3499 Price Schedule.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
3499 GELBERMAN Drydock
Solicitation number
W912BU24B0017
Issued by

About this file

This document is a Price Schedule for a federal contract opportunity to provide services to execute the overhaul of the U.S. Army Corps of Engineers drift collection vessel GELBERMAN. The key details are:

The contract requires furnishing all labor, materials, fittings, equipment, tools, power, heat, water, etc. to perform repairs and modifications to the 85-foot steel-hulled GELBERMAN, including drydocking, hull cleaning and painting, assisting with inspections, and other miscellaneous repairs. The period of performance is 60 days from delivery of the vessel to the Contractor's yard. Pricing is required for definite and indefinite line items across the major work categories of general contract requirements, hull repairs, machinery repairs, and miscellaneous repairs. Bids will be evaluated based on the total price for all definite and indefinite items, though the Government is not obligated to direct work under the indefinite items. The solicitation will be issued by the U.S. Army Corps of Engineers Philadelphia District, with a NAICS code of 336611 - Ship Building and Repairing.

View the file

Other files

File Type Posted
W912BU24B00170004.pdf PDF
W912BU24B00170003.pdf PDF
3499 Reference Drawings.zip ZIP file
W912BU24B00170002.pdf PDF
W912BU24B00170001.pdf PDF
W912BU24B0017.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

PRICE SCHEDULE DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT

0001 General Contract Requirements (SW-1 to SW-6 & SC-1 to SC-17) Sub-Total XXXXX $ - 0

0002Hull RepairsSub-TotalXXXXX$ - 0
0002AHull Repairs - Definite ItemsSub-TotalXXXXX$ - 0
0002AADry Docking (TP 1.01)1Lump Sum$ - 0$ - 0
0002ABGas-Freeing Compartments (TP 1.02)1Lump Sum$ - 0$ - 0
0002ACDocking Plugs (TP 1.03)1Lump Sum$ - 0$ - 0
0002ADExterior Cleaning and Painting (TP 1.04)1Lump Sum$ - 0$ - 0
0002AEInterior Cleaning and Painting (TP 1.05)1Lump Sum$ - 0$ - 0
0002AFKeel Cooler Cleaning & Install New Keel Cooler Repair Sets (TP 1.06)1Lump Sum$ - 0$ - 0
0002AGRepair Pilot House Exterior Receptacles (TP 1.07)1Lump Sum$ - 0$ - 0
0002AHSea Chest (TP 1.08)1Lump Sum$ - 0$ - 0
0002AIHull Anodes (TP 1.09)1Lump Sum$ - 0$ - 0
0002AJCleaning of Fuel Tanks (TP 1.10)1Lump Sum$ - 0$ - 0
0002AKFresh Water Tank Cleaning (TP 1.11)1Lump Sum$ - 0$ - 0
0002ALInspection of Tiller Assembly (TP 1.12)1Lump Sum$ - 0$ - 0
0002AMInstallation and Removal of Deck Hatches on #4 Compartment (TP 1.13)1Lump Sum$ - 0$ - 0
0002ANPilothouse Joinery Work (TP 1.14)1Lump Sum$ - 0$ - 0
0002AOInspection of Deck Plating in Head (TP 1.15)1Lump Sum$ - 0$ - 0
0002APCrane Engine & Main Engine Keel Cooler Mounting Hull Insert (TP 1.16)1Lump Sum$ - 0$ - 0
0002BHull Repairs - Indefinite ItemsSub-TotalXXXXX$ - 0
0002BASteelwork (TP 1.18)10,000Lbs.$ - 0$ - 0
0002BBWelding Seams (TP 1.19)1,000Lin - Ft$ - 0$ - 0
0002BCBilge Water Disposal (TP 1.20)1,000Gal.$ - 0$ - 0
0002BDGas-Freeing Compartments (TP 1.21)6Compartments$ - 0$ - 0
0002BEAdditional Audio-Gauging Requirements (TP 1.22)5Units (100 Shots)$ - 0$ - 0
0002BFReplacement of Docking Plugs (TP 1.23)6Docking Plugs$ - 0$ - 0
0002BGBolted Manhole Replacement (TP 1.24)4Manholes$ - 0$ - 0
0002BHPaint Damaged Areas From Pressure Washing (TP 1.25)1Lump Sum$ - 0$ - 0
0002BICO2 Bottle Removal (TP 1.26)1Lump Sum$ - 0$ - 0
0002BJBlast and Paint Deck Plates from #2 Tank and Engine Room (TP 1.27)1Lump Sum$ - 0$ - 0
0002BKPaint and Blast Superstructure (TP 1.28)1Lump Sum$ - 0$ - 0
0002BLAdditional Removal of Hull Anode Strap Studs (TP 1.29)50Straps$ - 0$ - 0
0002BMBlast and Paint Forepeak Tank (TP 1.30)1Lump Sum$ - 0$ - 0
0002BNBlast and paint Compartment #6 (TP 1.31)1Lump Sum$ - 0$ - 0
0002BOBlast and Paint Afterpeak Tank (TP 1.32)1Lump Sum$ - 0$ - 0
CLINDESCRIPTIONQUANTITYUNITUNIT PRICEAMOUNT
0003Machinery RepairsSub-TotalXXXXX$ - 0
0003AMachinery Repairs - Definite ItemsSub-TotalXXXXX$ - 0
0003AARudders (TP 2.01)1Lump Sum$ - 0$ - 0
0003ABPropeller Shaft Bear Clearances and Shaft Runout Readings (TP 2.02)1Lump Sum$ - 0$ - 0
0003ACSea Valves (TP2.03)1Lump Sum$ - 0$ - 0
0003ADDeck Vents (TP 2.04)1Lump Sum$ - 0$ - 0
0003AEPropeller Reconditioning (TP 2.05)1Lump Sum$ - 0$ - 0
0003AFInstall Vents on Grid Cooler Cofferdams (TP 2.06)1Lump Sum$ - 0$ - 0
0003AGPropellers (TP 2.07)1Lump Sum$ - 0$ - 0
0003AHRudder Stocks and Rudder Stock Bearings (TP 2.08)1Lump Sum$ - 0$ - 0
0003BMachinery Repairs - Indefinite ItemsSub-TotalXXXXX$ - 0
0003BAPropeller Shafts (TP 2.09)2Shafts$ - 0$ - 0
0003BBRepair Throttle Controls in Pilot House and Aft Steering Station (TP 2.10)1Lump Sum$ - 0$ - 0
0003BCPropeller Shaft Seal Replacements (TP 2.11)2Seals$ - 0$ - 0
0003BDPropeller Shaft Bearings (TP 2.12)4Bearings$ - 0$ - 0
0003BEEpoxy Propeller Shaft Bearing Liners (TP 2.13)2Liners$ - 0$ - 0
0003BFPropulsion System Alignment (TP 2.14)2Alignments$ - 0$ - 0
0003BGRenewal of Deck Vent Stems (TP 2.15)6Stems$ - 0$ - 0
0003BHRenewal of Deck Vents (TP 2.16)6Vents$ - 0$ - 0
0003BIAdditional Sea Valves (TP 2.17)8Valves$ - 0$ - 0
0003BJSea Valves Replacement (TP 2.18)1Lump Sum$ - 0$ - 0
DESCRIPTIONQUANTITYUNITUNIT PRICEAMOUNT
0004Miscellaneous RepairsSub-TotalXXXXX$ 25,000.00
0004AMiscellaneous Repairs - Indefinite ItemsSub-TotalXXXXX$ - 0
0004AAMiscellaneous Work (TP 3.01)1Lump Sum$ - 0$ - 0

TOTAL (Priced Line Iems 0001-00044) Total XXXXX $ 25,000.00

The Government may reject an offer as non-responsive if it is materially and mathematically unbalanced as to price for any offered item or combination of offered items. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices, which are significantly overstated for other work.

The Government will evaluate bids for award purposes by adding the total price for all definite and indefinite items. Evaluation of indefinite items will not obligate the Government to direct work under the indefinite items.

ALL BIDDERS ARE REQUIRED TO FILL OUT THE PRICE SCHEDULE ABOVE.

ALL LINE ITEMS ON THE PRICE SCHEDULE SHALL BE FILLED OUT INCLUDING UNIT PRICES AND TOTAL AMOUNTS.

ALL LINE ITEMS MUST BE FILLED OUT OR THE BID WILL BE DEEMED NON- RESPONSIVE. BIDDERS ARE INSTRUCTED TO ENTER A DOLLER AMOUNT ON EACH LINE ITEM OR THE BIDDER MUST PUT A “NO CHARGE (N/C)” NOTATION ON THE LINE ITEM.