This document is a solicitation for construction services to replace central chillers at a Department of Veterans Affairs medical center. The solicitation seeks a contractor to remove and replace two existing chillers, five pumps, and four exhaust fans at the VA New Jersey Healthcare System's Lyons Campus. The work includes site civil work, structural work, mechanical work, and electrical work. Bids are due by August 23, 2023 and must be submitted electronically to the specified contracting officer. This is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. The estimated period of performance is 365 calendar days from notice to proceed.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DZ--NRM - CON - 561A4-18-101 Replace Central Chillers -Construction, newest first.
File Type Posted
36C24223B0035 0004.docx DOCX document
Sherlock 802 with Opitional Strobe.pdf PDF
36C24223B0035 0003.docx DOCX document
CEI085065 - LYONS VA - POWER SYSTEM STUDY 6-1-09.pdf PDF
561A4-18-101 Replace Central Chillers RFI for Construction - with updates.pdf PDF
20-105 Refrigeration Machine Schedule (8-1-23).xlsx XLSX spreadsheet
36C24223B0035 0002.docx DOCX document
Roof Pictures.pdf PDF
561A4-18-101 Replace Central Chillers RFI for Construction.pdf PDF
S04 - Site Visit Sign In.pdf PDF
36C24223B0035 0001.docx DOCX document
Contract Drawings.pdf PDF
S02 - Wage Determination 07-03.pdf PDF
Contract Specifications.pdf PDF
S02 - Buy American Certificate.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBJECT*

561A4-18-101 Replace Central Chillers

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
14424
SOLICITATION NUMBER*
36C24223B0035
RESPONSE DATE/TIME/ZONE
08-23-2023 10:45AM EASTERN TIME, NEW YORK, USA
ARCHIVE
90 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
N
SET-ASIDE
SDVOSBC
PRODUCT SERVICE CODE*
Y1DZ
NAICS CODE*
238220
CONTRACTING OFFICE ADDRESS
Network Contracting Office - 2

Department of Veterans Affairs Canandaigua VAMC 400 Fort Hill Ave.

Canandaigua NY 14424

POINT OF CONTACT*

Victoria Clark Contracting Officer victoria.clark6@va.gov

PLACE OF PERFORMANCE

ADDRESS
151 Knollcroft Rd

Lyons, NJ 07939

POSTAL CODE
07939
COUNTRY
USA

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS

EMAIL DESCRIPTION

DESCRIPTION

Combined Synopsis/Solicitation Notice Combined Synopsis/Solicitation Notice Invitation For Bid #36C24223B0035 to Replace Central Chillers at the Lyons VAMC

*= Required Field
Combined Synopsis/Solicitation Notice

Combined Synopsis/Solicitation Notice

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

6. PROJECT NUMBER

7. ISSUED BY

CODE

8. ADDRESS

OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFOR

MANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR

INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than _______________________ calendar days for Government accepta nce after the date offers are due will not be considered and will be rejected.

OF 56

36C24223B0035 X 07-13-2023 561-23-4-6107-0009 561A4-18-101 Network Contracting Office - 2 Department of Veterans Affairs Canandaigua VAMC 400 Fort Hill Ave Canandaigua NY 14424 Network Contracting Office - 2 Department of Veterans Affairs Canandaigua VAMC 400 Fort Hill Ave.

Canandaigua NY 14424 Victoria Clark victoria.clark6@va.gov This project is to Replace Central Chillers at the VA NJ Healthcare System's Lyons Campus 151 Knollcroft Rd. Lyons, NJ 07939. The contractor shall furnish all materials, supplies, equipment, personnel and supervision to accomp lish project number 561A4-18-101 Replace Central Chillers IAW the Statement of Work, Specifications and Drawings attached hereto.

The Contractor will be responsible to coordinate and schedule work and shall be expected to plan work typically during duty hours of 8AM to 4:30PM EST except as noted in the general conditions and as approved by the Contracting Officer.

