This combined synopsis and solicitation requests quotes for a power study to be conducted at the Hines Information Technology Center in Hines, Illinois. The solicitation was issued by the Department of Veterans Affairs Strategic Acquisition Center Frederick to identify unused circuit breakers and produce a power study report. Quotes are due by November 19, 2020. A pre-bid walkthrough will take place on November 10, 2020, with registration required by November 6. Questions must be submitted by November 12. The period of performance for the power study is 150 days from award. The NAICS code is 541330 for engineering services and the small business size standard is $16.5 million.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment F - Pricing.xlsx | XLSX spreadsheet | |
| 36C10X21Q0019 0003.pdf | ||
| ATTACHMENT D.2 - PAST PERFORMANCE REFERENCES.pdf | ||
| 36C10X21Q0019 0002.pdf | ||
| 36C10X21Q0019 0001.pdf | ||
| 36C10X21Q0019_1.docx | DOCX document | |
| 36C10X21Q0019.docx | DOCX document | |
| Attachment E - Pricing and Level of Effort.xlsx | XLSX spreadsheet | |
| Attachment C - Past Performance Questionnaire.docx | DOCX document | |
| Attachment A1 - First Floor Area C.pdf | ||
| Attachment D - Past Performance References.pdf | ||
| Attachment B - Wage Determination Cook County IL.pdf | ||
| Attachment A3 - HITC Main Electrical Drawing.pdf | ||
| Attachment A2 - First Floor Area B.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Power Study
| Attachment E - Level of Effort |
| The level of effort shall be appropriate to the proposed approach in the Offeror’s technical quote. The Offeror has the ability to add additional labor categories to align with their technical approach. The Offeror must specify which labor category applies to labor performed by: (1) The Offeror; (2) Subcontractors; and/or (3) Divisions, subsidiaries, or affiliates of the offeror under a common control. Under no circumstances shall any pricing be included in the Technical Capability. |
| Task / Deliverable | Electrician | Project Manager | (labor category) | |
| Hours | Hours | Hours | ||
| 0001 | Kick-Off/Pre-Construction (FFP) | |||
| 0001A | Kick-Off/Pre-Construction Meeting (FFP) | |||
| 0001B | Draft Work Plan (FFP) | |||
| 0001C | Draft Activity Hazard Analysis (FFP) | |||
| 0001D | Draft Project Schedule (FFP) | |||
| 0002 | Method of Procedures (FFP) | |||
| 0003 | Final Activity Hazard Analysis (FFP) | |||
| 0004 | Final Work Plan (FFP) | |||
| 0005 | Project Management (FFP) | |||
| 0005A | Contractor Project Management Plan (FFP) | |||
| 0005B | Contractor Outline for Block of Instruction (FFP) | |||
| 0006 | Weekly Reports (FFP) | |||
| 0007 | Power Study (T&M) | |||
| 0007A | Power Study Report (T&M) | |||
| 0007B | Unused Circuit Breakers (T&M) | |||
| Total Hours | 0 | 0 | 0 |