36C10B18R2609-007.xlsx
XLSX spreadsheet 2 MB Posted
- Solicitation number
- 36C10B18R2609
About this file
36C10B18R2609 Attachment 006 VA MACM Excel Price Evaluation Spreadsheet.xlsx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C10B18R2609-A0005000.docx | DOCX document | |
| 36C10B18R2609-A0005001.pdf | ||
| 36C10B18R2609-A0004000.docx | DOCX document | |
| 36C10B18R2609-A0004001.pdf | ||
| 36C10B18R2609-A0004002.pdf | ||
| 36C10B18R2609-A0003001.pdf | ||
| 36C10B18R2609-A0003002.pdf | ||
| 36C10B18R2609-A0003000.docx | DOCX document | |
| 36C10B18R2609-A0002000.docx | DOCX document | |
| 36C10B18R2609-A0002002.pdf | ||
| 36C10B18R2609-A0002001.pdf | ||
| 36C10B18R2609-A0002003.xlsx | XLSX spreadsheet | |
| 36C10B18R2609-A0001000.docx | DOCX document | |
| 36C10B18R2609-A0001001.xlsx | XLSX spreadsheet | |
| 36C10B18R2609-004.pdf | ||
| 36C10B18R2609-006.pdf | ||
| 36C10B18R2609-001.pdf | ||
| 36C10B18R2609-005.pdf | ||
| 36C10B18R2609-002.xlsx | XLSX spreadsheet | |
| 36C10B18R2609-003.xlsx | XLSX spreadsheet | |
| 36C10B18R2609-000.docx | DOCX document |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions Instructions Tab
Evaluated Price Summary Tab Instructions -
(1) Offeror shall make no inputs in this tab. Evaluated Price Summary tab automatically calculates the total evaluated price.
T&M and Labor Hour Rate Table Tab Instructions -
(1) In red shaded cell in row 2 the Offeror shall enter the name of the Prime Offeror.
(2) Each labor category specified by the Government must be addressed (i.e., no un-addressed labor categories). (3) For each labor category specified by the Government the Offeror shall enter hourly fully loaded labor rates (no more than two decimal places) for the Base Period and Option Periods (all red shaded cells). If loaded labor rates are entered with more than two decimal places, cells are formatted to be flagged and will be color shaded. Ensure all loaded labor rate cells are corrected so no color shading is remaining before submitting the proposal.
(4) The fully loaded labor rates proposed may be escalated for each period as deemed appropriate by the Offeror.
(5) The proposed fully loaded labor rates will be incorporated into any resultant contract, as binding, Not To Exceed (NTE) ceiling loaded labor rates. The proposed fully loaded labor rates will be used for the prime and all subcontractors/team members in performance of this contract.
T&M Labor Tab Instructions -
(1) Offeror shall make no inputs in this tab. T&M Labor tab automatically calculates the total Not-To-Exceed T&M labor price.
T&M Material & Handling Tab Instructions -
(1) The Offeror shall use the Government provided estimated Not To Exceed (NTE) Material amounts in row 4. (2) In the red shaded cells, Offeror shall either enter a Material Fixed Handling percentage (whole number and two decimal places; i.e. 5.35%) or 0.00% (if Offeror proposes no Material Fixed Handling costs). If Material Handling percentage is entered with more than two decimal places, cells are formatted to be flagged and will be color shaded. Ensure all Material Handling percentage cells are corrected so no color shading is remaining before submitting the proposal. If not included in the proposal, Material Fixed Handling will not be added during contract performance. (3) The proposed Material Fixed Handling rates will be incorporated into any resultant contract, as binding, Not To Exceed (NTE) ceiling rates. (4) Calculation of the Total Evaluated Price for the T&M Material & Material Fixed Handling will be done automatically based on the Material Fixed Handling rates entered by the Offeror.
Labor Hour Labor Tab Instructions -
(1) Offeror shall make no inputs in this tab. Labor Hour Labor tab automatically calculates the total Not-To-Exceed Labor Hour price.
FFP Priced CLINs Tab Instructions -
(1) The Offeror shall enter unit prices (in red shaded cells) for the Firm Fixed Price CLINs. Unit prices shall be entered with no more than two decimal places. If unit prices are entered with more than two decimal places, cells are formatted to be flagged and will be color shaded. Ensure all unit price cells are corrected so no color shading is remaining before submitting proposal.