NAICS: 238220

Size Standard: $19M Magnitude of Construction: Between $2,000,000 and $5,000.000 Period of Performance: 365 calendar days from issuance from the Notice to Proceed

This requirement is 100% set aside for Service-Disabled Veteran Owned Small Business (SDVOSB). Potential contractors must be registered in SAM (www.sam.gov) with a Unique Entity Identifier (UEI) and are certified in the Veterans Small Business (VetCert) program (https://veterans.certify.sba.gov) at the time of bid submission and prior to award of this procurement. Bidders must submit thei r annual Vets-4212 Report.

A site visit is scheduled for 07/20/2023 at 10AM Eastern Time. Prospective bidders are to meet at BLDG 10 of the Lyons Campus. This will be the only site vis it for this project. No other site visits will be scheduled. All requests for information must be emailed to victoria.clark6@va.gov NLT 2PM Eastern Time on 07/25/2023.

ALL BIDS MUST BE

EMAILED TO VICTORIA.CLARK6@VA.GOV AND RECEIVED BY 10:45AM EASTERN TIME ON 08/23/2023. THE PUBLIC BID OPENING WILL BE AT 11:00AM EASTERN TIME ON 08/23/2023 VIA TELECONFERENCE. PLEASE SEE PAGE 13

FOR DIAL IN INFORMATION.

ALL BIDS MUST BE

TIMESTAMPED NO LATER THAN 10:45AM EASTERN TIME ON 08/23/2023. NO LATE BIDS WILL BE ACCEPTED.

Per FAR 36.209, construction contracts with Architect-Engineering Firms; no contract for the co nstruction of a project shall be awarded to the firm that designed the project or its subsidiaries or affiliates.

IAW 852.219-75 VA Notice of Limitations in Subcontracting, a Certificate of Compliance must be signed and submitted with your bid. The certificate can be found on page 47

Please fill out and return with your bid the attache d Buy American Certificate IAW 52.225-2

X 52.211-10 X

10:45AM

EDT

08-23-2023 X Page 1 of

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22.

AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) ( 26.

ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No fu rther cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED

STATES OF AMERICA

31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

Department of Veterans Affairs Network Contracting Activity 400 Fort Hill Ave.

Canandaigua NY 14424 Tungsten Network https://www.tungsten-network.com/ customer-campaigns/veteransaffairs/

Victoria Clark Contracting Officer

Page 1 of Table of Contents

PART I - THE SCHEDULE3
SECTION A - SOLICITATION/CONTRACT FORM3
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)3
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK4

STATEMENT OF WORK……………………………………………………………………………….8

INFORMATION REGARDING BIDDING MATERIAL…………………………………………….12

BID PRICING SHEET………………………………………………………………………………….13

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS14
2.1 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)14
2.2 52.216-1 TYPE OF CONTRACT (APR 1984)16
2.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014)17
2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)17
2.5 52.228-1 BID GUARANTEE (SEP 1996)18
2.6 52.233-2 SERVICE OF PROTEST (SEP 2006)19
2.7 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)19
2.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)20
2.9 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018)20
2.10 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)21
2.11 VAAR 852.239-75 INFORMATION AND COMMUNICATION TECHNOLOGY ACCESSIBILITY NOTICE (FEB 2023)21
REPRESENTATIONS AND CERTIFICATIONS23
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)23
3.2 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)27
3.3 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021)28
GENERAL CONDITIONS31
4.1 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) ALTERNATE I (APR 1984)31
4.2 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (MAR 2023)31
4.3 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (OCT 2022)34
4.4 SUPPLEMENTAL INSURANCE REQUIREMENTS38
4.5 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)39
4.6 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022)42
4.7 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)42
4.8 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018)42
4.9 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION)43
4.10 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION)46
4.11 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)47
4.12 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)48
4.13 VAAR 852.232-71 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (INCLUDING NAS– CPM) (NOV 2018)48
4.14 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)51
4.15 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019)52
4.16 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)53
4.17 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)53
4.18 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020)54
4.19 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)54
4.20 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019)55

STATEMENT OF WORK (SOW)

Project # 561A4-18-101 Replace Central Chillers Building 136 5/18/2023

1. Contract description.

Project is to provide the Lyons VA Medical Center (VAMC) with 2 new centrifugal chillers, 5 new variable speed pumps, and 4 new rooftop exhaust fans at building 136, Central Chiller Plant.

2. Background.

Project is necessary to update and replace two Chillers and associated equipment that are located in Building 136 at the Lyons Campus. The existing chillers are both past their useful life expectancy.

3. Scope.

This project will remove and replace 2 existing chillers, 5 existing pumps and 4 existing exhaust fans at the Lyons VAMC central chiller plant. By the end of construction, the Lyons VAMC should have the following new pieces of equipment:

· 1 new 700-ton centrifugal chiller (Chiller #2)

· 1 new 1,000-ton centrifugal chiller (Chiller #3)

· 3 new secondary chilled water pumps (pumps # 4, 5 and 6)

· 2 new condenser water pumps (Pumps # 8 and 9)

· 4 new roof mounted exhaust fans (Fans # 1, 2, 3 and 4)

· 1 new automatic transfer switch (ATS #8)

· 1 new manual transfer switch (MTS # 8)

· 2 new pad-mounted transformers (Transformer #5 and 6)

4. Specific Tasks.

A. Site Civil Work to include but not limited to:

· The extent of work includes but is not limited to, trenching and backfilling for new underground electrical, pouring new concrete pads for transformers # 5 and 6, installing new steel stanchions for above grade conduit support and restoring the site to its original conditions.

B. Structural work to include but not limited to:

· The extent of work includes pouring two new 4” thick concrete housekeeping pads for chiller #3 and ATS #8, restoring existing equipment pads and skids due to age, creating new penetrations in the exterior wall to allow entrance of new conduit into the building and providing a new 0.5-ton gantry to help in cleaning the basket strainers at the condenser water pumps.

C. Mechanical work to include but not limited to:

· Remove and replace existing chillers #2 (700-ton Carrier absorption chiller) and #3 (1,000-ton Carrier centrifugal chiller) with new centrifugal units. The new chillers are scheduled to be frictionless bearing type (magnetic bearing compressors) to provide the highest efficiency possible and to eliminate the need for oil which cuts down on maintenance required. The new chillers are selected and designed to operate at AHRI 550/590 standards:

· Chilled water temperature entering the Evaporator (Cooler): 54℉

· Chilled water temperature leaving the Evaporator (Cooler): 44℉

· Condenser Water temperature entering the condenser: 85℉

· Condenser Water temperature leaving condenser: 94.3℉

· For controls, the plan is to integrate the new chillers into the existing building management system (BMS) via a IonWorks open communication protocol. Each willer will be furnished with a set of marine water boxes on the evaporator and condenser section respectively.

· Replacement for pumps # 4, 5,6, 8 and 9 and rooftop exhaust fans #1, 2, 3 and 4. Plan is to remove and replace each pump and fan with an in-kind model. Each unit is selected to provide the highest efficiency possible at their operating conditions. Additionally, each new pump will receive a variable frequency drive (VFD) to enhance overall efficiency. All new pumps and exhaust fans are to be tied into the existing BMS and remain on the same control sequence currently in use.

D. Electrical work to include but not limited to:

· For the new chillers the plan is to provide each unit with a new 480V/3PH electrical service. For chiller #2 this will be achieved by suppling a new pad mounted transformer (transformer #5), a new automatic transfer switch (ATS #8), and a new manual transfer switch (MTS#8). The existing 4,160 volts electrical service will be supplied from the substation breaker L2 and will be fed to transformer #5, where it will step down to 480 volts. From there the service will continue to ATS #8, where two 480V feeds will be supplied; one feed will go to Chiller #2 and one will go back to MTS #8. Chiller #3, the design plan is similar except the only new addition will be a pad mounted transformer (transformer #6) to be fed from the existing ATS #2. Both chillers will have primary power from the existing substation and emergency power from the existing generators.

