2026-0812 4th Street Canal Bridge Replacement - IFB Civil Plan Set (2026-07-21).pdf

PDF 11 MB Posted

Attached to
W 4TH STREET PEDESTRIAN BRIDGE
Solicitation number
2026-0812
Issued by
Baldwin County, Alabama

About this file

This is a civil plan set for the W 4th Street Canal Bridge Improvements project prepared by Jinright & Associates Development Engineers for the City of Gulf Shores, Alabama. The project encompasses complete demolition of the existing bridge structure, abutments, and associated pavement, followed by construction of a new 35-foot by 16-foot pedestrian bridge with two 15-foot by 4-foot fishing areas at elevation 8.25 feet. The scope of work includes site grading and drainage, installation of 200 linear feet of 30-inch storm sewer pipe, construction of approximately 280 square yards of concrete sidewalk ranging from 6 to 15 feet wide, installation of concrete curb and gutter, driveway construction, riprap placement with filter blanket, and erosion control measures. The project involves significant quantities including 350 cubic yards of unclassified excavation, 250 cubic yards of borrow excavation, 336 square yards of asphalt planing, 424 square yards of superpave bituminous concrete wearing surface, 435 square yards of concrete sidewalk, and 930 square yards of solid sod. Sealed bids are due August 12, 2026 at 10:00 a.m. at Gulf Shores City Hall Council Chambers. The construction phasing sequence consists of seven phases beginning with construction entrance installation and erosion control measures, progressing through demolition, grading, storm drainage installation, paving, landscape stabilization, and final BMP removal and project closeout.

The project specifications require strict compliance with the Alabama Handbook for Erosion Control and Stormwater Management, with all best management practices installed and approved prior to land disturbance. Contractors are responsible for all utility coordination, including line spotting through Alabama One-Call at 1-800-292-8925, and for verifying utility locations with Gulf Shores Utilities, Baldwin EMC, Riviera Utilities, and Brightspeed. Geotechnical recommendations from Geocon Engineering & Materials Testing, Inc. (Project No. DL 4247-24, dated March 1, 2024) must be strictly followed for all grading, backfilling, and paving work, with independent soil testing and on-site inspection required. All concrete work must conform to the latest standards of Gulf Shores Utilities, and all traffic control must comply with the Manual on Uniform Traffic Control Devices (MUTCD). The contractor is solely responsible for sediment control, stormwater management, proper disposal of excess materials, protection of existing infrastructure and utilities, OSHA compliance, and maintaining positive drainage throughout the project. No separate payment is provided for traffic control or construction entrance/exit pad installation, and all improvements must be replaced at contractor expense if improperly installed.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4T H

ST

RE

ET

C

AN

AL

B

RI

DG

E

IM

PR

OV

EM

EN

TS

CI

TY

O F

GU

LF

S

HO

RE

S

Ji n ri gh t

A ss o ci at es

D ev el o p m en t

E n gi n ee rs

G re en o R o ad

N o rt h

F ai rh o p e, A la b am a

P .O

B o x ai rh o p e, A la b am a

P h o n e:

-3 ax (2

-3 ja d en gi n ee rs .c o m

A

L

C A

-3 -E

4th Street Canal Bridge Improvements

GULF SHORES, ALABAMA

GRADE, DRAIN, BASE AND PAVE

HARDSCAPE AND LANDSCAPING

4TH STREET

JULY 2026

VICINITY MAP

NOT TO SCALE

CITY OF GULF SHORES

205 CLUBHOUSE DRIVE, STE B

GULF SHORES, ALABAMA 36547

ANDY BAUER, PLANNING DIRECTOR

251.968.1151

PREPARED FOR:

NO CONSTRUCTION AND/OR LAND DISTURBANCE, EXCEPT THOSE NECESSARY TO INSTALL THE

BMP'S, SHALL BEGIN ON THIS PROJECT UNTIL THE BMP PLAN HAS BEEN INSTALLED AND

APPROVED BY THE CITY/COUNTY.

NOTE:

C1.0 C2.0 C2.1 C2.2 C3.0 C4.0 C5.0 C6.0 C7.0 C8.0 C9.0 C10.0 C11.0 C12.0

FOLLOWING SHEETS (BY OTHERS) MAY NOT BE INCLUDED WITHIN THIS SET

J. MARTIN PITTS PE LLC - THE GULF SHORES PEDESTRIAN BRIDGE

S0.0 S0.2 S1.0-S1.1 S1.3 S2.0 S2.1 S2.2 S3.0 S3.1-S3.2 S3.3 S3.4 S4.0 S4.1 S4.2 S5.0

LANDSCAPE PLANS

LP100

LP500

LP501

LI100

LI500

LI501

LE100

COVER SHEET

CIVIL CONSTRUCTION NOTES

PLANS LEGEND SHEET

SUMMARY TABLE OF QUANTITIES

TYPICAL SECTIONS

EXISTING CONDITIONS

DEMOLITION PLAN

SITE LAYOUT

GEOMETRIC CONTROL LAYOUT

GRADING & DRAINAGE PLAN

PLAN AND PROFILE

CIVIL CONSTRUCTION DETAILS

EROSION CONTROL PLAN

EROSION CONTROL DETAILS

INDEX TO SHEETS:

SHEET DESCRIPTION

UTILITY INFORMATION

CONTRACTOR SHALL HAVE ALL EXISTING BURIED UTILITIES

"LINE SPOTTED" BY CALLING 1-800-292-8925 (ALABAMA ONE-CALL)

OR BY CONTACTING LOCAL UTILITY COMPANIES

WATER/ SEWER:

GULF SHORES UTILITIES

RHONDA BUTLER - GENERAL MANAGER

(251) 968-6323 ext 3336 gsurbutler@gmail.com

1629 EAST 1ST ST, GULF SHORES, AL 36542

POWER:

BALDWIN EMC

KEN PIMPERL - (251) 989-0220

19600 STATE HIGHWAY 59, SUMMERDALE, AL 36580

GAS:

RIVIERA UTILITIES

JAMES WALLACE - (251) 943-5001

413 EAST LAUREL AVE, FOLEY, AL 36535

FIBER/ OTHER

COMMUNICATION:

BRIGHTSPEED

FORREST CHERNEY - (980) 376-1408

1120 SOUTH TRYON ST, SUITE 700, CHARLOTTE, NC 28203

Professional Land Surveyors

SURVEY PROVIDED BY:

Wattier Surveying, Inc.

TITLE SHEET

ISOMETRIC

GENERAL NOTES

GEOTECH REPORT

EXISTING BRIDGE PLAN

DEMO BRIDGE PLAN

EXISTING BRIDGE SITE IMAGES

PROPOSED BRIDGE PLAN

PROPOSED BRIDGE SHEET PILE AND HELICAL SECTION

PROPOSED BRIDGE STRUCTURE PLAN

PROPOSED BRIDGE STRUCTURE SECTION

W 16X31 TO 8X24 GLULAM CONNECTION DETAILS

8X8 VERTICAL POST TO 8X24 GLULAM CONNECTION DETAILS

RAILING DETAILS

CONNECTION DETAILS

SITE

LANDSCAPE PLANTING PLAN

LANDSCAPE PLANTING DETAILS

LANDSCAPE PLANTING SPECIFICATIONS

IRRIGATION PLAN

IRRIGATION DETAILS

IRRIGATION SPECIFICATIONS

SITE LIGHTING PLAN

W

ES

T 4T

H

ST

RE

ET

B

RI

DG

E

IM

PR

OV

EM

EN

TS

CI

TY

O F

GU

LF

S

HO

RE

S

JOB NO:

SCALE:

DATE:

DRAFTER:

SHEET:

26-2016.20

JULY 2026

KYR

G re en o R d N o rt h S te

C

F ai rh o p e, A la b am a

P .O

B o x

F ai rh o p e, A la b am a

P h o n e:

-3 ja d en gi n ee rs .c o m

A

L

C A

-3 -E

AP

PR

DA

TE

RE

VI

SI

ON

NO

/2

2/

IS

SU

E

FO

R

BI

D

1.