VA MACM Platform Price Tab Instructions -
(1) The Offeror shall price its proposed VA MACM Platform based on commercial AWS pricing for evaluation purposes only. The Offeror shall provide an accounting of all cloud services, cloud service quantities and projected cost of cloud services based upon AWS Commercial pricing. Offerors shall use the AWS Commercial cost estimation tools found at: https://aws.amazon.com/aws-cost-management/. (2) Since AWS pricing fluctuates on a continuous basis, the Offeror shall identify on row 3 the date pricing was obtained from the AWS Tool and provide screen shots of the proposed prices out of the AWS estimating tool for the date the estimate was developed. (3) Since the proposed VA MACM Platform price is for evaluation purposes only, the price will not be included in the awarded contract value.
Evaluated Price Summary
| Evaluated Price Summary Tab | ||||||
| Category | Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | Total |
| Total Evaluated T&M Labor - Not To Exceed (NTE) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Evaluated T&M Material and Material Handling NTE | $ 1,476,525.00 | $ 1,499,558.79 | $ 1,522,951.91 | $ 1,546,709.96 | $ 1,570,838.64 | $ 7,616,584.30 |
| Total Evaluated T&M Labor, Material, and Material Handling - NTE | $ 1,476,525.00 | $ 1,499,558.79 | $ 1,522,951.91 | $ 1,546,709.96 | $ 1,570,838.64 | $ 7,616,584.30 |
Total Evaluated Tier 4 Help Desk Support - NTE (Labor Hour Optional Task) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Total Evaluated Firm Fixed Price (Mandatory Tasks) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Evaluated Firm Fixed Price (Optional Tasks - Not Including Contract Transition) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Evaluated Firm Fixed Price (Optional Task - Contract Transition Out Plan) * | $ - 0 | $ - 0 | ||||
| Total Evaluated Firm Fixed Price (Optional Task - Contract Transition Out Services) * | $ - 0 | $ - 0 | ||||
| Total Evaluated Firm Fixed Price (Mandatory and Optional Tasks) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Total Evaluated VA MACM Platform Price (For Evaluation Purposes Only) $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Total Evaluated Price (T&M, Labor Hour, Firm Fixed Price, and VA MACM Platform Price) $ 1,476,525.00 $ 1,499,558.79 $ 1,522,951.91 $ 1,546,709.96 $ 1,570,838.64 $ 7,616,584.30
* Optional Tasks Contract Transition Out Plan (CLIN 5001AA) and Contact Transition Out Services (CLIN 5001AB) may be exercised at any time during the period of performance. For evaluation purposes the price will be included in Option Period 4.
T&M and Labor Hour Rate Table
| T&M and Labor Hour Rate Table Tab PROPOSED FULLY LOADED LABOR RATES | ||||||
| Prime Offeror Name | ||||||
| Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | ||
| PWS 5.3.5 T&M Labor Category | Site | Fully Loaded Hourly Labor Rate | Fully Loaded Hourly Labor Rate | Fully Loaded Hourly Labor Rate | Fully Loaded Hourly Labor Rate | Fully Loaded Hourly Labor Rate |
| Project Analyst | Off-Site (Contractor Site) |
| Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | ||
| PWS 5.5 Labor Hour Labor Category | Site | Fully Loaded Hourly Labor Rate | Fully Loaded Hourly Labor Rate | Fully Loaded Hourly Labor Rate | Fully Loaded Hourly Labor Rate | Fully Loaded Hourly Labor Rate |
| Project Manager | Off-Site (Contractor Site) | |||||
| Project Analyst | Off-Site (Contractor Site) | |||||
| Configuration Manager | Off-Site (Contractor Site) | |||||
| Configuration Manager, Senior | Off-Site (Contractor Site) | |||||
| Integration Engineer | Off-Site (Contractor Site) | |||||
| Integration Engineer, Expert | Off-Site (Contractor Site) | |||||
| Security Analyst | Off-Site (Contractor Site) | |||||
| Software Engineer | Off-Site (Contractor Site) | |||||
| Software/System Architect | Off-Site (Contractor Site) | |||||
| System Administrator | Off-Site (Contractor Site) | |||||
| System Administrator, Senior | Off-Site (Contractor Site) | |||||
| Test Engineer | Off-Site (Contractor Site) |
T&M Labor T&M Labor Tab
| Prime Offeror Name | Base Period | Base Period | Base Period | Option Period 1 | Option Period 1 | Option Period 1 | Option Period 2 | Option Period 2 | Option Period 2 | Option Period 3 | Option Period 3 | Option Period 3 | Option Period 4 | Option Period 4 | Option Period 4 | Total Base and Option Periods | Total Base and Option Periods | ||
| PWS Task | Labor Category | Site | Labor Hours |
(For Evaluation Purposes Only) Loaded Hourly Labor Rate Total Labor Labor Hours (For Evaluation Purposes Only) Loaded Hourly Labor Rate Total Labor Labor Hours (For Evaluation Purposes Only) Loaded Hourly Labor Rate Total Labor Labor Hours (For Evaluation Purposes Only) Loaded Hourly Labor Rate Total Labor Labor Hours (For Evaluation Purposes Only) Loaded Hourly Labor Rate Total Labor Labor Hours (For Evaluation
| Purposes Only) | Total Labor | |||||||||||||||||||
| 5.3.5 | Project Analyst | Off-Site (Contractor Site) | 960 | $ - 0 | $ - 0 | 480 | $ - 0 | $ - 0 | 480 | $ - 0 | $ - 0 | 480 | $ - 0 | $ - 0 | 480 | $ - 0 | $ - 0 | 2,880 | $ - 0 |
&D page &P If Used for Source Selection Information See FAR 2.101 and 3.104
T&M Material and Handling
| T&M Material & Material Handling Tab | |||||||||||
| Base Period | Option Period 1 | Option Period 2 | Option Period 3 | Option Period 4 | Total | ||||||
| Material - Not To Exceed (NTE) | $ 1,476,525.00 | $ 1,499,558.79 | $ 1,522,951.91 | $ 1,546,709.96 | $ 1,570,838.64 | $ 7,616,584.30 | |||||
| Material Fixed Handling Percent and Amount - NTE | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Material & Material Fixed Handling Amount - NTE | $ 1,476,525.00 | $ 1,499,558.79 | $ 1,522,951.91 | $ 1,546,709.96 | $ 1,570,838.64 | $ 7,616,584.30 |
Labor Hour Labor
| Labor Hour Labor Tab | |||||||||||||||||||
| Tier 4 Help Desk Support (Labor Hour Optional Task) | |||||||||||||||||||
| Prime Offeror Name | Base Period | Base Period | Base Period | Option Period 1 | Option Period 1 | Option Period 1 | Option Period 2 | Option Period 2 | Option Period 2 | Option Period 3 | Option Period 3 | Option Period 3 | Option Period 4 | Option Period 4 | Option Period 4 | Total Base and Option Periods | Total Base and Option Periods | ||
| PWS Task | Labor Category | Site | Labor Hours |
(For Evaluation Purposes Only) Loaded Hourly Labor Rate Total Labor Labor Hours (For Evaluation Purposes Only) Loaded Hourly Labor Rate Total Labor Labor Hours (For Evaluation Purposes Only) Loaded Hourly Labor Rate Total Labor Labor Hours (For Evaluation Purposes Only) Loaded Hourly Labor Rate Total Labor Labor Hours (For Evaluation Purposes Only) Loaded Hourly Labor Rate Total Labor Labor Hours (For Evaluation
| Purposes Only) | Total Labor | |||||||||||||||||||
| 5.5 | Project Manager | Off-Site (Contractor Site) | 480 | $ - 0 | Need Rate | 480 | $ - 0 | Need Rate | 480 | $ - 0 | Need Rate | 480 | $ - 0 | Need Rate | 480 | $ - 0 | Need Rate | 2,400 | ERROR:#VALUE! | |
| Project Analyst | Off-Site (Contractor Site) | 480 | $ - 0 | Need Rate | 480 | $ - 0 | Need Rate | 480 | $ - 0 | Need Rate | 480 | $ - 0 | Need Rate | 480 | $ - 0 | Need Rate | 2,400 | ERROR:#VALUE! | ||
| Configuration Manager | Off-Site (Contractor Site) | 960 | $ - 0 | Need Rate | 960 | $ - 0 | Need Rate | 960 | $ - 0 | Need Rate | 960 | $ - 0 | Need Rate | 960 | $ - 0 | Need Rate | 4,800 | ERROR:#VALUE! | ||
| Configuration Manager, Senior | Off-Site (Contractor Site) | 960 | $ - 0 | Need Rate | 960 | $ - 0 | Need Rate | 960 | $ - 0 | Need Rate | 960 | $ - 0 | Need Rate | 960 | $ - 0 | Need Rate | 4,800 | ERROR:#VALUE! | ||
| Integration Engineer | Off-Site (Contractor Site) | 960 | $ - 0 | Need Rate | 960 | $ - 0 | Need Rate | 960 | $ - 0 | Need Rate | 960 | $ - 0 | Need Rate | 960 | $ - 0 | Need Rate | 4,800 | ERROR:#VALUE! | ||
| Integration Engineer, Expert | Off-Site (Contractor Site) | 960 | $ - 0 | Need Rate | 960 | $ - 0 | Need Rate | 960 | $ - 0 | Need Rate | 960 | $ - 0 | Need Rate | 960 | $ - 0 | Need Rate | 4,800 | ERROR:#VALUE! | ||
| Security Analyst | Off-Site (Contractor Site) | 480 | $ - 0 | Need Rate | 480 | $ - 0 | Need Rate | 480 | $ - 0 | Need Rate | 480 | $ - 0 | Need Rate | 480 | $ - 0 | Need Rate | 2,400 | ERROR:#VALUE! | ||
| Software Engineer | Off-Site (Contractor Site) | 960 | $ - 0 | Need Rate | 960 | $ - 0 | Need Rate | 960 | $ - 0 | Need Rate | 960 | $ - 0 | Need Rate | 960 | $ - 0 | Need Rate | 4,800 | ERROR:#VALUE! | ||
| Software/System Architect | Off-Site (Contractor Site) | 960 | $ - 0 | Need Rate | 960 | $ - 0 | Need Rate | 960 | $ - 0 | Need Rate | 960 | $ - 0 | Need Rate | 960 | $ - 0 | Need Rate | 4,800 | ERROR:#VALUE! | ||
| System Administrator | Off-Site (Contractor Site) | 960 | $ - 0 | Need Rate | 960 | $ - 0 | Need Rate | 960 | $ - 0 | Need Rate | 960 | $ - 0 | Need Rate | 960 | $ - 0 | Need Rate | 4,800 | ERROR:#VALUE! | ||
| System Administrator, Senior | Off-Site (Contractor Site) | 960 | $ - 0 | Need Rate | 960 | $ - 0 | Need Rate | 960 | $ - 0 | Need Rate | 960 | $ - 0 | Need Rate | 960 | $ - 0 | Need Rate | 4,800 | ERROR:#VALUE! | ||
| Test Engineer | Off-Site (Contractor Site) | 480 | $ - 0 | Need Rate | 480 | $ - 0 | Need Rate | 480 | $ - 0 | Need Rate | 480 | $ - 0 | Need Rate | 480 | $ - 0 | Need Rate | 2,400 | ERROR:#VALUE! | ||
| Total Labor | 9,600 | $ - 0 | 9,600 | $ - 0 | 9,600 | $ - 0 | 9,600 | $ - 0 | 9,600 | $ - 0 | 48,000 | ERROR:#VALUE! |
&D page &P If Used for Source Selection Information See FAR 2.101 and 3.104
FFP Priced CLINs
| FFP Priced CLINs Tab | |||||
| LINE ITEM | DELIVERABLE DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL EVALUATED PRICE |
| Base Period FFP Mandatory Tasks: | |||||
| 0001 | Project Management in IAW PWS Section 5.1 and its subtasks | 12 | MO | $ - 0 | |
| 0002 | VA MACM Platform Development and App Migration IAW PWS Section 5.2 | 13 | EA | $ - 0 | |
| 0003 | VA MACM Operations and System Maintenance Support IAW PWS Section 5.3.1 - NTE 12 Months | 12 | MO | $ - 0 | |
| 0004 | Security IAW PWS Section 5.3.2 and its subtasks, except for 5.3.2.2 | 12 | MO | $ - 0 | |
| 0004AB | ATO Package Documentation IAW PWS 5.3.2.2 | 1 | LO | $ - 0 | |
| 0005 | Disaster Recovery and Continuity of Operations IAW PWS 5.3.3 and its subtasks | 12 | MO | $ - 0 | |
| 0006 | Monitoring and Alerting IAW PWS 5.3.4 and its subtasks | 12 | MO | $ - 0 | |
| 0008 | Engineering Technical Support IAW PWS 5.3.6 | 12 | MO | $ - 0 | |
| 0009 | General Engineering Support IAW PWS 5.3.7 | 12 | MO | $ - 0 | |
| 0010 | Release and Development Management IAW PWS 5.4 and its subtasks | 12 | MO | $ - 0 | |
| Base Period Total FFP Mandatory Tasks | $ - 0 |
| Base Period FFP Optional Task: | ||||
| 0011 | Additional VA MACM Platform Development and App Migration Support IAW PWS 5.2.3 (NTE) | 32 | EA | $ - 0 |
| Base Period Total Evaluated FFP (Mandatory and Optional Tasks) | $ - 0 |
| Option Period 1 FFP Mandatory Tasks: | ||||
| 1001 | Project Management in IAW PWS Section 5.1 and its subtasks | 12 | MO | $ - 0 |
| 1002 | VA MACM Operations and System Maintenance Support IAW PWS Section 5.3.1 | 12 | MO | $ - 0 |
| 1003 | Security IAW PWS Section 5.3.2 and its subtasks | 12 | MO | $ - 0 |
| 1004 | Disaster Recovery and Continuity of Operations IAW PWS 5.3.3 and its subtasks | 12 | MO | $ - 0 |
