S02 Typical DRAWINGS-Philips AZURION-New Equipment.pdf
PDF 1 MB Posted
- Solicitation number
- 36C24123R0185
About this file
This document set includes drawings and specifications for the installation of a Philips Azurion 7FD12 ceiling-mounted medical imaging system. The drawings provide details on equipment layout, electrical and network connections, support structure requirements, and site preparation checklists. A private branch circuit with overcurrent protection and a manual disconnect must be installed for the Azurion system. Only equipment within the certified Azurion ground domain may be connected to this circuit to prevent ground loops. Third-party equipment used in the same patient area must be grounded separately.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24123R0185 0001.docx | DOCX document | |
| RFI questions Phase I.docx | DOCX document | |
| P03 SSJ 523A4-24-005-Signed CO signed.pdf | ||
| MA WD MA20230001.txt | TXT text file | |
| S02 Reference Drawing Existing.pdf | ||
| S02 - Past Performance Questionnaire - Sample.pdf | ||
| 36C24123R0185.docx | DOCX document | |
| S02 523A4-24-005 SOW revised.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C1
THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C1 AND SHOULD NOT BE SEPARATED.
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N S
R D
D a t e
D r a w n
Q u o t e
O r d e r
A z u r i o n
F
D
C e i l i n g
04.19.2017
N o n e
N o n e
T H
E
I N
F O
R M
A T
I O
N
I N
T
H
S
P
A C
K A
G E
R O
V I D
D
C
U S
T O
M E
R
C
O N
V E
N I E
N C
E
A
O
B
E
C
O N
S T
R U
A
R C
H I T
E C
T U
R A
L
D
R A
W I N
C
O N
S T
R U
C T
I O
N
D
O C
U M
E N
T S
P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d
S t a n d a r d e f e r e n c e
D r a w i n g
N o t
S i t e
S p e c i f i c
K o n i n k l i j k h i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n i w o l o p a r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
D r a
B y
Healthcare www.healthcare.philips.com
Table of Contents
Revision History
Note for Architects and/or Contractors: If revisions are listed, these drawings must be thoroughly reviewed so that all changes can be incorporated into your project
Rev. Date
Revision Descriptions By
Transport Details ------------------------------------ AD1
Equipment Details -------------------------- AD2 - AD5
Equipment Plan ---------------------------------------- A1
Equipment Legend ------------------------------------ AL
General Notes ----------------------------------------- AN
Section A - Equipment Plan
Check List -------------------------------------------- CHK
Remote Service Network --------------------- N1 - N2
Electrical Details ---------------------------- ED1 - ED4
Raceway & Conduit Information ------------- E2 - E3
Electrical Plan ------------------------------------------- E1
Electrical Legend -------------------------------------- EL
Electrical Notes ---------------------------------------- EN
Section E - Electrical Plan
Support Details ------------------------------ SD1 - SD4
Support Plan - Ceiling -------------------------------- S2
Support Plan - Floor & Wall ------------------------- S1
Support Legend ---------------------------------------- SL
Support Notes ------------------------------------------ SN
Section S - Support Plan
AN
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N S
R D
D a t e
D r a w
Q u o t e
O r d e r
A z u r i o n
F
D
C e i l i n g
04.19.2017
N o n e
N o n e
T H
E
I N
F O
R M
A T
I O
N
C
K A
O
V I D
S
T O
M E
R
C
O N
V E
N I E
N C
E
A
B
E
C
O N
S T
R U
A
R C
H I T
E C
T U
R A
L
D
R A
W I N
C
O N
S T
R U
C T
I O
N
D
O C
U M
E N
T S
P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d
S t a n d a f e r e n c e
D r a w i n g
N o t
S i t e
S p e c i f i c
K o n i n k l i j i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
D r a
Minimum Site Preparation Requirements
A smooth efficient installation is vital to Philips and their customers. Understanding what the minimum site preparation requirements are will help achieve this goal. The following list clearly defines the requirements which must be fulfilled before the installation can begin.
1. Walls to be painted or covered, baseboards installed, floors to be tiled and/or covered, ceiling shall have grid tiles and luminaires installed and operational.
2. Doors and windows, especially radiation protection barriers, installed and finished with locksets operational.
3. All electrical convenience outlets, raceways, wireways, auxiliary fittings, knockouts, cable connectors, terminal and power distribution blocks, cable openings, chase nipples, junction boxes and pull boxes installed and operational.
4. A private supply mains branch circuit with overcurrent protective circuit breaker and manual operable circuit disconnect means shall be present and operational. Definition of "Private supply" means an end-leave of the hospital distribution system after the last overcurrent protective disconnect means from which all equipment included in the Azurion ground domain is powered.
Note that only equipment included in the Azurion certification and equipment with which the
Azurion has a compatibility statement are allowed to be inside the Azurion ground domain. All other electrical equipment is not allowed to have a functional connection to the Azurion system and shall have no direct galvanic connection to prevent ground loops. 3rd party equipment that does not have a function connection with the Azurion system, but that is intended to be used inside the same patient area as the Azurion System shall be grounded to the PCB inside the
ERB with a ground bonding of <= 200 mOhm for plugable equipment.
5. 120V convenience outlets operational.
6. All support structure correctly installed. All channels, pipes, beams and/or other supporting devices should be level, parallel, and free of lateral or longitudinal movements.
7. All contractor supplied cables pulled and terminated.
8. A dust-free environment in and around the procedure room.
9. All HVAC (heating, ventilating and air conditioning) installed and operational as per specifications.
10. Architectural features such as computer floor, wood floor, casework, bulkheads, installed and finished. When technical cabinets are installed in a closet with doors, it is suggested that the customer install a temperature alarm in the event of an air conditional failure.
11. All plumbing installed and finished.
12. Philips does not install or connect developing tanks, automatic processors or associated equipment, built in illuminators, cassette pass boxes, loading benches and cabinets, lead protective screens, panels or lead glass window and frame. This is to be done by the customer/contractor.
13. Clear door openings for moving equipment into the building must be 42" (1067mm) W x 82"
(2083mm) H min. 48" (1219mm) W x 82" (2083mm) H rec., Or larger contingent on an 8'-0"
(2438mm) corridor width.
14. Countertop is 30" (765mm) for seated height and 36" (915mm) for standing height.
Note
Once Philips has moved equipment into the suite and started the installation, the contractor shall schedule his work around the Philips installation team on site. It is suggested that a telephone be provided in the room to receive telephone calls. This would alleviate facility staff from answering calls for Philips personnel.
Remote Service Diagnostics
Medical imaging equipment to be installed by Philips Medical is equipped with a service diagnostic feature which allows for remote and on site service diagnostics. To establish this feature, a RJ45 type ethernet 10/100/1000 Mbit network connector must be installed as shown on plan. Access to customer's network via their remote access server is needed for Remote
Service Network (RSN) connectivity. All cost with this feature are the responsibility of the customer.
(16.0)
HVAC Requirement for General Equipment Locations
*Average heat emission during clinical use
Data applicable for basic system:
Large monitor + 4 x small monitor in Monitor Ceiling Suspension
1 workstation + 2 x small monitor in Control Room
Add 1706 BTU/hr for additional large monitor
Add 273 BTU/hr for additional small monitor
Add 1024 BTU/hr for additional workstation
See AL sheet for additional heat load in case of UPS
Equipment's designed airflow is from front/side to back. Please design the air handling in the rack cabinet equipment area accordingly.
Heating, ventilation, and air conditioning requirements must maintain temperature at 72 degrees +/- 5 degrees Fahrenheit as well as a non-condensing relative humidity at 20-80% with
10% maximum variation. These temperature and humidity levels must be maintained in all (3) rooms (equipment, examination and control rooms).
(16.1)
General Specifications
1. Responsibility
The customer shall be solely responsible, at its expense for preparation of site, including any required structural alterations. The site preparation shall be in accordance with plans and specifications provided by Philips. Compliance with all safety electrical and building codes relevant to the equipment and its installation is the sole responsibility of customer.
The customer shall advise Philips of conditions at or near the site which could adversely affect the installation work and shall ensure that such conditions are corrected and that the site is fully prepared and available to Philips before the installation work is due to begin. The customer shall provide all necessary plumbing, carpentry work, or raceway
(conduits, wireways, auxiliary gutters, etc.) required to attach and install products ready for use.
2. Permits
Customer shall obtain all permits and licenses required by federal, state/provincial or local authorities in connection with the construction, installation and operation of the products and related rules, regulations, shall bear any expense in obtaining same or in complying with any ordinances and statutes.
3. Radiation Protection
The customer or his contractor, at his own expense, shall obtain the service of a licensed radiation physicist to specify radiation protection. (X-Ray Tube output 125 KVp max.)
4. Asbestos and Other Toxic Substances
Philips assumes no hazardous waste (i.e., PCB's in existing transformers) exists at the site. If any hazardous material is found, it shall be the sole responsibility of the customer to properly remove and dispose of this material at its expense. Any delays caused in the project for this special handling shall result in Philips time period for completion being extended by like period of time. Philips assumes that no asbestos material is involved in this project in any ceilings, walls or floors. If any asbestos material is found anywhere on the site, it shall be the customer's sole responsibility to properly remove and/or make safe this condition, at the customer's sole expense.
5. Labor
In the event local labor conditions make it impossible or undesirable to use Philips' regular employees for such installation and connection, such work shall be performed by laborers supplied by the customer, or by an independent contractor chosen by the customer at the customer's expense, and in such case, Philips agrees to furnish adequate engineering supervision for proper completion of the installation.
6. Schedule
The general contractor should provide Philips with a schedule of work to assist in the coordination of delivery of Philips supplied products which are to be installed by the contractor and delivery of the primary equipment.
7. Extended Installation or Turnkey Work by Philips
Any room preparation requirements for Philips equipment indicated on these drawings is the responsibility of the customer. If an extended installation or turnkey contract exists between Philips and the customer for room preparation work required by the equipment represented on these drawings, some of the responsibilities of the customer as depicted in these drawings may be assumed by Philips. In the event of a conflict between the work described in the turnkey contract workscope and these drawings, the turnkey contract workscope shall govern.
8. Infection Control and Interim Life Safety Measures
Compliance with all Infection Control and Interim Life Safety Measures shall be the sole responsibility of the customer. The customer shall provide all means and methods necessary for compliance with Infection Control (IC) and Interim Life Safety Measures
(ILSM) in connection with the construction and installation/operation of the products shown herein and shall bear any expenses related to same.
(16.0)
Electrical Requirements
Mains 40E Cabinet
Maximum Rated Power: 100kW
Supply Configuration: 3 phase, equally sized insulated power conductors and an insulated equipment grounding conductor. Insulated grounding conductor shall have the same or larger size than line conductors. Line wires shall be no smaller than 6 AWG, 90 degrees Celcius or higher temperature rating. The conductor size is dependant on the upstream circuit breaker rating:
Minimum 2 AWG for 125A circuit breaker rating.
Nominal Line Voltage: 480 VAC, 60 Hz
Branch Power
Requirement: 100 kVA (System only; verify UPS power requirements)
Circuit Breaker: 3 phase, Type D 125A with long-time delay and shunt trip
(16.1)
Remote Control of Room Lighting
The control of customer lighting must incorporate an electrical isolation system such as demonstrated on Sheet ED3. Lighting scheme is the responsibility of the customer.
(12.0)
Operation
Temperature 67°F (20°C) to 77°F (25°C)
Temperature gradient Max. 1°F / Minute (0.5°C / Minute)
Humidity (non-condensing)
Humidity shall be stable within 10%
20% to 80%
Exam Room *6483 BTU/hr
Equipment Room
*8189 BTU/hr
Control Room *1706 BTU/hr
AL
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N S
R D
D a t e
D r a w
Q u o t e
O r d e r
A z u r i o n
F
D
C e i l i n g
04.19.2017
N o n e
N o n e
T H
E
I N
F O
R M
A T
I O
N
C
K A
O
V I D
S
T O
M E
R
C
O N
V E
N I E
N C
E
A
B
E
C
O N
S T
R U
A
R C
H I T
E C
T U
R A
L
D
R A
W I N
C
O N
S T
R U
C T
I O
N
D
O C
U M
E N
T S
P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d
S t a n d a f e r e n c e
D r a w i n g
N o t
S i t e
S p e c i f i c
K o n i n k l i j i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
D r a
Weight
(lbs)
Heat Load
(btu/hr)
Detail Sheet
Equipment Designation
Description
Equipment Legend
Optional item furnished by Philips
Future
Existing
Furnished by Philips and installed by contractor
Installed by customer/contractor
Furnished by customer/contractor and installed by customer/contractor
G
D
C
B
Furnished and installed by PhilipsA
F
E
A SP Poly G Stand (Ceiling Version) 2387 1195 AD2
A MSA Angio Diagnost 7 1693 205 AD2
A MA Mains 40E Cabinet 826 5464 AD3
A DB Documentation Box - Mounted on Wheels
(Final location to be coordinated with customer and/or local Philips Service)
176 0 AD4
A ATY Exam Room Auxiliary Box 7 1.7 AD4
G MAV Mavig Ceiling Track w/ Radiation Shield 167 350 AD5
G IH Interventional Hardware 73 2424 AD5
G MB Image 40E Cabinet 441 1877 AD3
A ME Certeray iX Generator Cabinet 320 2971 AD3
A MR Peripheral 40E Cabinet 441 2049 AD3
Items not on Philips Quote/Order
A DH Dosimetry Hub .44 - AD5
G NVA Network video adapter 1.1 - AD5
G PEA Power over ethernet adapter 1.3 - AD5
G PDR Personal Dose Meter Rack .22 - AD5
G VB1 Video Connection Box 11 34 AD4
G VB8 Video Connection Box 11 34 AD4
A CY Control Room Connection Box 102 567 AD3
G TV 58" LCD Monitor Suspension 563 1020 AD4
AD7 Table Floor Plate ℄ o l a b l e
R e c o m m e n d e d
M i n i m u m
Equipment closet doors to be hung from ceiling mounted track, no floor tracks allowed
MSA
SP
Head
End
DH
TV
MAV
9'-8"
6'-0" 25'-10"
25'-10"
MR
MB
ME
MA
VB8
NVA
PEA
ATY
CY
Customer's Physio
(PHY)
Coordinate final location with customer
IH
VB1VB2
PDR
Exact location to be coordinated by Customer and local Philips service.
DB
VB3 VB4 VB5 VB6 VB7
A1
THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C1 AND SHOULD NOT BE SEPARATED.
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N S
R D
D a t e
D r a w
Q u o t e
O r d e r
A z u r i o n
F
D
C e i l i n g
04.19.2017
N o n e
N o n e
T H
E
I N
F O
R M
A T
I O
N
C
K A
O
V I D
S
T O
M E
R
C
O N
V E
N I E
N C
E
A
B
E
C
O N
S T
R U
A
R C
H I T
E C
T U
R A
L
D
R A
W I N
C
O N
S T
R U
C T
I O
N
D
O C
U M
E N
T S
P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d
S t a n d a f e r e n c e
D r a w i n g
N o t
S i t e
S p e c i f i c
K o n i n k l i j i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
D r a
Equipment Layout
1/4" = 1'-0"
Required Unistrut Height: 9' - 6
" / -0 (2900mm, +10mm / -0)
Unistrut height measured from finished floor to bottom of Unistrut.
* Counters and cabinetry shown to be supplied and installed by contractor.
General Notes
* Architect to coordinate with end users/technicians to determine final placement of control desk components prior to installation in order to avoid rework.
Architect to coordinate with Philips Project Manager to reflect final placement on
Philips drawings.
Source Location
Displayed
VB1
Physio
Control FlexVision
VB2 IH Control FlexVision
VB3
VB4
VB5
VB6
VB7
VB8 DH Control FlexVision
AD1
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N S
R D
D a t e
D r a w
Q u o t e
O r d e r
A z u r i o n
F
D
C e i l i n g
04.19.2017
N o n e
N o n e
T H
E
I N
F O
R M
A T
I O
N
C
K A
O
V I D
S
T O
M E
R
C
O N
V E
N I E
N C
E
A
B
E
C
O N
S T
R U
A
R C
H I T
E C
T U
R A
L
D
R A
W I N
C
O N
S T
R U
C T
I O
N
D
O C
U M
E N
T S
P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d
S t a n d a f e r e n c e
D r a w i n g
N o t
S i t e
S p e c i f i c
K o n i n k l i j i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
D r a
Detail - Poly Diagnost G Ceiling (L-ARM) Transport Details
Detail - Poly Diagnost G (C-ARM) Transport Details
Transport Possibilities
Crate Pallet Kick Wheels Wide Kick Wheels Small
Height 57.09" (1450mm) 54.80" (1392mm) 49.25" (1251mm) 49.25" (1251mm)
Weight 2033 lbs (922 kg) 1911 lbs (867 kg) 1764 lbs (800 kg) 1764 lbs (800 kg)
Transport Possibilities
Crate Pallet Klick Wheels
Height 77.95" (1980mm) 75.59" (1920mm) 70.08" (1780mm)
Weight 2028 lbs (920 kg) 1907 lbs (865 kg) 1764 lbs (800 kg)
3'-3
[1000mm] m m
3 4 m m
3'-0
[928mm]
5'-1
[1568mm]
7 8 m m
7 8 m m
3'-0
[923mm]
3'-7
[1100mm]
3'-7
[1100mm] m m
5'-5
[1653mm]
3 4 m m
(12.0) m m
AD2
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N S
R D
D a t e
D r a w
Q u o t e
O r d e r
A z u r i o n
F
D
C e i l i n g
04.19.2017
N o n e
N o n e
T H
E
I N
F O
R M
A T
I O
N
C
K A
O
V I D
S
T O
M E
R
C
O N
V E
N I E
N C
E
A
B
E
C
O N
S T
R U
A
R C
H I T
E C
T U
R A
L
D
R A
W I N
C
O N
S T
R U
C T
I O
N
D
O C
U M
E N
T S
P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d
S t a n d a f e r e n c e
D r a w i n g
N o t
S i t e
S p e c i f i c
K o n i n k l i j i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
D r a m m m m m m
M a x
Top
Side
2'-1
[650mm]
12'-9
[3900mm]
Maximum Travel m m
5'-10
[1795mm]
[290mm]
[290mm]Front
Table Pivot is optional. This allows the table to rotate -90, +180 degrees about center of table base.
5 8 m m
R e q u i r e d
U n i s t r u t h e i g h t m m
3'-3"
[990mm]
7'-7
[2330mm] m m m m
5'-10
[1795mm]
Optional Table
Pivot ℄ (-90, +180 degrees)
Indicates equipment movement
Hose Outlet
Parked position limited 300mm for shorter rooms
Hose Arm and Outlet on opposite side
(Optional)
3 4 m m
8'-6
[2594mm] m m
M i n
(12.0)
SP
Poly G Stand (Ceiling Version)
Weight Heat Dissipation
2387 lbs 1195 btu/hr
(12.0)
MSA
Angio Diagnost 7
Weight Heat Dissipation
1693 lbs 205 btu/hr
3'-3"
[990mm]
Minimum clearance required for installation of carriage into rails (either side)
2'-1
[650mm]
1'-11
[588mm]
4'-5
[1350mm] m m m m
Floor Plate ℄ m
AD3
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N S
R D
D a t e
D r a w
Q u o t e
O r d e r
A z u r i o n
F
D
C e i l i n g
04.19.2017
N o n e
N o n e
T H
E
I N
F O
R M
A T
I O
N
C
K A
O
V I D
S
T O
M E
R
C
O N
V E
N I E
N C
E
A
B
E
C
O N
S T
R U
A
R C
H I T
E C
T U
R A
L
D
R A
W I N
C
O N
S T
R U
C T
I O
N
D
O C
U M
E N
T S
P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d
S t a n d a f e r e n c e
D r a w i n g
N o t
S i t e
S p e c i f i c
K o n i n k l i j i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
D r a
Front
The CRC Cover must be attached to the back box.
Acoustic noise level: <= 55 dB(A) @ 1 meter in front of the rack and
1 meter high (1 meter = 39.37")
CRC Cover
CRC Extension
Top m m
Side
1'-8
[520mm]
[276mm]
[160mm]
CRC Cover
1'-9
[550mm]
(16.0)
MA
Mains 40E Cabinet
Weight Heat Dissipation
826 lbs 5464 btu/hr
Top m m
Side
1'-8
[520mm]
[175mm]
1'-9
[550mm]
Front
The CRC Cover must be attached to the back box.
Acoustic noise level: <= 65 dB(A) @ 1 meter in front of the rack and
1 meter high (1 meter = 39.37")
CRC Cover
CRC Cover
(16.0)
MR
Peripheral 40E Cabinet
Weight Heat Dissipation
441 lbs 2049 btu/hr
Top m m
Side
1'-8
[520mm]
[175mm]
1'-9
[550mm]
Front
The CRC Cover must be attached to the back box.
Acoustic noise level: <= 48 dB(A) @ 1 meter in front of the rack and
1 meter high (1 meter = 39.37")
CRC Cover
CRC Cover
(16.0)
MB
Image 40E Cabinet
Weight Heat Dissipation
441 lbs 1877 btu/hr
Top m m
Side
1'-8
[520mm]
[175mm]
1'-9
[550mm]
The CRC Cover must be attached to the back box.
Acoustic noise level: <= 55 dB(A) @ 1 meter in front of the rack and
1 meter high (1 meter = 39.37")
Front
CRC Cover
CRC Cover
(16.0)
ME
Certeray iX Generator 40E Cabinet
Weight Heat Dissipation
320 lbs 2971 btu/hr
Control Module
Review Module
Front Side
Top
Front Side
Top
Touch Screen Module
(Optional)
DVD Writer
(Optional)
1'-0"
[304mm] m m
[160mm] m m
Front Side
Top
LCD Monitor
5 8 m m
1'-10
[564mm]
1 2 m m
Front Side
Top
Keyboard / Mouse
3 8 m m m m
1'-7
[490mm]
[60mm]
3 8 m m
Front Side
Top
Connection Box
(See SD3 for mounting options)
5 8 m m
2'-7
[800mm] m m m m
1 2 m m
(16.0)
CY
Control Room Connection Box
(All Components)
Weight Heat Dissipation
102 lbs 567 btu/hr
Front Side
Top
1'-5
[442mm]
1'-5
[442mm] m m
Front Side
Top
1 4 m m
9"
[228mm]
1 2 m
AD4
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N S
R D
D a t e
D r a w
Q u o t e
O r d e r
A z u r i o n
F
D
C e i l i n g
04.19.2017
N o n e
N o n e
T H
E
I N
F O
R M
A T
I O
N
C
K A
O
V I D
S
T O
M E
R
C
O N
V E
N I E
N C
E
A
B
E
C
O N
S T
R U
A
R C
H I T
E C
T U
R A
L
D
R A
W I N
C
O N
S T
R U
C T
I O
N
D
O C
U M
E N
T S
P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d
S t a n d a f e r e n c e
D r a w i n g
N o t
S i t e
S p e c i f i c
K o n i n k l i j i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
D r a
Front
Top
Side m m
[195mm]
1 4 m m
(12.0)
ATY
Auxiliary Box
Weight Heat Dissipation
7 lbs 1.7 btu/hr
Front
Top
Side
1'-9
[550mm] m m m m
1'-1
[335mm]
(12.0)
DB
Documentation Box
Weight Heat Dissipation
176 lbs 0 btu/hr m m
Front
Top
Side
(16.0)
VB1
VB8
Video Connection Box
Weight Heat Dissipation
11 lbs 34 btu/hr
[242mm]
[240mm] m m
Front
Top
Side
6'-4
[1950mm] m m
12'-9
[3900mm]
5'-2
[1587mm]
9'-5
[2895mm]
11'-6
[3510mm]
1 8 m m
7 8 m m
For swing labs, 2700mm long ceiling rails are delivered. Maximum longitudinal column travel = 2100mm.
Weight shown is total weight including monitors, suspension, cabling, and options.
Bearing Forces:
(Tension) Tmax = 661 lbs/support
(Shear) Vmax = 150 lbs/support
(15.0)
TV
58" LCD Monitor Suspension
Weight Heat Dissipation
563 lbs 1020 btu/hr
AD5
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N S
R D
D a t e
D r a w
Q u o t e
O r d e r
A z u r i o n
F
D
C e i l i n g
04.19.2017
N o n e
N o n e
T H
E
I N
F O
R M
A T
I O
N
C
K A
O
V I D
S
T O
M E
R
C
O N
V E
N I E
N C
E
A
B
E
C
O N
S T
R U
A
R C
H I T
E C
T U
R A
L
D
R A
W I N
C
O N
S T
R U
C T
I O
N
D
O C
U M
E N
T S
P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d
S t a n d a f e r e n c e
D r a w i n g
N o t
S i t e
S p e c i f i c
K o n i n k l i j i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
D r a
C4
8'-2
[2500mm]
2'-7
[800mm]
Max.
Cross Support
1 4 m m
Radiation Shield
7'-2
[2190mm]
Front
Top
Side
Maximum Travel
1'-8
[510mm]
360°
360°
2'-5
[750mm]
360°
1'-1
[336mm]
1 4 m m
Detail - Cross Support
(Not to scale) m m
Two, " (12mm) Dia. holes
Bearing Forces:
(Tension) Tmax = 908 lbs/support
(Shear) Vmax = 38 lbs/support
Note: For Integris Systems, the post of the Rad Shield post needs to be mounted on the head-end of the table in relation to the Monitor Suspension transverse carriage.
m m
(12.0)
MAV
Mavig Ceiling Track
Weight Heat Dissipation
167 lbs 350 btu/hr
2'-11
[910mm]
Weight shown is for all components.
Front Side
Top
Front Side
Top
19" (480mm) Flat Panel Monitor
Multiswitch
Front Side
Top
Front Side
Top
CPU
Keyboard / Mouse m m
1'-4
[425mm]
7 8 m m m m
1'-1
[336mm]
3 8 m m
1'-5
[434mm] m m m m m m
1'-6"
[457mm]
[66mm]
1 2 m m m m
(12.0)
IH
Interventional Hardware
Weight Heat Dissipation
73 lbs 2424 btu/hr
Front Side
Top
1 4 m m
[184mm]
3 8 m m
Network video adapter Power over ethernet adapter
Bottom
Left m m
Front Back
Dosimetry Hub
Top
(15.0)
DoseAware Xtend
Weight Heat Dissipation
DH .44 lbs - btu/hr
NVA 1.1 lbs - btu/hr
PEA 1.3 lbs - btu/hr
PDR .22 lbs - btu/hr m m
2.93"
[75mm]
Front Back
Top
Left m m
4.51"
[115mm] m m
Personal Dose Meter Rack
Left Front
Top m m
15.75"
[400mm] m m m
SN
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N S
R D
D a t e
D r a w
Q u o t e
O r d e r
A z u r i o n
F
D
C e i l i n g
04.19.2017
N o n e
N o n e
T H
E
I N
F O
R M
A T
I O
N
C
K A
O
V I D
S
T O
M E
R
C
O N
V E
N I E
N C
E
A
B
E
C
O N
S T
R U
A
R C
H I T
E C
T U
R A
L
D
R A
W I N
C
O N
S T
R U
C T
I O
N
D
O C
U M
E N
T S
P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d
S t a n d a f e r e n c e
D r a w i n g
N o t
S i t e
S p e c i f i c
K o n i n k l i j i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
D r a
Equipment Support Information
1. General
The customer shall be solely responsible, at its expense, for preparation of the site, including any required structural alterations. The site preparation shall be in accordance with this plan and specifications, the architectural/construction drawings and in compliance with all safety and building codes. The customer shall be solely responsible for obtaining all construction permits from jurisdictional authority.
2. Equipment Anchorage
Philips provides, with this plan and specifications, information relative to equipment size, weight, shape, anchoring hole locations and forces which may be exerted on anchoring fasteners. The customer shall be solely responsible, through the engineer of record for the building, to provide on the architectural/construction drawings, information regarding the approved method of equipment anchoring to floors, wall and/or ceiling of the building. Any anchorage test required by local authority shall be the customer's responsibility. Stud type anchor bolts should not be specified as they hinder equipment removal for service. Consult with Philips service prior to specifying anchor methods. Philips equipment must be electrically isolated from anchorage.
3. Floor Loading and Surface
Philips provides, with this plan and specifications, information relative to size, weight and shape of floor mounted equipment. The customer shall be solely responsible, through the engineer of record for the building, to provide on the architectural/construction drawings confirmation of the structural adequacy of the floor upon which the equipment will be placed. Any load test required by local authority, shall be the customer's responsibility.
The floor surface upon which Philips equipment is to be placed/anchored shall be flat and level to within
" (2mm) over a length of 39" (1m).
4. Ceiling Support Apparatus
a. Philips provides, with this plan and specifications, information relative to size, weight and shape of ceiling supported equipment. The customer shall be solely responsible, through the engineer of record for the building, to provide on the architectural/construction drawings, information regarding the approved method of structural support apparatus, fasteners and anchorage to which Philips will attach equipment.
Any anchorage and/or load test required by local authority shall be the customer's responsibility. Philips equipment must be electrically isolated from anchorage.
b. Contractor to clearly mark Philips equipment longitudinal centerline on bottom of each structural support.
c. The structural support apparatus surface to which Philips equipment is to be attached, shall have horizontal equipment attachment surfaces parallel, square and level to within
" (2mm) per entire span.
d. Any drilling and/or tapping of holes required to attach Philips equipment to the structural support apparatus shall be the responsibility of the customer.
e. Fasteners/anchors (i.e., bolts, spring nuts, lock and flat washers) and strip closures shall be provided by the customer.
5. Lighting
Luminaires shall be placed in such a position that they are not obscured by equipment or its movement, nor shall they interfere with Philips ceiling rails and equipment movement or otherwise adversely affect the equipment. Such luminaire locations shall be the sole responsibility of the customer.
6. Ceiling Obstructions
There shall be no obstructions that project below the finished ceiling in the area covered by ceiling suspended equipment travel.