· New pumps will keep the existing power wiring from the main switchgear and only replace the existing conduit and wire from the switchgear, back to their respective disconnect switch. This will be required to install the new VFD, that each pump motor will receive. All new motors are scheduled to match existing voltage and horsepower to minimize overall change to existing system.

· New roof mounted exhaust fans will keep the existing power wiring up to the roof and to extended it as required to the new fan. Each new fan should receive a new disconnect switch.

E. Energy Efficiency

· Replacement chillers #2 and 3 should meet ASHRAE 90.1 and AHRI 550/590 requirements for energy efficiency. Each chiller will be provided with an integral VFD starter. As for pumps (#4, 5,6, 8 and 9) each one is schedule to come with a VFD for enhanced efficiency.

F. Tie-In Points (Electrical, HVAC, Plumbing, Fire Protection, Etc.)

· All Tie-in points are to be reviewed by the VA FMS staff and respective VA shop supervisors or designated shop appointee.

G. Asbestos/ Hazardous Materials

· There is a small amount of asbestos containing material (ACM) in the flashing for the rooftop exhaust fans. Contractor to abate per specifications.

H. Further information- for furthermore in-depth instructions, refer to the specifications and Construction drawings.

5. Performance Monitoring (if applicable).

Work shall be coordinated with facility thru the Contracting Office Representative (COR). COR will monitor the contractor work performance on daily basis and the contractor is required to submit daily’s progress report to the COR. Contractor submission requirements

· Daily logs are due daily but at the latest Monday following the completion of the work week.

· Project Managers and Supervisors from the selected contractor are to attended weekly or bi-weekly meetings. Timeframe to be determine by COR based on contractor performance.

· Certified payroll to be submitted weekly/biweekly depending on payroll frequency.

6. Security Requirements.

General Contractor’s employees shall not enter the project site without appropriate security badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

No photography of VA premises is allowed without written permission of the Contracting Officer except as specifically required by the scope of the work.

VA reserves the right to close or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.

7. Government-Furnished Equipment (GFE)/Government-Furnished Information (GFI).

N/A

8. Other Pertinent Information or Special Considerations.

a. Identification of Possible Follow-on Work.

Not Used

b. Identification of Potential Conflicts of Interest (COI).

Not Used

e. Inspection and Acceptance Criteria.

The COR is responsible for certifying that the work done under the contract is performed to time and standard. They are also responsible to assure the inspection and acceptance of products provided incidental to services.

9. Risk Control Contractor shall take all measures for safety & infection control and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered.

Contractor shall permit access to Department of Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Medical Center operations will continue during the construction period.

10. Place of Performance.

Minimize interference of construction activities with flow of Medical Center traffic, keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.

11. Period of Performance.

Contractor to start immediately after receiving the NTP, estimate completion time is 365 calendar days.

INFORMATION REGARDING BIDDING MATERIAL

(a) Bidding materials consisting of Invitation for Bids, drawings, specifications and contract forms will be available on sam.gov in electronic format only by searching for solicitation number 36C24223B0035. All interested parties (subs & primes) should register at https://sam.gov/ as an “Interested Vendor” so that others will know of our interest in participating in this procurement. A Bidder’s mailing list WILL NOT BE prepared by the Contract Specialist. SOLICITATION AMENDMENTS: Amendments to the solicitation will be posted at SAM.gov/. Paper copies of the amendments will NOT be individually mailed. By registering to “Receive Notification”, you will be notified by e-mail of any new amendments that have been issued and posted. No other notification of amendments will be provided. Bidders are reminded that they are responsible for obtaining and acknowledging all amendments to this solicitation prior to the time for receipt of bids.

