTEGRATED PART LOAD EFFICIENCY (IPLV)MIN. PART LOAD EFFICIENCIESEVAPORATORCONDESNERCOMPRESSORREFRIG. TYPEUNIT OPERATING WEIGHTREMARKS
100%75%50%25%WATER QUANTITYNO. OF PASSESWATER ENT.WATER LV.PRESS. DROPFOULING FACTORWATER QUANTITYNO. OF PASSESWATER ENT.WATER LV.PRESS. DROPFOULING FACTORNO. OF COMP.VOLTAGEMCAMOCP
TONSKW/TONKW/TONKW/TONGPM°F°FFTGPM°F°FFTLBS
WC-2BUILDING 136MEDICAL CENTERWATER COOLED CENTRIFUGAL7000.56750.32140.56750.40610.27280.29251,6752544411.90.0001001,9692859512.70.0002501460/3/606261,000R-513A31,426SEE NOTES
WC-3BUILDING 136MEDICAL CENTERWATER COOLED CENTRIFUGAL1,0000.59270.31930.59270.40960.27120.27862,3922544417.40.0001002,8302859516.20.0002501460/3/609331,600R-513A39,908SEE NOTES
NOTES
1. PROVIDE WITH LONWORKS OPEN PROTOCOL COMMUNITCATION. COORDINATE WITH CONTROLS INSTALLER ON ALL REQUIREMENTS.
2. PROVIDE WITH SINGLE POINT POWER CONNECTION.
3. PROVIDE WITH UNIT MOUNTED INTEGRAL VFD STARTER(S).
4. PROVIDE WITH FLANGED RIGHT HAND PIPING CONNECTIONS.
5. PROVIDE MARINE WATERBOXES ON BOTH THE EVAPORATOR AND CONDENSER. REAR INLET/TOP OUTLET ON THE EVAPORATOR AND FRONT INLET/TOP OUTLET ON THE CONDESNER.
6. PROVIDE WITH HINGED DOORS ON BOTH ENDS.