7. Seismic Anchorage (For Seismic Zones Only)
All seismic anchorage hardware, including brackets, backing plates, bolts, etc., shall be supplied and installed by the customer/contractor unless otherwise specified within the support legend on this sheet. Installation of electronic cabinets to meet seismic anchorage requirements must be accomplished using flush mounted expansion type anchor/bolt systems to facilitate the removal of a cabinet for maintenance. Do not use threaded rod/adhesive anchor systems. Consult with Philips regarding any anchor system issues. Philips equipment must be electrically isolated from anchorage.
8. Floor Obstructions/ Floor Coverings
There shall be no obstructions on the floor (sliding door tracks, etc.) in front of the Philips technical cabinets. Floor must be clear to allow cabinets to be pulled away from the wall for service.
Contractor to verify with Philips the preferred floor covering installation method.
9. Safety Factors
In a worst case situation the dynamic bolt force of a floor or ceiling must be multiplied by factor 4. (static bolt force of the ceiling must be multiplied by factor 8).
10. Stiffness Requirements of Ceiling
Horizontal Stiffness: preferred 10,000,000 Newton/meter - 57.1 klb/in, minimal 6,000,000 Newton/meter - 34.2 klb/in
Vertical Stiffness: preferred 10,000,000 Newton/meter - 57.1 klb/in, minimal 6,000,000 Newton/meter - 34.2 klb/in
Rotation Stiffness: minimal 20,000,000 Newtonmeter/Rad - 177,014 (klb in)/Rad
The maximum deflection on the Philips rails must not exceed 0.04" (1mm) caused by the static load (weight) of the ceiling stand
11. Vibration
The maximal allowed external frequency that will not destroy the image quality of our equipment is:
a. 0 Hz till 20 Hz (frequency area of our equipment) - Displacement amplitude is smaller than 0.005mm
b. Greater than 20 Hz - Displacement amplitude is smaller than 0.01mm
(16.0)
SL
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N S
R D
D a t e
D r a w
Q u o t e
O r d e r
A z u r i o n
F
D
C e i l i n g
04.19.2017
N o n e
N o n e
T H
E
I N
F O
R M
A T
I O
N
C
K A
O
V I D
S
T O
M E
R
C
O N
V E
N I E
N C
E
A
B
E
C
O N
S T
R U
A
R C
H I T
E C
T U
R A
L
D
R A
W I N
C
O N
S T
R U
C T
I O
N
D
O C
U M
E N
T S
P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d
S t a n d a f e r e n c e
D r a w i n g
N o t
S i t e
S p e c i f i c
K o n i n k l i j i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
D r a
Floor & Wall Support Legend
Item Number
Description
Detail Sheet
Optional
Future
Existing
Furnished by Philips and installed/anchored by contractor
Installed/anchored by customer/contractor
Furnished and installed by customer/contractor and installed/anchored by customer/contractor
G
D
C
B
Furnished and installed/anchored by Philips (exceptions may exist, see Note 2)A
F
E
See S1 for Floor & Wall Support Layout
Ceiling Support Legend
Item Number
Description
Detail Sheet
Optional
Future
Existing
Furnished by Philips and installed by contractor
Installed by customer/contractor
Furnished by customer/contractor and installed by customer/contractor
G
D
C
B
Furnished and installed by PhilipsA
F
E
See S2 for Ceiling Support Layout
Notes:
1. Anchors for items that are installed/anchored by customer/contractor shall be provided by customer/contractor.
2. Anchors for items that are installed/anchored by Philips shall be provided by
Philips. If customer's engineering documents specify anchors other than those listed in this document, the anchors shall be provided by customer/contractor and installed by Philips.
3. In all instances, the wall and/or floor support are the sole responsibility of the customer/contractor. The customer's architect/engineer of record shall specify wall and/or floor support sufficient for the bolt forces shown on the details.
D F2 AD7 Universal Floor Plate SD1
A C1 2 - Philips Poly G Rails SD1
A C2 2 - Philips Monitor Equipment Rails SD1
A C4 Mavig Ceiling Track AD5
B F1 Support in wall for Control Room Connection Box (CY) SD3
A F1 Anchors in wall for Control Room Connection Box (CY) SD3
B C3 Unistrut (P1001 or equavalent in meeting Philips ceiling requirements, geometry of channel and geometry of fixing block) - Bottom of Unistrut 0" to
" (6mm)
Below Finished Ceiling
SD1
G F3 Network Video Adapter Bracket SD4
G F4 Personal Dose Meter Rack SD4
B C5 Dosimetry Hub Ceiling Plate SD4 o l a b l e
Level of floor ±
" (2mm) per 39" (1m) within this area.
F2
13'-2
3'-6"
9'-8"
Level of floor ±
" (2mm) per 39" (1m) within this area.
F3
F1
5'-6" 7'-8"
F4
1'-5"
S1
THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C1 AND SHOULD NOT BE SEPARATED.
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N S
R D
D a t e
D r a w
Q u o t e
O r d e r
A z u r i o n
F
D
C e i l i n g
04.19.2017
N o n e
N o n e
T H
E
I N
F O
R M
A T
I O
N
C
K A
O
V I D
S
T O
M E
R
C
O N
V E
N I E
N C
E
A
B
E
C
O N
S T
R U
A
R C
H I T
E C
T U
R A
L
D
R A
W I N
C
O N
S T
R U
C T
I O
N
D
O C
U M
E N
T S
P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d
S t a n d a f e r e n c e
D r a w i n g
N o t
S i t e
S p e c i f i c
K o n i n k l i j i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
D r a
Floor & Wall Support Layout
1/4" = 1'-0"
Required Unistrut Height: 9' - 6
" / -0 (2900mm, +10mm / -0)
Unistrut height measured from finished floor to bottom of Unistrut.
Refer to Floor/Wall Support Legend -
Sheet SL o l a b l e
℄1
5 8
5 8
1'-2" 2'-2" 2'-2" 2'-2" 2'-2" 2'-2" 2'-2" 3'-2"
7 8
7'-11"
7'-2
1 4
Typ.
Ceiling Clearance
See Sheet "SD2"
C1
C1
C3
C5
4'-11"
C2
C2
C4
9'-8"
S2
THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C1 AND SHOULD NOT BE SEPARATED.