(b) If bid exceeds $150,000 a bid bond must be submitted. A bid guarantee is required in an amount not less than 20 percent of the bid price but shall not exceed $3,000,000. Failure to furnish the required bid guarantee in the proper form and amount, by the time set for opening of bids, will require rejection of the bid in all cases except those listed in FAR 28.101-4, and may be cause for rejection even then.

(c) If the contract will exceed $150,000 (see FAR 28.102-1 for lesser amount), the bidder to whom award is made will be required to furnish two bonds, a Payment Bond, SF 25A, and a Performance Bond, SF 25, each in the penal sum as noted in the General Conditions of the Specification. Copies of SFs 25 and 25A may be obtained upon application to the issuing office.

(d) If the bid is between $30,000 - $150,000. The bidder to whom award is made will be required to furnish a Payment Bond, Standard Form 25A or alternative payment protection which conforms to the requirements set forth in FAR Clause 52.228-13, Alternative Payment Protections, as noted in the General Conditions of this Specification. Copies of the Standard Form of Payment Bond may be obtained upon application to the Issuing Office.

DESCRIPTION OF WORK: GENERAL CONSTRUCTION: : The Contractor shall furnish all necessary professional Construction services to provide complete scope of work for project 561A4-18-101 Replace Central Chillers in accordance to the project drawings and specifications for the VA NJ Health Care System, Lyons NJ.

Magnitude of Construction: $2,000,000 and $5,000,000

Project Number 561A4-18-101 Replace Central Chillers

BID PRICING SHEET

Bids providing less than 120 Calendar Days of Government Acceptance after the date bids are due will not be considered and will be rejected.

The bidder agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this bid is accepted by the Government in writing within 120 calendar days after the date bids are due.

BASE BID: ITEM I, GENERAL CONSTRUCTION: Work includes general construction, alterations, necessary removal of existing structures and construction and certain other items as required by the contract drawings and specifications.

The work shall be performed, as shown for Project Number 561A4-18-101 Replace Central Chillers. It is located at Department of Veterans Affairs, New Jersey VA Healthcare System’s Lyons Campus, 151 Knollcroft Rd. Lyons, NJ 07939 in accordance with contract documents.

The contract completion time is 365 calendar days from receipt of Notice to Proceed (NTP).

BASE BID $ ___________________________

SOLICITATION 36C24223B0035 PROJECT 561A4-18-101 Replace Central Chillers at the Lyons VA Campus.

ALL bids shall be emailed to Victoria Clark, Contracting Specialist, at Victoria.Clark6@va.gov prior to the bid opening time. The bids shall include copies of a bid bond. The bid opening shall take place on August 23, 2023 at 11:00am EST. No hand-carried or mailed bids will be accepted.

The bid opening will take place via a Microsoft Teams conference call.

To join by phone please dial 1-347-566-4838 and use access code 104 895 545

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

2.1 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021) The Offeror shall not complete the representation at paragraph (d)(1) of this provision if the Offeror has represented that it ‘‘does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument’’ in paragraph (c)(1) in the provision at 52.204–26, Covered Telecommunications Equipment or Services—Representation, or in paragraph (v)(2)(i) of the provision at 52.212–3, Offeror Representations and Certifications–Commercial Products and Commercial Services. The Offeror shall not complete the representation in paragraph (d)(2) of this provision if the Offeror has represented that it ‘‘does not use covered telecommunications equipment or services, or any equipment, system, or service that uses covered telecommunications equipment or services’’ in paragraph (c)(2) of the provision at 52.204–26, or in paragraph (v)(2)(ii) of the provision at 52.212–3.

(a) Definitions. As used in this provision— Backhaul, covered telecommunications equipment or services, critical technology, interconnection arrangements, reasonable inquiry, roaming, and substantial or essential component have the meanings provided in the clause 52.204–25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

(b) Prohibition. (1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115–232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. Nothing in the prohibition shall be construed to—

(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or

(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.

(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115–232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract or extending or renewing a contract with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract. Nothing in the prohibition shall be construed to—

(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or

(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.

(c) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for “covered telecommunications equipment or services.”

(d) Representations. The Offeror represents that—

(1) It [ ] will, [ ] will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation. The Offeror shall provide the additional disclosure information required at paragraph (e)(1) of this section if the Offeror responds “will’’ in paragraph (d)(1) of this section; and

(2) After conducting a reasonable inquiry, for purposes of this representation, the Offeror represents that— It [ ] does, [ ] does not use covered telecommunications equipment or services, or use any equipment, system, or service that uses covered telecommunications equipment or services. The Offeror shall provide the additional disclosure information required at paragraph (e)(2) of this section if the Offeror responds “does’’ in paragraph (d)(2) of this section.

(e) Disclosures. (1) Disclosure for the representation in paragraph (d)(1) of this provision. If the Offeror has responded “will’’ in the representation in paragraph (d)(1) of this provision, the Offeror shall provide the following information as part of the offer:

(i) For covered equipment—

(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the original equipment manufacturer (OEM) or a distributor, if known);

(B) A description of all covered telecommunications equipment offered (include brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and

(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.

(ii) For covered services—

(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or

(B) If not associated with maintenance, the Product Service Code (PSC) of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.

(2) Disclosure for the representation in paragraph (d)(2) of this provision. If the Offeror has responded “does’’ in the representation in paragraph (d)(2) of this provision, the Offeror shall provide the following information as part of the offer:

(i) For covered equipment—

(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the OEM or a distributor, if known);

(B) A description of all covered telecommunications equipment offered (include brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and

(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.

(ii) For covered services—

(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or

(B) If not associated with maintenance, the PSC of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.

(End of Provision)

2.2 52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.

(End of Provision)

2.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) (a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of Provision)

2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers.

(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

(End of Provision)

2.5 52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20% percent of the bid price or , whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of Provision)

2.6 52.233-2 SERVICE OF PROTEST (SEP 2006)

Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:

Victoria Clark Contracting Officer Hand-Carried Address:

Department of Veterans Affairs Network Contracting Activity 400 Fort Hill Ave.

Canandaigua NY 14424 Mailing Address:

Department of Veterans Affairs Network Contracting Activity 400 Fort Hill Ave.

Canandaigua NY 14424

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of Provision)

2.7 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for— July 20, 2023 at 10AM

(c) Participants will meet at— BLDG 10 Conference Room (End of Provision)

2.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/browse/index/far https://www.va.gov/oal/library/vaar/

(End of Provision)

FAR Number
Title
Date
52.204-7
SYSTEM FOR AWARD MANAGEMENT
OCT 2018
52.204-16
COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING
AUG 2020
52.204-22
ALTERNATIVE LINE ITEM PROPOSAL
JAN 2017
52.214-3
AMENDMENTS TO INVITATIONS FOR BIDS
DEC 2016
52.214-4
FALSE STATEMENTS IN BIDS
APR 1984
52.214-5
SUBMISSION OF BIDS
DEC 2016
52.214-6
EXPLANATION TO PROSPECTIVE BIDDERS
APR 1984
52.214-7
LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS
NOV 1999
52.214-18
PREPARATION OF BIDS—CONSTRUCTION
APR 1984
52.214-19
CONTRACT AWARD—SEALED BIDDING—CONSTRUCTION
AUG 1996
52.214-34
SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE
APR 1991
52.214-35
SUBMISSION OF OFFERS IN U.S. CURRENCY
APR 1991
52.228-17
INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE)
FEB 2021
52.222-23
NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION
FEB 1999
52.229-11
TAX ON CERTAIN FOREIGN PROCUREMENTS—NOTICE AND REPRESENTATION
JUN 2020

2.9 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018)

(a) Any protest filed by an interested party shall—

(1) Include the name, address, fax number, email and telephone number of the protester;

(2) Identify the solicitation and/or contract number;

(3) Include an original signed by the protester or the protester’s representative and at least one copy;

(4) Set forth a detailed statement of the legal and factual grounds of the protest, including a description of resulting prejudice to the protester, and provide copies of relevant documents;

(5) Specifically request a ruling of the individual upon whom the protest is served;

(6) State the form of relief requested; and

(7) Provide all information establishing the timeliness of the protest.

(b) Failure to comply with the above may result in dismissal of the protest without further consideration.

(c) Bidders/offerors and Contracting Officers are encouraged to use alternative dispute resolution (ADR) procedures to resolve protests at any stage in the protest process. If ADR is used, the Department of Veterans Affairs will not furnish any documentation in an ADR proceeding beyond what is allowed by the Federal Acquisition Regulation.

(End of Provision)

2.10 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)

(a) As an alternative to filing a protest with the Contracting Officer, an interested party may file a protest by mail or electronically with: Executive Director, Office of Acquisition and Logistics, Risk Management and Compliance Service (003A2C), Department of Veterans Affairs, 810 Vermont Avenue NW, Washington, DC 20420 or Email: EDProtests@va.gov.

(b) The protest will not be considered if the interested party has a protest on the same or similar issue(s) pending with the Contracting Officer.

(End of Provision)

2.11 VAAR 852.239-75 INFORMATION AND COMMUNICATION TECHNOLOGY ACCESSIBILITY NOTICE (FEB 2023)

(a) Any offeror responding to this solicitation must comply with established VA Information and Communication Technology (ICT) (formerly Electronic and Information (EIT)) accessibility standards. Information about Section 508 is available at http://www.section508.va.gov/.

(b) The Section 508 accessibility standards applicable to this solicitation are stated in the clause at 852.239–75, Information and Communication Technology Accessibility. In order to facilitate the Government’s determination whether proposed ICT supplies meet applicable Section 508 accessibility standards, offerors must submit appropriate VA Section 508 Checklists, in accordance with the checklist completion instructions. The purpose of the checklists is to assist VA acquisition and program officials in determining whether proposed ICT supplies, or information, documentation and services conform to applicable Section 508 accessibility standards. The checklists allow offerors or developers to self-evaluate their supplies and document—in detail—whether they conform to a specific Section 508 accessibility standard, and any underway remediation efforts addressing conformance issues.

(c) Respondents to this solicitation must identify any exception to Section 508 requirements. If an offeror claims its supplies or services meet applicable Section 508 accessibility standards, and it is later determined by the Government, i.e., after award of a contract or order, that supplies or services delivered do not conform to the described accessibility standards, remediation of the supplies or services to the level of conformance specified in the contract will be the responsibility of the Contractor at its expense.

(End of Provision)

REPRESENTATIONS AND CERTIFICATIONS

3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 238220.

(2) The small business size standard is $19 Million.

(3) The small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519, if the acquisition—

(i) Is set aside for small business and has a value above the simplified acquisition threshold;

(ii) Uses the HUBZone price evaluation preference regardless of dollar value, unless the offeror waives the price evaluation preference; or

(iii) Is an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204–7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:

[ ] (i) Paragraph (d) applies.

[ ] (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c)(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements—Representation. This provision applies to all solicitations.

(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.

(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(vi) 52.204-26, Covered Telecommunications Equipment or Services—Representation. This provision applies to all solicitations.

(vii) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations—Representation.

(viii) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(ix) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.

(x) 52.214-14, Place of Performance—Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(xi) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(xii) 52.219-1, Small Business Program Representations (Basic, Alternates I, and II). This provision applies to solicitations when the contract is for supplies to be delivered or services to be performed in the United States or its outlying areas, or when the contracting officer has applied part 19 in accordance with 19.000(b)(1)(ii).

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(C) The provision with its Alternate II applies to solicitations that will result in a multiple-award contract with more than one NAICS code assigned.

(xiii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract is for supplies to be delivered or services to be performed in the United States or its outlying areas, or when the contracting officer has applied part 19 in accordance with 19.000(b)(1)(ii).

(xiv) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xvi) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .