Attachment E - Level of Effort.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
B599--HITC Power Study Federal contract opportunity
Solicitation number
36C10X21Q0019
Issued by
Department of Veterans Affairs Strategic Acquisition Center Frederick

About this file

This combined synopsis and solicitation requests quotes for a power study to be conducted at the Hines Information Technology Center in Hines, Illinois. The solicitation was issued by the Department of Veterans Affairs Strategic Acquisition Center Frederick to identify unused circuit breakers and produce a power study report. Quotes are due by November 19, 2020. A pre-bid walkthrough will take place on November 10, 2020, with registration required by November 6. Questions must be submitted by November 12. The period of performance for the power study is 150 days from award. The NAICS code is 541330 for engineering services and the small business size standard is $16.5 million.

View the file

Other files for this federal contract opportunity

Other files attached to B599--HITC Power Study, newest first.
File Type Posted
Attachment F - Pricing.xlsx XLSX spreadsheet
36C10X21Q0019 0003.pdf PDF
ATTACHMENT D.2 - PAST PERFORMANCE REFERENCES.pdf PDF
36C10X21Q0019 0002.pdf PDF
36C10X21Q0019 0001.pdf PDF
36C10X21Q0019_1.docx DOCX document
36C10X21Q0019.docx DOCX document
Attachment E - Pricing and Level of Effort.xlsx XLSX spreadsheet
Attachment C - Past Performance Questionnaire.docx DOCX document
Attachment A1 - First Floor Area C.pdf PDF
Attachment D - Past Performance References.pdf PDF
Attachment B - Wage Determination Cook County IL.pdf PDF
Attachment A3 - HITC Main Electrical Drawing.pdf PDF
Attachment A2 - First Floor Area B.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Power Study

Attachment E - Level of Effort
The level of effort shall be appropriate to the proposed approach in the Offeror’s technical quote. The Offeror has the ability to add additional labor categories to align with their technical approach. The Offeror must specify which labor category applies to labor performed by: (1) The Offeror; (2) Subcontractors; and/or (3) Divisions, subsidiaries, or affiliates of the offeror under a common control. Under no circumstances shall any pricing be included in the Technical Capability.
Task / DeliverableElectricianProject Manager(labor category)
HoursHoursHours
0001Kick-Off/Pre-Construction (FFP)
0001AKick-Off/Pre-Construction Meeting (FFP)
0001BDraft Work Plan (FFP)
0001CDraft Activity Hazard Analysis (FFP)
0001DDraft Project Schedule (FFP)
0002Method of Procedures (FFP)
0003Final Activity Hazard Analysis (FFP)
0004Final Work Plan (FFP)
0005Project Management (FFP)
0005AContractor Project Management Plan (FFP)
0005BContractor Outline for Block of Instruction (FFP)
0006Weekly Reports (FFP)
0007Power Study (T&M)
0007APower Study Report (T&M)
0007BUnused Circuit Breakers (T&M)
Total Hours000