36C24220B0035-0001002.pdf
PDF Posted
- Solicitation number
- 36C24220B0035
About this file
This solicitation package describes a federal contract opportunity to improve electrical deficiencies at the VA East Orange Campus in New Jersey. The contract is a Service-Disabled Veteran Owned Small Business set-aside with a cost estimate between $5-10 million. The scope of work includes replacing campus transformers and switchgear, upgrading substations and electrical panels in various buildings, and installing generator connections in electrical vaults. Response submissions are due on or about April 20, 2020. The selected contractor must complete all work within 730 calendar days of notice to proceed.
36C24220B0035 0001 S02 Drawing 01-General.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24220B0035-0002000.docx | DOCX document | |
| 36C24220B0035-0001001.pdf | ||
| 36C24220B0035-0001003.pdf | ||
| 36C24220B0035-0001005.pdf | ||
| 36C24220B0035-0001004.pdf | ||
| 36C24220B0035-0001000.docx | DOCX document | |
| 36C24220B0035-020.pdf | ||
| 36C24220B0035-015.docx | DOCX document | |
| 36C24220B0035-021.pdf | ||
| 36C24220B0035-019.pdf | ||
| 36C24220B0035-017.pdf | ||
| 36C24220B0035-016.pdf | ||
| 36C24220B0035-018.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOT C
V
A
I L
S
T
R
E
E
A
B
O
F
R
D
V
E
LOT C
11A
M
E
A
G
H
A
D
5a
OUTPATIENT PARKING
G
R
E
G
I V
E
86 150
L O
T
A
JA
C
O B
C
IR
C
LE
G R
E G
G
D
R I V
E
O R
E S
K
R
E E
T
LOT B
M
E
A
G
H
A
D
C
A
F
F
E
R
A
T
A C
O
U
R
T
15a
L
L
F
U
C
H
I
V
N
V
O
R
E
S
R
E
E
T
S
I
G
L
N
E
2a
L
R
E
I V
E
LOT D
B U
C H
A
D
R I V
E
BOILER
HOUSE
15b
VAULT A
VAULT B
G-001
DRAWING LISTCAMPUS SITE PLAN
PROJECT TITLE:
EAST ORANGE CAMPUS
VA NJ HEALTH CARE SYSTEM
IMPROVE ELECTRICAL DEFICIENCIES PH II A & B
PROJECT NO. 561-18-135
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
IMPROVE ELECTRICAL
DEFICIENCIES, II A & B
561-18-135
VA NJ HEALTH CARE SYSTEM
385 TREMONT AVENUE
EAST ORANGE, NJ 07018
X
18-096
ISSUED FOR CONSTRUCTION
FULLY SPRINKLERED
1, 2, 5, 7
Foresite Group, Inc.
2128 Moores Mill Rd.
Suite C
Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.fg-inc.net
02/05/2020
GENERAL: SHEET NUMBER TOTAL SHEETS
G-001 COVER SHEET 1 OF 2
G-002 VAULT LIFE SAFETY PLAN 2 OF 2
CIVIL:
CD101 DEMOLITION PLAN 1 OF 3
CS502 SITE GRADING AND UTILITY PLAN 2 OF 3
CS505 CONSTRUCTION DETAILS 3 OF 3
STRUCTURAL:
S-001 GENERAL NOTES 1 OF 5
S-101 FRAMING PLAN VAULT A 2 OF 5
S-102 FRAMING PLAN VAULT B 3 OF 5
S-301 STRUCTURAL DETAILS 4 OF 5
S-302 STRUCTURAL DETAILS 5 OF 5
ELECTRICAL:
E-001 ELECTRICAL NOTES,LEGENDS, AND ABBREVIATIONS 1 OF 19
ES-101 PARTIAL SITE PLAN ELECTRICAL 2 OF 19
E-101 A VAULT ELECTRICAL PLANS BUILDING 1, A (LEVEL) 3 OF 19
E-102 B VAULT ELECTRICAL PLANS BUILDING 1, C (LEVEL) 4 OF 19
E-103 C VAULT ELECTRICAL PLANS 5 OF 19
E-111 BUILDING 1 PARTIAL PLANS ELECTRICAL 6 OF 19
E-121 BUILDING 2 PARTIAL PLANS ELECTRICAL 7 OF 19
E-151 BUILDING 5 PARTIAL PLANS ELECTRICAL 8 OF 19
E-152 BUILDING 5 PARTIAL PLANS ELECTRICAL AND DIAGRAMS 9 OF 19
E-171 BUILDING 7 PARTIAL PLANS ELECTRICAL 10 OF 19
E-401 ELECTRICAL PANEL SCHEDULES 11 OF 19
E-402 ELECTRICAL PANEL SCHEDULES 12 OF 19
E-501 VAULT ENCLOSURE SECTIONS, ELEVATIONS, 13 OF 19
AND EXHAUST FAN DETAILS
E-502 DETAILS AND DIAGRAMS 14 OF 19
E-601 ELECTRICAL SINGLE LINE DIAGRAM (MV) 15 OF 19
DEMOLITION/EXISTING)
E-602 ELECTRICAL SINGLE LINE DIAGRAM (MV) NEW 16 OF 19
E-603 ELECTRICAL SINGLE LINE DIAGRAMS 17 OF 19
SUBSTATIONS AN/AE
E-604 ELECTRICAL SINGLE LINE DIAGRAMS 18 OF 19
SUBSTATIONS BN/BE
E-605 ELECTRICAL SINGLE LINE DIAGRAM 19 OF 19
SUBSTATION CE
TOTAL NUMBER OF SHEETS: 29
SAFETY REVIEW RESUBMISSION 11/20/19REV 1
N
R
A
N
046636
E
E N
I
G
H
K
I
A
W
O
N
A
T
R
F
SEAL
R
P
O
O
I
SS
O E
H
RC
A
I
L
A
N
L
E
N
C
I
M
H
E
A
L
S
DocuSign Envelope ID: CA86D127-DB02-414A-9C7B-04E0EE29525A
2/4/2020
FEC
FEC
ESCAPE LADDER
TO GRADE - SEE
STRUCTURAL DRAWINGS
EXTERIOR
SPACE
TOTAL SQ. FT.