| 1005 | Monitoring and Alerting IAW PWS 5.3.4 and its subtasks | 12 | MO | $ - 0 |
| 1007 | Engineering Technical Support IAW PWS 5.3.6 | 12 | MO | $ - 0 |
| 1008 | General Engineering Support IAW PWS 5.3.7 | 12 | MO | $ - 0 |
| 1009 | Release and Development Management IAW PWS 5.4 and its subtasks | 12 | MO | $ - 0 |
| Option Period 1 Total FFP Mandatory Tasks | $ - 0 |
| Option Period 1 FFP Optional Task: | ||||
| 1010 | Additional VA MACM Platform Development and App Migration Support IAW PWS 5.2.3 (NTE) | 32 | EA | $ - 0 |
Option Period 1 Total Evaluated FFP (Mandatory and Optional Tasks) $ - 0
| Option Period 2 FFP Mandatory Tasks: | ||||
| 2001 | Project Management in IAW PWS Section 5.1 and its subtasks | 12 | MO | $ - 0 |
| 2002 | VA MACM Operations and System Maintenance Support IAW PWS Section 5.3.1 | 12 | MO | $ - 0 |
| 2003 | Security IAW PWS Section 5.3.2 and its subtasks | 12 | MO | $ - 0 |
| 2004 | Disaster Recovery and Continuity of Operations IAW PWS 5.3.3 and its subtasks | 12 | MO | $ - 0 |
| 2005 | Monitoring and Alerting IAW PWS 5.3.4 and its subtasks | 12 | MO | $ - 0 |
| 2007 | Engineering Technical Support IAW PWS 5.3.6 | 12 | MO | $ - 0 |
| 2008 | General Engineering Support IAW PWS 5.3.7 | 12 | MO | $ - 0 |
| 2009 | Release and Development Management IAW PWS 5.4 and its subtasks | 12 | MO | $ - 0 |
| Option Period 2 Total FFP Mandatory Tasks | $ - 0 |
| Option Period 2 FFP Optional Task: | ||||
| 2010 | Additional VA MACM Platform Development and App Migration Support IAW PWS 5.2.3 (NTE) | 32 | EA | $ - 0 |
Option Period 2 Total Evaluated FFP (Mandatory and Optional Tasks) $ - 0
| Option Period 3 FFP Mandatory Tasks: | ||||
| 3001 | Project Management in IAW PWS Section 5.1 and its subtasks | 12 | MO | $ - 0 |
| 3002 | VA MACM Operations and System Maintenance Support IAW PWS Section 5.3.1 | 12 | MO | $ - 0 |
| 3003 | Security IAW PWS Section 5.3.2 and its subtasks | 12 | MO | $ - 0 |
| 3004 | Disaster Recovery and Continuity of Operations IAW PWS 5.3.3 and its subtasks | 12 | MO | $ - 0 |
| 3005 | Monitoring and Alerting IAW PWS 5.3.4 and its subtasks | 12 | MO | $ - 0 |
| 3007 | Engineering Technical Support IAW PWS 5.3.6 | 12 | MO | $ - 0 |
| 3008 | General Engineering Support IAW PWS 5.3.7 | 12 | MO | $ - 0 |
| 3009 | Release and Development Management IAW PWS 5.4 and its subtasks | 12 | MO | $ - 0 |
| Option Period 3 Total FFP Mandatory Tasks | $ - 0 |
| Option Period 3 FFP Optional Task: | ||||
| 3010 | Additional VA MACM Platform Development and App Migration Support IAW PWS 5.2.3 (NTE) | 32 | EA | $ - 0 |
Option Period 3 Total Evaluated FFP (Mandatory and Optional Tasks) $ - 0
| Option Period 4 FFP Mandatory Tasks: | ||||
| 4001 | Project Management in IAW PWS Section 5.1 and its subtasks | 12 | MO | $ - 0 |
| 4002 | VA MACM Operations and System Maintenance Support IAW PWS Section 5.3.1 | 12 | MO | $ - 0 |
| 4003 | Security IAW PWS Section 5.3.2 and its subtasks | 12 | MO | $ - 0 |
| 4004 | Disaster Recovery and Continuity of Operations IAW PWS 5.3.3 and its subtasks | 12 | MO | $ - 0 |
| 4005 | Monitoring and Alerting IAW PWS 5.3.4 and its subtasks | 12 | MO | $ - 0 |
| 4007 | Engineering Technical Support IAW PWS 5.3.6 | 12 | MO | $ - 0 |
| 4008 | General Engineering Support IAW PWS 5.3.7 | 12 | MO | $ - 0 |
| 4009 | Release and Development Management IAW PWS 5.4 and its subtasks | 12 | MO | $ - 0 |
| Option Period 4 Total FFP Mandatory Tasks | $ - 0 |
| Option Period 4 FFP Optional Task: | ||||
| 4010 | Additional VA MACM Platform Development and App Migration Support IAW PWS 5.2.3 (NTE) | 32 | EA | $ - 0 |
Option Period 4 Total Evaluated FFP (Mandatory and Optional Tasks Without Contract Transition CLINs) $ - 0
| Optional Task Contract Transition: | ||||
