This document is Attachment K Contract Cost Package for Natural Resource Technology Inc., which appears to be part of a state contract vehicle, likely for Wisconsin based on references to Milwaukee, Racine, and Kenosha counties. The document outlines the firm's pricing structure for various environmental and technical services under what appears to be a state-managed contract system.

The contract covers multiple service categories including asbestos inspections for bridge structures at a fixed rate of $950 per structure across all Wisconsin regions (Northeast, North Central, Northwest, Southeast, and Southwest), with special provisions for large structures like the Hoan Bridge in Milwaukee to be negotiated separately. Additional services are priced on hourly rates including asbestos inspection for buildings and other structures ($75.50 average hourly rate with a range of $68-$83), various project staff positions ranging from Administrative Support ($22.11/hour) to Contract Manager ($52.01/hour), and subcontracted asbestos abatement services. The contract includes a 217% overhead rate on direct labor, 7% profit margin, and reimbursement for travel expenses including mileage at $0.51/mile, meals ($8 breakfast, $10 lunch, $20 dinner), and lodging ($70/night standard, $80/night in Milwaukee area counties). Equipment, supplies, and subcontractor costs are billed at actual cost with no markup.

View the file

Other files

File Type Posted
3194_1.PDF PDF
3194_2.DOCX DOCX document
3194_3.DOCX DOCX document
3194_0.PDF PDF
3194_5.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tab 1 Hourly Rates and Costs

ATTACHMENT K Contract Cost Package

FIRM NAME: Natural Resource Technology Inc.

Asbestos Inspections ‐ Bridges Terms: Lump Sum Asbestos inspection, per bridge structure, Northeast region 950.00$ cost per structure Asbestos inspection, per bridge structure, North Central region 950.00$ cost per structure Asbestos inspection, per bridge structure, Northwest region 950.00$ cost per structure Asbestos inspection, per bridge structure, Southeast region 950.00$ cost per structure Asbestos inspection, per bridge structure, Southwest region 950.00$ cost per structure NOTE: Prices for long, multiple‐section structures such as the Hoan Bridge in Milwaukee will be negotiated separately at the time of request.

Asbestos inspection, buildings, bridge tender houses, other structures Terms: direct hourly rate Asbestos Inspector 75.50$ Average Hourly Rate Asbestos Inspector $68 to $83 Hourly Wage Range Asbestos abatement Terms: direct hourly rate Exterior Abatement Worker to be subcontractedAverage Hourly Rate Exterior Asbestos Supervisor to be subcontractedAverage Hourly Rate Asbestos Worker to be subcontractedAverage Hourly Rate Asbestos Supervisor to be subcontractedAverage Hourly Rate Asbestos Project Designer to be subcontractedAverage Hourly Rate Asbestos Management Planner to be subcontractedAverage Hourly Rate Equipment and supplies Terms: direct expense, no markup Subcontractor Costs Overhead rate Mileage

Terms: actual cost, no markup 217% Percentage of Direct Labor

Terms: current state reimbursement rate Per mile, personal vehicle rate $0.51/mile Meals Terms: current state reimbursement rate Breakfast 8.00$ Lunch 10.00$ Dinner 20.00$ Lodging Terms: current state reimbursement rate, excluding taxes Per night $70.00 Per night, Milwaukee, Racine and Kenosha counties $80.00

Fill in only those cells highlighted in blue. Cells in green are calculated.

Tab 1 Hourly Rates and Costs

FIRM NAME: Natural Resource Technology Inc.

Project Staff Terms: direct hourly rate Contract Manager $ Project Supervisor $ Engineer $ Hydrogeologist $ Scientist $ Field Technician $

CADD, GIS $

Accounting $ Administrative Support $

52.01 Average Hourly Rate

34.29 Average Hourly Rate

28.56 Average Hourly Rate

29.36 Average Hourly Rate

28.92 Average Hourly Rate

22.74 Average Hourly Rate

27.60 Average Hourly Rate

23.00 Average Hourly Rate

22.11 Average Hourly Rate

Profit Terms: percentage of labor and overhead Rate 7% Percentage of Direct Labor + Labor Overhead