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N S
R D
D a t e
D r a w
Q u o t e
O r d e r
A z u r i o n
F
D
C e i l i n g
04.19.2017
N o n e
N o n e
T H
E
I N
F O
R M
A T
I O
N
C
K A
O
V I D
S
T O
M E
R
C
O N
V E
N I E
N C
E
A
B
E
C
O N
S T
R U
A
R C
H I T
E C
T U
R A
L
D
R A
W I N
C
O N
S T
R U
C T
I O
N
D
O C
U M
E N
T S
P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d
S t a n d a f e r e n c e
D r a w i n g
N o t
S i t e
S p e c i f i c
K o n i n k l i j i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
D r a
Ceiling Support Layout
1/4" = 1'-0"
Required Unistrut Height: 9' - 6
" / -0 (2900mm, +10mm / -0)
Unistrut height measured from finished floor to bottom of Unistrut.
Refer to Ceiling Support Legend -
Sheet SL
SD1
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N S
R D
D a t e
D r a w
Q u o t e
O r d e r
A z u r i o n
F
D
C e i l i n g
04.19.2017
N o n e
N o n e
T H
E
I N
F O
R M
A T
I O
N
C
K A
O
V I D
S
T O
M E
R
C
O N
V E
N I E
N C
E
A
B
E
C
O N
S T
R U
A
R C
H I T
E C
T U
R A
L
D
R A
W I N
C
O N
S T
R U
C T
I O
N
D
O C
U M
E N
T S
P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d
S t a n d a f e r e n c e
D r a w i n g
N o t
S i t e
S p e c i f i c
K o n i n k l i j i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
D r a
F2 C1
Detail - Structural Azurion FD12 (Ceiling)
(Not Site Specific)
AD7 Table
Floor Plate to Floor Bolt Forces:
(Tension) Tmax = 1950 lbs/bolt
(Shear) Vmax = 776 lbs/bolt
(17.0)
Poly G
Poly G Bearing Forces:
(Tension) Tmax = 2639 lbs/fixing block
(Shear) Vmax = 561 lbs/fixing block
27" (685mm) maximum allowed distance between unistrut (seven unistrut required)
Floor plate supplied by Philips / installed by Customer. Counterbored holes are sized for
" (12mm) anchors per Seismic requirements.
Note: The bearing force shown for the Poly G is the maximum instantaneous equipment bearing load that can result from abusive use of the system.
This force can occur at two locations (each fixing block) simultaneously on the same Unistrut (or equal) rail.
If seismic forces must be considered, please refer to the seismic calculation sheets provided by Philips for the specific system components.
[73mm]
4'-10
[1497mm] m m
Hose Outlet
AD7 Universal
Floor Plate
Floor Plate ℄ (Scribe Mark)
[93mm]
2'-2"
[660mm]
[150mm] m m
12'-9
[3900mm]
Max.
2'-2"
[660mm]
2'-2"
[660mm]
2'-2"
[660mm]
2'-2"
[660mm]
1'-2"
[355mm]
F2
Detail - AD7 Universal Floor Plate - Notes for Installation
(Not to scale)
1. 1.18" (30mm) thick floor plate, flush mounted with top of slab.
2. Level within 1/32" (1mm) per 39" (1m) across surface of plate.
1. Use Jam nuts M16 (h=8.0mm) or (h=9.5mm)
2. Use only 1 washer.
3. Use loctite 243 instead of a lock washer.
4. Torque value to be determined by structural engineer of record.
(15.0)
Four holes, 0.74" (19mm) dia.
Counterbored 1.57" (40mm) dia. x 0.83" (21mm) deep
1'-8
[525mm]
1'-5
[450mm]
[38mm]
[38mm] m m m m
7 8 m m
Stand m m
[150mm]
[170mm]
Floor plate mounting to the building:
In case threaded rods are used and the nut protrudes above the floor plate surface, DO NOT GRIND DOWN THE NUT, but follow the procedure stated below to ensure the nut is flush with the floor plate surface.
Offset border of floor covering (Vinyl) by 0.16"
(4mm) outwards. Follow outline of raised portion of floor plate. Do not cover holes with floor covering due to fluid protection plate mounting.
C1 C2 C3
(16.0)
Detail - Clip Rail Cross-Section
(Not to scale)
Cover
Clip
Self-locking
Bolt, M10x40
Clip Rail
Fixing Block
[72mm]
4"
[101mm]
[151mm]
[159mm] m m
Detail - Philips Fixing Block for Philips Ceiling Rails (Clip Rails)
(Not to scale)
P1001 Unistrut (or equal)*
See S2
Sheet
See S2
Sheet
General Requirements:
1. Philips does not specify the overhead equipment support structure. Unistrut may or may not be used. If Unistrut are used, it is up to Unistrut and the structural engineer for the project to determine which of its products are appropriate for each project.
2. *P1001 Unistrut or equivalent is specified. An equivalent may be used as long as it meets Philips ceiling requirements, geometry of channel, and geometry of fixing block to be installed inside unistrut.
Finished Ceiling Requirements:
1. Finished ceiling must NOT be lower than the bottom of the
Unistrut in order to prevent damage to the finished ceiling during the installation of clip rails. Finished ceiling height to be mounted
0" to
" (6mm) above bottom of Unistrut.
Fixing Block Installation Requirements:
1. Nothing shall be attached to the Unistrut with any fastener that protrudes into the Unistrut which would interfere with positioning of the fixing block.
2. Fixing blocks for Philips ceiling rails (Clip rails) are designed to be installed in P1001 Unistrut.
3. The inside of the Unistrut must be clear of obstructions
(including paint).
Unistrut Requirements:
1. Unistrut elements must be rigid and comply with the ceiling structure requirements. See SN sheet, line #4 "Ceiling Support
Apparatus".
2. Welding Unistrut may warp Unistrut and deteriorate the structural integrity of the Unistrut. Consult the Structural
Engineer of Record prior to welding any Unistrut.
Fixing Block
Finished Ceiling t o m m
Table ℄
Screws to be kept 3/4" or higher above the bottom of the unistrut channel
3 4 m m
[32mm]
5 8 m m
6"
[152mm]
[21mm] m m
[2mm]
[4mm]
[84mm]
[48mm]
Detail - Clip Rail Spacing
(Not to scale)
(12.0)
Detail - Cable Hose Outlet
(Not to scale)
2'-11
" ± 0.06"
[899mm ± 1.5mm]
[115mm] m m
[248mm] m m
[115mm] m m
Six mounting holes, M6
SD2
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N S
R D
D a t e
D r a w
Q u o t e
O r d e r
A z u r i o n
F
D
C e i l i n g
04.19.2017
N o n e
N o n e
T H
E
I N
F O
R M
A T
I O
N
C
K A
O
V I D
S
T O
M E
R
C
O N
V E
N I E
N C
E
A
B
E
C
O N
S T
R U
A
R C
H I T
E C
T U
R A
L
D
R A
W I N
C
O N
S T
R U
C T
I O
N
D
O C
U M
E N
T S
P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d
S t a n d a f e r e n c e
D r a w i n g
N o t
S i t e
S p e c i f i c
K o n i n k l i j i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
D r a
Detail - Restricted Ceiling Area for Objects that Project Below Finished Ceiling
(Not site specific)
(14.0)
5'-3"
[1600mm]
13'-3"
[4039mm]
Table Floor Plate ℄
B
A
A
B
A
No objects that project below finished ceiling are allowed in this area (lights, smoke detectors, sprinkler heads, etc).
No objects that project more than 4.5" (115mm) below finished ceiling are allowed in this area (lights, smoke detectors, sprinkler heads, soffit, etc).
6'-10"
[2083mm]
Detail - AD7 Table, Fixed/Pivot Base - Clearance Area
(Not to scale)
1'-1
[350mm]
1'-11
[588mm]
2'-4"
[711mm] m m
1'-11
[595mm]
3'-11
[1200mm] m m m m
[262mm]
Floor Plate ℄
Philips Flush
Mounted Floor Plate
(15.0)
3 8 m
SD3
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N S
R D
D a t e
D r a w
Q u o t e
O r d e r
A z u r i o n
F
D
C e i l i n g
04.19.2017
N o n e
N o n e
T H
E
I N
F O
R M
A T
I O
N
C
K A
O
V I D
S
T O
M E
R
C
O N
V E
N I E
N C
E
A
B
E
C
O N
S T
R U
A
R C
H I T
E C
T U
R A
L
D
R A
W I N
C
O N
S T
R U
C T
I O
N
D
O C
U M
E N
T S
P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d
S t a n d a f e r e n c e
D r a w i n g
N o t
S i t e
S p e c i f i c
K o n i n k l i j i l i p s
E l e c t r o n i c s
N
V
A l l r i g h t s r e s e r v e d
R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r
P r o j e c t
M a n a g e r
C o n t a c t
N u m b e r
E m a i l
D r a
F1
Bolt Forces:
(Tension) Tmax = 14 lbs/bolt
(Shear) Vmax = 25 lbs/bolt
Equipment Option
Anchor Style
(provided by Philips)
Anchor Size
(provided by Philips)
Qty.
Support Size & Material
(provided & installed by customer/contractor)
Mavig Ceiling Track A
Bolts, flat washer, lock washer, spring nuts
A307 Grade or ASME
Grade 5 Bolts:
(10mm) x 2" (50mm) L
Spring Nuts:
" (10mm)
8 Unistrut
Control Room Connection
Box (CY)
A
Round Phillips Head
Self Drilling Screws
#10-16 x 1
" (38mm) L
Drywall with minimum 20 gauge
Steel backing
B
SPAX Multipurpose flat head screw
#10 x 1
" (38mm) L
Drywall with minimum 20 gauge
Steel backing
C
Toggler Snaptoggle and
(round head screws)
#BA and (#10-24 x
" (63.5mm) L)
Minimum
" (16mm) Drywall
Anchors for items that are installed/anchored by customer/contractor shall be provided by customer/contractor. Anchors for items that are installed/anchored by Philips shall be provided by Philips. If customer's engineering documents specify anchors other than those listed below, the anchors shall be provided by customer/contractor and installed by Philips. In all instances, the wall and/or floor support are the sole responsibility of the customer/contractor. The customer's architect/engineer of record shall specify wall and/or floor support sufficient for the bolt forces shown on the details.
Pre-Evaluated and -Approved Anchor Reference List for Philips Installers
Detail - CY - Wall Mount Template
(Not to scale)
Wall Raceway
Connection
Box
Connection Box wall mounted under counter
(Preferred) m m
2'-7
[800mm] m m
1 2 m m
2'-9"
[838mm]
Min. gap between wall raceway for Connection Box
(16.0)
Detail - CY - Bracket Mount Option
(Not to scale)
Bracket to be made locally.
1'-0
[320mm]
[5mm]
[50mm] m m m m m m m m m m m m
1 4 m m
5 8 m m m m
Wall Raceway
Connection Box
2'-3
[700mm]
4x Ø
" (6mm)
6x Ø
" (5mm)
2'-5
[760mm]
2'-1
[640mm]
Top
Front Side m m
[250mm] m m
[50mm]
Detail - CY
Support Frame Option
(Not to scale)
5"
[127mm]
[5mm]
(16.0)(16.0)
1'-2
[380mm]
1'-1
[350mm]
[190mm]
[30mm] m m m m
[8mm]
To be made locally
Front Side
Connection Box on table
(Optional)
Detail - CY - Cable Outlets
(Not to scale)
Front Cover
Cable Outlet (Bottom)
Cable Outlet (Top)
Cable Outlet
(Rear)
Closing Cover
(Only one closing cover included)
Connection Box
(16.0)
Cable Outlet
(Rear)
When the extruded plate is removed, use caution to protect cables against sharp edges
(16.0)
Notes:
Connection Box needs to be electrically isolated from building steel.
Locate box within 6.5' (2m) of the review module and monitors.
[3mm]
Detail - Video Connection Box - Hole Pattern for Mounting
(Not to scale)
(16.0)
[226mm]
1 8 m m
[53mm]
[120mm]
[53mm]
SD4
P r o j e c t
D e t a i l s
P h i l i p s
C o n t a c t s
P r o j e c t
D r a w i n g
N u m b e r
N S
R D
D a t e
D r a w
Q u o t e
O r d e r
A z u r i o n
F
D
C e i l i n g
04.19.2017
N o n e
N o n e
T H
E
I N
F O
R…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .