36C24219B0016-003.pdf

PDF 9 MB Posted

Attached to
561A4-12-150 Repair Brick Façade B-135
Solicitation number
36C24219B0016
Issued by

About this file

36C24219B0016 100_Drawings-R.pdf

View the file

Other files

File Type Posted
36C24219C0134-000.docx DOCX document
36C24219B0016-0002001.pdf PDF
36C24219B0016-0002000.docx DOCX document
36C24219B0016-0001001.pdf PDF
36C24219B0016-0001002.pdf PDF
36C24219B0016-0001000.docx DOCX document
36C24219B0016-001.docx DOCX document
36C24219B0016-002.pdf PDF
36C24219B0016-004.pdf PDF
36C24219B0016-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AA/COS

CHIEF ENGINEERING

CHIEF ENVIRONMENTAL

ENGINEERING

TECHNICIAN

OPERATIONS

SUPERVISOR

MAINTENANCE

SUPERVISOR

BUILDING/GROUNDS

SUPERVISOR

QUALITY MANAGEMENT

IC RN-PPCI

SAFETY OFFICER

PATIENT SAFETY PPCI

CHIEF VA POLICE

IT/TELECOM

JOB TITLE SIGNATURES

APPROVAL SIGNATURES

Department of Veterans Affairs

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Office of Construction and Facilities Management

CONSULTANTS:

Approved: Project Director

REPAIR BRICK FACADE

B-135

VA LYONS CAMPUS, VA NEW JERSEY

561A4-06-150

TJW GSE06/18/2018

BUILDING 135

612 NW Kay Drive | Lee's Summit | Missouri | 64063

(816) 525-9833 | (816) 472-5656 | tjw@tom-arch.com

SEAL:ARCHITECT/ENGINEER OF RECORD:

65% DESIGN SUBMISSION 08/25/2017

WATSON ENGINEERING, PC

1112 STATE ROUTE 434

OWEGO, NY 13827

(607) 223-4334

CMG

10727 W 128 ST

OVERLAND PARK, KS 66213

(913) 239-8900 G001

COVER SHEET

REPAIR BRICK FACADE B-135

VA NEW JERSEY HEALTH CARE SYSTEM

LYONS, NEW JERSEY

VICINITY MAP KEY MAP

B-135

B-135

DRAWING SHEET INDEX

SHEET # SHEET TITLE

G001 COVER SHEET

G002 GENERAL INFORMATION

C100 SCAFFOLDING ELEVATION DRAWINGS

S100 SECTION DETAILS

AE101 ROOF PLAN

AE151 ENLARGED PLANS & ELEVATIONS

AE201 EAST ELEVATION

AE202 NORTH ELEVATION

AE203 WEST ELEVATIONS

AE204 SOUTH ELEVATIONS

AE205 EAST/WEST ELEVATIONS

AE206 COURTYARD ELEVATIONS

AE500 DETAILS

N N

2018.12.18

561A4-12-150

REPLACE CAST STONE JOINTS AT BUILDING EXTERIOR

- Remove existing sealant / caulk, backer rod and grout around all exterior capstone joints

- Clean dirt and debris from inside joints

- Replace sealant / caulk, backer rod and grout around all exterior capstone joints

REPLACE JOINTS AT EXTERIOR WINDOWS

- Remove existing sealant / caulk around all exterior windows and cast stone sills

- Clean dirt and debris from inside joints

- Replace sealant / caulk around all exterior windows and cast stone sills

- Clean cast stone sills

- Clean windows from any dirt or debris from construction

REPAIR BRICK AT BUILDING EXTERIOR

- Remove brick courses at parapet (courses from capstone to parapet flashing, APPROX. 12 courses)

- Clean out any grout and mortar.

- Install proper flashing

- Install brick with weep holes every 2'-0" O.C.

- Ref: 4/AE500

REPAIR PORTION OF ENTRY CANOPY ROOF

- Remove existing roof membrane and insulation

- Install new tapered insulation to existing roof drains.

- Install new roof membrane

- Ref: AE500 for details

- NOTE: Entrance must remain open at all times. Reference Civil drawings for scaffolding layout.