OCCUPANCY
(1 / 300SQ. FT)
1723 5
SECURITY FENCE AND
GATE - SEE CIVIL
DRAWINGS
ESCAPE LADDER TO
GRADE - SEE STRUCTURAL
DRAWINGS
FEC
FEC
EXIT DISTANCE:
71' - 11"
COMMON PATH OF
TRAVEL: 9' - 10"
TOTAL SQ. FT.
OCCUPANCY
(1 / 300SQ. FT)
1695 5
SECURITY FENCE AND
GATE - SEE CIVIL
DRAWINGS
5'-0" MAX. TO HIGHEST
OPERABLE POINT
CLEAR INTERIOR
DIMENSIONS: 9"D x
9"W x 27"T
FIRE EXTINGUISHER CABINET
A-VAULT LIFE SAFETY PLAN
SCALE: 1/4" = 1'-0"
G-002
VAULT LIFE SAFETY PLAN
2 2
0 2' 4' 8'
B-VAULT LIFE SAFETY PLAN
SCALE: 1/4" = 1'-0"
0 2' 4' 8'
EXIT DISTANCE:
76' - 8"
COMMON PATH OF
TRAVEL: 16' - 6"
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C D
E
Dwg. of
LocationLocation
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
CONSULTANTS:
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120
Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
NC License #: C-1848
U.S. Department of Veterans Affairs
© COPYRIGHT Apogee Consulting Group, P.A.Revisions: Date#
IMPROVE ELECTRICAL
DEFICIENCIES, II A & B
561-18-135
VA NJ HEALTH CARE SYSTEM
385 TREMONT AVENUE
EAST ORANGE, NJ 07018
X
18-096
100% CD
FULLY SPRINKLERED
1, 2, 5, 7
Foresite Group, Inc.
2128 Moores Mill Rd.
Suite C
Auburn, AL 36830 o | 334.887.6064 f | 334.887.6024 w | www.fg-inc.net
October 15, 2019
BUILDING CODES:
IBC 2015.
INDUSTRIAL OCCUPANCY.
ELECTRICAL EQUIPMENT ROOM -MAXIMUM FLOOR AREA PER
OCCUPANT 300 SQ FT.
UNSPRINKLERED.
MAXIMUM EXIT DISTANCE 100 FEET.
COMMON PATH TRAVEL 75 FEET.
EXIT MUST BE ONE HALF THE MAXIMUM DIAGONAL DISTANCE
APART.
DOOR SHALL SWING IN DIRECTION OF EGRESS TRAVEL WHERE
WHERE SERVING AN OCCUPANT T LOAD OF 50 OR MORE PERSONS
OR A GROUP H OCCUPANCY .
NRC
DOORS FROM ELECTRICAL ROOMS SHALL SWING OUT.
SEE SPECIFICATIONS SECTIONS 104413 FOR FIRE EXTINGUISHERS
SPECIFICATIONS.
SAFETY REVIEW RESUBMISSION 11/20/19REV 1
PROVIDE NEW FIRE EXTINGUISHER CABINETS AND FIRE
EXTINGUISHER WHERE INDICATED. TOP OF CABINET 60" AFF MAX.
EXISTING GENERATOR, ELECTRICAL PANELS, SWITCHGEAR, AND
ALL EQUIPMENT IN THE SPACE NOT BEING REMOVED MUST BE
PROTECTED WITH PLASTIC SHEETING DURING DEMOLITION AND
CONSTRUCTION - MAINTAIN VENTING REQUIREMENTS FOR ACTIVE
EQUIPMENT.
DAILY WET MOPPING OF ENTIRE SPACE MUST BE COMPLETED TO
AVOID DAMAGE TO EXISTING EQUIPMENT.
PROVIDE HEPA UNITS EXHAUSTED TO EXTERIOR DURING
DEMOLITION AND CONSTRUCTION.
PROVIDE STICKY WALK OFF MATS WHERE INDICATED.
A
B
C
D
E
A
A
B
B
B
B
C
C
C
C
D
D
E
E
E
E
E
E
A
A
SHEET KEY NOTES
REMOVE ALL OLD FIRE EXTINGUISHERS, BACK BOARDS AND
SIGNAGE.
PAINT ALL DOOR THRESHOLDS YELLOW. REMOVE EXISTING
PLYWOOD RAMPS AT ALL EXISTING DOOR THRESHOLDS.
PROVIDE NEW 3'-0"W SWITCHBOARD MAT (CORRUGATED
SURFACE) AROUND ALL ELECTRICAL EQUIPMENT.
1.
2.
3.
FIRE EXTINGUISHER CABINET DETAIL
SCALE: NTS
N
R
A
N
046636
E
E N
I
G
H
K
I
A
W
O
N
A
T
R
F
SEAL
R
P
O
O
I
SS
O E
H
RC
A
I
L
A
N
L
E
N
C
I
M
H
E
A
L
S
DocuSign Envelope ID: CA86D127-DB02-414A-9C7B-04E0EE29525A
2/4/2020
| 2020-02-04T11:49:30-0800 | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it. Updated .