This document is a Group Specification (SPEC-947) for Award #23371 issued by the State of New York Executive Department, Office of General Services, Procurement Services, located at Corning Tower in Albany, NY. The specification covers commodity group 31555 for Liquid Bituminous Materials and was issued on November 14, 2023, superseding the previous SPEC-940 dated October 30, 2019.
The contract covers the procurement of liquid bituminous materials, specifically asphalt emulsions, which must be sourced from New York State Department of Transportation (NYSDOT) approved locations and primary sources. All materials must comply with NYSDOT Materials Method 702-2 Asphalt Emulsion Quality Assurance requirements for sampling, testing, inspection, certification, and shipping. Contractors must operate approved manufacturing facilities with minimum storage capacity of 10,000 gallons per tank for each type of asphalt emulsion, maintain proper heating equipment, and have scales or meters tested annually for accuracy. The specification requires detailed ticketing systems that document facility identification, quantities measured by truck scale or meter, and specific measurements including net weight and gallons at 60°F for emulsions. The State reserves the right to inspect facilities at any time, with deficiencies requiring correction within 10 days or the contractor will be considered in default.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 315xxPriceAdjust25.xlsx | XLSX spreadsheet | |
| 3150223371PL_AsphaltMix.xlsx | XLSX spreadsheet | |
| 3150223371_AMGroupSpec949.pdf | ||
| 3150223371_DetailedSpecCMCMM.pdf | ||
| 3150223371_Insurance.pdf | ||
| 31502PriceAdjust24.xlsx | XLSX spreadsheet | |
| 31555PriceAdjust23.xlsx | XLSX spreadsheet | |
| 315xxPriceAdjust24.xlsx | XLSX spreadsheet | |
| 31555PriceAdjust25.xlsx | XLSX spreadsheet | |
| 3150223371QQ_AsphaltMix.xlsx | XLSX spreadsheet | |
| 3150223371_GeneralSpec.pdf | ||
| 3150223371p.pdf | ||
| 3150223371_DetailedSpecCPMP.pdf | ||
| 3150223371_HowtoUse.pdf | ||
| 3150223371_NYSDOTRegions.pdf | ||
| 3150223371ra.pdf | ||
| 315xxPriceAdjust26.xlsx | XLSX spreadsheet |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Liquids Group Specification #947
AWARD #23371
GROUP SPECIFICATION (SPEC-947) – LIQUID BITUMINOUS MATERIALS
23371_Liquids Group Specification #947 Page 2 of 4
GROUP SPECIFICATION
COMMODITY GROUPS:
31555
LIQUID BITUMINOUS MATERIALS
DATE OF ISSUE 11/14/2023
NO. OF PAGES 3
SPECIFICATION NO. 947
(Supersedes SPEC-940 dated October 30, 2019)
BIDDERS ARE REQUESTED TO RETAIN THIS SPECIFICATION FOR FUTURE REFERENCE
Contents
GENERAL INFORMATION
MATERIALS:
SAMPLING, TESTING, INSPECTING, AND REPORTING:
REQUIRED QUALIFICATIONS:
State of New York Executive Department
Office of General Services Procurement Services
Corning Tower - 38th Floor Empire State Plaza Albany, NY 12242
23371_Liquids Group Specification #947 Page 3 of 4
GENERAL INFORMATION
MATERIALS:
Materials supplied must be from a NYS Dept. of Transportation approved location/primary source (listed on the NYS Approved List).
SAMPLING, TESTING, INSPECTING, AND REPORTING:
All liquid bituminous material intended for use on State agency and non-State agency projects shall be sampled, tested, inspected, certified and shipped in accordance with NYSDOT Materials Method 702-2 Asphalt Emulsion Quality Assurance. The State reserves the right to inspect liquid bituminous material supply facilities and the equipment of any successful bidder at any time for conformance with the requirements listed herein; if deficiencies are found, such deficiencies shall be corrected within 10 days or the contractor will be considered in default.
REQUIRED QUALIFICATIONS:
A NYS approved primary source must meet the following conditions:
1. The Contractor’s liquid bituminous materials manufacturing facility shall have been approved by the
NYSDOT.
2. The liquid bituminous material shall be obtained from a primary source listed on the NYSDOT approved list of primary sources. An approved primary source is a Contractor that samples, tests, and certifies that the materials are in conformance with the NYSDOT materials specifications.
3. Asphalt emulsions as defined in NYSDOT Standard Specifications §702, shall be stored in an approved facility having a minimum of one permanent storage tank for each type of asphalt emulsion bid. The tank(s) shall have a storage capacity of at least 10,000 gallons each, be capable of maintaining material homogeneity and have equipment capable of heating the material to the proper application temperature prior to shipment.
4. The Contractor shall have evidence available to show that the scale or meter(s) have been tested for accuracy by either a competent scale technician or the County Sealer of Weights and Measures. The scale or meter check shall be performed each calendar year before any material is supplied.
5. The quantity of liquid bituminous material shall be measured by truck scale or meter(s) and a ticket shall be printed to document the quantity.
The ticket printed shall meet the following requirements:
a. Storage facility identification;
b. Ticket Number;
c. Date/time;
d. Item Number and Type;
e. Quantity ticket printed by machine; and
f. Quantity in 60° F gallons for emulsions.
23371_Liquids Group Specification #947 Page 4 of 4
GENERAL INFORMATION
6. Truck Scales: The ticket printer shall machine print in digital form a minimum of two of the following:
(1) Tare weight
(2) Gross weight
(3) Net weight
The scale system shall be interlocked to allow printing only when the scale has come to a complete rest.
A truck scale shall be located at the storage facility unless the following conditions are met:
(a) The Contractor owns the truck scale or has full control of the weighing operations. The scale shall be located in close proximity (approximately 1,000 feet or less) to the storage tanks. The acceptability of the distance will be determined by the NYSDOT.
(b) The Contractor provides documentation to the NYSDOT that it has complete access to the truck scale 24 hrs/day, 7 days/week.
7. Meters: The ticket printer shall machine print in digital form:
(1) Beginning meter reading;
(2) Ending meter reading; and
(3) Total gallons at 60° F.
If a meter is used, it shall be permanently installed to connect it with the approved storage tank(s) and shall be used to measure all quantities.
THE END OF GROUP SPECIFICATION
| GENERAL INFORMATION |
| MATERIALS: |
| SAMPLING, TESTING, INSPECTING, AND REPORTING: |
| REQUIRED QUALIFICATIONS: |
| GENERAL INFORMATION |
File details come from the government source that posted it. Updated .