Attachment F - Pricing.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- B599--HITC Power Study Federal contract opportunity
- Solicitation number
- 36C10X21Q0019
About this file
This document contains a pricing template and details of a federal contract opportunity for a power study. The pricing template provides a framework for offerors to propose hourly rates for labor categories including an electrician and project manager that will be used on a time and material basis. Task deliverables are outlined including project management plans, weekly reports, and a power study report. The 150-day period of performance will take place at the Hines Information Technology Center in Hines, Illinois. Quotes are due by November 19, 2020 following an optional pre-bid meeting on November 10, 2020. The solicitation is issued by the Department of Veterans Affairs Strategic Acquisition Center Frederick for a power study in accordance with the attached performance work statement.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment E - Level of Effort.xlsx | XLSX spreadsheet | |
| 36C10X21Q0019 0003.pdf | ||
| ATTACHMENT D.2 - PAST PERFORMANCE REFERENCES.pdf | ||
| 36C10X21Q0019 0002.pdf | ||
| 36C10X21Q0019 0001.pdf | ||
| 36C10X21Q0019_1.docx | DOCX document | |
| 36C10X21Q0019.docx | DOCX document | |
| Attachment E - Pricing and Level of Effort.xlsx | XLSX spreadsheet | |
| Attachment C - Past Performance Questionnaire.docx | DOCX document | |
| Attachment D - Past Performance References.pdf | ||
| Attachment B - Wage Determination Cook County IL.pdf | ||
| Attachment A3 - HITC Main Electrical Drawing.pdf | ||
| Attachment A2 - First Floor Area B.pdf | ||
| Attachment A1 - First Floor Area C.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Power Study Attachment F - Pricing
| The Offeror shall provide the hours for each deliverable and the labor rates for the proposed labor categories. CLINs 0007A & 0007B must specify fixed hourly rates in its offer that include wages, overhead, general and administrative expenses, and profit. Offerors shall propose hourly rates that are rounded to two decimal places. Per FAR 52.216-31, the Offeror must specify whether the fixed hourly rate for each labor category applies to labor performed by: (1) The offeror; (2) Subcontractors; and/or (3) Divisions, subsidiaries, or affiliates of the offeror under a common control. Incomplete documentation may not be considered for an award. The Offeror has the ability to add/remove labor categories to align with their technical approach. Equipment/material pricing shall be added into column G row 21. | |||||||
| Task / Deliverable | Electrician | Project Manager | (labor category) | ||||
| Hours | Hours | Hours | Units | Unit Rate | Total | ||
| 0001 | Kick-Off/Pre-Construction (FFP) | ||||||
| 0001A | Kick-Off/Pre-Construction Meeting (FFP) | 1 | $0.00 | $0.00 | |||
| 0001B | Draft Work Plan (FFP) | 1 | $0.00 | $0.00 | |||
| 0001C | Draft Activity Hazard Analysis (FFP) | 1 | $0.00 | $0.00 | |||
| 0001D | Draft Project Schedule (FFP) | 1 | $0.00 | $0.00 | |||
| 0002 | Method of Procedures (FFP) | 1 | $0.00 | $0.00 | |||
| 0003 | Final Activity Hazard Analysis (FFP) | 1 | $0.00 | $0.00 | |||
| 0004 | Final Work Plan (FFP) | 1 | $0.00 | $0.00 | |||
| 0005 | Project Management (FFP) | ||||||
| 0005A | Contractor Project Management Plan (FFP) | 1 | $0.00 | $0.00 | |||
| 0005B | Contractor Outline for Block of Instruction (FFP) | 1 | $0.00 | $0.00 | |||
| 0006 | Weekly Reports (FFP) | 21 | $0.00 | $0.00 | |||
| 0007 | Power Study (T&M) | ||||||
| 0007A | Power Study Report (T&M) | 1 | $0.00 | $0.00 | |||
| 0007B | Unused Circuit Breakers (T&M) | 1 | $0.00 | $0.00 | |||
| 0007C | Equipment/Material (T&M) | 1 | $0.00 | ||||
| Total Hours | 0 | 0 | 0 | ||||
| Labor Rate | $0.00 | $0.00 | $0.00 | ||||
| Subtotals | $0.00 | $0.00 | $0.00 | ||||
| TOTAL | $0.00 |
File details come from the government source that posted it. Updated .