3194_3.DOCX
DOCX document 23 KB Posted
- Attached to
- Environmental Consulting Services
- Contract number
- 407414
- Issued by
- Wisconsin
About this file
This document appears to be a project cost estimation template or form from the Wisconsin Department of Transportation (WisDOT). The template is structured to capture project details and cost breakdowns for what appears to be environmental or consulting services, given the reference to a Site Health and Safety Plan and the requirement for reports to be distributed to WisDOT's Environmental Services Section (ESS) and Regional Environmental Coordinator.
The template provides a comprehensive cost structure framework that includes lump sum items, vendor labor costs calculated by task, rate, and hours, direct expenses itemized by quantity and unit price, overhead and profit margins, and subcontractor costs with their respective service descriptions and pricing basis. The document requires specification of project elements with completion dates, scope of services, assumptions, and various reporting requirements including both electronic PDF and bound paper formats. While the template shows the cost calculation structure, the actual monetary values, project specifics, timeline details, and contractor information fields are left blank for completion during the bidding or project planning process.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3194_1.PDF | ||
| 3194_2.DOCX | DOCX document | |
| 021417NRT.pdf | ||
| 3194_0.PDF | ||
| 3194_5.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WisDOT Project ID:
Site(s):
City:
County:
Highway and Termini (when applicable):
Total Estimated Cost:
Report recipients and report format (electronic or paper):
| Recipient |
| Number of Copies |
| Preferred format |
| WisDOT ESS |
| 2 |
| 1 bound/stapled paper |
1 electronic (PDF)
| Region Environmental Coordinator |
| 1 |
Paper Electronic
Timetable for completion:
| Project Element |
| Completion date |
Scope of Services:
Include Site Health and Safety Plan:
Assumptions:
Estimated Cost:
Lump Sum Items: Total: $ List items
Vendor Labor: Total: $
| Task |
| Rate Title |
| Hours |
| Rate |
| Cost |
Direct Expenses: Total: $
| Item |
| Quantity |
| Unit |
| Unit Price |
| Total |
Overhead: $ Profit: $
Subcontractor costs: Total: $
| Subcontractor |
| Subcontracted Services |
| Cost basis /Unit Price |
| Cost |
File details come from the government source that posted it. Updated .