| 5001AA | Contract Transition Out Plan IAW PWS Section 5.6.1 | 1 | LO | $ - 0 |
| 5001AB | Contract Transition Out Services IAW PWS Section 5.6.2 | 1 | LO | $ - 0 |
Total Evaluated Firm Fixed Price Base Period, Option Periods, and All Optional Tasks $ - 0
VA MACM Platform Price VA MACM Platform Price Tab
| Date Pricing Obtained from AWS Tool: | |||||||||||||||||
| Base Period | Base Period | Base Period | Option Period 1 | Option Period 1 | Option Period 1 | Option Period 2 | Option Period 2 | Option Period 2 | Option Period 3 | Option Period 3 | Option Period 3 | Option Period 4 | Option Period 4 | Option Period 4 | Total | ||
| Item # | Description/Part Number | Quantity | Unit Price | Extended Price | Quantity | Unit Price | Extended Price | Quantity | Unit Price | Extended Price | Quantity | Unit Price | Extended Price | Quantity | Unit Price | Extended Price | Extended Price |
| 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 4 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 5 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 6 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 7 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 8 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 9 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 10 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 11 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 12 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 13 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 14 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 15 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 16 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 17 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 18 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 19 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 20 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 21 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 22 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 23 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 24 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 25 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 26 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 27 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 28 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 29 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 30 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 31 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 32 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 33 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 34 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 35 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 36 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 37 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 38 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 39 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 40 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 41 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 42 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 43 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 44 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 45 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 46 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 47 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 48 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 49 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| 50 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||
| Total VA MACM Platform Price (For Evaluation Purposes Only) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
File details come from the government source that posted it.