REPLACE JOINTS AT CLERESTORY WINDOWS

- Remove existing sealant / caulk around exterior clerestory windows

- Clean dirt and debris from inside joints

- Replace sealant / caulk around all exterior windows

- Clean windows from any dirt or debris from construction

CORRECT LEANING PARAPET WALL

- Install #4 bar in core of 8" and 4" CMU blocks

- See ROOF PLAN for location

- See sheet S100 for details

CLEAN CAPSTONE AT BUILDING EXTERIOR

- Remove lime run and efflorescence from face of brick

- Replace sealant / caulk, backer rod and grout at joints as required

CLEAN BRICK FACADE

- Remove lime run and efflorescence from face of brick

- Repair or replace cracked and damaged brick

- Tuck point areas with mortar failure

BASE BID ITEMS

SCOPE OF WORK SUMMARY

(A)

(B)

(C)

(D)

(E)

(F)

(G)

(H)

A

B

D

H

C

H

B

E

A

B

F

H

A

C

E

B

EXAMPLE PHOTOGRAPHS

H

Department of Veterans Affairs

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Office of Construction and Facilities Management

CONSULTANTS:

Approved: Project Director

REPAIR BRICK FACADE

B-135

VA LYONS CAMPUS, VA NEW JERSEY

561A4-06-150

TJW GSE06/18/2018

BUILDING 135

612 NW Kay Drive | Lee's Summit | Missouri | 64063

(816) 525-9833 | (816) 472-5656 | tjw@tom-arch.com

SEAL:ARCHITECT/ENGINEER OF RECORD:

65% DESIGN SUBMISSION 08/25/2017

WATSON ENGINEERING, PC

1112 STATE ROUTE 434

OWEGO, NY 13827

(607) 223-4334

CMG

10727 W 128 ST

OVERLAND PARK, KS 66213

(913) 239-8900 G002

GENERAL INFORMATION

Department of

Veterans

Affairs

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

1 2 3 4 5 6 87 9

97 8654321

Office of

Construction and Facilities

Management

CONSULTANTS:

Approved: Project Director

REPAIR BRICK FACADE

B-135

VA LYONS CAMPUS, VA NEW JERSEY

561A4-06-150

AJS GSE06/18/2018

BUILDING 135

P

R

E

L

I

M

I

N

A

R

Y

N

O

T

F

R

C

O

N

S

T

R

U

C

T

I

O

N

612 NW Kay Drive | Lee's Summit | Missouri | 64063

(816) 525-9833 | (816) 472-5656 | ajs@tom-arch.com

SEAL:

ARCHITECT/ENGINEER OF RECORD:

100% DESIGN SUBMISSION 06/18/2018

WATSON ENGINEERING, PC

1112 STATE ROUTE 434

OWEGO, NY 13827

(607) 223-4334

CMG

10727 W 128 ST

OVERLAND PARK, KS 66213

(913) 239-8900

NOTES:

1. PROPOSED SCAFFOLDING STAIRCASE TO BE COMPLETE WITH

RAILING WHICH IS NOT SHOWN FOR CLARITY.

2. PROPOSED TOP WORKING PLATFORM TO BE COMPLETED WITH

TOE BOARDS AND GUARD RAILS, WHICH ARE NOT SHOWN FOR

CLARITY.

3. PROPOSED ANCHOR SCREWS TO BE INSTALLED INTO BRICK

JOINT.

4. ANCHOR HOLE TO BE SEALED WITH CAULKING UPON REMOVAL

OF SCAFFOLDING.

SCALE: 3/16" = 1'-0"

PROPOSED SCAFFOLDING AREA PLAN VIEW

F1

EXISTING ENTRYWAY OVERHANG

EXISTING TRAFFIC CIRCLE

SCALE: 3/16" = 1'-0"

PROPOSED SCAFFOLDING AREA ELEVATION VIEW

C1

21'

8'

18'

ENTRYWAY INTO BUILDING 135

WALL AREAS TO BE REPAIRED OVER GLASS ROOF TO ENTRYWAY.

GLASS TO BE PROTECTED BEFORE ANY WORK IS COMPLETED.

SCAFFOLDING TO ANCHOR TO WALLS OR UP AND OVER GLASS

ANGLED ROOF TO MAIN ROOF.

GLASS ROOF OF ENTRYWAY

ANGLED GLASS ROOF BELOW SCAFFOLDING,

TO BE PROTECTED DURING WORK

C100

SCAFFOLDING

ELEVATION DRAWINGS

1'

25' W8X6.2 ALUMINUM BEAMS TO COVER 8' OF

THE SKYLIGHT

18' W8X6.2 ALUMINUM BEAM TO ENSURE THE

LONGITUDINAL BEAMS DO NOT SLIP

2" ISO FOAM INSULATION

PLASTIC TARP TO PREVENT

MOISTURE FROM INSULATION

" CDX EXTERIOR PLYWOOD

MECHANICALLY FASTENED TO

ALUMINUM BEAMS

W8X6.2 ALUMINUM BEAMS

W8X18 ALUMINUM BEAM TO ENSURE

LONGITUDINAL BEAMS DO NOT SLIP

WATER PROOF BEAM ENDS

1'

