3-2026-0812 CONTRACTUAL DOCUMENTS.pdf

PDF 245 KB Posted

Attached to
W 4TH STREET PEDESTRIAN BRIDGE
Solicitation number
2026-0812
Issued by
Baldwin County, Alabama

About this file

This document comprises the contractual materials for the City of Gulf Shores, Alabama's W 4th Street Pedestrian Bridge project. The scope of work encompasses the complete removal and replacement of an existing canal bridge with a new pedestrian bridge, including demolition of existing bridge structures, abutments, and pavement, along with construction of infrastructure elements such as the replacement bridge and bridge approach, drainage systems, grading, hardscape, landscape features, and all related site work. The project requires all trades and labor necessary to complete construction in accordance with the provided specifications. Sealed bids were to be received and opened in public session on Wednesday, August 12, 2026, at 10:00 A.M. in the Gulf Shores City Hall Council Chambers.

The contractual documents establish the terms and conditions under which qualified contractors must submit bids to provide all materials and labor for the project. The documents contain the formal specifications, requirements, and contract language governing the bidding process and subsequent execution of the work. Additional details regarding pricing terms, payment schedules, bonding requirements, insurance obligations, and specific technical specifications are contained within the contractual documentation that establishes the framework for contractor selection and project completion.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTUAL DOCUMENTS, GENERAL CONDITIONS,

SPECIAL PROVISIONS AND TECHNICAL SPECIFICATIONS,

AND INSTRUCTION TO BIDDERS

FOR

W 4TH STREET PEDESTRIAN BRIDGE

CITY OF GULF SHORES, ALABAMA

JULY 2026

W 4th Street Pedestrian Bridge 1

TABLE OF CONTENTS

Table of Contents

INVITATION FOR BIDS

INSTRUCTIONS TO BIDDERS

REQUIREMENTS FOR CONTRACTS AND PURCHASES

APPENDIX A AFFIDAVIT OF CONTRACTOR OR DIRECT VENDOR

APPENDIX B AFFIDAVIT FOR SUBCONTRACTOR

PROPOSAL FORM

BID BOND

PERFORMANCE BOND

LABOR AND MATERIAL BOND

NOTICE OF AWARD

CONTRACT

NOTICE TO PROCEED

WAIVER AND RELEASE OF LIEN

GENERAL CONDITIONS

W 4th Street Pedestrian Bridge 2

INVITATION FOR BIDS

Sealed Bids will be received, opened, and read aloud in public session by the City of Gulf Shores, Alabama, for W 4th Street Pedestrian Bridge at 10:00 A.M., Wednesday, August 12, 2026 in the Gulf Shores City Hall Council Chambers. Work will include removal and replacement of the existing canal bridge with a Pedestrian Bridge. Included in the scope of work is all trades and sitework related to the removal of existing bridge, abutments, and pavement and construction of infrastructure: bridge and bridge approach, drainage, grading, hardscape, landscape, and other related items. Qualified contractors are invited to Bid. This contract is for the purpose of providing all materials and labor to install the CITY OF GULF SHORES 4th STREET BRIDGE REPLACEMENT in conformance with the Specifications.

Contract Documents are available for download from the City’s Bonfire Bidding Procurement Portal:

https://gulfshores.bonfirehub.com/portal/?tab=openOpportunities

A mandatory pre-bid conference will be held at 10:00 A.M. on Wednesday, August 5, 2026 in the Council Chambers in City Hall. Bids from Bidders who do not attend this conference will be rejected.

The Contractor will be required to obtain a business license from the City to operate within the Corporate Limits.

Sealed bids are to be submitted via the Bonfire Bidding Procurement Portal. Contact Shelby DeBlieux at (251) 968-1443 or sdeblieux@gulfshoresal.gov with any general bidding questions.

Please contact Bonfire Customer Support for technical assistance at (800) 354-8010 or support.bonfire@eunasolutions.com

The lowest responsive, responsible Bid will be accepted with key consideration based upon the benefit to the public. However, the City of Gulf Shores, Alabama, reserves the right to reject any and all Bids, to waive any irregularity in the Bids received, and to accept or reject any items of the Bid for the benefit of the public. No conditional Bids will be accepted. No Bid may be withdrawn for a period of thirty (30) days after the scheduled closing date and time for the receipt of Bids.

THE CITY OF GULF SHORES, ALABAMA

W 4th Street Pedestrian Bridge 3

INSTRUCTIONS TO BIDDERS

1. BID FORMS

A complete set of Bidding Documents is included herein.

2. EXAMINATION OF DOCUMENTS AND PROJECT SITE

A. Carefully examine the Bidding Documents, Specifications and the work site. Bids shall include all costs required to execute the work under the existing conditions.

B. Direct inquiries and questions to the Engineering Construction Manager in writing at ccolvin@gulfshoresal.gov.

C. Extra payments will not be made for conditions which can be determined by examining the documents and the site.

3. INTERPRETATIONS AND ADDENDA

A. Should the Bidder find discrepancies, ambiguities, or omissions in the Specifications, or should he be in doubt as to their meaning, he shall at once notify the Construction Manager.

B. The Construction Manager will issue Addenda to clarify discrepancies, ambiguities, or omissions in the Specifications.

C. Addenda will be posted to the Bonfire procurement portal. Addenda shall become part of the contract and all bidders must acknowledge receipt of Addenda on their bid form or their bid will be rejected. Bidders shall be bound by ALL Addenda.

4. MODIFICATIONS AND WITHDRAWAL OF BIDS

A. Bids may not be modified after submittal.

B. Any bidder may withdraw his Bid, either personally or by written request, at any time prior to scheduled time for opening bids.

C. No Bidder may withdraw his Bid for a period of thirty (30) days after date set for opening thereof, and all Bids shall be subject to acceptance by the Owner during this period.

5. MANDATORY PRE-BID CONFERENCE

A mandatory pre-bid conference will be held prior to the bid opening. Bids from Bidders who do not attend this conference will be rejected. The date of the pre-bid conference is shown in the Invitation to Bid.

W 4th Street Pedestrian Bridge 4

6. AWARD OF CONTRACT

A. The Owner will award a single contract, dependent upon availability of funds.

B. The contract will be awarded to the lowest responsive qualified contractor, subject to Owner’s right to reject any or all Bids and to waive informality and irregularity in Bids and bidding.

C. The Owner shall have the right to accept Alternates in any order or combination, unless otherwise specifically provided in the Bid Documents, and to determine the low Bidder on the basis of the sum of the Base Bid and Alternates accepted.

7. PRE-QUALIFICATION OF CONTRACTORS

Each Bidder shall be prepared, if requested by the Owner, to present evidence of its experience, qualifications, and financial ability to carry out the terms of the Contract.

The Owner reserves the right to disqualify any bidder who, in the judgment of the Owner, fails to adequately demonstrate qualifications and experience sufficient to enable that bidder to successfully complete the scope of work under this Contract.

8. EXECUTION OF CONTRACT

A. Within ten (10) days of Notice of Award, the Contractor shall deliver to Owner policies of insurance or insurance certificates as required by Contract Documents.

All policies or certificates of insurance shall be approved by Owner before the successful Contractor may proceed with Work.

B. The Contractor shall commence work within ten (10) days following receipt of the

Notice to Proceed or on a date stipulated in the authorization to proceed.

9. LAWS AND REGULATIONS

The Contractor’s attention is directed to the fact that all applicable State laws, Municipal Ordinances and the Rules and Regulations of all authorities having jurisdiction over construction of the project shall apply to the contract throughout and they will be deemed to be included in the contract the same as though herein written out in full.

10. ALABAMA LICENSED CONTRACTOR

All Contractors submitting bids in excess of Fifty Thousand Dollars ($50,000.00) must be licensed Contractors in the State of Alabama and must give their License Number on their Bid Form. Contracts less than Fifty Thousand Dollars ($50,000.00) will not require a general Contractor’s license; however, all other requirements shall remain the same.

11. BID BOND

W 4th Street Pedestrian Bridge 5

All bids in excess of Fifty Thousand Dollars ($50,000) shall require a bid bond equal to 5% of contract amount or $10,000 ($50,000 for ALDOT funded projects) whichever is lesser. Bid bonds will be returned by the Owner after the contract has been awarded.

12. PERFORMANCE BOND

If the winning bid is in excess of Fifty Thousand Dollars ($50,000), the Contractor shall obtain a performance bond equal to 100% of contract amount and shall be provided within ten (10) days of Notice of Award.

13. LABOR & MATERIALS BOND

If the winning bid is in excess of Fifty Thousand Dollars ($50,000), the Contractor shall obtain a Labor & Materials Payment Bond equal to but not less than 50% of contract amount and shall be provided within ten (10) days of Notice of Award. The bond shall include payment of reasonable attorney’s fees incurred by successful claimants in civil actions.

14. COMPLETION DATE

Upon receipt of the Notice to Proceed, the Contractor shall commence the work within ten (10) days from the Date of the Notice and shall complete the work within duration

(90) calendar days from the date of the Notice.

15. LIQUIDATED DAMAGES

A. Deduction at the rate of Three Hundred Dollars ($300.00) per day shall be made from the total Contract price for each and every calendar day beyond the duration (90) days from the date of Notice to Proceed that the work remains not satisfactorily completed.

B. The above mentioned sum shall be deducted as Liquidated Damages and not as penalty, the said sum being specifically agreed upon in advance as a measure of damage to the Owner on account of the delay, and the Contract price reduced by the aggregate of the entire damages so deducted shall be accepted in full satisfaction of all work executed under the contract.

16. COMPLIANCE WITH IMMIGRATION AND NATIONALITY ACT

The City will not intentionally award publicly funded contracts to any contractor who knowingly employs unauthorized alien workers, constituting a violation of the employment provisions contained in 8 U.S.C. Bid No. 02-017-5-Section 1324a (e) [Section 274A (e) of the Immigration and Nationality Act (“INA”)]. The City shall consider the employment by any contractor of unauthorized aliens a violation of Section 274A (e) of the INA. Such violation by the Recipient of the employment provisions contained in Section 274A (e) of the INA shall be grounds for unilateral cancellation of this Agreement by the City.

Contractor is required to comply with the Immigration Reform and Control Act of 1986

(IRCA) which requires all individuals hired after November 6, 1986 to provide their

W 4th Street Pedestrian Bridge 6 employers with proof of citizenship or authorization to work in the United States. City may at any time request to inspect proof of citizenship.

W 4th Street Pedestrian Bridge 7

REQUIREMENTS FOR CONTRACTS AND PURCHASES

Effective January 1, 2012 under the “Beason-Hammon Alabama Taxpayer and Citizen Protection Act,” Act No. 2011-535, Alabama Code (1975) Section 31-13-1, Et Seq., before entering into a contract with the City to:

1. Perform a service;

2. Perform work;

3. Provide a product;

4. Accept a grant; and/or

5. Accept an initiative the State of Alabama requires the business entity to sign a notarized affidavit agreeing:

1. Not to knowingly employ, hire for employment, or continue to employ, any unauthorized aliens in the State of Alabama;

2. To enroll in the E-Verify Program, to verify the immigration status of every employee required to be re-verified through that system and to provide documentation of its enrollment; and

3. To require its subcontractors to comply with the above requirements.

Before any contract can be let, purchase can be made, or payment can be issued by the City of Gulf Shores after January 1, 2012, the Affidavit on the reverse side of this document must be completed, notarized, and returned to our offices.

Note: Proof of enrollment in the E-Verify Program must accompany the Affidavit, unless you do not have or hire any employees.

Questions about this process may be directed to Shelby DeBlieux, Purchasing Officer, at (251) 968-1443 or via e-mail at sdeblieux@gulfshoresal.gov.

COMPLETED AFFIDAVIT MUST BE RETURNED IN SEALED BID.

W 4th Street Pedestrian Bridge 8

APPENDIX A

AFFIDAVIT OF CONTRACTOR OR DIRECT VENDOR

State of _______________ County of _____________

Before me, a notary public, personally appeared _________________________________ (print name) who, being duly sworn, says as follows:

As a condition for the award of any contract, grant, or incentive by the City of Gulf Shores, Alabama, I hereby attest that in my capacity as ________________________________ (state position) for ______________________________________________________________ (state business entity/employer/contractor name) that said business entity/employer/contractor shall not knowingly employ, hire for employment, or continue to employ an unauthorized alien within the State of Alabama.

I further attest that said business entity/employer/contractor is enrolled in the E-Verify program.

(ATTACH DOCUMENTATION ESTABLISHING THAT BUSINESS

ENTITY/EMPLOYER/CONTRACTOR IS ENROLLED IN THE E-VERIFY

PROGRAM)

Signature of Affiant

Sworn to and subscribed before me this ____ day of _____________________, 20____.

I certify that the affiant is known (or made known) to me to be the identical party he or she claims to be.

Signature and Seal of Notary Public

W 4th Street Pedestrian Bridge 9

APPENDIX B

AFFIDAVIT FOR SUBCONTRACTOR

State of _______________ County of _____________

Before me, a notary public, personally appeared _________________________________ (print name) who, being duly sworn, says as follows:

As a condition for acting as a contractor or subcontractor on a project paid for by contract, grant, or incentive by the City of Gulf Shores, Alabama, I hereby attest that in my capacity as ________________________________ (state position) for ______________________________________________________________ (state business entity/employer/contractor name) that said business entity/employer/contractor shall not knowingly employ, hire for employment, or continue to employ an unauthorized alien within the State of Alabama.

I further attest that said business entity/employer/contractor is enrolled in the E-Verify program.

(ATTACH DOCUMENTATION ESTABLISHING THAT BUSINESS

ENTITY/EMPLOYER/CONTRACTOR IS ENROLLED IN THE E-VERIFY

PROGRAM)

Signature of Affiant

Sworn to and subscribed before me this ____ day of _____________________, 20____.

I certify that the affiant is known (or made known) to me to be the identical party he or she claims to be.

Signature and Seal of Notary Public

W 4th Street Pedestrian Bridge 10

PROPOSAL FORM

TO: City of Gulf Shores P.O. Box 299 Gulf Shores, AL 36547

BIDDER: _______________________________

OWNERS: City of Gulf Shores, Alabama

PROJECT: W 4th Street Pedestrian Bridge

The BIDDER in compliance with the INSTRUCTIONS TO BIDDERS having received the Plans and Specifications for the PROJECT, and having received, read, and taken into account all ADDENDA as follows: (List number and dates of each Addendum) ______________________ and having inspected the site(s) and the conditions affecting and governing the accomplishment of the PROJECT, the undersigned proposes to furnish all materials and perform all labor, as specified to complete the base bid and any alternate bid(s) for the following:

BID TAB

ITEM

ITEM DESCRIPTION UNIT

PLAN

QTY

UNIT

PRICE

TOTAL AMOUNT

REMOVAL OF STRUCTURES, STRUCTURE NO. 1 -

EX. BRIDGE (205-A)

EA 1

2 REMOVING PIPE (206-D) LF 24

3 REMOVING FENCE (206-D) LF 41

4 UNCLASSIFIED EXCAVATION (210-A) CUYD 350

5 BORROW EXCAVATION (210-D) CUYD 250

6 FOUNDATION BACKFILL (214-B) CUYD 22

7 ROADBED PROCESSING (230-B) SQYD 30

CRUSHED AGGREGATE BASE COURSE, TYPE B,

PLANT MIXED, 6" COMPACTED THICKNESS (301-A)

SQYD 30

9 TACK COAT (405-A) GAL 17

W 4th Street Pedestrian Bridge 11

ITEM DESCRIPTION UNIT

PLAN

QTY

UNIT

PRICE

TOTAL AMOUNT

PLANING EXISTING PAVEMENT (APPROXIMATELY

1.10" THRU 2.0" THICK) (408-A)

SQYD 318

SUPERPAVE BITUMINOUS CONCRETE WEARING

SURFACE LAYER, 1/2" MAXIMUM AGGREGATE SIZE

MIX, ESAL RANGE C/D, 165LB/SY (424-A)

SQYD 336

SUPERPAVE BITUMINOUS CONCRETE UPPER

BINDER LAYER, 1" MAXIMUM AGGREGATE SIZE

MIX, ESAL RANGE C/D, 220LB/SY (424-B)

SQYD 21

13 ASPHALT LEVELING COURSE, 0-2" SQYD 670

AGGREGATE SURFACING (CRUSHED AGGREGATE

BASE, TYPE B) (430-B)

TON 15

15 30" STORM SEWER PIPE (CLASS 3 R.C.) (433-A) LF 200

16 MOBILIZATION (600-A) LS 1

17 NON-WOVEN SEPARATION FABRIC (MIRAFI 160N) SQYD 30

18 LOOSE RIPRAP, CLASS II, 24" THICK (610-A) SQYD 111

FILTER BLANKET, GEOTEXTILE (NON WOVEN) (610-

D)

SQYD 111

20 CONCRETE SIDEWALK, 6" THICK (618-A) SQYD 435

CONCRETE DRIVEWAY, 6" THICK (INCLUDES WIRE

MESH) (618-B)

SQYD 75

22 DETECTABLE WARNING SURFACE (618-C) SQFT 28

23 INLETS, 4'x4' WEIR INLET (621-C) EA 1

24 6" CONCRETE HEADER CURB (623-B) LF 38

25 WATER VALVE BOX RESET (641-S) EA 1

26 TOPSOIL (650-A) CUYD 130

27 SOLID SOD (654-A) SQYD 930

28 SILT FENCE, TYPE "A" (665-J) LF 550

29 SILT FENCE REMOVAL (665-O) LF 550

30 INLET PROTECTION, STAGE 3 OR 4 (665-P) EA 1

W 4th Street Pedestrian Bridge 12

ITEM DESCRIPTION UNIT

PLAN

QTY

UNIT

PRICE

TOTAL AMOUNT

31 WATTLE (665-Q) LF 25

32 ENGINEERING CONTROLS (680-A) LS 1

STAINLESS STEEL BOLLARD, COMPLETE IN PLACE

(770-L)

EA 8

34 PEDESTRIAN BRIDGE LS 1

SUBTOTAL

LANDSCAPE

LINE

NO.

ITEM DESCRIPTION UNIT

PLAN

QTY

UNIT

PRICE

TOTAL AMOUNT

35 BIKE RACK, ANOVA METRO 5-LOOP EA 2

30 GAL LAGERSTROEMIA INDICA X FAURIEI

'NATCHEZ' / NATCHEZ CRAPE MYRTLE

EA 2

37 12'-14' HT SABAL PALMETTO / SABAL PALM EA 12

38 3.0" CAL TAXODIUM DISTICHUM / BALD CYPRESS EA 2

3 GAL CALLICARPA AMERICANA / AMERICAN

BEAUTYBERRY

EA 16

3 GAL SERENOA REPENS `CINEREA` / SILVER SAW

PALMETTO

EA 22

3 GAL CONRADINA CANESCENS / FALSE

ROSEMARY

EA 48

42 1 GAL HELIANTHUS DEBILIS / BEACH SUNFLOWER EA 32

3 GAL JUNIPERUS CHINENSIS `PARSONII` /

PARSON`S JUNIPER

EA 59

3 GAL MYRICA CERIFERA 'DON'S DWARF' / DON'S

DWARF WAX MYRTLE

EA 19

3 GAL SCHIZACHYRIUM SCOPARIUM / LITTLE

BLUESTEM

EA 159

CYNODON DACTYLON 'TIF 419' / TIF 419

BERMUDAGRASS

SF 7,596

47 RAIN BIRD 1806-SAM-PRS 8 SERIES MPR EA 34

48 RAIN BIRD 1806-SAM-PRS 10 SERIES MPR EA 7

W 4th Street Pedestrian Bridge 13

ITEM DESCRIPTION UNIT

PLAN

QTY

UNIT

PRICE

TOTAL AMOUNT

49 RAIN BIRD 1806-SAM-PRS 12 SERIES MPR EA 11

50 RAIN BIRD 1806-SAM-PRS 15 SERIES MPR EA 16

51 RAIN BIRD 1812-SAM-PRS 5 SERIES MPR EA 8

52 RAIN BIRD 1812-SAM-PRS 8 SERIES MPR EA 8

53 RAIN BIRD 1812-SAM-PRS 10 SERIES MPR EA 6

54 RAIN BIRD 1812-SAM-PRS 12 SERIES MPR EA 11

55 RAIN BIRD 1812-SAM-PRS 15 SERIES MPR EA 19

56 RAIN BIRD 5006-PL-PC-SAM-R-MPR 25 EA 15

57 RAIN BIRD 5006-PL-PC-SAM-R-MPR 30 EA 2

58 RAIN BIRD PGA GLOBE 1 1/2" EA 4

59 RAIN BIRD PGA GLOBE 1" EA 2

60 BALL VALVE EA 2

61 RAIN BIRD ESP4ME3 WITH (1) ESP-SM3 EA 1

62 RAIN BIRD RSD-BEX EA 1

63 WATER METER 3/4" EA 1

IRRIGATION LATERAL LINE: PVC CLASS 200 SDR 21

1"

LF 1,706

IRRIGATION LATERAL LINE: PVC CLASS 200 SDR 21

1 1/2"

LF 36

IRRIGATION MAINLINE: PVC CLASS 200 SDR 21 1

1/2"

LF 331

67 PIPE SLEEVE: PVC SCHEDULE 40 LF 124

68 ACORN STYLE POLE LIGHT BY BALDWIN EMC. EA 4

SUBTOTAL

W 4th Street Pedestrian Bridge 14

ITEM DESCRIPTION UNIT

PLAN

QTY

UNIT

PRICE

TOTAL AMOUNT

TOTAL BID AMOUNT

I/we agree to furnish at the prices shown and guarantee that each offered will meet or exceed all specifications, terms and conditions, and requirements listed. This is the total price and includes all charges to the City of Gulf Shores. I herein affirm that I have not been in any agreement or collusion among bidders in restraint of competition to bid at a fixed price or to refrain from bidding otherwise.

Name of Bidder

Address

Telephone/Fax Number

Email address

Corporate Seal Al. Contractor License No. (if applicable)

Witness Signature

Date Title

W 4th Street Pedestrian Bridge 15

BID BOND

KNOW ALL MEN BY THESE PRESENTS:

THAT ________________________________________________________________________

(Name of Contractor)

___________________________________________________________________, as Principal, (Address) and __________________________________________________________________________ (Name of Surety) of __________________________________________________________________, as Surety, (Address) are held and firmly bound unto the City of Gulf Shores, as oblige, in the full and just sum of:

lawful money of the United States, for the payment of which sum, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

WHEREAS, the said Principal is herewith submitting its Proposal for:

W 4th Street Pedestrian Bridge

The condition of this obligation is such that, if the aforesaid Principal shall be awarded the Contract, the said Principal will, within the time required, enter into a formal Contract, and give a good and sufficient bond to secure the performance of the terms and conditions of the Contract, then this obligation to be void; otherwise, the Principal and the Surety will pay unto the full amount of said bond. If no other bids are received, the full amount of the proposal guarantee shall be so retained or recovered as liquidated damages for such default.

SIGNED, SEALED AND DELIVERED ___________________________________________

(Date)

Witness as to Principal:

(Name of Contracting Firm)

By: ___________________________________________

Title: _________________________________________

___________________________ (Name of Surety)

By: ___________________________________________

Title: _________________________________________

BIDS WILL NOT BE CONSIDERED

UNLESS BID BOND IS SIGNED BY

PRINCIPAL AND SURETY, OR IN

LIEU THEREOF, A CERTIFIED

CHECK MUST ACCOMPANY THE

PROPOSAL

W 4th Street Pedestrian Bridge 16

PERFORMANCE BOND

KNOW ALL MEN BY THESE PRESENTS: That we _______________________________

______________________________________ and __________________________________ (hereinafter called the Principal) (the Surety) are held and firmly bound unto The City of Gulf Shores and/or its assigns in the penal sum of

($___________ ) for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrator, successors, and assigns jointly and severely for the faithful performance of a certain written Contract dated the ______ day of ____________, 20___, entered into between the Principal and the Owner for W 4th Street Pedestrian Bridge, a copy of which Contract is incorporated herein by reference and is made a part hereof as if fully copied herein.

