528A5-23-503_Replace_Windows_B36 SOW.pdf

PDF 152 KB Posted

Attached to
Z1DA--NRM-CONST 528A5-23-503 BUILDING 36 GROUND AND SECOND FLOOR WINDOW REPLACEMENTS
Solicitation number
36C24223B0018
Issued by

About this file

This solicitation package includes a scope of work and federal contract opportunity for replacing windows in Building 36 at the Canandaigua VA Medical Center in New York. 142 windows on the ground and second floors will be removed and replaced with new aluminum frame windows meeting energy efficiency requirements, while maintaining the historic appearance. The work includes demolition, installation, finishing, and abatement of lead-based paint in accordance with EPA and OSHA regulations. Bidders must provide phasing plans to minimize impacts to occupied areas and complete window work within one day per location. The total project duration is 365 days. The solicitation was issued by the Department of Veterans Affairs VHA VISN 2 for the Building 36 Ground and Second Floor Window Replacements project numbered 36C24223B0018.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Replace Windows Building 36 Ground and Second Floor

528A5-23-503

GENERAL PROJECT WORK SCOPE DESCRIPTION

Existing Conditions:

The Canandaigua VAMC is located at 400 Fort Hill Avenue, Canandaigua, NY 14424. The layout is a campus with more than 30 buildings located on over 150 acres. Normal working hours are Monday – Friday 8:00am – 4:30pm. Current windows in Building 36 are out of date at the ground and second levels. The scope includes upgrading the existing windows to more energy efficient windows while maintaining historic features to the fenestration. Building 36 is currently partially vacant on the first and second floors with mixed use departmental occupancy on the ground floor.

Scope of Work:

The general scope of this project is to replace windows and accompanying parts on the ground and second floors of Building 36, at the VA Medical Center, Canandaigua, NY.

GENERAL SCOPE:

A. DEMOLITION:

a. Remove 142 windows, trim, and sealants. Dispose of all materials in accordance with regulations and specifications.

b. Contractor is to completely remove and dispose of all materials associated with the window replacement. Hazardous materials are to be abated and disposed of in accordance with NYS Code rule 56.

c. Existing windows have lead based paint. Removal and disposal of windows must comply with all state and federal regulations including OSHA 29 CFR

1926.62 and EPA.

d. Window removal and abatement to take place from the outside unless otherwise approved by the COR.

B. WINDOW INSTALLATION:

a. Provide all labor, material, and equipment to install 142 various sized new aluminum frame windows.

b. Abate and remove existing window in its entirety. Prep to receive new window as scheduled. Patch and match to existing finishes.

c. New windows are to meet all current energy requirements.

d. Windows are to match existing windows in style, functionality and appearance unless otherwise indicated on contract drawings.

e. All windows will include muntins between the glass unless otherwise indicated. Integrated mullions systems are to be included

f. Windows are to be double hung operable unless otherwise indicated. Insect screens are to be provided for both sashes.

g. Questions concerning existing conditions must be captured through proof of photo-documentation to determine ownership.

C. WINDOW FINISHING:

a. Where window is to be replaced in a finished space, contractor is responsible for all exterior and interior finishes associated with a complete window installation.

D. EXISTING GROUND FLOOR WINDOWS:

a. Replace (5) “F” Type windows in the Call Center Training room and near the temporary Canteen as shown in drawing A101.

E. EXISTING PORCH WINDOWS:

a. Replace (14) Aluminum Manufactured Infill (Architectural) Panels to match window frame material as shown on drawings A102; A201.

PHASING

A. Contractor is to provide a phasing plan that will minimize the impact to occupied areas.

Occupied areas of Building 36 and adjacent buildings must be able to maintain operations throughout the project.

B. Contractor is to complete all work associated with individual window removal and installation in 1 working day for no more than 5 windows at a time. Contractor is responsible to ensure a weather tight seal is completed throughout the process.

C. Contractor is required to provide two week notice for any window replacement in an occupied area.

CODE REQUIREMENTS:

The installed system must, at a minimum, be in accordance with all applicable codes including Veterans Affairs standards which can be found at https://www.cfm.va.gov/til/. This will include, but not be limited to: Department of Veterans Affairs Design Manuals, VA Publications, and Construction Standards, National Fire Protection Code (NFPA), Life Safety Code, Underwriters Laboratory (UL), International Building Code IBC, National Electric Code (NEC), the VA Information Security Handbook 6500.6, Occupational Health and Safety (OSHA), and Environmental Protection Agency (EPA) requirements (to include Mold Remediation in Schools and Commercial Buildings). All work will be completed by certified individuals. All abatement will be in compliance with NYSCR 56.

Specifications: Please see attached.

https://www.cfm.va.gov/til/

General Requirements:

A. The contractor shall review the contract documents for conflicts. Where conflicts exist work shall not proceed until the COR has been notified and has given direction.

B. Where incidental work is required to accomplish work shown on the drawings, this work is implied and shall be included as part of the base bid.

C. Prior to any work commencing in an area, the contractor shall notify the COR of his intention to work in the area and shall schedule a walkthrough with the COR to determine existing conditions.

D. After the work, the existing work areas shall be returned to their original state before final approval shall be given. After the completion of construction, the contractor shall completely clean all surfaces of construction debris. All surfaces shall be wiped clean of dust, including fixtures, window sills, door frames, etc.

E. The contractor shall provide a minimum of two (2) hardcopies of operating and service manuals for each device/material installed as part of the project.

F. The contractor shall receive all deliveries of materials, equipment, tools, or other goods off of station, and bring them to the job site. The Canandaigua VA shall not accept deliveries for project purposes.

G. The contractor shall prepare and submit an excel spreadsheet listing all submittals required. The worksheet shall be submitted by the contractor and reviewed and re-submitted as necessary.

H. The contractor shall not proceed with any on-site work until the completion of the submittal process or approval to proceed from the CO and COR without completion of the submittal process. Not less than 14 calendar days shall be planned for COR review of each submittal. Re-submittals shall be provided as required by the COR, and shall be treated as a new, separate submittal.

I. Any non-lead time materials will only be paid for when installed.

J. Any items identified as punch list items will be fixed prior to project closeout.

K. Special care will be taken to secure tools and construction equipment during construction as this facility has patients in it.

L. Work cleanliness must be adhered to throughout the project.

M. Sounds and vibrations must be kept to a minimum to avoid patient disruption. The COR reserves the right to stop work if sound and vibrations are impacting patient living.

N. Off tour work may be required to minimize impact to Veterans and employees.

O. The contractor shall warranty all work included for 1 year from the date of acceptance.

Warranty shall include any labor or parts necessary to ensure complete functionality of the work.

Submittals:

Submittals are required for all items outlined in the specification and include but are not limited to the submittals as shown in the attached submittal log.

Project Duration:

The total project duration for this project is not to exceed 365 days. This includes all processes starting with submission and approval of all submittals and ending with final punch list completion.

Existing Conditions:
Scope of Work:
GENERAL SCOPE:
B. WINDOW INSTALLATION:
C. WINDOW FINISHING:
D. EXISTING GROUND FLOOR WINDOWS:
PHASING
CODE REQUIREMENTS:
General Requirements:
Submittals:
Project Duration: