315xxPriceAdjust25.xlsx

XLSX spreadsheet 3 MB Posted

Attached to
Comprehensive Bituminous Concrete (Asphalt Mix and Cold Patch) (Statewide)
Contract number
Not on record
Issued by
New York

About this file

This document is a series of monthly asphalt price adjustment notifications from the New York State Department of Transportation (NYSDOT) covering April through August 2025. The adjustments apply to two contract awards: Award #23388 (Contract No. PC70701-PC70719) for Bituminous Concrete Asphalt Mixtures and Award #23389 (Contract No. PC70720-PC70724) for Liquid Bituminous Materials, both designated as 2025 VPP (Value Priced Projects) NYSDOT Specific Projects funded by federal and state sources.

The contract vehicles cover comprehensive asphalt-related materials including chip seal, cold recycling, heater scarification, paver placed surface treatment, joint and crack filler/sealer, microsurfacing, quick set slurry seal, and various asphalt mixtures. Price adjustments are calculated monthly based on the F.O.B. Terminal Price for unmodified PG 64-22 binder, using a February 1, 2025 base price of $598.00 per ton. Monthly posted prices increased from $621.00 in April to $648.00 in August 2025. The adjustments apply to original contract prices using specific formulas based on petroleum content percentages, with thresholds requiring minimum changes of $0.010 per gallon, $0.001 per pound, $0.002 per linear foot, or $0.10 per ton. Price adjustments are computed to three decimal places and affect various material categories including tack coat, asphalt emulsions, surface treatments, and asphalt mixtures, with different percentage-based calculations for each material type.

View the file

Other files

File Type Posted
3150223371PL_AsphaltMix.xlsx XLSX spreadsheet
3150223371_AMGroupSpec949.pdf PDF
3150223371_DetailedSpecCMCMM.pdf PDF
3150223371_Insurance.pdf PDF
31502PriceAdjust24.xlsx XLSX spreadsheet
31555PriceAdjust23.xlsx XLSX spreadsheet
315xxPriceAdjust24.xlsx XLSX spreadsheet
31555PriceAdjust25.xlsx XLSX spreadsheet
3150223371_LiquidGroupSpec947.pdf PDF
3150223371QQ_AsphaltMix.xlsx XLSX spreadsheet
3150223371_GeneralSpec.pdf PDF
3150223371p.pdf PDF
3150223371_DetailedSpecCPMP.pdf PDF
3150223371_HowtoUse.pdf PDF
3150223371_NYSDOTRegions.pdf PDF
3150223371ra.pdf PDF
315xxPriceAdjust26.xlsx XLSX spreadsheet
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

August 2025 Asphalt Price Adjustment - August 2025

GroupDescriptionAward #Contract No.
31503Bituminous Concrete Asphalt Mixtures

(2025 VPP NYSDOT Specific Projects) (Federal & State Funds) 23388 PC70701 - PC70719 Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder) 31555 Liquid Bituminous Materials (2025 VPP NYSDOT Specific Projects) (Federal & State Funds) (Chip Seal; Cold Recycling; Heater Scarification; Paver Placed Surface Treatment; and Joint & Crack Filler/Sealer) 23389 PC70720 - PC70724

Bituminous materials price adjustment(s) EFFECTIVE on:August 1, 2025ERROR:#REF!
Award(s) using February 1, 2025 base index of$598.000per ton.Year:2025
In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s),Month:AugustPosted Price2025
the following price adjustments have been calculated.Month$/ton
MONTHLY PG 64-22 BINDER ADJUSTMENT:The August 2025 Average is$648.000per tonAsphalt Price AdjustmentJanuary
(F.O.B. Terminal Price for unmodified PG 64-22 binder without anti-stripping agent)Base Average =$598.000February
The February 1, 2025 Base Average FOB Terminal Price for Asphalt Cement was$598.000per ton.New Average =$648.000March
Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to moreApril621
than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price.May626
All Asphalt Price Adjustments will be computed to three decimal places.June632
Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by usingJuly646
the price adjustments listed below:August648
Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page.September
CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS:November
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLONDecember
702.0700Asphalt Filler (18-60)100.000.20100.20$0.213ERROR:#VALUE!Month2026
702.3001RS-155.001.7056.70$0.121ERROR:#VALUE!$/ton
702.3002RS-1h55.001.7056.70$0.121$0.000January
702.3101RS-263.002.7065.70$0.140$0.000February
702.3102HFRS-263.002.7065.70$0.140$0.000March
702.3201MS-265.008.2073.20$0.156$0.000April
702.3301HFMS-265.008.2073.20$0.156$0.000May
702.3401HFMS-2h65.002.7067.70$0.144ERROR:#REF!June
702.3402HFMS-2s65.008.2073.20$0.156ERROR:#REF!July
702.3501SS-157.000.2057.20$0.122ERROR:#REF!August
702.3501
(Cold Recycling only)SS-165.000.2065.20$0.139ERROR:#REF!September
702.3601SS-1h57.000.2057.20$0.122ERROR:#REF!October
702.3601
(Cold Recycling only)SS-1h65.000.2065.20$0.139ERROR:#REF!November
702.3101PRS-263.002.7065.70$0.140ERROR:#REF!December
702.3102PHFRS-263.002.7065.70$0.140ERROR:#REF!
702.3301PHFMS-265.008.2073.20$0.156ERROR:#REF!
702.4001CRS-160.002.7062.70$0.133ERROR:#REF!
702.4002CRS-1h60.002.7062.70$0.133ERROR:#REF!
702.4101PCRS-265.002.7067.70$0.144ERROR:#REF!
702.4201CMS-265.0010.2075.20$0.160ERROR:#REF!
702.4301CMS-2h65.0010.2075.20$0.160ERROR:#REF!
702.4401CSS-157.000.2057.20$0.122ERROR:#REF!
702.4401
(Cold Recycling only)CSS-165.000.2065.20$0.139ERROR:#REF!
702.4501CSS-1h57.000.2057.20$0.122ERROR:#REF!
702.4501
(Cold Recycling only)CSS-1h65.000.2065.20$0.139ERROR:#REF!
702.4601CQS-1h62.000.2062.20$0.132ERROR:#REF!
702.4001PCRS-1p60.002.7062.70$0.133ERROR:#REF!
702.4101PCRS-2p65.002.7067.70$0.144ERROR:#REF!
702.4601PCQS-1p62.000.2062.20$0.132ERROR:#REF!
HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
417.0101Recycling Agent65.001.0066.00$0.017ERROR:#REF!
JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / LANE MILE
ASTM D6690 Type II-56.000.2056.20$11.957ERROR:#REF!
Mastic Materials-40.000.2040.20$8.553ERROR:#REF!
MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
413.02010118Microsurfacing, Type II, F19.000.209.20$1.748ERROR:#REF!
413.02020118Microsurfacing, Type II, F29.000.209.20$1.748ERROR:#REF!
413.02030118Microsurfacing, Type II, F39.000.209.20$1.748ERROR:#REF!
413.03010118Microsurfacing, Type III, F17.500.207.70$1.463ERROR:#REF!
413.03020118Microsurfacing, Type III, F27.500.207.70$1.463ERROR:#REF!
413.03030118Microsurfacing, Type III, F37.500.207.70$1.463ERROR:#REF!
413.04030118Microsurfacing, Type III Rut Filling7.500.207.70$1.463ERROR:#REF!
414.03030118Quick-set Slurry, Type II13.500.2013.70$2.603ERROR:#REF!
414.04030118Quick-set Slurry, Type III12.000.2012.20$2.318ERROR:#REF!
PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
415.0X0F0218Paver Placed ST - Conventional6.501.007.50$3.750ERROR:#REF!
415.1X0F0218Paver Placed ST - Modified6.501.007.50$3.750ERROR:#REF!
ASPHALT MIXTURES (NYSDOT SPECIFIC PROJECTS - VPP) ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
404.017901True & Leveling F9, Asphalt, 70 Series****1********ERROR:#REF!
404.018901True & Leveling F9, Asphalt, 80 Series****1********ERROR:#REF!
404.058901Shim Course F9, Asphalt8.2519.25$4.625ERROR:#REF!
404.068X016.3 F1/F2/F3 Top Course Asphalt, 80 Series6.7017.70$3.850ERROR:#REF!
404.09XX019.5 Top Course Asphalt6.2017.20$3.600ERROR:#REF!
404.12XX0112.5 Top Course Asphalt5.5016.50$3.250ERROR:#REF!
404.19XX0119 F9 Binder Course Asphalt, 80 Series4.9015.90$2.950ERROR:#REF!
*** The conversion factor for Truing & Leveling will be computed separately using the conversion factors for the individual mixtures used
TACK COAT (Per Gallon):
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLON
407.0102Diluted Tack Coat40.000.2040.20$0.086
407.0103Straight Tack Coat55.000.2055.20$0.117
407.01040009Non - Tracking Tack Coat50.000.2050.20$0.107
FORMULAS & EXAMPLE
ASPHALT EMULSIONS, CHIP SEAL, COLD RECYCLING AND HEATER SCARIFICATION ITEMS

Unit prices per gallon will be subject to adjustment based on the following formula:

Price Adjustment = (

(per gallon)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$3.000 + ($0.213191489361702) =$3.213
Total Material Price After Adjustment:$3.213per gallon
FORMULAS & EXAMPLE
JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing)

Unit prices per Lane Mile will be subject to adjustment based on the following formula:

Price Adjustment = (

(per Lane Mile)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: ASTM D6690 Type II at $1,500.00/Lane Mile (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$1,500.000 + ($11.9574468085106) =$1,511.957
Total Material Price After Adjustment:$1,511.957per Lane Mile
FORMULAS & EXAMPLE
ASPHALT MIX & MICROSURFACING ITEMS (NYSDOT VPP)

Unit prices per ton will be subject to adjustment based on the following formula:

Price Adjustment = (

(per ton)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
Example: 1 ton of 404.058901 at $200.000/ ton (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$200.000 + ($4.625) =$204.625
Total Material Price After Adjustment:$204.625per ton

https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot July 2025 Asphalt Price Adjustment - July 2025

GroupDescriptionAward #Contract No.
31503Bituminous Concrete Asphalt Mixtures

(2025 VPP NYSDOT Specific Projects) (Federal & State Funds) 23388 PC70701 - PC70719 Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder) 31555 Liquid Bituminous Materials (2025 VPP NYSDOT Specific Projects) (Federal & State Funds) (Chip Seal; Cold Recycling; Heater Scarification; Paver Placed Surface Treatment; and Joint & Crack Filler/Sealer) 23389 PC70720 - PC70724

Bituminous materials price adjustment(s) EFFECTIVE on:July 1, 2025ERROR:#REF!
Award(s) using February 1, 2025 base index of$598.000per ton.Year:2025
In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s),Month:JulyPosted Price2025
the following price adjustments have been calculated.Month$/ton
MONTHLY PG 64-22 BINDER ADJUSTMENT:The July 2025 Average is$646.000per tonAsphalt Price AdjustmentJanuary
(F.O.B. Terminal Price for unmodified PG 64-22 binder without anti-stripping agent)Base Average =$598.000February
The February 1, 2025 Base Average FOB Terminal Price for Asphalt Cement was$598.000per ton.New Average =$646.000March
Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to moreApril621
than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price.May626
All Asphalt Price Adjustments will be computed to three decimal places.June632
Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by usingJuly646
the price adjustments listed below:August
Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page.September
CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS:November
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLONDecember
702.0700Asphalt Filler (18-60)100.000.20100.20$0.205ERROR:#VALUE!Month2026
702.3001RS-155.001.7056.70$0.116ERROR:#VALUE!$/ton
702.3002RS-1h55.001.7056.70$0.116$0.000January
702.3101RS-263.002.7065.70$0.134$0.000February
702.3102HFRS-263.002.7065.70$0.134$0.000March
702.3201MS-265.008.2073.20$0.150$0.000April
702.3301HFMS-265.008.2073.20$0.150$0.000May
702.3401HFMS-2h65.002.7067.70$0.138ERROR:#REF!June
702.3402HFMS-2s65.008.2073.20$0.150ERROR:#REF!July
702.3501SS-157.000.2057.20$0.117ERROR:#REF!August
702.3501
(Cold Recycling only)SS-165.000.2065.20$0.133ERROR:#REF!September
702.3601SS-1h57.000.2057.20$0.117ERROR:#REF!October
702.3601
(Cold Recycling only)SS-1h65.000.2065.20$0.133ERROR:#REF!November
702.3101PRS-263.002.7065.70$0.134ERROR:#REF!December
702.3102PHFRS-263.002.7065.70$0.134ERROR:#REF!
702.3301PHFMS-265.008.2073.20$0.150ERROR:#REF!
702.4001CRS-160.002.7062.70$0.128ERROR:#REF!
702.4002CRS-1h60.002.7062.70$0.128ERROR:#REF!
702.4101PCRS-265.002.7067.70$0.138ERROR:#REF!
702.4201CMS-265.0010.2075.20$0.154ERROR:#REF!
702.4301CMS-2h65.0010.2075.20$0.154ERROR:#REF!
702.4401CSS-157.000.2057.20$0.117ERROR:#REF!
702.4401
(Cold Recycling only)CSS-165.000.2065.20$0.133ERROR:#REF!
702.4501CSS-1h57.000.2057.20$0.117ERROR:#REF!
702.4501
(Cold Recycling only)CSS-1h65.000.2065.20$0.133ERROR:#REF!
702.4601CQS-1h62.000.2062.20$0.127ERROR:#REF!
702.4001PCRS-1p60.002.7062.70$0.128ERROR:#REF!
702.4101PCRS-2p65.002.7067.70$0.138ERROR:#REF!
702.4601PCQS-1p62.000.2062.20$0.127ERROR:#REF!
HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
417.0101Recycling Agent65.001.0066.00$0.016ERROR:#REF!
JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / LANE MILE
ASTM D6690 Type II-56.000.2056.20$11.479ERROR:#REF!
Mastic Materials-40.000.2040.20$8.211ERROR:#REF!
MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
413.02010118Microsurfacing, Type II, F19.000.209.20$1.748ERROR:#REF!
413.02020118Microsurfacing, Type II, F29.000.209.20$1.748ERROR:#REF!
413.02030118Microsurfacing, Type II, F39.000.209.20$1.748ERROR:#REF!
413.03010118Microsurfacing, Type III, F17.500.207.70$1.463ERROR:#REF!
413.03020118Microsurfacing, Type III, F27.500.207.70$1.463ERROR:#REF!
413.03030118Microsurfacing, Type III, F37.500.207.70$1.463ERROR:#REF!
413.04030118Microsurfacing, Type III Rut Filling7.500.207.70$1.463ERROR:#REF!
414.03030118Quick-set Slurry, Type II13.500.2013.70$2.603ERROR:#REF!
414.04030118Quick-set Slurry, Type III12.000.2012.20$2.318ERROR:#REF!
PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
415.0X0F0218Paver Placed ST - Conventional6.501.007.50$3.600ERROR:#REF!
415.1X0F0218Paver Placed ST - Modified6.501.007.50$3.600ERROR:#REF!
ASPHALT MIXTURES (NYSDOT SPECIFIC PROJECTS - VPP) ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
404.017901True & Leveling F9, Asphalt, 70 Series****1********ERROR:#REF!
404.018901True & Leveling F9, Asphalt, 80 Series****1********ERROR:#REF!
404.058901Shim Course F9, Asphalt8.2519.25$4.440ERROR:#REF!
404.068X016.3 F1/F2/F3 Top Course Asphalt, 80 Series6.7017.70$3.696ERROR:#REF!
404.09XX019.5 Top Course Asphalt6.2017.20$3.456ERROR:#REF!
404.12XX0112.5 Top Course Asphalt5.5016.50$3.120ERROR:#REF!
404.19XX0119 F9 Binder Course Asphalt, 80 Series4.9015.90$2.832ERROR:#REF!
*** The conversion factor for Truing & Leveling will be computed separately using the conversion factors for the individual mixtures used
TACK COAT (Per Gallon):
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLON
407.0102Diluted Tack Coat40.000.2040.20$0.082
407.0103Straight Tack Coat55.000.2055.20$0.113
407.01040009Non - Tracking Tack Coat50.000.2050.20$0.103
FORMULAS & EXAMPLE
ASPHALT EMULSIONS, CHIP SEAL, COLD RECYCLING AND HEATER SCARIFICATION ITEMS

Unit prices per gallon will be subject to adjustment based on the following formula:

Price Adjustment = (

(per gallon)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$3.000 + ($0.204663829787234) =$3.205
Total Material Price After Adjustment:$3.205per gallon
FORMULAS & EXAMPLE
JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing)

Unit prices per Lane Mile will be subject to adjustment based on the following formula:

Price Adjustment = (

(per Lane Mile)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: ASTM D6690 Type II at $1,500.00/Lane Mile (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$1,500.000 + ($11.4791489361702) =$1,511.479
Total Material Price After Adjustment:$1,511.479per Lane Mile
FORMULAS & EXAMPLE
ASPHALT MIX & MICROSURFACING ITEMS (NYSDOT VPP)

Unit prices per ton will be subject to adjustment based on the following formula:

Price Adjustment = (

(per ton)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
Example: 1 ton of 404.058901 at $200.000/ ton (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$200.000 + ($4.44) =$204.440
Total Material Price After Adjustment:$204.440per ton

https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot June 2025 Asphalt Price Adjustment - June 2025

GroupDescriptionAward #Contract No.
31503Bituminous Concrete Asphalt Mixtures

(2025 VPP NYSDOT Specific Projects) (Federal & State Funds) 23388 PC70701 - PC70719 Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder) 31555 Liquid Bituminous Materials (2025 VPP NYSDOT Specific Projects) (Federal & State Funds) (Chip Seal; Cold Recycling; Heater Scarification; Paver Placed Surface Treatment; and Joint & Crack Filler/Sealer) 23389 PC70720 - PC70724

Bituminous materials price adjustment(s) EFFECTIVE on:June 1, 2025ERROR:#REF!
Award(s) using February 1, 2025 base index of$598.000per ton.Year:2025
In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s),Month:JunePosted Price2025
the following price adjustments have been calculated.Month$/ton
MONTHLY PG 64-22 BINDER ADJUSTMENT:The June 2025 Average is$632.000per tonAsphalt Price AdjustmentJanuary
(F.O.B. Terminal Price for unmodified PG 64-22 binder without anti-stripping agent)Base Average =$598.000February
The February 1, 2025 Base Average FOB Terminal Price for Asphalt Cement was$598.000per ton.New Average =$632.000March
Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to moreApril621
than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price.May626
All Asphalt Price Adjustments will be computed to three decimal places.June632
Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by usingJuly
the price adjustments listed below:August
Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page.September
CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS:November
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLONDecember
702.0700Asphalt Filler (18-60)100.000.20100.20$0.145ERROR:#VALUE!Month2026
702.3001RS-155.001.7056.70$0.082ERROR:#VALUE!$/ton
702.3002RS-1h55.001.7056.70$0.082$0.000January
702.3101RS-263.002.7065.70$0.095$0.000February
702.3102HFRS-263.002.7065.70$0.095$0.000March
702.3201MS-265.008.2073.20$0.106$0.000April
702.3301HFMS-265.008.2073.20$0.106$0.000May
702.3401HFMS-2h65.002.7067.70$0.098ERROR:#REF!June
702.3402HFMS-2s65.008.2073.20$0.106ERROR:#REF!July
702.3501SS-157.000.2057.20$0.083ERROR:#REF!August
702.3501
(Cold Recycling only)SS-165.000.2065.20$0.094ERROR:#REF!September
702.3601SS-1h57.000.2057.20$0.083ERROR:#REF!October
702.3601
(Cold Recycling only)SS-1h65.000.2065.20$0.094ERROR:#REF!November
702.3101PRS-263.002.7065.70$0.095ERROR:#REF!December
702.3102PHFRS-263.002.7065.70$0.095ERROR:#REF!
702.3301PHFMS-265.008.2073.20$0.106ERROR:#REF!
702.4001CRS-160.002.7062.70$0.091ERROR:#REF!
702.4002CRS-1h60.002.7062.70$0.091ERROR:#REF!
702.4101PCRS-265.002.7067.70$0.098ERROR:#REF!
702.4201CMS-265.0010.2075.20$0.109ERROR:#REF!
702.4301CMS-2h65.0010.2075.20$0.109ERROR:#REF!
702.4401CSS-157.000.2057.20$0.083ERROR:#REF!
702.4401
(Cold Recycling only)CSS-165.000.2065.20$0.094ERROR:#REF!
702.4501CSS-1h57.000.2057.20$0.083ERROR:#REF!
702.4501
(Cold Recycling only)CSS-1h65.000.2065.20$0.094ERROR:#REF!
702.4601CQS-1h62.000.2062.20$0.090ERROR:#REF!
702.4001PCRS-1p60.002.7062.70$0.091ERROR:#REF!
702.4101PCRS-2p65.002.7067.70$0.098ERROR:#REF!
702.4601PCQS-1p62.000.2062.20$0.090ERROR:#REF!
HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
417.0101Recycling Agent65.001.0066.00$0.011ERROR:#REF!
JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / LANE MILE
ASTM D6690 Type II-56.000.2056.20$8.131ERROR:#REF!
Mastic Materials-40.000.2040.20$5.816ERROR:#REF!
MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
413.02010118Microsurfacing, Type II, F19.000.209.20$1.748ERROR:#REF!
413.02020118Microsurfacing, Type II, F29.000.209.20$1.748ERROR:#REF!
413.02030118Microsurfacing, Type II, F39.000.209.20$1.748ERROR:#REF!
413.03010118Microsurfacing, Type III, F17.500.207.70$1.463ERROR:#REF!
413.03020118Microsurfacing, Type III, F27.500.207.70$1.463ERROR:#REF!
413.03030118Microsurfacing, Type III, F37.500.207.70$1.463ERROR:#REF!
413.04030118Microsurfacing, Type III Rut Filling7.500.207.70$1.463ERROR:#REF!
414.03030118Quick-set Slurry, Type II13.500.2013.70$2.603ERROR:#REF!
414.04030118Quick-set Slurry, Type III12.000.2012.20$2.318ERROR:#REF!
PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
415.0X0F0218Paver Placed ST - Conventional6.501.007.50$2.550ERROR:#REF!
415.1X0F0218Paver Placed ST - Modified6.501.007.50$2.550ERROR:#REF!
ASPHALT MIXTURES (NYSDOT SPECIFIC PROJECTS - VPP) ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
404.017901True & Leveling F9, Asphalt, 70 Series****1********ERROR:#REF!
404.018901True & Leveling F9, Asphalt, 80 Series****1********ERROR:#REF!
404.058901Shim Course F9, Asphalt8.2519.25$3.145ERROR:#REF!
404.068X016.3 F1/F2/F3 Top Course Asphalt, 80 Series6.7017.70$2.618ERROR:#REF!
404.09XX019.5 Top Course Asphalt6.2017.20$2.448ERROR:#REF!
404.12XX0112.5 Top Course Asphalt5.5016.50$2.210ERROR:#REF!
404.19XX0119 F9 Binder Course Asphalt, 80 Series4.9015.90$2.006ERROR:#REF!
*** The conversion factor for Truing & Leveling will be computed separately using the conversion factors for the individual mixtures used
TACK COAT (Per Gallon):
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLON
407.0102Diluted Tack Coat40.000.2040.20$0.058
407.0103Straight Tack Coat55.000.2055.20$0.080
407.01040009Non - Tracking Tack Coat50.000.2050.20$0.073
FORMULAS & EXAMPLE
ASPHALT EMULSIONS, CHIP SEAL, COLD RECYCLING AND HEATER SCARIFICATION ITEMS

Unit prices per gallon will be subject to adjustment based on the following formula:

Price Adjustment = (

(per gallon)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$3.000 + ($0.144970212765957) =$3.145
Total Material Price After Adjustment:$3.145per gallon
FORMULAS & EXAMPLE
JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing)

Unit prices per Lane Mile will be subject to adjustment based on the following formula:

Price Adjustment = (

(per Lane Mile)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: ASTM D6690 Type II at $1,500.00/Lane Mile (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$1,500.000 + ($8.13106382978723) =$1,508.131
Total Material Price After Adjustment:$1,508.131per Lane Mile
FORMULAS & EXAMPLE
ASPHALT MIX & MICROSURFACING ITEMS (NYSDOT VPP)

Unit prices per ton will be subject to adjustment based on the following formula:

Price Adjustment = (

(per ton)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
Example: 1 ton of 404.058901 at $200.000/ ton (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$200.000 + ($3.145) =$203.145
Total Material Price After Adjustment:$203.145per ton

https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot May 2025 Asphalt Price Adjustment - May 2025

GroupDescriptionAward #Contract No.
31503Bituminous Concrete Asphalt Mixtures

(2025 VPP NYSDOT Specific Projects) (Federal & State Funds) 23388 PC70701 - PC70719 Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder) 31555 Liquid Bituminous Materials (2025 VPP NYSDOT Specific Projects) (Federal & State Funds) (Chip Seal; Cold Recycling; Heater Scarification; Paver Placed Surface Treatment; and Joint & Crack Filler/Sealer) 23389 PC70720 - PC70724

Bituminous materials price adjustment(s) EFFECTIVE on:May 1, 2025ERROR:#REF!
Award(s) using February 1, 2025 base index of$598.000per ton.Year:2025
In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s),Month:MayPosted Price2025
the following price adjustments have been calculated.Month$/ton
MONTHLY PG 64-22 BINDER ADJUSTMENT:The May 2025 Average is$626.000per tonAsphalt Price AdjustmentJanuary
(F.O.B. Terminal Price for unmodified PG 64-22 binder without anti-stripping agent)Base Average =$598.000February
The February 1, 2025 Base Average FOB Terminal Price for Asphalt Cement was$598.000per ton.New Average =$626.000March
Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to moreApril621
than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price.May626
All Asphalt Price Adjustments will be computed to three decimal places.June
Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by usingJuly
the price adjustments listed below:August
Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page.September
CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS:November
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLONDecember
702.0700Asphalt Filler (18-60)100.000.20100.20$0.119ERROR:#VALUE!Month2026
702.3001RS-155.001.7056.70$0.068ERROR:#VALUE!$/ton
702.3002RS-1h55.001.7056.70$0.068$0.000January
702.3101RS-263.002.7065.70$0.078$0.000February
702.3102HFRS-263.002.7065.70$0.078$0.000March
702.3201MS-265.008.2073.20$0.087$0.000April
702.3301HFMS-265.008.2073.20$0.087$0.000May
702.3401HFMS-2h65.002.7067.70$0.081ERROR:#REF!June
702.3402HFMS-2s65.008.2073.20$0.087ERROR:#REF!July
702.3501SS-157.000.2057.20$0.068ERROR:#REF!August
702.3501
(Cold Recycling only)SS-165.000.2065.20$0.078ERROR:#REF!September
702.3601SS-1h57.000.2057.20$0.068ERROR:#REF!October
702.3601
(Cold Recycling only)SS-1h65.000.2065.20$0.078ERROR:#REF!November
702.3101PRS-263.002.7065.70$0.078ERROR:#REF!December
702.3102PHFRS-263.002.7065.70$0.078ERROR:#REF!
702.3301PHFMS-265.008.2073.20$0.087ERROR:#REF!
702.4001CRS-160.002.7062.70$0.075ERROR:#REF!
702.4002CRS-1h60.002.7062.70$0.075ERROR:#REF!
702.4101PCRS-265.002.7067.70$0.081ERROR:#REF!
702.4201CMS-265.0010.2075.20$0.090ERROR:#REF!
702.4301CMS-2h65.0010.2075.20$0.090ERROR:#REF!
702.4401CSS-157.000.2057.20$0.068ERROR:#REF!
702.4401
(Cold Recycling only)CSS-165.000.2065.20$0.078ERROR:#REF!
702.4501CSS-1h57.000.2057.20$0.068ERROR:#REF!
702.4501
(Cold Recycling only)CSS-1h65.000.2065.20$0.078ERROR:#REF!
702.4601CQS-1h62.000.2062.20$0.074ERROR:#REF!
702.4001PCRS-1p60.002.7062.70$0.075ERROR:#REF!
702.4101PCRS-2p65.002.7067.70$0.081ERROR:#REF!
702.4601PCQS-1p62.000.2062.20$0.074ERROR:#REF!
HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
417.0101Recycling Agent65.001.0066.00$0.009ERROR:#REF!
JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / LANE MILE
ASTM D6690 Type II-56.000.2056.20$6.696ERROR:#REF!
Mastic Materials-40.000.2040.20$4.790ERROR:#REF!
MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
413.02010118Microsurfacing, Type II, F19.000.209.20$1.748ERROR:#REF!
413.02020118Microsurfacing, Type II, F29.000.209.20$1.748ERROR:#REF!
413.02030118Microsurfacing, Type II, F39.000.209.20$1.748ERROR:#REF!
413.03010118Microsurfacing, Type III, F17.500.207.70$1.463ERROR:#REF!
413.03020118Microsurfacing, Type III, F27.500.207.70$1.463ERROR:#REF!
413.03030118Microsurfacing, Type III, F37.500.207.70$1.463ERROR:#REF!
413.04030118Microsurfacing, Type III Rut Filling7.500.207.70$1.463ERROR:#REF!
414.03030118Quick-set Slurry, Type II13.500.2013.70$2.603ERROR:#REF!
414.04030118Quick-set Slurry, Type III12.000.2012.20$2.318ERROR:#REF!
PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
415.0X0F0218Paver Placed ST - Conventional6.501.007.50$2.100ERROR:#REF!
415.1X0F0218Paver Placed ST - Modified6.501.007.50$2.100ERROR:#REF!
ASPHALT MIXTURES (NYSDOT SPECIFIC PROJECTS - VPP) ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
404.017901True & Leveling F9, Asphalt, 70 Series****1********ERROR:#REF!
404.018901True & Leveling F9, Asphalt, 80 Series****1********ERROR:#REF!
404.058901Shim Course F9, Asphalt8.2519.25$2.590ERROR:#REF!
404.068X016.3 F1/F2/F3 Top Course Asphalt, 80 Series6.7017.70$2.156ERROR:#REF!
404.09XX019.5 Top Course Asphalt6.2017.20$2.016ERROR:#REF!
404.12XX0112.5 Top Course Asphalt5.5016.50$1.820ERROR:#REF!
404.19XX0119 F9 Binder Course Asphalt, 80 Series4.9015.90$1.652ERROR:#REF!
*** The conversion factor for Truing & Leveling will be computed separately using the conversion factors for the individual mixtures used
TACK COAT (Per Gallon):
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLON
407.0102Diluted Tack Coat40.000.2040.20$0.048
407.0103Straight Tack Coat55.000.2055.20$0.066
407.01040009Non - Tracking Tack Coat50.000.2050.20$0.060
FORMULAS & EXAMPLE
ASPHALT EMULSIONS, CHIP SEAL, COLD RECYCLING AND HEATER SCARIFICATION ITEMS

Unit prices per gallon will be subject to adjustment based on the following formula:

Price Adjustment = (

(per gallon)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$3.000 + ($0.119387234042553) =$3.119
Total Material Price After Adjustment:$3.119per gallon
FORMULAS & EXAMPLE
JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing)

Unit prices per Lane Mile will be subject to adjustment based on the following formula:

Price Adjustment = (

(per Lane Mile)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: ASTM D6690 Type II at $1,500.00/Lane Mile (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$1,500.000 + ($6.69617021276596) =$1,506.696
Total Material Price After Adjustment:$1,506.696per Lane Mile
FORMULAS & EXAMPLE
ASPHALT MIX & MICROSURFACING ITEMS (NYSDOT VPP)

Unit prices per ton will be subject to adjustment based on the following formula:

Price Adjustment = (

(per ton)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
Example: 1 ton of 404.058901 at $200.000/ ton (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$200.000 + ($2.59) =$202.590
Total Material Price After Adjustment:$202.590per ton

https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot April 2025 Asphalt Price Adjustment - April 2025

GroupDescriptionAward #Contract No.
31503Bituminous Concrete Asphalt Mixtures

(2025 VPP NYSDOT Specific Projects) (Federal & State Funds) 23388 PC70701 - PC70719 Contract Manager Input NYSDOT Average Posted Prices for Asphalt (Performance Graded Binder) 31555 Liquid Bituminous Materials (2025 VPP NYSDOT Specific Projects) (Federal & State Funds) (Chip Seal; Cold Recycling; Heater Scarification; Paver Placed Surface Treatment; and Joint & Crack Filler/Sealer) 23389 PC70720 - PC70724

Bituminous materials price adjustment(s) EFFECTIVE on:April 1, 2025ERROR:#REF!
Award(s) using February 1, 2025 base index of$598.000per ton.Year:2025
In compliance with the referenced price adjustment clauses contained in the Contract Award Notification for the referenced award(s),Month:AprilPosted Price2025
the following price adjustments have been calculated.Month$/ton
MONTHLY PG 64-22 BINDER ADJUSTMENT:The April 2025 Average is$621.000per tonAsphalt Price AdjustmentJanuary
(F.O.B. Terminal Price for unmodified PG 64-22 binder without anti-stripping agent)Base Average =$598.000February
The February 1, 2025 Base Average FOB Terminal Price for Asphalt Cement was$598.000per ton.New Average =$621.000March
Asphalt Price Adjustments shall be calculated and applied to the original prices. There will not be Asphalt Price Adjustments unless the change amounts to moreApril621
than $0.010 per gallon, $0.001 per pound, $0.002 per linear foot or $0.10 per ton from the original price.May
All Asphalt Price Adjustments will be computed to three decimal places.June
Until further notice, please revise the original contract per gallon/linear foot/ton prices for materials in the referenced award(s) by usingJuly
the price adjustments listed below:August
Note: Examples and formulas of how to calculate these price adjustmets can be found at the bottom of this page.September
CHIP SEAL AND COLD RECYCLING ITEMS - MONTHLY PRICE ADJUSTMENTS:November
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLONDecember
702.0700Asphalt Filler (18-60)100.000.20100.20$0.098ERROR:#VALUE!Month2026
702.3001RS-155.001.7056.70$0.055ERROR:#VALUE!$/ton
702.3002RS-1h55.001.7056.70$0.055$0.000January
702.3101RS-263.002.7065.70$0.064$0.000February
702.3102HFRS-263.002.7065.70$0.064$0.000March
702.3201MS-265.008.2073.20$0.072$0.000April
702.3301HFMS-265.008.2073.20$0.072$0.000May
702.3401HFMS-2h65.002.7067.70$0.066ERROR:#REF!June
702.3402HFMS-2s65.008.2073.20$0.072ERROR:#REF!July
702.3501SS-157.000.2057.20$0.056ERROR:#REF!August
702.3501
(Cold Recycling only)SS-165.000.2065.20$0.064ERROR:#REF!September
702.3601SS-1h57.000.2057.20$0.056ERROR:#REF!October
702.3601
(Cold Recycling only)SS-1h65.000.2065.20$0.064ERROR:#REF!November
702.3101PRS-263.002.7065.70$0.064ERROR:#REF!December
702.3102PHFRS-263.002.7065.70$0.064ERROR:#REF!
702.3301PHFMS-265.008.2073.20$0.072ERROR:#REF!
702.4001CRS-160.002.7062.70$0.061ERROR:#REF!
702.4002CRS-1h60.002.7062.70$0.061ERROR:#REF!
702.4101PCRS-265.002.7067.70$0.066ERROR:#REF!
702.4201CMS-265.0010.2075.20$0.074ERROR:#REF!
702.4301CMS-2h65.0010.2075.20$0.074ERROR:#REF!
702.4401CSS-157.000.2057.20$0.056ERROR:#REF!
702.4401
(Cold Recycling only)CSS-165.000.2065.20$0.064ERROR:#REF!
702.4501CSS-1h57.000.2057.20$0.056ERROR:#REF!
702.4501
(Cold Recycling only)CSS-1h65.000.2065.20$0.064ERROR:#REF!
702.4601CQS-1h62.000.2062.20$0.061ERROR:#REF!
702.4001PCRS-1p60.002.7062.70$0.061ERROR:#REF!
702.4101PCRS-2p65.002.7067.70$0.066ERROR:#REF!
702.4601PCQS-1p62.000.2062.20$0.061ERROR:#REF!
HEATER SCARIFICATION ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / POUND
417.0101Recycling Agent65.001.0066.00$0.008ERROR:#REF!
JOINT & CRACK FILLER/SEALER ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / LANE MILE
ASTM D6690 Type II-56.000.2056.20$5.500ERROR:#REF!
Mastic Materials-40.000.2040.20$3.934ERROR:#REF!
MICROSURFACING & QUICK SET SLURRY SEAL ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
413.02010118Microsurfacing, Type II, F19.000.209.20$1.748ERROR:#REF!
413.02020118Microsurfacing, Type II, F29.000.209.20$1.748ERROR:#REF!
413.02030118Microsurfacing, Type II, F39.000.209.20$1.748ERROR:#REF!
413.03010118Microsurfacing, Type III, F17.500.207.70$1.463ERROR:#REF!
413.03020118Microsurfacing, Type III, F27.500.207.70$1.463ERROR:#REF!
413.03030118Microsurfacing, Type III, F37.500.207.70$1.463ERROR:#REF!
413.04030118Microsurfacing, Type III Rut Filling7.500.207.70$1.463ERROR:#REF!
414.03030118Quick-set Slurry, Type II13.500.2013.70$2.603ERROR:#REF!
414.04030118Quick-set Slurry, Type III12.000.2012.20$2.318ERROR:#REF!
PAVER PLACED SURFACE TREATMENT ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
415.0X0F0218Paver Placed ST - Conventional6.501.007.50$1.725ERROR:#REF!
415.1X0F0218Paver Placed ST - Modified6.501.007.50$1.725ERROR:#REF!
ASPHALT MIXTURES (NYSDOT SPECIFIC PROJECTS - VPP) ITEMS - MONTHLY PRICE ADJUSTMENTS:
ITEMGRADE / DESCRIPTION% ASPHALTFUEL
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUST / TON
404.017901True & Leveling F9, Asphalt, 70 Series****1********ERROR:#REF!
404.018901True & Leveling F9, Asphalt, 80 Series****1********ERROR:#REF!
404.058901Shim Course F9, Asphalt8.2519.25$2.128ERROR:#REF!
404.068X016.3 F1/F2/F3 Top Course Asphalt, 80 Series6.7017.70$1.771ERROR:#REF!
404.09XX019.5 Top Course Asphalt6.2017.20$1.656ERROR:#REF!
404.12XX0112.5 Top Course Asphalt5.5016.50$1.495ERROR:#REF!
404.19XX0119 F9 Binder Course Asphalt, 80 Series4.9015.90$1.357ERROR:#REF!
*** The conversion factor for Truing & Leveling will be computed separately using the conversion factors for the individual mixtures used
TACK COAT (Per Gallon):
ITEMGRADE / DESCRIPTION% ASPHALTPETROLEUM
ALLOWANCETOTAL ALLOWABLE
PETROLEUM %PRICE ADJUSTMENT / GALLON
407.0102Diluted Tack Coat40.000.2040.20$0.039
407.0103Straight Tack Coat55.000.2055.20$0.054
407.01040009Non - Tracking Tack Coat50.000.2050.20$0.049
FORMULAS & EXAMPLE
ASPHALT EMULSIONS, CHIP SEAL, COLD RECYCLING AND HEATER SCARIFICATION ITEMS

Unit prices per gallon will be subject to adjustment based on the following formula:

Price Adjustment = (

(per gallon)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: 1 gallon of 702.0700 at $3.000/ gallon (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$3.000 + ($0.098068085106383) =$3.098
Total Material Price After Adjustment:$3.098per gallon
FORMULAS & EXAMPLE
JOINT AND CRACK FILLER/SEALER ITEMS (for Crack Sealing)

Unit prices per Lane Mile will be subject to adjustment based on the following formula:

Price Adjustment = (

(per Lane Mile)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
235
Example: ASTM D6690 Type II at $1,500.00/Lane Mile (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$1,500.000 + ($5.50042553191489) =$1,505.500
Total Material Price After Adjustment:$1,505.500per Lane Mile
FORMULAS & EXAMPLE
ASPHALT MIX & MICROSURFACING ITEMS (NYSDOT VPP)

Unit prices per ton will be subject to adjustment based on the following formula:

Price Adjustment = (

(per ton)New Monthly Average
F.O.B. Terminal Price-Base Average F.O.B.
Terminal Price) X Total Allowable Petroleum %
Example: 1 ton of 404.058901 at $200.000/ ton (example, not reflecting actual pricing from the contract)
Binder Adjustment:
$200.000 + ($2.1275) =$202.128
Total Material Price After Adjustment:$202.128per ton

https://www.dot.ny.gov/main/business-center/contractors/construction-division/fuel-asphalt-steel-price-adjustments?nd=nysdot

File details come from the government source that posted it. Updated .