NOW, THEREFORE, the condition of this obligation is such that if the Principal shall faithfully perform the terms, undertakings, covenants, agreements, and conditions of the contract in all respects on his part, and shall fully pay all obligation incurred in connection with the performance of such Contract on account of labor and materials used in connection therewith and all such other obligations of every form, nature, and character, and shall save harmless the Owner from all cost and damage which may be suffered by reason of the failure to fully and completely perform said Contract and shall reimburse and repay the Owner for all expenditures of every kind, character, and description which may be incurred by the Owner in making good any and every default which may exist on the part of the Principal in connection with the performance of said Contract and further that the Principal shall pay all lawful claims of all persons, firms, partnerships, or corporations for all labor performed and material furnished in connection with the performance of the Contract, and that the failure to do so with such persons, firms, partnerships, or corporations shall give them a direct right of action against the Principal and Surety under this obligation; and provided, however, that no suit, action, or proceedings by reason of any default whatever shall be brought on this Bond after one year from the date on which the final payment on the contract falls due, and provided further that if any alterations or additions which may be made under the Contract, or in the work to be done under it, or the giving by the Owner of any extension of time for the performance of the Contract or any other forbearance on the part of either the Owner or the Principal shall not, in any way, release the Principal and Surety or either of them, their heirs, executors, administrators, successors, or assigns from their liability hereunder, notice to the Surety of any such alterations, extension, or forbearance being expressly waived. This obligation shall remain in full force and effect until the performance of all covenants, terms, and conditions herein stipulated and after such performance this obligation shall become void.

W 4th Street Pedestrian Bridge 17

IN TESTIMONY WHEREOF, witness the hands and seal of the parties hereto on this ________ day of _____________, 20__.

Executed in two (2) counterparts.

Witness: By: _______________________________

Countersigned:

(Resident Agent)

BONDING COMPANY:

ADDRESS:

COMPANY

ADDRESS

W 4th Street Pedestrian Bridge 18

LABOR AND MATERIAL BOND

KNOW ALL MEN BY THESE PRESENTS: That we, _______________________________

_____________________________________, as Principal, and ________________________

_____________________________________, as Surety, are held and firmly bound unto The City of Gulf Shores and/or its assigns (hereinafter called the Owner), in the penal sum of _______________________________________________________Dollars ($______________) lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, personal representatives, successors, and assigns jointly and severally, firmly by these presents.

WHEREAS, said Principal has entered into a certain contract with W 4th Street Pedestrian Bridge, for which Contract and the Plans and Specifications for said work shall be deemed a part hereof as fully as if set out herein.

NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal and all subcontractors to whom any portion of work provided for in said contract is sublet and all assignees of said Principal and of such subcontractors shall promptly make payments to all persons supplying him or them with labor, materials, equipment, or supplies for or in the prosecution of the work provided for in such contract, or in any amendment or extension of or additions to said Contract noticed which modifications to the Surety being hereby waived and for the payment of reasonable attorney's fees, incurred by the claimant or claimants in suits on said Bond, then the above obligation shall be void, otherwise to remain in full force and effect, PROVIDED, however that this Bond is subject to the following conditions and limitations.

a. Any person, firm, or corporation that has furnished labor, materials, equipment, or supplies for or in the prosecution of the work provided for in said Contract shall have a direct right of action against the Principal and Surety on this Bond, which right of action shall be asserted in a proceeding, instituted in the county in which the work provided for in said Contract is to be performed, or in any county in which said Principal or Surety does business. Such right of action shall be asserted in a proceeding instituted in the name of the claimant or claimants for his or their use and benefit against said Surety or either of them (but not later than one year after the final settlement of said Contract) in which action such claim or claims shall be adjudicated and judgment rendered thereon.

b. The principal and Surety hereby designate and appoint ___________________________

(To be filled in by Surety Company) as the agent of each of them to receive and accept service of process other pleading issued or filed in any proceeding instituted on this Bond and hereby consent that such service shall be the same as personal service on the Principal and/or Surety.

W 4th Street Pedestrian Bridge 19

c. The Surety shall not be liable hereunder for damage or compensation recoverable under any Workman's Compensation or Employer's Liability Statute.

d. In no event shall the Surety be liable for a greater sum than the penalty of this Bond, or subject to any suit, action, or proceeding thereon that is instituted later than one year after the final settlement of said Contract.

e. This Bond is given pursuant to the terms of Act No. 39, General Laws of Alabama, approved February 8, 1935, entitled "An Act to Further Provide for Bonds of Contractors on State and Other Public Works and Suits Thereon".

Executed in two (2) counterparts.

SIGNED, SEALED, AND DELIVERED THIS ______ day of ____________ 20__.

Witness: By: ________________________________

Countersigned:

(Resident Agent)

BONDING COMPANY:

ADDRESS:

COMPANY

ADDRESS

W 4th Street Pedestrian Bridge 20

NOTICE OF AWARD

DATED:

TO:

You have been awarded a contract for W 4th Street Pedestrian Bridge

Within ten (10) days of the date of this Notice of Award, you must deliver to the OWNER the enclosed contract documents, fully executed, signed and witnessed, and a Certificate of Insurance as follows:

2 originals - Contract 1 original - Performance Bond 1 original - Labor and Material Bond 1 original - Certificate of Insurance certifying compliance with all insurance requirements specified in the General Conditions

Within ten (10) days after receipt of the above documents, OWNER will return to you one (1) fully signed original of the Contract.

You will be notified of the time and place for a preconstruction conference; your proposed work schedule must be delivered to the City at that time.

Failure to deliver the aforementioned contract documents and insurance certificate within the time specified will entitle OWNER to consider your bid abandoned, to annul this Notice of Award, and to declare your Bid Security forfeited.

CITY OF GULF SHORES (OWNER)

By: ______________________________________ Clint Colvin, Construction Manager

W 4th Street Pedestrian Bridge 21

CONTRACT

THIS AGREEMENT, made and entered into the _____ day of ____________, 20__, at Gulf

Shores, State of Alabama, by and between ___________________________________, hereinafter called the Contractor, and the City of Gulf Shores, Alabama, and/or its assigns, hereinafter called the Owner.

WITNESSETH;

That the Contractor, for the consideration hereinafter set out, hereby agrees with the Owner as follows:

1. That the Contractor shall perform all of the work in a satisfactory manner in accordance with the plans and specifications, Bid requirements and conditions, which are attached hereto and made a part hereof as if fully contained herein, for W 4th Street Pedestrian Bridge.

2. That the Contractor shall commence the work to be performed under this agreement within the Contract Time as defined in the General Conditions.

All work shall be accomplished with quality in a manner which will maintain safety to life and property, and reduce to a minimum any interference with abutting property or public travel. All work shall be inspected and approved by the City Engineering Construction Manager and his staff as Owner's representatives before payment shall be made.

3. The Owner hereby agrees to pay to the Contractor for satisfactory performance of the agreement, subject to additions and deductions as provided in the contractual Documents, in lawful money of the United States as follows:

4. Estimates of work completed shall be made by the Contractor each month and submitted to the Owner. Within thirty (30) calendar days after submittal by the Contractor, the owner shall make partial payments to the Contractor on the basis of the estimate of work, duly certified and approved by the City Construction Manager, and performed during the preceding calendar month by the Contractor, less two and a half percent (2.5%) of the amount of such estimate which is to be retained by the owner until all work (100%) has been satisfactorily completed in accordance with this agreement.

5. Upon substantial completion and inspection of all work covered by this agreement, payment of the Contract sum shall be made within thirty (30) calendar days, less retainage.

Said retainage shall be retained until: 1) Submission by the Contractor of evidence satisfactory to the Owner that all payrolls, material bills, and other costs incurred by the Contractor in connection with the construction of the work have been paid in full including a Waiver and Release of Lien on the form included in the Contract Documents; 2) Legal notice of advertisement of completion has been advertised four (4) consecutive weeks in some newspaper of general circulation in Baldwin County, Alabama, as approved by the

W 4th Street Pedestrian Bridge 22

Owner; 3) Final inspection by the City Construction Manager and final acceptance of the work by the Owner.

6. It is mutually agreed between the Owner and the Contractor that timely performance is of the essence to this Contract, and the Contractor agrees to keep a working force on the job of the size that is adequate to perform all work in accordance with the Contractor’s approved work schedule.

7. The Contractor hereby agrees to warrant that all material and workmanship is of the quality, quantity, and character specified and shown, and that any faulty materials or workmanship made known to him within one (1) year after date of final certificate of payment shall be made good by him without additional expense to the Owner.

Failure to complete the work within the allotted Contract time will cause loss to the Owner in administrative, engineering, inspection, interest, and supervision charges. Therefore, any overrun in the Contract time, which in the opinion of the City Contract Manager is caused by undue delay, shall be charged to the Contractor at $300.00 per day and deducted from the final payment.

8. The Owner reserves the right to terminate the contract upon written notice to the Contractor at least ten (10) days prior to said termination. In the event that the Contract is terminated, the Contractor will be compensated in accordance with the bid items of the Contract and its attachment for all approved work in place.

9. By signing this contract, the Contractor represents and agrees that it is not currently engaged in, nor will it engage in, any boycott of a person or entity based in or doing business with a jurisdiction with which the State of Alabama can enjoy open trade.

IN WITNESS WHEREOF, the parties hereto have executed this agreement on the day and date first above written in two (2) counterparts, each of which shall, without proof or accounting for the other counterpart, be deemed an original contract.

(Corporate Seal) ________________________________ (Contractor)

By: ________________________________ Its ____________________ Attest: __________________________ Its ____________________

(Seal) City of Gulf Shores, Alabama (Owner)

By: _________________________________ Robert Craft, Mayor

Attest: ____________________________________ Tobi Waters, City Clerk

W 4th Street Pedestrian Bridge 23

NOTICE TO PROCEED

TO: DATE: ________________

You are hereby notified to commence work in accordance with the Agreement dated _________, 20__, on or before ______________, 20__. You are to complete the work within duration (xx) consecutive calendar days, or by ______________, 20__.

City of Gulf Shores, Alabama (OWNER)

By ________________________________

ACCEPTANCE OF NOTICE

Receipt of the above NOTICE TO PROCEED is hereby acknowledged this ______ day of __________, 20__.

By: ____________________________

W 4th Street Pedestrian Bridge 24

WAIVER AND RELEASE OF LIEN

FROM:

TO: City of Gulf Shores, Alabama (Owner of Project)

PROJECT NAME: W 4th Street Pedestrian Bridge

KNOW ALL MEN BY THESE PRESENTS:

1. The undersigned, having been employed by the City of Gulf Shores to furnish labor and/or materials for the referenced project, does hereby waive and release any and all lien and claim or right to lien and claim against the City of Gulf Shores on the referenced project on account of labor, services, equipment, materials, etc. furnished for the referenced project.

2. The undersigned further certifies that to the best of his knowledge and belief, there are no unsatisfied or outstanding claims of any character arising out of the furnishing of labor, equipment, services, and/or materials for the referenced project.

3. The undersigned further agree that, after execution of this document, it will indemnify, defend at its expense, and save the City of Gulf Shores harmless from any and all claims or liens arising out of the undersigned's furnishing of labor, equipment, services, and/or materials for the referenced project.

4. The undersigned has executed this document in order to induce the City of Gulf Shores to make final payment to and in no way acts as a release of any claim the undersigned may have against parties other than the City of Gulf Shores arising out of the furnishing of labor and/or materials for the referenced project.

IN WITNESS WHEREOF, the undersigned has signed and sealed this instrument this ______ day of _____________, 20__.

STATE OF ALABAMA

COUNTY OF BALDWIN

Personally appeared before me the undersigned Notary Public in and for said County and State, ______________________, who is known to me and who, after being duly sworn, deposes and says that the facts stated in the above affidavit are true.

NOTARY PUBLIC

W 4th Street Pedestrian Bridge 25

GENERAL CONDITIONS

1. OWNER

The Owner for W 4th Street Pedestrian Bridge is the City of Gulf Shores, Alabama.

The mailing address for the Owner is Post Office Box 299, Gulf Shores, Alabama 36547.

2. LOCAL LICENSE REQUIREMENT

Attention is called to the fact that all companies performing work on this Contract must obtain a Business License from the City of Gulf Shores available at City Hall.

3. CONTRACT DOCUMENTS

The Owner will furnish the Contractor free of charge one (1) set of plans and specifications. Additional sets may be purchased at cost to Contractor.

4. PAYMENTS AND COMPLETION

Once in each month, the Contractor may submit an Application for Payment for completed work in place on the enclosed form. Payment, less retainage, shall be made to the Contractor within thirty (30) days of receipt and approval of Application for Payment.

The final monthly payment prior to the expiration of the Contract shall not be made until:

1) Submission by the Contractor of evidence satisfactory to the Owner that all payrolls, material bills, and other costs incurred by the Contractor in connection with the work under this contract have been paid in full including a Waiver and Release of Lien on the form included in the Contract Documents; 2) FOR CONTRACTS OF $50,000 OR MORE, legal notice of advertisement of completion has been advertised four (4) consecutive weeks in some newspaper of general circulation in Baldwin County, Alabama (approved by the Owner); 3) Final inspection and acceptance of the work by the Owner. Final payment will be made to Contractor within thirty (30) days after satisfactory completion of (1), (2) and (3) above.

5. INSURANCE REQUIREMENTS

Contractor agrees, at its sole expense, to maintain on a primary and non-contributory basis during the life of this Contract, or the performance of Work hereunder, insurance coverages, limits, and endorsements as set out below. Contractor agrees to obtain Commercial General Liability, Business Auto Liability, Worker’s Compensation, and Commercial Umbrella/Excess Liability before starting the work. Contractor also agrees to undertake the obligation to insure that all subcontractors abide by these same insurance requirements.

The Contractor agrees the insurance requirements herein as well as City’s review or acknowledgment is not intended to and shall not in any manner limit or qualify the liabilities and obligations assumed by the Contractor under this Contract. A copy of the policy shall be provided upon request.

Commercial General Liability

W 4th Street Pedestrian Bridge 26

Contractor agrees to maintain Commercial General Liability at a limit of liability not less than $1,000,000 Each Occurrence, $2,000,000 Annual Aggregate. Contractor agrees its coverage will not contain any restrictive endorsement(s) excluding or limiting Product/Completed Operations, Independent Contractors, X-C-U Coverage, Contractual Liability, Personal Injury and Advertising Injury, Independent Contractors, or Cross Liability.

Business Automobile Liability Contractor agrees to maintain Business Automobile Liability at a limit of liability not less than $1,000,000 Each Occurrence. Coverage shall include liability for Owned, Non-Owned, and Hired Automobiles.

Worker’s Compensation & Employer’s Liability Regardless of any “minimum requirements” of the State of Alabama, Contractor shall obtain Worker’s Compensation insurance covering all workers involved in the Work. (Note: Elective exemptions or coverage through an employee leasing arrangement will violate this requirement.)

Subcontractor shall also obtain Employer’s Liability insurance with minimum limits of $1,000,000 Each Accident, $1,000,000 Disease Policy Limit, and $1,000,000 Each Employee.

Commercial Umbrella/Excess Liability Contractor agrees to maintain either a Commercial Umbrella or Excess Liability at a limit of liability not less than $5,000,000 Each Occurrence, $5,000,000 Aggregate. The Contractor agrees to endorse the City as an “Additional Insured” on the Commercial Umbrella/Excess Liability, unless the Commercial Umbrella/Excess Liability provides coverage on a pure/true follow-form basis, or the City is automatically defined as an Additional Protected Person.

Additional Insured Endorsements The Contractor agrees to endorse the City as an Additional Insured on the Commercial General Liability with the following Additional Insured endorsement, or similar endorsement providing equal or broader Additional Insured coverage:

CG2010 10 01 – Additional Insured; Owners, Lessees, or Contractors, CG2010 07 04 – Additional Insured; Owners, Lessees, or Contractors; Scheduled Person or

Organization endorsement in combination with the additional endorsement of CG2037 10 01

– Additional Insured; Owners, Lessees, or Contractors

Completed Operations shall be required to provide back coverage for the Contractor’s “your work” as defined in the policy and liability arising out of the products-completed operations hazard.

(Attach an actual copy of the endorsement(s) – Contact your insurance agent.) The name of the organization endorsed as Additional Insured for all endorsement shall read “City of Gulf Shores.”

Deductibles, Coinsurance Penalties & Self-Insured-Retention Contractor agrees to be fully and solely responsible for any deductible, coinsurance penalty, or self-insured retention expenses; including any loss not covered because of coinsurance penalty, or coverage exclusion or limitation. The Contractor agrees any Self-Insured-Retention or deductible shall not exceed $25,000. For deductible amounts that exceed this amount, the Contract agrees, when requested by City, to maintain a Commercial Surety Bond in an amount equal to said deductible amount.

Waiver of Subrogation Contractor agrees by entering into this written Contract to a Waiver of Subrogation in favor of the City. If a policy prohibits waiving subrogation rights without an endorsement, the Contractor agrees to endorse it with a Waiver of Transfer of Rights of Recovery Against Others, or an equivalent endorsement. This Waiver of Subrogation requirement shall not apply to any policy which voids coverage if subrogation is waived.

Right to Revise or Reject The City reserves the right to revise any insurance requirement based on insurance market conditions affecting the availability or affordability of coverage; or changes in the scope of

W 4th Street Pedestrian Bridge 27 work/specifications affecting the applicability of coverage. Additionally, the City reserves the right, but not the obligation, to review and reject and insurance policies failing to meet the criteria stated herein, or any insurer(s) providing coverage, due to its poor financial condition or failure to operate legally in the State of Alabama. In such events, City shall provide Contractor written notice of such revisions or rejections.

Certificate of Insurance Contractor agrees to provide City a Certificate of Insurance evidencing the above coverages. If the Contractor receives a non-renewal or cancellation or other material change notice from an insurance carrier affording coverage required herein, Contractor agrees to notify the City immediately with specifics as to which coverage is no longer in compliance. The City shall have the right, but not the obligation, of prohibiting Contractor from entering the Work site until a new Certificate of Insurance is provided to the City evidencing the replacement coverage. The Contractor agrees the City reserves the right to withhold payment to Contractor until evidence of reinstated or replacement coverage is provided to the City. If the Contractor fails to maintain the insurance as set forth herein, the Contractor agrees the City shall have the right, but not the obligation, to purchase replacement insurance, which the Contractor agrees to reimburse any premiums or expenses incurred by the City.

The Contractor agrees the Certificate(s) of Insurance shall:

1. Clearly indicate the City has been endorsed on the Commercial Umbrella/Excess Liability, and Commercial General Liability policy as an Additional Insured. Clearly indicate the project name and project number.

2. Clearly indicated Certificate Holder(s) as follows:

Original to: City of Gulf Shores, Alabama Attn: Purchasing Officer P.O. Box 299 Gulf Shores, AL 36547 Fax (251) 968-1470

6. WORK SCHEDULE

After contract award, the contractor shall coordinate his work schedule with the Engineering Construction Manager. Any modifications to the established work schedule shall be first approved by the Construction Manager.

7. COMPLETION DATE

A. Project Duration and Completion Date shall be as stipulated in the Notice to Proceed.

B. The completion date shall not be extended except for unavoidable delays caused by, but not limited to, fires, floods, storms, strikes, accidents, or other circumstances beyond the Contractor’s control. The Contractor may only request additional completion time within one week from the occurrence of the delay. The Construction Manager shall be the sole judge of such "unavoidable delays", and the extent thereof.

In the event that such a determination is made, the date of completion shall be extended by a length of time equal to that lost by such circumstances. The Owner shall not be liable to the Contractor for any damages or additional compensation as a consequence of delay, hindrance, interference or other similar event, caused by

W 4th Street Pedestrian Bridge 28

Owner; or by reason of fire, casualty, act of God or any other reason beyond the Owner’s control.

8. CLAIMS

A “Claim” is a Contractor’s demand or assertion seeking, as a matter of right, an increase in Contract Amount, an extension in the time for performance of the Contractor’s Work, or relief with respect to the terms of the Contract Documents. All Claims must be made by written notice to the Owner at least one (1) week prior to the beginning of the Contractor’s affected or additional work, or within one (1) week of the Subcontractor’s first knowledge of the event, whichever shall first occur, otherwise, such claims shall be deemed waived.

Pending final resolution of a Claim or any other dispute between Contractor and Owner, unless otherwise agreed in writing, the Contractor shall proceed diligently with performance of the Contractor’s Work, disputed or otherwise, and without interruption, deficiency, or delay.

9. TERMINATION FOR CAUSE

In the event that any of the provisions of this Contract are violated by the Contractor, or by any of his Subcontractors, the Owner may serve written notice upon the Contractor and Surety of its intention to terminate the Contract, such notices to contain the reasons for such intention to terminate the Contract, and unless within ten (10) days after the serving of such notice upon the Contractor, such violation or delay shall cease and satisfactory arrangement of correction be made, the Contract shall, upon the expiration of said ten (10) days, cease and terminate. In the event of any such termination, the Owner shall immediately serve notice thereof upon the Surety and the Contractor and the Surety shall have the right to take over and perform the Contract; provided, however, that if the Surety does not commence performance thereof within ten (10) days from the date of the mailing to such Surety of notice of termination, the Owner may take over the work and prosecute the same to completion by contract or by force account for the account and at the expense of the Contractor and the Contractor and his Surety shall be liable to the Owner for any excess cost occasioned by the Owner thereby, and in such event the Owner may take possession of and utilize in completing the work, such materials, appliances and plant as may be on the site of the work and necessary therefore.

10. TERMINATION FOR CONVENIENCE

The Owner may terminate this contract at any time by giving at least ten (10) days’ notice in writing to the Contractor. If the contract is terminated by the Owner as provided herein, the Contractor will be paid for the time provided and expenses incurred up to the termination date.

11. SANITARY FACILITIES

The Contractor shall provide on-site sanitary facilities, if he so deems sanitary facilities to be necessary. No sanitary facilities shall be provided by the Owner.

W 4th Street Pedestrian Bridge 29

12. STORAGE OF MATERIALS

All equipment and materials may be stored within the City at a location(s) approved by the Owner. No payments will be made for offsite stored materials unless approved in advance by the Owner.

13. DISPOSAL OF MATERIALS

Any waste and excess materials shall be disposed of by the Contractor in a safe manner conforming to all Federal and State Occupational and Environmental Laws and Regulations including, but not limited to, the Occupational Safety and Health Act (OSHA), the Clean Air Act (CAA), the Clean Water Act (CWA), the Safe Drinking Water Act (SDWA), the Toxic Substances Control Act (TSCA), and Alabama Department of Environmental Management (ADEM) Regulations.

14. DRAWINGS AND CONTRACTUAL DOCUMENTS

The Contractual Documents shall consist of the Request for Proposals, Instructions for Bidders, Proposal, Proposal Forms, Contract, General Conditions, and Special Conditions, Technical Specifications (Alabama Department of Transportation Standard Specifications for Highway Construction, Current Edition), all amendments and addenda thereto, and Drawings attached hereto.

File details come from the government source that posted it. Updated .