5'

Department of

Veterans

Affairs

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

Revisions: Date

1 2 3 4 5 6 87 9

97 8654321

Office of

Construction and Facilities

Management

CONSULTANTS:

Approved: Project Director

REPAIR BRICK FACADE

B-135

VA LYONS CAMPUS, VA NEW JERSEY

561A4-06-150

AJS GSE06/18/2018

BUILDING 135

P

R

E

L

I

M

I

N

A

R

Y

N

T

F

R

C

O

N

S

T

R

U

C

T

I

O

N

612 NW Kay Drive | Lee's Summit | Missouri | 64063

(816) 525-9833 | (816) 472-5656 | ajs@tom-arch.com

SEAL:

ARCHITECT/ENGINEER OF RECORD:

100% DESIGN SUBMISSION 06/18/2018

WATSON ENGINEERING, PC

1112 STATE ROUTE 434

OWEGO, NY 13827

(607) 223-4334

CMG

10727 W 128 ST

OVERLAND PARK, KS 66213

(913) 239-8900

SCALE: 1-1/2" = 1'-0"

EXISTING PARAPET WALL SECTION VIEW DETAIL

F1

CAPSTONE

BRICK FACADE TO BE REPAIRED

8" CMU BLOCK

ROOF MEMBRANE RUNS UP WALL

AND UNDER COPING STONE

4" CMU BLOCK

RIGID ROOF INSULATION

TYPICAL BEAM

BUILDING

INTERIOR

SCALE: 1-1/2" = 1'-0"

PROPOSED PARAPET WALL SECTION VIEW DETAIL

F4

NEW BRICK FACADE

8" CMU BLOCK

ROOF MEMBRANE RUNS UP WALL

AND UNDER COPING STONE

4" CMU BLOCK

RIGID ROOF INSULATION

TYPICAL BEAM

BUILDING

INTERIOR

6' LONG #4 BAR PLACED IN CORES OF 8"

AND 4" CMU BLOCKS AND SURROUNDED

BY HIGH STRENGTH MORTAR

SCALE: 1-1/2" = 1'-0"

PROPOSED PARAPET ANCHORED ROD SECTION VIEW DETAIL

F7

1'-4"

6' LONG #4 BAR PLACED IN CORES OF 8"

AND 4" CMU BLOCKS AND SURROUNDED

BY HIGH STRENGTH MORTAR

4" CMU BLOCK

8" CMU BLOCK

7"

S100

SECTION DETAILS

EXISTING CAPSTONE

MASONRY MAT

NEW INSULATION

INSULATION TO BE REPLACED

FABRIC FLASHING AT ALL BEAMS

REMOVE ALL GROUT, MORTAR AND DEBRIS FROM AIR CAVITY

NOTES:

1. EXISTING CONDITIONS BASED OFF AS-BUILTS PROVIDED BY

GOVERNMENT, IF ANY DEVIATIONS OCCUR CONTACT THE EOR

IMMEDIATELY.

AE204

AE203

AE202

AE2055

AE2051 2

AE2053 4

AE151

AE151

AE2011

AE2012

AE202

AE203 2

AE204

AE206

20' - 10"

9' - 6" 17' - 1"

2 2 2

REPLACE CAST STONE JOINTS AT BUILDING EXTERIOR

NOT USED

NOT USED

REPAIR ROOF AT ENTRY CANOPY

REPLACE JOINTS AT CLERESTORY WINDOWS

CORRECT LEANING PARAPET WALL

CLEAN CAST STONE AT BUILDING EXTERIOR

NOT USED

NO WORK AT NEW ADDIDTION

NO WORK AT PARAPET AND EXTERIOR ELEVATION

NO WORK AT MECHANICAL PENTHOUSE

BID ITEMS

EXTERIOR REPAIR LEGEND

1 EXISTING FIRE DEPARTMENT CONNECTION

2 EXISTING BUILDING EXIT. EGRESS PATH FROM INTERIOR OF BUILDING TO

REMAIN OPEN DURING CONSTRUCTION. PROVIDE OVERHEAD PROTECTION

12' FROM EXTERIOR OF EXIT WHEN PERFORMING OVERHEAD WORK WITHIN

A 30' RADIUS OF THE EXIT

SAFETY NOTES LEGEND

3 SKYLIGHTS ARE NOT DESIGNED TO WITHSTAND FALL OR STEPPING ON.

PROVIDE ADEQUATE BARRIER AROUND SKYLIGHT PER OSHA 1926

4 CONTRACTOR TO PROVIDE ADEQUATE FALL PROTECTION AT PERIMETER

OF ROOF PER OSHA 1926. TYPICAL REQUIREMENT WHERE WORK IS DONE

WITHIN 10' OF EDGE OF ROOF.

5 CAULK IN THIS AREA FOUND TO CONTAIN ASBESTOS. ABATE PER

REQUIREMENTS IN ASBESTOS REPORT CREATED BY BRIGGS ASSOCIATES

Department of Veterans Affairs

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Office of Construction and Facilities Management

CONSULTANTS:

Approved: Project Director

REPAIR BRICK FACADE

B-135

VA LYONS CAMPUS, VA NEW JERSEY

561A4-06-150

TJW GSE06/18/2018

BUILDING 135

612 NW Kay Drive | Lee's Summit | Missouri | 64063

(816) 525-9833 | (816) 472-5656 | tjw@tom-arch.com

SEAL:ARCHITECT/ENGINEER OF RECORD:

65% DESIGN SUBMISSION 08/25/2017

WATSON ENGINEERING, PC

1112 STATE ROUTE 434

OWEGO, NY 13827

(607) 223-4334

CMG

10727 W 128 ST

OVERLAND PARK, KS 66213

(913) 239-8900 AE101

ROOF PLAN

1" = 20'-0"

ROOF PLAN

B

A

C

D

E

A A

A

A

A

A

A A

A A

A

A

A

AA

A

A

A

A

A

A

A

A D

E

F

F F

G

H

J

J

J

J

J

J

J

J

G

G

G

G G

G

G

K

L

K

K

K

K

L

L

L

EXTENTS OF ROOF MEMBRANE AND INSULATION REMOVAL

REPLACE CAST STONE CAPSTONE

JOINTS AT BUILDING EXTERIOR

REPAIR BRICK AT BUILDING EXTERIOR.

PROTECT GLASS BELOW

AE500

** UNDERSIDE ** REMOVE EXISTING DRYWALL SOFFIT

AND REPLACE WITH PRE-FINISHED ALUM. SOFFIT

ON EXISTING METAL FRAMING SYSTEM

AE1512

AE151

Sim

AE151

Sim

AE151 2

S im

NEW ROOF MEMBRANE AND INSULATION

AE500

CRICKETS 1/4":1'-0" TYP.

CRICKETS 1/4":1'-0" TYP.

DO NOT BLOCK WEEP HOLES AT EXISTING WALL

DO NOT BLOCK WEEP HOLES AT EXISTING WALL

AE500

AE500

AE500

AE500

AE500 EXISTING ROOF MEMBRANE TO REMAIN

REPLACE SEALANT/ CAULK AT

WINDOW JOINTS

CLEAN DIRT AND DEBRIS FROM WINDOWS

ONCE CONSTRUCTION IS COMPLETED

*WINDOWS TO REMAIN

DEMOLITION NOTES

REMOVE EXISTING BUILT-UP ROOFING SYSTEM

INCLUDING INSULATION AND WOOD BLOCKING

DOWN TO EXISTING MTL DECK.

CLEAN, INSPECT AND PREPARE EXISTING MTL

ROOF DECK TO RECEIVE NEW ROOFING SYSTEM.

REMOVE EXISTING MTL COUNTER FLASHING AND

CAULK AT EXISTING BUILDING.

REMOVE EXISTING MTL COUNTER FLASHING AT

SKYLIGHTS. EXISTING PLYWOOD TO REMAIN.

EXISTING SKYLIGHT TO REMAIN.

EXISTING SKYLIGHT MTL CURB TO REMAIN.

REMOVE EXISTING MTL COUNTER FLASHING AND

SHEATHING BENEATH. EXISTING COPING TO

REMAIN.

EXISTING DRAIN TO REMAIN.

EXISTING MTL COUNTER FLASHING AT SKYLIGHT TO

REMAIN.

NOTE: ENTRANCE MUST REMAIN OPEN AT ALL TIMES.

REFERENCE CIVIL DRAWINGS FOR SCAFFOLDING LAYOUT.

1 EXISTING FIRE DEPARTMENT CONNECTION

2 EXISTING BUILDING EXIT. EGRESS PATH FROM INTERIOR OF BUILDING TO

REMAIN OPEN DURING CONSTRUCTION. PROVIDE OVERHEAD PROTECTION

12' FROM EXTERIOR OF EXIT WHEN PERFORMING OVERHEAD WORK WITHIN

A 30' RADIUS OF THE EXIT

SAFETY NOTES LEGEND

3 SKYLIGHTS ARE NOT DESIGNED TO WITHSTAND FALL OR STEPPING ON.

PROVIDE ADEQUATE BARRIER AROUND SKYLIGHT PER OSHA 1926

4 CONTRACTOR TO PROVIDE ADEQUATE FALL PROTECTION AT PERIMETER

OF ROOF PER OSHA 1926. TYPICAL REQUIREMENT WHERE WORK IS DONE

WITHIN 10' OF EDGE OF ROOF.

5 CAULK IN THIS AREA FOUND TO CONTAIN ASBESTOS. ABATE PER

REQUIREMENTS IN ASBESTOS REPORT CREATED BY BRIGGS ASSOCIATES

Department of Veterans Affairs

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Office of Construction and Facilities Management

CONSULTANTS:

Approved: Project Director

REPAIR BRICK FACADE

B-135

VA LYONS CAMPUS, VA NEW JERSEY

561A4-06-150

TJW GSE06/18/2018

BUILDING 135

612 NW Kay Drive | Lee's Summit | Missouri | 64063

(816) 525-9833 | (816) 472-5656 | tjw@tom-arch.com

SEAL:ARCHITECT/ENGINEER OF RECORD:

65% DESIGN SUBMISSION 08/25/2017

WATSON ENGINEERING, PC

1112 STATE ROUTE 434

OWEGO, NY 13827

(607) 223-4334

CMG

10727 W 128 ST

OVERLAND PARK, KS 66213

(913) 239-8900 AE151

ENLARGED PLANS &

ELEVATIONS

1/4" = 1'-0"

DEMO CANOPY ROOF PLAN

1/4" = 1'-0"

CLERESTORY ROOF PLAN

1/4" = 1'-0"

NEW CANOPY ROOF PLAN

1/4" = 1'-0"

CLERESTORY ELEVATION

1 2

4 4

TOP OF MEMBRANE

8 1/2" ABOVE DECK

/4

S L O

P E

/4

S L O

P E

NOTE: ENTRANCE MUST REMAIN OPEN AT ALL TIMES.

REFERENCE CIVIL DRAWINGS FOR SCAFFOLDING LAYOUT.

N

N

N

REPLACE JOINTS AT EXTERIOR WINDOWS

REPAIR BRICK AT BUILDING EXTERIOR

REPAIR ROOF AT ENTRY CANOPY

NOT USED

NOT USED

CLEAN CAST STONE CAPSTONE AT BUILDING EXTERIOR

CLEAN BRICK FACADE

NOT USED

NOT USED

NO WORK AT MECHANICAL PENTHOUSE

EXTERIOR REPAIR LEGEND

Department of Veterans Affairs

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Office of Construction and Facilities Management

CONSULTANTS:

Approved: Project Director

REPAIR BRICK FACADE

B-135

VA LYONS CAMPUS, VA NEW JERSEY

561A4-06-150

TJW GSE06/18/2018

BUILDING 135

612 NW Kay Drive | Lee's Summit | Missouri | 64063

(816) 525-9833 | (816) 472-5656 | tjw@tom-arch.com

SEAL:ARCHITECT/ENGINEER OF RECORD:

65% DESIGN SUBMISSION 08/25/2017

WATSON ENGINEERING, PC

1112 STATE ROUTE 434

OWEGO, NY 13827

(607) 223-4334

CMG

10727 W 128 ST

OVERLAND PARK, KS 66213

(913) 239-8900 AE201

EAST ELEVATION

B

A

C

D

E

1/8" = 1'-0"

EAST ELEVATION -1

B

BB

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

1/8" = 1'-0"

EAST ELEVATION - 2

BB

D

F

G

H

J

C

H

C

H

CC

H

C

CC

H

C

H

H H

HHHHH

AA A

K

L

LL

AA A

L

AGGG A

H

REPAIR BRICK AT BUILDING EXTERIOR

NOT USED

REPLACE JOINTS AT CLERESTORY WINDOWS

CORRECT LEANING PARAPET WALL

NOT USED

CLEAN BRICK FACADE

NO WORK AT NEW ADDIDTION

NOT USED

NO WORK AT MECHANICAL PENTHOUSE

EXTERIOR REPAIR LEGEND

Department of Veterans Affairs

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Office of Construction and Facilities Management

CONSULTANTS:

Approved: Project Director

REPAIR BRICK FACADE

B-135

VA LYONS CAMPUS, VA NEW JERSEY

561A4-06-150

TJW GSE06/18/2018

BUILDING 135

612 NW Kay Drive | Lee's Summit | Missouri | 64063

(816) 525-9833 | (816) 472-5656 | tjw@tom-arch.com

SEAL:ARCHITECT/ENGINEER OF RECORD:

65% DESIGN SUBMISSION 08/25/2017

WATSON ENGINEERING, PC

1112 STATE ROUTE 434

OWEGO, NY 13827

(607) 223-4334

CMG

10727 W 128 ST

OVERLAND PARK, KS 66213

(913) 239-8900 AE202

NORTH ELEVATION

1/8" = 1'-0"

NORTH ELEVATION - 1

1/8" = 1'-0"

NORTH ELEVATION - 2

B

A

C

D

E

B B B B B

B B B B B

E

CC

B

B

B

B

B B B B B

B B B B B

F

F F F F

G

H

J

CCC

HHH

H

JJJ J J

J J

J J

J

J J J J J

H

CCC CC

H HHHH

J J

J

J J

J

JJ

JJJ

J

J

K

L

L

L

AA

AAA

AAAAA

REPAIR BRICK AT BUILDING EXTERIOR

NOT USED

NOT USED

NOT USED

CLEAN CAST STONE CAPSTONE AT BUILDING EXTERIOR

CLEAN BRICK FACADE

NOT USED

NO WORK AT PARAPET AND EXTERIOR ELEVATION

NO WORK AT MECHANICAL PENTHOUSE

EXTERIOR REPAIR LEGEND

Department of Veterans Affairs

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Office of Construction and Facilities Management

CONSULTANTS:

Approved: Project Director

REPAIR BRICK FACADE

B-135

VA LYONS CAMPUS, VA NEW JERSEY

561A4-06-150

TJW GSE06/18/2018

BUILDING 135

612 NW Kay Drive | Lee's Summit | Missouri | 64063

(816) 525-9833 | (816) 472-5656 | tjw@tom-arch.com

SEAL:ARCHITECT/ENGINEER OF RECORD:

65% DESIGN SUBMISSION 08/25/2017

WATSON ENGINEERING, PC

1112 STATE ROUTE 434

OWEGO, NY 13827

(607) 223-4334

CMG

10727 W 128 ST

OVERLAND PARK, KS 66213

(913) 239-8900 AE203

WEST ELEVATIONS

1/8" = 1'-0"

WEST ELEVATION - 1

1/8" = 1'-0"

WEST ELEVATION - 2

B

A

C

D

E

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

OPEN BELOW

F

G

H

J

C C C C C C

H H H H H H

C C C C C

H H H H H H H H

H

K

L

L

G GGAAAA

AA A A

K

REPLACE CAST STONE CAPSTONE JOINTS AT BUILDING

EXTERIOR

REPLACE JOINTS AT EXTERIOR WINDOWS

REPAIR BRICK AT BUILDING EXTERIOR

NOT USED

NOT USED

NOT USED

CLEAN CAST STONE CAPSTONE AT BUILDING EXTERIOR

CLEAN BRICK FACADE

NOT USED

NO WORK AT PARAPET AND EXTERIOR ELEVATION

NO WORK AT MECHANICAL PENTHOUSE

EXTERIOR REPAIR LEGEND

Department of Veterans Affairs

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Office of Construction and Facilities Management

CONSULTANTS:

Approved: Project Director

REPAIR BRICK FACADE

B-135

VA LYONS CAMPUS, VA NEW JERSEY

561A4-06-150

TJW GSE06/18/2018

BUILDING 135

612 NW Kay Drive | Lee's Summit | Missouri | 64063

(816) 525-9833 | (816) 472-5656 | tjw@tom-arch.com

SEAL:ARCHITECT/ENGINEER OF RECORD:

65% DESIGN SUBMISSION 08/25/2017

WATSON ENGINEERING, PC

1112 STATE ROUTE 434

OWEGO, NY 13827

(607) 223-4334

CMG

10727 W 128 ST

OVERLAND PARK, KS 66213

(913) 239-8900 AE204

SOUTH ELEVATIONS

1/8" = 1'-0"

SOUTH ELEVATION - 1

1/8" = 1'-0"

SOUTH ELEVATION - 2

B

A

C

D

E

B

B

B

B B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

F

G

H

J

C

H HH

H

CCCCCC C

HHH

HHH

K

L

AGGAAAAA A

L

L

GG AAAA

K K

K K

K

K

K

K

C

HHHH

C C C

HHH

REPAIR BRICK AT BUILDING EXTERIOR

NOT USED

NOT USED

NOT USED

CLEAN CAST STONE CAPSTONE AT BUILDING EXTERIOR

CLEAN BRICK FACADE

NOT USED

NO WORK AT PARAPET AND EXTERIOR ELEVATION

NOT USED

EXTERIOR REPAIR LEGEND

Department of Veterans Affairs

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Office of Construction and Facilities Management

CONSULTANTS:

Approved: Project Director

REPAIR BRICK FACADE

B-135

VA LYONS CAMPUS, VA NEW JERSEY

561A4-06-150

TJW GSE06/18/2018

BUILDING 135

612 NW Kay Drive | Lee's Summit | Missouri | 64063

(816) 525-9833 | (816) 472-5656 | tjw@tom-arch.com

SEAL:ARCHITECT/ENGINEER OF RECORD:

65% DESIGN SUBMISSION 08/25/2017

WATSON ENGINEERING, PC

1112 STATE ROUTE 434

OWEGO, NY 13827

(607) 223-4334

CMG

10727 W 128 ST

OVERLAND PARK, KS 66213

(913) 239-8900 AE205

EAST/WEST ELEVATIONS

1/8" = 1'-0"

EAST ELEVATION - 3

1/8" = 1'-0"

WEST ELEVATION - 3

1/8" = 1'-0"

EAST ELEVATION - 4

1/8" = 1'-0"

WEST ELEVATION - 4

1/8" = 1'-0"

EAST ELEVATION - 5

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

A

C

D

E

F

G

H

J

K

L

A A A

A A A

A A A

G G G

G G G

H

HHH

H H

H

HHHHH

H

H H H

H

HHH

H

C C CC

CCCC

CCC CC

K

K

REPLACE CAST STONE CAPSTONE JOINTS AT BUILDING

EXTERIOR

REPLACE JOINTS AT EXTERIOR WINDOWS

REPAIR BRICK AT BUILDING EXTERIOR

NOT USED

NOT USED

NOT USED

CLEAN CAST STONE CAPSTONE AT BUILDING EXTERIOR

CLEAN BRICK FACADE

NOT USED

NOT USED

NOT USED

EXTERIOR REPAIR LEGEND

Department of Veterans Affairs

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Office of Construction and Facilities Management

CONSULTANTS:

Approved: Project Director

REPAIR BRICK FACADE

B-135

VA LYONS CAMPUS, VA NEW JERSEY

561A4-06-150

TJW GSE06/18/2018

BUILDING 135

612 NW Kay Drive | Lee's Summit | Missouri | 64063

(816) 525-9833 | (816) 472-5656 | tjw@tom-arch.com

SEAL:ARCHITECT/ENGINEER OF RECORD:

65% DESIGN SUBMISSION 08/25/2017

WATSON ENGINEERING, PC

1112 STATE ROUTE 434

OWEGO, NY 13827

(607) 223-4334

CMG

10727 W 128 ST

OVERLAND PARK, KS 66213

(913) 239-8900 AE206

COURTYARD

ELEVATIONS

1/8" = 1'-0"

COURTYARD - SOUTH ELEVATION

B

A

C

D

E

F

G

H

J

1/8" = 1'-0"

COURTYARD - WEST ELEVATION

1/8" = 1'-0"

COURTYARD - NORTH ELEVATION

1/8" = 1'-0"

COURTYARD - EAST ELEVATION

B B BB B B B

B B BB B B B

B B

B B

B B B

B B B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

K

L

AA

A A A

A A A A

A A A

G GA

CC C

HH H H

H

C C C

H H H

C C C C C C

H H H H H

CCCC

H

HH

FACE BRICK TO BE DEMOLISHED

TO EXISTING FLASHING

FIELD VERIFY

1' - 2" EXIST.

EXISTING ROOF

MEMBRANE

REMOVE EXISTING CAST STONE

COPING. STORE AND PROTECT

FOR RE-INSTALLATION

EXISTING 8" CMU

INSULATION TO BE REMOVED

FABRIC FLASHING AT ALL BEAMS

EXISTING FACE BRICK TO REMAIN

REMOVE ALL GROUT, MORTOR

AND DEBRIS FROM AIR CAVITY

NEW FACE BRICK

FIELD VERIFY

1' - 2" EXIST.

EXISTING ROOF

MEMBRANE

RE-INSTALL

EXISTING CAST

STONE COPING

EXISTING 8" CMU

THRU-WALL FLASHING

INSULATION

VAPOR BARRIER

WEEP @ 2'-0" O.C.

EXISTING FACE BRICK TO REMAIN

MASONRY MAT

VAPOR BARRIER TO RUN UP WALL

AND UNDER COPING STONE

FACE BRICK TO BE

DEMOLISHED

FIELD VERIFY

1' - 2" EXIST.

EXISTING ROOF

MEMBRANE TO REMAIN

REMOVE EXISTING CAST STONE

COPING. STORE AND PROTECT

FOR RE-INSTALLATION

EXISTING 8" CMU

INSULATIONTO BE REMOVED

FABRIC FLASHING AT ALL BEAMS

EXISTING FACE BRICK TO

REMAIN

REMOVE EXISTING METAL CAP

EXISTING SKYLIGHT TO BE PROTECTED

DURING CONSTRUCTION

EXISTING FACE BRICK AT AND

BELOW SKYLIGHT TO REMAIN

EXISTING FLASHING TO BE REMOVED

NEW FACE BRICK

FIELD VERIFY

1' - 2" EXIST.

EXISTING ROOF

MEMBRANE TO REMAIN

RE-INSTALL EXISTING

CAST STONE COPING

EXISTING 8" CMU

NEW INSULATION

FABRIC FLASHING AT ALL BEAMS

EXISTING FACE BRICK TO

REMAIN

EXISTING SKYLIGHT TO BE PROTECTED

DURING CONSTRUCTION

EXISTING FACE BRICK AT AND

BELOW SKYLIGHT TO REMAIN

MASONRY MAT

THRU-WALL FLASHING

SINGLE PLY SEALANT

METAL BAR COUNTER FLASHING

WEEP @ 2'-0" O.C.

SINGLE-PLY SEALANT

COUNTER FLASHING

BAR NAIL-IN

12" O.C. MAX

EPDM MEMBRANE FLASHING

FULLY ADHERED EPOXY ROOFING

CANT STRIP

TAPERED INSULATION

EXISTING MTL ROOF DECK

EPDM MEMBRANE FLASHING

FULLY ADHERED EPOXY ROOFING

CANT STRIP

TAPERED INSULATION

EXISTING MTL ROOF DECK

EXISTING SHEET MTL TO REMAIN

12" O.C. MAX.

EXISTING SHEATHING TO REMAIN

DENS EXTERIOR SHEATHING

F

IE

L D

V E

R

IF

Y

MTL COPING TO MATCH EXISTING

5"

EXISTING WOOD BLOCKING

EXISTING PRE-CAST PANELS

EXISTING MTL STUD SYSTEM

EXISTING MTL DECK

EPDM MEMBRANE FLASHING

FULLY ADHERED EPOXY ROOFING

CANT STRIP

TAPERED INSULATION

12" O.C. MAX.

DENS EXTERIOR SHEATHING

REMOVE EXISTING VENT AND DRYWALL

SOFFIT. INSTALL PRE-FINISHED ALUM.

SOFFIT PANELS OVER EXISTING METAL

FRAMING SYSTEM.

Department of Veterans Affairs

Drawing Title Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Office of Construction and Facilities Management

CONSULTANTS:

Approved: Project Director

REPAIR BRICK FACADE

B-135

VA LYONS CAMPUS, VA NEW JERSEY

561A4-06-150

TJW GSE06/18/2018

BUILDING 135

612 NW Kay Drive | Lee's Summit | Missouri | 64063

(816) 525-9833 | (816) 472-5656 | tjw@tom-arch.com

SEAL:ARCHITECT/ENGINEER OF RECORD:

65% DESIGN SUBMISSION 08/25/2017

WATSON ENGINEERING, PC

1112 STATE ROUTE 434

OWEGO, NY 13827

(607) 223-4334

CMG

10727 W 128 ST

OVERLAND PARK, KS 66213

(913) 239-8900 AE500

DETAILS

1 1/2" = 1'-0"

DEMO TYP. PARAPET SECTION

1 1/2" = 1'-0"

TYP. PARAPET SECTION

1 1/2" = 1'-0"

DEMO WALL SECTION

1 1/2" = 1'-0"

NEW WALL SECTION

1 1/2" = 1'-0"

SECTION @ CANOPY

1 1/2" = 1'-0"

SECTION @ SKYLIGHT

1 1/2" = 1'-0"

SECTION @ CANOPY PARAPET (TYP)

Sheets
G001 - COVER SHEET
G002 - GENERAL INFORMATION
AE101 - ROOF PLAN
AE151 - ENLARGED PLANS & ELEVATIONS
AE201 - EAST ELEVATION
AE202 - NORTH ELEVATION
AE203 - WEST ELEVATIONS
AE204 - SOUTH ELEVATIONS
AE205 - EAST/WEST ELEVATIONS
AE206 - COURTYARD ELEVATIONS
AE500 - DETAILS

File details come from the government source that posted it.