N/A

CI

VI

L

CO

NS

TR

UC

TI

ON

N

OT

ES

C2.0

1. THE CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL STATE, LOCAL AND FEDERAL

LAWS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT ALL OF THESE LAWS AND

REGULATIONS HAVE BEEN MET.

2. THE CONTRACTOR SHALL NOTIFY JADE CONSULTING'S RESPECTIVE TESTING COMPANY AND ANY

LOCAL JURISDICTIONAL INSPECTOR FOR APPROVAL 48 HOURS BEFORE THE BEGINNING OF ANY

SUBSEQUENT PHASE OF CONSTRUCTION.

3. THE CONTRACTOR SHALL IMMEDIATELY INFORM THE ENGINEER OF ANY DISCREPANCIES OR

ERRORS DISCOVERED IN THE PLANS.

4. THE CONTRACTOR IS REQUIRED TO COORDINATE WITH THE ONE-CALL LINE LOCATE CENTER FOR

THE MARKING OF UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL

RENEW CONFORMATION NUMBERS AS OFTEN AS REQUIRED DURING THE DURATION OF THE

PROJECT. THE CURRENT CONFIRMATION NUMBER SHALL BE ON PROJECT SITES AT ALL TIMES.

5. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE LOCATION OF ANY AND ALL

EXISTING UNDERGROUND UTILITIES AND TO TAKE WHATEVER STEPS ARE NECESSARY TO

PROVIDE FOR THEIR PROTECTION. THE ENGINEER HAS DILIGENTLY ATTEMPTED TO LOCATE AND INDICATE ALL EXISTING FACILITIES ON THESE PLANS. HOWEVER, THIS INFORMATION IS SHOWN

FOR THE CONTRACTORS CONVENIENCE ONLY. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR

THE LOCATION OF UTILITIES SHOWN OR NOT SHOWN. THE CONTRACTOR IS TO CONTACT THE

UTILITY COMPANIES FOR EXACT LOCATION OF THEIR UTILITIES PRIOR TO STARTING

CONSTRUCTION. ANY AND ALL DAMAGE MADE TO UTILITIES BY THE CONTRACTOR SHALL BE THE

SOLE RESPONSIBILITY OF THE CONTRACTOR TO REPAIR AND REPLACE.

6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING INFRASTRUCTURE.

7. ALL WATER CONSTRUCTION METHODS AND MATERIALS SHALL CONFORM TO THE LATEST

EDITION OF THE "STANDARDS AND SPECIFICATIONS" OF GULF SHORES UTILITIES.

8. ALL SEWER CONSTRUCTION METHODS AND MATERIALS SHALL CONFORM TO THE LATEST

EDITION OF THE "STANDARDS AND SPECIFICATIONS" OF GULF SHORES UTILITIES.

9. ALL MANHOLES WITHIN THE 100 YEAR FLOOD PLAIN SHALL BE CONSTRUCTED THREE (3) FEET

ABOVE GRADE.

10. THE CONTRACTOR SHALL EMPLOY ALL NECESSARY MEASURES TO ENSURE THAT THE PROJECT IS

OSHA COMPLIANT.

11. THE CONTRACTOR SHALL EXPLORE EXISTING STRUCTURES, UTILITIES AND PIPING SO THAT ANY

REQUIRED ADJUSTMENT MAY BE MADE.

12. ANY EXCESS MATERIAL FROM CONSTRUCTION ACTIVITIES SHALL BE LEGALLY DISPOSED OF BY

THE CONTRACTOR AT HIS EXPENSE.

13. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE LOCATION AND INVERTS OF ALL

UTILITIES PRIOR TO COMMENCEMENT OF ANY WORK ITEM. THE PROJECT ENGINEER SHALL BE

NOTIFIED IMMEDIATELY IF ANY DISCREPANCIES ARE FOUND.

14. CONTRACTOR IS RESPONSIBLE FOR ALL COORDINATION WITH ALL RESPECTIVE UTILITY

PROVIDERS AND AUTHORITIES. PROPER NOTICE SHALL BE GIVEN PRIOR TO ANY WORK STARTING.

15. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ADEQUATE BEDDING AND HAUNCHING FOR ALL

IMPROVEMENTS.

16. CONTRACTOR SHALL REPLACE ANY FAULTY OR IMPROPERLY INSTALLED IMPROVEMENTS AT THEIR

EXPENSE.

17. THE CONTRACTOR SHALL EMPLOY A LAND SURVEYOR REGISTERED IN THE STATE OF ALABAMA TO

RESET ANY PROPERTY MARKERS DAMAGED DURING CONSTRUCTION AT THEIR EXPENSE.

18. CONTRACTOR SHALL NOT DEVIATE FROM PLANS WITHOUT PROPER CONSENT.

19. CONTRACTOR SHALL STRICTLY FOLLOW THE LOCAL AUTHORITIES AND/OR GEOTECHNICAL

REPORTS FOR ALL GRADING, BACKFILLING, AND PAVING REQUIREMENTS. ALL RESPECTIVE TASKS

SHALL BE APPROVED BY RESPONSIBLE INSPECTOR PRIOR TO ACCEPTANCE.

20. THE CONTRACTOR WILL ENSURE THAT POSITIVE AND ADEQUATE DRAINAGE IS MAINTAINED AT

ALL TIMES WITHIN THE PROJECT LIMITS. THIS MAY INCLUDE, BUT NOT BE LIMITED TO,

REPLACEMENT OR RECONSTRUCTION OF EXISTING DRAINAGE STRUCTURES THAT HAVE BEEN

DAMAGED, REMOVED OR REGRADED AS REQUIRED BY THE ENGINEER.

21. ALL GRAVITY PIPES SHALL BE LAID ON SMOOTH CONTINUOUS GRADES WITH NO DETECTABLE

BENDS AT JOINTS.

22. ALL STORM DRAINAGE INLET STRUCTURES SHALL HAVE A NEENAH CAST IRON FRAME AND COVER, OR APPROVED EQUAL, FOR ACCESS.

23. SOIL TESTING AND ON-SITE INSPECTION SHALL BE PERFORMED BY AN INDEPENDENT

GEOTECHNICAL ENGINEER. THE SOILS ENGINEER SHALL PROVIDE COPIES OF TEST REPORTS TO

THE CONTRACTOR, THE OWNER AND THE OWNER'S REPRESENTATIVE AND SHALL PROMPTLY

NOTIFY THE OWNER, HIS REPRESENTATIVE AND THE CONTRACTOR SHOULD WORK PERFORMED

BY THE CONTRACTOR FAIL TO MEET THESE SPECIFICATIONS. THE CONTRACTOR SHALL PROVIDE

ADEQUATE NOTICE TO SOILS ENGINEER FOR THE REQUIRED TESTING OF THE PROJECT.

24. THE CONTRACTOR SHALL PROVIDE ANY EXCAVATION AND MATERIAL SAMPLES NECESSARY TO

CONDUCT REQUIRED SOIL TESTS. ALL ARRANGEMENTS AND SCHEDULING FOR THE TESTING

SHALL BE THE CONTRACTORS RESPONSIBILITY.

SITE NOTES:

PROJECT NOTES:

1. ALL TRAFFIC CONTROL SHALL COMPLY WITH THE LATEST EDITION OF THE MANUAL ON

UNIFORM TRAFFIC CONTROL DEVICES (MUTCD).

2. ALL TRAFFIC PLANS SHALL BE COORDINATED WITH THE CITY OF GULF SHORES PUBLIC WORKS

DEPARTMENT.

3. NECESSARY BARRICADES, SUFFICIENT LIGHTS, SIGNS AND OTHER TRAFFIC CONTROL

METHODS MAY BE NECESSARY AS PER THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES,

PART IV. THESE DEVICES SHALL BE PROVIDED AND MAINTAINED THROUGHOUT

CONSTRUCTION. NO SEPARATE PAYMENT WILL BE MADE FOR TRAFFIC CONTROL

REQUIREMENTS.

4. ALL TEMPORARY TRAFFIC CONTROL SHALL COMPLY WITH PART VI OF THE MUTCD LATEST

EDITION.

TRAFFIC CONTROL NOTES:

1. ALL EROSION CONTROL PROCEDURES SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH THE

"ALABAMA HANDBOOK FOR EROSION CONTROL AND STORMWATER MANAGEMENT ON CONSTRUCTION

SITES AND URBAN AREAS".

2. ALL BEST MANAGEMENT PRACTICES (BMP) PROCEDURES SHALL BE IN PLACE AND INSPECTED PRIOR TO ANY

LAND DISTURBING ACTIVITY.

3. ALL DISTURBED AREAS SHALL BE TEMPORARILY GRASSED AND MULCHED IF THEY WILL BE LEFT

UNATTENDED FOR 13 DAYS.

4. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED BY THE PROJECT ENGINEER AND/OR LOCAL

JURISDICTIONAL INSPECTOR.

5. CONSTRUCTION ENTRANCE/EXIT PADS SHALL BE INSTALLED BY THE CONTRACTOR AT CONSTRUCTION ACCESS POINTS PRIOR TO LAND DISTURBANCE AND SHALL BE MAINTAINED THROUGHOUT THE PROJECT.

(NO DIRECT PAYMENT)

6. THE APPROVED BEST MANAGEMENT PRACTICES PLAN SHALL BE PRESENT ON THE SITE WHENEVER LAND

DISTURBING ACTIVITY HAS BEGUN.

7. SILT FENCE AND/OR EROSION CONTROL NETTING SHALL BE PLACED ALONG THE DOWNSTREAM SIDE OF

ALL PROPOSED FILL CONSTRUCTION.

8. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ACCOMPLISH EROSION CONTROL FOR ALL DRAINAGE

PATTERNS CREATED AT VARIOUS STAGES DURING CONSTRUCTION.

9. WHEN REQUIRED CONTRACTOR SHALL INSPECT EROSION CONTROL MEASURES AT THE END OF EACH WORKING DAY AND RAIN EVENT TO ENSURE MEASURES ARE FUNCTIONING PROPERLY. CONTRACTOR SHALL

PROPERLY MAINTAIN ALL BMP'S IN ACCORDANCE WITH THE "HANDBOOK".

10. CONTRACTOR SHALL IMMEDIATELY REPAIR AND/OR REPLACE ANY DAMAGED OR IMPROPERLY FUNCTIONING

BMP.

11. ANY SILT IN THE DETENTION POND SHALL BE REMOVED AS DIRECTED BY THE PROJECT ENGINEER OR LOCAL AUTHORITY. THE DETENTION POND SHALL ALSO BE REGRADED TO FINAL DESIGN PRIOR TO FINAL

ACCEPTANCE OF PROJECT. THERE IS NO DIRECT PAYMENT FOR THIS ACTIVITY.

12. ALL DISTURBED AREAS MUST BE PERMANENTLY STABILIZED IN ACCORDANCE WITH THE HANDBOOK PRIOR

TO FINAL ACCEPTANCE.

13. CONTRACTOR SHALL ROUTINELY CLEAN OUT ANY SILT ACCUMULATION FROM THE PROJECTS DRAINAGE

STRUCTURES AS REQUIRED BY PROJECT ENGINEER AND/OR LOCAL AUTHORITY.

14. CONTRACTOR IS SOLELY RESPONSIBLE FOR SEDIMENT CONTROL AND STORMWATER MANAGEMENT FOR PROJECT. CONTRACTOR SHALL NOTIFY PROJECT ENGINEER IMMEDIATELY OF ANY FAILING BMP.

SEDIMENT CONTROL & STORMWATER MANAGEMENT NOTES:

PHASE ONE

· INSTALL CONSTRUCTION ENTRANCE/EXIT

· CLEAR AREA REQUIRED FOR SILT FENCE PLACEMENT

· INSTALL SILT FENCE (SBA)

PHASE TWO

· WATTLES, INLET, AND OUTLET PROTECTION TO BE INSTALLED

PHASE THREE

· DEMOLITION AND REMOVAL OF DEMO DEBRIS

· CLEAR/GRUB REMAINING SITE AREAS

PHASE FOUR

· INSTALL STORM DRAINAGE MEASURES

· GRADE SITE TO ROUGH GRADES

PHASE FIVE

· CONSTRUCT ROADS (PAVING, CURB AND GUTTER, SIDEWALKS, AND DRIVEWAYS)

PHASE SIX

· STABILIZE DISTURBED AREAS WITH SOLID SOD

· INSTALL PERMANENT LANDSCAPING

PHASE SEVEN

· REMOVE BMP MEASURES

· REMOVE SILT FENCE

· PROJECT COMPLETE, FINAL INSPECTION, FILE NOTICE OF TERMINATION

CONSTRUCTION PHASE SEQUENCE:

T 4T

H

ST

RE

ET

B

RI

DG

E

IM

PR

OV

EM

EN

TS

CI

TY

O F

GU

LF

S

HO

RE

S

JOB NO:

SCALE:

DATE:

DRAFTER:

SHEET:

26-2016.20

JULY 2026

KYR

G re en o R d N o rt h S te

C

F ai rh o p e, A la b am a

P .O

B o x

F ai rh o p e, A la b am a

P h o n e:

-3 ja d en gi n ee rs .c o m

A

L

C A

-3 -E

AP

PR

DA

TE

RE

VI

SI

ON

NO

/2

2/

IS

SU

E

FO

R

BI

D

1.

N/A

PL

AN

S

LE

GE

ND

S

HE

ET

EXISTING TREELINE

LEGEND

160.00

EXISTING OAK

EXISTING PALM

EXISTING PINE

TREE LEGEND

C2.1

W W

SS SS

GAS GAS

UGC

EXIST. OVERHEAD UTILITY AND UTILITY POLE

EXIST. GUY WIRE AND UTILITY POLEGUY

EXIST. WATER LINE

EXIST. SANITARY SEWER LINE

EXIST. GAS LINE

EXIST. FIBER OPTIC CABLE LINE

EXIST. FENCE LINE

EXIST. PIPE

EXIST. EDGE OF WATER

EXIST. POWER POLE

EXIST. LIGHT POLE

EXIST. WATER VALVE

EXIST. FIRE HYDRANT

EXIST. SANITARY SEWER MANHOLE

EXIST. FIBER OPTIC CABLE BOX

EXIST. ASPHALT PAVING

EXIST. CONCRETE

EXIST. GRAVEL

PROPOSED ASPHALT OVERLAY

PROPOSED HEAVY DUTY

CONCRETE (BROOM FINISH)

EXIST. 1 FOOT CONTOUR

EXIST. 5 FOOT CONTOUR

EXIST. GRADE SPOT ELEVATION

PROPOSED 1 FOOT CONTOUR

PROPOSED 5 FOOT CONTOUR

FINISHED GRADE ELEVATION

OHE

FO

TO BE REMOVED

TO BE REMOVED

TO BE REMOVED

S EXIST. SANITARY SEWER MANHOLE

C EXIST. COMMUNICATION BOX

PROPOSED BRIDGE

ASPHALT TO BE MILLED

SBA - SEDIMENT BARRIER (SILT FENCE, TYPE A)

SS - SOLID SOD/SEED AND MULCH

ALL AREAS REQD TO BE PERMANENTLY STABILIZED

PROPOSED ASPHALT

PROPOSED GRAVEL

PROPOSED CONCRETE JOINTS

EXIST. SANITARY SEWER FORCE MAIN LINE

R.O.W.

CENTERLINE

BENCHMARK

EXISTING AXLE FOUND

CONCRETE MONUMENT FOUND

OPEN TOP IRON PIPE FOUND

CAPPED ROD FOUND

CAPPED ROD SET

EXIST. RIGHT-OF-WAY

EXIST. CENTERLINE

EXIST. SIGNAGE

PROPOSED WEIR INLET

WTL - WATTLE

160.50 T.O.C. FINISHED GRADE ELEVATION (TOP OF CURB)

DRAINAGE DIRECTION

PROPOSED RIP RAP W/ FILTER BLANKET

T 4T

H

ST

RE

ET

B

RI

DG

E

IM

PR

OV

EM

EN

TS

CI

TY

O F

GU

LF

S

HO

RE

S

JOB NO:

SCALE:

DATE:

DRAFTER:

SHEET:

26-2016.20

JULY 2026

KYR

G re en o R d N o rt h S te

C

F ai rh o p e, A la b am a

P .O

B o x

F ai rh o p e, A la b am a

P h o n e:

-3 ja d en gi n ee rs .c o m

A

L

C A

-3 -E

AP

PR

DA

TE

RE

VI

SI

ON

NO

/2

2/

IS

SU

E

FO

R

BI

D

1.

N/A

SU

M

M

AR

Y

TA

BL

E

OF

Q

UA

NT

IT

IE

S

C2.2

QUANTITY ALDOT ITEM NO. UNIT ITEM DESCRIPTION PROJECT NOTES

1 205-A EA REMOVAL OF STRUCTURES, STRUCTURE NO. 1 - EX. BRIDGE

24 206-D LF REMOVING PIPE

41 206-D LF REMOVING FENCE

350 210-A CUYD UNCLASSIFIED EXCAVATION

250 210-D CUYD BORROW EXCAVATION

22 214-B CUYD FOUNDATION BACKFILL

30 230-B SQYD ROADBED PROCESSING

30 301-A SQYD CRUSHED AGGREGATE BASE COURSE, TYPE B, PLANT MIXED, 6" COMPACTED THICKNESS

17 405-A GAL TACK COAT (0.05 GAL/SY)

318 408-A SQYD PLANING EXISTING PAVEMENT (APPROXIMATELY 1.10" THRU 2.0" THICK)

336 424-A SQYD SUPERPAVE BITUMINOUS CONCRETE WEARING SURFACE LAYER, 1/2" MAXIMUM AGGREGATE SIZE MIX, ESAL RANGE C/D, 165LB/SY

21 424-B SQYD SUPERPAVE BITUMINOUS CONCRETE UPPER BINDER LAYER, 1" MAXIMUM AGGREGATE SIZE MIX, ESAL

RANGE C/D, 220LB/SY (ASPHALT LEVELING COURSE)

670 424-B SQYD ASPHALT LEVELING COURSE, 0-2"

15 430-B TON AGGREGATE SURFACING (CRUSHED AGGREGATE BASE, TYPE B)

200 533-A LF 30" STORM SEWER PIPE (CLASS 3 R.C.)

1 600-A LS MOBILIZATION

30 608-A SQYD NON-WOVEN SEPARATION FABRIC (MIRAFI 160N)

111 610-A SQYD LOOSE RIPRAP, CLASS II, 24" THICK

111 610-D SQYD FILTER BLANKET, GEOTEXTILE (NON WOVEN)

435 618-A SQYD CONCRETE SIDEWALK, 6" THICK

75 618-B SQYD CONCRETE DRIVEWAY, 6" THICK (INCLUDES WIRE MESH)

28 618-C SQFT DETECTABLE WARNING SURFACE

1 621-C EA INLETS, 4'x4' WEIR INLET

38 623-B LF 6" CONCRETE HEADER CURB

1 641-S EA WATER VALVE BOX RESET

130 650-A CUYD TOPSOIL

930 654-A SQYD SOLID SOD

550 665-J LF SILT FENCE, TYPE "A"

550 665-O LF SILT FENCE REMOVAL

1 665-P EA INLET PROTECTION, STAGE 3 OR 4

25 665-Q LF WATTLE

1 680-A LS ENGINEERING CONTROLS

8 770-L EA STAINLESS STEEL BOLLARD, COMPLETE IN PLACE

SUMMARY TABLE OF QUANTITIES

T 4T

H

ST

RE

ET

B

RI

DG

E

IM

PR

OV

EM

EN

TS

CI

TY

O F

GU

LF

S

HO

RE

S

JOB NO:

SCALE:

DATE:

DRAFTER:

SHEET:

26-2016.20

JULY 2026

KYR

G re en o R d N o rt h S te

C

F ai rh o p e, A la b am a

P .O

B o x

F ai rh o p e, A la b am a

P h o n e:

-3 ja d en gi n ee rs .c o m

A

L

C A

-3 -E

AP

PR

DA

TE

RE

VI

SI

ON

NO

/2

2/

IS

SU

E

FO

R

BI

D

1.

NTS

TY

PI

CA

L

SE

CT

IO

NS

1. SUBGRADE SOILS BELOW THE ROADWAYS AND 2' BEYOND THE

PAVEMENT OR CURB LINE SHALL BE UNDERCUT TO A DEPTH OF 2' BELOW

THE EXISTING GROUND SURFACE OR TO DEPTH THAT WILL PROVIDE FOR

2' OF STRUCTURAL FILL BELOW THE BOTTOM OF THE BASE LAYER

(WHICHEVER UNDERCUT IS DEEPER).

2. THE FULL WIDTH OF THE TYPICAL SECTION, FROM TIE POINT TO TIE

POINT, SHALL BE GRADED AND PERMANENTLY STABILIZED PRIOR TO FINAL

INSPECTION WITH CITY OF GULF SHORES.

3. SOLID SOD SHALL BE PROVIDED BETWEEN SIDEWALK AND BACK OF

CURB.

4. EXPANSION JOINT MATERIAL SHALL BE PROVIDED AT ALL RADII POINTS

ALONG THE CONCRETE CURB & GUTTER AND SIDEWALKS AND WHERE

CURB AND SIDEWALKS ADJOIN CURB INLETS.

TYPICAL SECTION NOTES:

78 6

STA 0+34.70 TO STA 3+88.62

NTS

TYPICAL SIDEWALK SECTION: W 4TH STREET

C3.0

ASPHALT OVERLAY TYPICAL SECTION FOR

INTERSECTING STREETS

MILLED ASPHALT TIE-IN DETAIL

NTS

MILLED ASPHALT TIE-IN,

1.5" MIN. THICKNESS

REQ'D., 1 TO 6 EA, 0-2"

ASPHALT LEVELING COURSE

FULL-DEPTH ASPHALT PAVEMENT BUILD-UP

ALL GRADING AND PAVING SHALL CONFORM

WITH GEOTECH REPORT PROVIDED BY

"GEOCON ENGINEERING & MATERIALS

TESTING, INC" DATED MARCH 1, 2024.

GEOCON PROJECT NO. DL 4247-24

NTS

C

C C

FO

FO

FO

S

S

W

W

OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE

O H

E O

H E

O H

E O

H E

O H

E O

H E

O H

E O

H E

O H

E

O H

E O

H E

O H

EOHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

W

W W W W W W W W W W W W W W W W W

W

W

W W

W

O H

E O

H E

O H

E O

H E

O H

E O

H E

O H

E

W

W

W

W

W

W

W

W

W

W

W

W

W

SS

SS

GAS GAS GAS GAS GAS GAS

GAS

GAS

GAS

LEGEND

BENCHMARK

EXISTING AXLE FOUND

CONCRETE MONUMENT FOUND

OPEN TOP IRON PIPE FOUND

CAPPED ROD FOUND

CAPPED ROD SET

R.O.W.

UGC

RIGHT-OF-WAY

CENTERLINE CENTERLINE

EXIST. OVERHEAD UTILITY AND UTILITY POLE

EXIST. GUY WIRE AND UTILITY POLEGUY

EXIST. WATER LINE

EXIST. SANITARY SEWER LINE

EXIST. GAS LINE

EXIST. FIBER OPTIC CABLE LINE

EXIST. FENCE LINE

EXIST. PIPE

EXIST. EDGE OF WATER

EXIST. POWER POLE

EXIST. LIGHT POLE

EXIST. WATER VALVE

EXIST. FIRE HYDRANT

EXIST. SANITARY SEWER MANHOLE

EXIST. FIBER OPTIC CABLE BOX

EXIST. ASPHALT PAVING

EXIST. CONCRETE

EXIST. GRAVEL

FO

S EXIST. SANITARY SEWER MANHOLE

C EXIST. COMMUNICATION BOX

EXIST. SANITARY SEWER FORCE MAIN LINE

PROPOSED CONCRETE JOINTS

PROPOSED WEIR INLET

EXIST. SIGNAGE

W

OHE

SS SS

GAS

( IN FEET )

1 inch = ft.

GRAPHIC SCALE

W

ES

T 4T

H

ST

RE

ET

B

RI

DG

E

IM

PR

OV

EM

EN

TS

CI

TY

O F

GU

LF

S

HO

RE

S

JOB NO:

SCALE:

DATE:

DRAFTER:

SHEET:

26-2016.20

JULY 2026

KYR

G re en o R d N o rt h S te

C

F ai rh o p e, A la b am a

P .O

B o x

F ai rh o p e, A la b am a

P h o n e:

-3 ja d en gi n ee rs .c o m

A

L

C A

-3 -E

AP

PR

DA

TE

RE

VI

SI

ON

NO

/2

2/

IS

SU

E

FO

R

BI

D

1.

1" = 20'

EX

IS

TI

NG

C

ON

DI

TI

ON

S

Professional Land Surveyors

SURVEY PROVIDED BY:

Wattier Surveying, Inc.

1. REFER TO SHEET C2.0 FOR ADDITIONAL NOTES.

NOTES:

EXISTING UTILITIES INDICATED ON THESE PLANS ARE BASED ON AVAILABLE

INFORMATION. CONTRACTOR IS REQUIRED TO VERIFY LOCATION, BURY DEPTH, SIZE

AND MATERIAL TYPE PRIOR TO ANY UTILITY IMPROVEMENTS. THE ENGINEER SHALL BE

NOTIFIED IMMEDIATELY OF ANY DISCREPANCIES THAT ARE FOUND.

EXISTING UTILITIES DISCLAIMER:

UTILITY INFORMATION

CONTRACTOR SHALL HAVE ALL EXISTING BURIED UTILITIES

"LINE SPOTTED" BY CALLING 1-800-292-8925 (ALABAMA ONE-CALL)

OR BY CONTACTING LOCAL UTILITY COMPANIES

WATER/ SEWER:

GULF SHORES UTILITIES

RHONDA BUTLER - GENERAL MANAGER

(251) 968-6323 ext 3336 gsurbutler@gmail.com

1629 EAST 1ST ST, GULF SHORES, AL 36542

POWER:

BALDWIN EMC

KEN PIMPERL - (251) 989-0220

19600 STATE HIGHWAY 59, SUMMERDALE, AL 36580

GAS:

RIVIERA UTILITIES

JAMES WALLACE - (251) 943-5001

413 EAST LAUREL AVE, FOLEY, AL 36535

FIBER/ OTHER

COMMUNICATION:

BRIGHTSPEED

FORREST CHERNEY - (980) 376-1408

1120 SOUTH TRYON ST, SUITE 700, CHARLOTTE, NC 28203

C4.0

C C

FO

FO

FO

S

S

W

W

(REQ'D., REMOVE)

REQ'D., SAWCUT AND REMOVE EXISTING ASPHALT

(SAWCUT TO PROVIDE SMOOTH EDGE)

(REQ'D., REMOVE)

(REQ'D., REMOVE)

(REQ'D., TO REMAIN)

(REQ'D., REMOVE)

(REQ'D., TO REMAIN)

(REQ'D., REMOVE)

REQ'D., MILLING

EXISTING ASPHALT

REQ'D., MILLING EXISTING

ASPHALT

(REQ'D., REMOVE)

(REQ'D., REMOVE)

(REQ'D., REMOVE)(REQ'D., TO REMAIN)

(REQ'D., TO REMAIN)

(REQ'D., TO REMAIN)

(REQ'D., TO REMAIN)

(REQ'D., TO REMAIN)

(REQ'D., TO REMAIN)

(REQ'D., TO REMAIN)

REQ'D., SAWCUT AND REMOVE

APPROX. 54 SY EXIST. GRAVEL

OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE

O H

E O

H E

O H

E O

H E

O H

E O

H E

O H

E O

H E

O H

E

O H

E O

H E

O H

EOHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

W

W W W W W W W W W W W W W W W W W

W

W

W W

W

O H

E O

H E

O H

E O

H E

O H

E O

H E

O H

E

W

W

W

W

W

W

W

W

W

W

W

W

W

SS

SS

GAS GAS GAS GAS GAS GAS

GAS

GAS

GAS

LEGEND

BENCHMARK

EXISTING AXLE FOUND

CONCRETE MONUMENT FOUND

OPEN TOP IRON PIPE FOUND

CAPPED ROD FOUND

CAPPED ROD SET

R.O.W.

UGC

RIGHT-OF-WAY

CENTERLINE CENTERLINE

EXIST. OVERHEAD UTILITY AND UTILITY POLE

EXIST. GUY WIRE AND UTILITY POLEGUY

EXIST. WATER LINE

EXIST. SANITARY SEWER LINE

EXIST. GAS LINE

EXIST. FIBER OPTIC CABLE LINE

EXIST. FENCE LINE

EXIST. PIPE

EXIST. EDGE OF WATER

EXIST. POWER POLE

EXIST. LIGHT POLE

EXIST. WATER VALVE

EXIST. FIRE HYDRANT

EXIST. SANITARY SEWER MANHOLE

EXIST. FIBER OPTIC CABLE BOX

EXIST. ASPHALT PAVING

EXIST. CONCRETE

EXIST. GRAVEL

FO

S EXIST. SANITARY SEWER MANHOLE

C EXIST. COMMUNICATION BOX

EXIST. SANITARY SEWER FORCE MAIN LINE

PROPOSED CONCRETE JOINTS

PROPOSED WEIR INLET

EXIST. SIGNAGE

W

OHE

SS SS

GAS

TO BE REMOVED

TO BE REMOVED

TO BE REMOVED

ASPHALT MILLING

DE

M

OL

IT

IO

N

PL

AN

W

ES

T 4T

H

ST

RE

ET

B

RI

DG

E

IM

PR

OV

EM

EN

TS

CI

TY

O F

GU

LF

S

HO

RE

S

JOB NO:

SCALE:

DATE:

DRAFTER:

SHEET:

26-2016.20

JULY 2026

KYR

G re en o R d N o rt h S te

C

F ai rh o p e, A la b am a

P .O

B o x

F ai rh o p e, A la b am a

P h o n e:

-3 ja d en gi n ee rs .c o m

A

L

C A

-3 -E

AP

PR

DA

TE

RE

VI

SI

ON

NO

/2

2/

IS

SU

E

FO

R

BI

D

1.

1" = 20'

1. ALL DEMOLITION TO BE DISPOSED OF IN ACCORDANCE

WITH ALL LOCAL, STATE, AND FEDERAL LAWS AND

REGULATIONS.

DEMOLITION NOTE:

EXISTING UTILITIES INDICATED ON THESE PLANS ARE BASED ON AVAILABLE

INFORMATION. CONTRACTOR IS REQUIRED TO VERIFY LOCATION, BURY DEPTH, SIZE

AND MATERIAL TYPE PRIOR TO ANY UTILITY IMPROVEMENTS. THE ENGINEER SHALL BE

NOTIFIED IMMEDIATELY OF ANY DISCREPANCIES THAT ARE FOUND.

EXISTING UTILITIES DISCLAIMER:

Professional Land Surveyors

SURVEY PROVIDED BY:

Wattier Surveying, Inc.

C5.0

( IN FEET )

1 inch = ft.

GRAPHIC SCALE

C C

FO

FO

FO

S

S

W

W

W

OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE

O H

E O

H E

O H

E O

H E

O H

E O

H E

O H

E O

H E

O H

E

O H

E O

H E

O H

EOHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

W

W W W W W W W W W W W W W W W W W

W

W

W W

W

O H

E O

H E

O H

E O

H E

O H

E O

H E

O H

E

W

W

W

W

W

W

W

W

W

W

W

W

W

W

SS

SS

GAS GAS GAS GAS GAS GAS

GAS

GAS

GAS

ST

A=

0+

ST

A=

1+

ST

A=

2+

STA=3+00

ST

A=

4+

ST

A=

4+

BEGIN PHASE:

STA:0+00.00

OFF:0.00'

END PHASE:

STA:4+26.59

OFF:0.00'

REQ'D; 35'X16' PEDESTRIAN BRIDGE W/

2 EA 15'x4' FISHING AREA. ELEV. 8.25'

SEE BRIDGE PLAN SHEET S3.3

REQ'D., ASPHALT OVERLAY

REQ'D; 95 LF 12' WIDE

6" THICK CONCRETE SIDEWALK

REQ'D; 105 LF 12' WIDE

6" THICK CONCRETE SIDEWALK

REQ'D; 60 LF 10' WIDE

6" THICK CONCRETE SIDEWALK

REQ'D; 20 LF TAPPER FROM 10'

SIDEWALK TO 12' SIDEWALK

REQ'D; 20 LF TAPER FROM

12' SIDEWALK TO 15' SIDEWALK

REQ'D; 20 LF TAPER FROM 12'

SIDEWALK TO 15' SIDEWALKREQ'D; AGGREGATE SURFACING

REQ'D; ASPHALT SURFACING

REQ'D; FUTURE

SIDEWALK CONNECTION

REQ'D; 5 EA STAINLESS STEEL

PIPE BOLLARDS. 6' O.C.

REQ'D; 1 TO 6 EA, 0-2"

ASPHALT LEVELING COURSE

REQ'D; ABUTMENT WALLS

SEE DETAILS SHEETS S3.1, S3.2REQ'D; ADA TYLE, TYP.

REQ'D., 3 EA STAINLESS STEEL

PIPE BOLLARDS. 6' O.C.

REQ'D; SAWCUT

CONTRACTION JOINTS

REQ'D; SAWCUT

CONTRACTION JOINTS

REQ'D; ASPHALT SURFACING

REQ'D; 10 SY CONCRETE

W/ BIKE RACK

REQ'D; FENCE ALONG TOP OF WALL

SEE DETAIL SHEET S3.1

REQ'D; FENCE ALONG TOP OF WALL

SEE DETAIL SHEET S3.2

REQ'D; 10 SY CONCRETE

W/ BIKE RACK

REQ'D; CONCRETE DRIVEWAY

REQ'D; SAWCUT

CONTRACTION JOINTS

REQ'D; RESET EX. VALVE BOX

W/ TRAFFIC RATED BOX.

REQ'D; CONNECT TO EX.

DRIVEWAY (FLUSH)

REQ'D; 6" CONCRETE

HEADER CURB

REQ'D; 57 SY RIP-RAP, CLASS II,

24" THICK W/ FILTER BLANKET

REQ'D; 54 SY RIP-RAP, CLASS II,

24" THICK W/ FILTER BLANKET

LEGEND

BENCHMARK

EXISTING AXLE FOUND

CONCRETE MONUMENT FOUND

OPEN TOP IRON PIPE FOUND

CAPPED ROD FOUND

CAPPED ROD SET

R.O.W.

UGC

RIGHT-OF-WAY

CENTERLINE CENTERLINE

EXIST. OVERHEAD UTILITY AND UTILITY POLE

EXIST. GUY WIRE AND UTILITY POLEGUY

EXIST. WATER LINE

EXIST. SANITARY SEWER LINE

EXIST. GAS LINE

EXIST. FIBER OPTIC CABLE LINE

EXIST. FENCE LINE

EXIST. PIPE

EXIST. EDGE OF WATER

EXIST. POWER POLE

EXIST. LIGHT POLE

EXIST. WATER VALVE

EXIST. FIRE HYDRANT

EXIST. SANITARY SEWER MANHOLE

EXIST. FIBER OPTIC CABLE BOX

EXIST. ASPHALT PAVING

EXIST. CONCRETE

EXIST. GRAVEL

PROPOSED ASPHALT OVERLAY

PROPOSED HEAVY DUTY

CONCRETE (BROOM FINISH)

FO

S EXIST. SANITARY SEWER MANHOLE

C EXIST. COMMUNICATION BOX

PROPOSED BRIDGE

PROPOSED ASPHALT

PROPOSED GRAVEL

EXIST. SANITARY SEWER FORCE MAIN LINE

PROPOSED CONCRETE JOINTS

PROPOSED WEIR INLET

EXIST. SIGNAGE

W

OHE

SS SS

GAS

PROPOSED RIP RAP W/ FILTER BLANKET

SI

TE

L

AY

OU

T

W

ES

T 4T

H

ST

RE

ET

B

RI

DG

E

IM

PR

OV

EM

EN

TS

CI

TY

O F

GU

LF

S

HO

RE

S

JOB NO:

SCALE:

DATE:

DRAFTER:

SHEET:

26-2016.20

JULY 2026

KYR

G re en o R d N o rt h S te

C

F ai rh o p e, A la b am a

P .O

B o x

F ai rh o p e, A la b am a

P h o n e:

-3 ja d en gi n ee rs .c o m

A

L

C A

-3 -E

AP

PR

DA

TE

RE

VI

SI

ON

NO

/2

2/

IS

SU

E

FO

R

BI

D

1.

1" = 20'

NOTES TO CONTRACTOR:

1. THE CONTRACTOR SHALL PROTECT AND MAINTAIN ANY EXISTING SLOPES AND INFRASTRUCTURES

ON THE SITE ( I.E. PONDS, INLETS, ETC.).

2. CONTRACTOR TO VIDEO ALL EXISTING SEWER AND DRAIN LINES TO ENSURE THEY ARE CLEAR AND

IN PROPER WORKING ORDER. PROVIDE VIDEO TO THE OWNER.

3. AFTER THE STORM DRAIN SYSTEM IS COMPLETED THE CONTRACTOR SHALL VIDEO THE SYSTEM

AND SUBMIT VIDEO TO THE OWNER FOR REVIEW.

4. THE CONTRACTOR SHALL MAINTAIN ACCESS TO THE SITE FOR THE DURATION OF THE PROJECT.

5. ALL EARTHWORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH GEOTECHNICAL

RECOMMENDATIONS.

6. ALL CONDUIT LOCATIONS FOR POWER, TELEPHONE, AND CABLE SHALL BE COORDINATED WITH

ARCHITECTURAL PLANS AND LOCAL UTILITY PROVIDERS.

Professional Land Surveyors

SURVEY PROVIDED BY:

Wattier Surveying, Inc.

C6.0

( IN FEET )

1 inch = ft.

GRAPHIC SCALE

ST

A=

0+

ST

A=

1+

ST

A=

2+

STA=3+00

ST

A=

4+

ST

A=

4+

BEGIN PHASE:

STA:0+00.00

OFF:0.00'

END PHASE:

STA:4+26.59

OFF:0.00'

PI

: 0

+3 4.

PI

: 2

+2 8.

PI

: 2

+6 3.

PI

: 3

+8 8.

PC

: 0

+9 6.

PC: 1

+2 3.8

PC

: 1

+5 9.

PC

: 2

+8 1.

PC: 3+03.87

PC: 3+39.43

PC: 3+70.70

PT: 1

+1

1.5

PT

: 1

+3 8.

PT

: 2

+0 9.

PT: 2+88.15

PT: 3

+18.94

PT: 3+57.76

PT

: 3

+7 9.

PR

C

: 1 +8

2.

23C1

C2 C3 C4 C5

C6

C7

C8

LEGEND

BENCHMARK

EXISTING AXLE FOUND

CONCRETE MONUMENT FOUND

OPEN TOP IRON PIPE FOUND

CAPPED ROD FOUND

CAPPED ROD SET

R.O.W.

UGC

RIGHT-OF-WAY

CENTERLINE CENTERLINE

EXIST. OVERHEAD UTILITY AND UTILITY POLE

EXIST. GUY WIRE AND UTILITY POLEGUY

EXIST. WATER LINE

EXIST. SANITARY SEWER LINE

EXIST. GAS LINE

EXIST. FIBER OPTIC CABLE LINE

EXIST. FENCE LINE

EXIST. PIPE

EXIST. EDGE OF WATER

EXIST. POWER POLE

EXIST. LIGHT POLE

EXIST. WATER VALVE

EXIST. FIRE HYDRANT

EXIST. SANITARY SEWER MANHOLE

EXIST. FIBER OPTIC CABLE BOX

EXIST. ASPHALT PAVING

EXIST. CONCRETE

EXIST. GRAVEL

PROPOSED ASPHALT OVERLAY

PROPOSED HEAVY DUTY

CONCRETE (BROOM FINISH)

FO

S EXIST. SANITARY SEWER MANHOLE

C EXIST. COMMUNICATION BOX

PROPOSED BRIDGE

PROPOSED ASPHALT

PROPOSED GRAVEL

EXIST. SANITARY SEWER FORCE MAIN LINE

PROPOSED CONCRETE JOINTS

PROPOSED WEIR INLET

EXIST. SIGNAGE

W

OHE

SS SS

GAS

PROPOSED RIP RAP W/ FILTER BLANKET

ALIGNMENT CURVE DATA

CURVE #

C1

C2

C3

C4

C5

C6

C7

C8

RADIUS

20.00'

20.25'

170.00'

245.00'

10.00'

10.00'

10.00'

10.00'

DELTA ANGLE

42°12'30"

40°55'48"

7°42'42"

6°19'00"

36°33'17"

86°19'44"

105°02'08"

49°50'36"

CHORD LENGTH

14.40'

14.16'

22.86'

27.00'

6.27'

13.68'

15.87'

8.43'

CHORD BEARING

N10°26'06.64"E

N10°15'27.53"E

N8°39'25.16"W

N8°08'25.38"W

N30°17'52.35"W

N5°24'38.83"W

N9°43'26.01"W

N37°19'12.00"W

ARC LENGTH

14.73'

14.47'

22.88'

27.01'

6.38'

15.07'

18.33'

8.70'

TANGENT

7.72'

7.56'

11.46'

13.52'

3.30'

9.38'

13.04'

4.65'

PC STATION

0+96.82

1+23.82

1+59.35

1+82.23

2+81.77

3+03.87

3+39.43

3+70.70

PT STATION

1+11.56

1+38.28

1+82.23

2+09.24

2+88.15

3+18.94

3+57.76

3+79.40

GE

OM

ET

RI

C

CO

NT

RO

L

LA

YO

UT

W

ES

T 4T

H

ST

RE

ET

B

RI

DG

E

IM

PR

OV

EM

EN

TS

CI

TY

O F

GU

LF

S

HO

RE

S

JOB NO:

SCALE:

DATE:

DRAFTER:

SHEET:

26-2016.20

JULY 2026

KYR

G re en o R d N o rt h S te

C

F ai rh o p e, A la b am a

P .O

B o x

F ai rh o p e, A la b am a

P h o n e:

-3 ja d en gi n ee rs .c o m

A

L

C A

-3 -E

AP

PR

DA

TE

RE

VI

SI

ON

NO

/2

2/

IS

SU

E

FO

R

BI

D

1.

1" = 20'

Professional Land Surveyors

SURVEY PROVIDED BY:

Wattier Surveying, Inc.

C7.0

( IN FEET )

1 inch = ft.

GRAPHIC SCALE

C C

FO

FO

FO

S

S

W

W

W

CB-1

REQ'D., WEIR INLET

ONE WEIR OPEN (W)

THROAT ELEV = 2.50

(N)30" RCP INV (OUT): -2.03

REQ'D., 200LF 30" RCP @ 0.15%

REQ'D; 30" RCP

INV. -2.33

OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE

O H

E O

H E

O H

E O

H E

O H

E O

H E

O H

E O

H E

O H

E

O H

E O

H E

O H

EOHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

W

W W W W W W W W W W W W W W W W W

W

W

W W

W

O H

E O

H E

O H

E O

H E

O H

E O

H E

O H

E

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

SS

SS

GAS GAS GAS GAS GAS GAS

GAS

GAS

GAS

3.75

3.75

8.258.25 3.85

4 3

7 7

3 7

ST

A=

0+

ST

A=

1+

ST

A=

2+

STA=3+00

ST

A=

4+

ST

A=

4+

BEGIN PHASE:

STA:0+00.00

OFF:0.00'

END PHASE:

STA:4+26.59

OFF:0.00'

3.65

3.

T .O

.C

3.

REQ'D; 57 SY RIP-RAP, CLASS II,

24" THICK W/ FILTER BLANKET

REQ'D; 54 SY RIP-RAP, CLASS II,

24" THICK W/ FILTER BLANKET

3.454.00 T.O.C.

3.50

3.10 3.25

4.80

4.80

4.65

4.50

4.00

4.10 4.25

4.15

4.35

4.25

2.

MATCH EX.

MATCH EX.

MATCH EX.

MATCH EX.

LEGEND

BENCHMARK

EXISTING AXLE FOUND

CONCRETE MONUMENT FOUND

OPEN TOP IRON PIPE FOUND

CAPPED ROD FOUND

CAPPED ROD SET

160.00

R.O.W.

UGC

RIGHT-OF-WAY

CENTERLINE CENTERLINE

EXIST. OVERHEAD UTILITY AND UTILITY POLE

EXIST. GUY WIRE AND UTILITY POLEGUY

EXIST. WATER LINE

EXIST. SANITARY SEWER LINE

EXIST. GAS LINE

EXIST. FIBER OPTIC CABLE LINE

EXIST. FENCE LINE

EXIST. PIPE

EXIST. EDGE OF WATER

EXIST. POWER POLE

EXIST. LIGHT POLE

EXIST. WATER VALVE

EXIST. FIRE HYDRANT

EXIST. SANITARY SEWER MANHOLE

EXIST. FIBER OPTIC CABLE BOX

EXIST. ASPHALT PAVING

EXIST. CONCRETE

EXIST. GRAVEL

PROPOSED ASPHALT OVERLAY

PROPOSED HEAVY DUTY

CONCRETE (BROOM FINISH)

EXIST. 1 FOOT CONTOUR

EXIST. 5 FOOT CONTOUR

EXIST. GRADE SPOT ELEVATION

PROPOSED 1 FOOT CONTOUR

PROPOSED 5 FOOT CONTOUR

FINISHED GRADE ELEVATION

FO

S EXIST. SANITARY SEWER MANHOLE

C EXIST. COMMUNICATION BOX

PROPOSED BRIDGE

PROPOSED ASPHALT

PROPOSED GRAVEL

EXIST. SANITARY SEWER FORCE MAIN LINE

PROPOSED CONCRETE JOINTS

PROPOSED WEIR INLET

EXIST. SIGNAGE

W

OHE

SS SS

GAS

160.50 T.O.C. FINISHED GRADE ELEVATION (TOP OF CURB)

DRAINAGE DIRECTION

PROPOSED RIP RAP W/ FILTER BLANKET

GR

AD

IN

G

DR

AI

NA

GE

P

LA

N

W

ES

T 4T

H

ST

RE

ET

B

RI

DG

E

IM

PR

OV

EM

EN

TS

CI

TY

O F

GU

LF

S

HO

RE

S

JOB NO:

SCALE:

DATE:

DRAFTER:

SHEET:

26-2016.20

JULY 2026

KYR

G re en o R d N o rt h S te

C

F ai rh o p e, A la b am a

P .O

B o x

F ai rh o p e, A la b am a

P h o n e:

-3 ja d en gi n ee rs .c o m

A

L

C A

-3 -E

AP

PR

DA

TE

RE

VI

SI

ON

NO

/2

2/

IS

SU

E

FO

R

BI

D

1.

1" = 20'

Professional Land Surveyors

SURVEY PROVIDED BY:

Wattier Surveying, Inc.

C8.0

NOTES TO CONTRACTOR:

1. THE CONTRACTOR SHALL PROTECT AND MAINTAIN ANY EXISTING SLOPES AND INFRASTRUCTURES

ON THE SITE ( I.E. PONDS, INLETS, ETC.).

2. CONTRACTOR TO VIDEO ALL EXISTING SEWER AND DRAIN LINES TO ENSURE THEY ARE CLEAR AND

IN PROPER WORKING ORDER. PROVIDE VIDEO TO THE OWNER.

3. AFTER THE STORM DRAIN SYSTEM IS COMPLETED THE CONTRACTOR SHALL VIDEO THE SYSTEM

AND SUBMIT VIDEO TO THE OWNER FOR REVIEW.

4. THE CONTRACTOR SHALL MAINTAIN ACCESS TO THE SITE FOR THE DURATION OF THE PROJECT.

5. ALL EARTHWORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH GEOTECHNICAL

RECOMMENDATIONS.

6. ALL CONDUIT LOCATIONS FOR POWER, TELEPHONE, AND CABLE SHALL BE COORDINATED WITH

ARCHITECTURAL PLANS AND LOCAL UTILITY PROVIDERS.

( IN FEET )

1 inch = ft.

GRAPHIC SCALE

C C

C

FO FO

FO

S

S

W

W

W

W

W

CB-1

REQ'D., WEIR INLET

ONE WEIR OPEN (W)

THROAT ELEV = 2.50

(N)30" RCP INV (OUT): -2.03

REQ'D., 200LF 30" RCP @ 0.15%

REQ'D; 30" RCP

INV. -2.33

OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE

O H

E

O H

E

O H

E

O H

E

O H

E

O H

E

O H

E

O H

E

O H

E

O H

E O

H E

O H

EOHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

OHE

W

W W W W W W W W W W W W W W W W W W

W

W

W W

W

W

O H

E O

H E

O H

E O

H E

O H

E O

H E

O H

E

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

SS

SS

SS

SS

GAS GAS GAS GAS GAS GAS

GAS

GAS

GAS

3.75

3.75

8.258.25 3.85

4 3

7 7

3 7

ST

A=

0+

ST

A=

1+

ST

A=

2+

00 STA=3+00

ST

A=

4+

ST

A=

4+

BEGIN PHASE:

STA:0+00.00

OFF:0.00'

END PHASE:

STA:4+26.59

OFF:0.00'

3.65

3.

T .O

.C

3.

REQ'D; 57 SY RIP-RAP, CLASS II,

24" THICK W/ FILTER BLANKET

REQ'D; 54 SY RIP-RAP, CLASS II,

24" THICK W/ FILTER BLANKET

3.45

4.00 T.O.C.

3.50

3.10 3.25

4.80

4.80

4.65

4.50

4.00

4.10 4.25

4.15

4.35

4.25

2.

MATCH EX.

MATCH EX.

MATCH EX.

MATCH EX.

Profile View of 4th Street Horizontal Scale: 1" = 20'

Vertical Scale: 1" = 5'

-15

-10

-5

-15

-10

-5

0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+27

0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+27

VPI STA = 1+19.26

EL = 4.38

L = 45.53' K = 19.16

G1 = 0.35% G2 = 2.73%

VP

C

S

TA

+9 6.

EL

.3

VP

T

ST

A

1+

.0

EL

.0

CB-1

REQD., WEIR INLET

ONE WEIR OPEN (W)

RIM ELEV = 2.50

(N)30" RCP INV (OUT): -2.03

REQ'D., 200LF 30" RCP @ 0.15%

G R

AD

E

BR

EA

K

ST

A

3+

.1

EL

.0

-4.14%

4.49% 3.59% 2.61%

-4.04% -3.26%

-3.37% -4.14% -1.65%0.43%

3.68%

-2.45% H

P

ST

A

2+

.3

EL

.3

VPI STA = 2+46.39

EL = 8.45

L = 35.00' K = 15.26

G1 = 1.15% G2 = -1.15%

VP

C

S

TA

+2 8.

EL

.2

VP

T

ST

A

2+

.8

EL

.2

PEDESTRIAN BRIDGE

BEGIN STA 2+28.89

END STA 2+63.89

ELEV. 8.25' BRIDGE DESIGN INCLUDED

ON SHEETS S3.3, S3.4

REQ'D; 57 SY RIP-RAP, CLASS II,

24" THICK W/ FILTER BLANKET

REQ'D; 54 SY RIP-RAP, CLASS II,

24" THICK W/ FILTER BLANKET

W

ES

T 4T

H

ST

RE

ET

B

RI

DG

E

IM

PR

OV

EM

EN

TS

CI

TY

O F

GU

LF

S

HO

RE

S

JOB NO:

SCALE:

DATE:

DRAFTER:

SHEET:

26-2016.20

JULY 2026

KYR

G re en o R d N o rt h S te

C

F ai rh o p e, A la b am a

P .O

B o x

F ai rh o p e, A la b am a

P h o n e:

-3 ja d en gi n ee rs .c o m

A

L

C A

-3 -E

AP

PR

DA

TE

RE

VI

SI

ON

NO

/2

2/

IS

SU

E

FO

R

BI

D

1.

PL

AN

P

RO

FI

LE

H:1"=20' / V:1"=5'

HORIZ. SCALE: 1"=20'

VERT. SCALE: 1"=5'

C9.0

CI

VI

L

CO

NS

TR

UC

TI

ON

D

ET

AI

LS

W

ES

T

4T H

ST

RE

ET

B

RI

DG

E

IM

PR

OV

EM

EN

TS

CI

TY

O

F

GU

LF

S

HO

RE

S

JOB NO:

SCALE:

DATE:

DRAFTER:

SHEET:

26-2016.20

JULY 2026

KYR

G re en o R d N o rt h S te

C

F ai rh o p e, A la b am a

P .O

B o x

F ai rh o p e, A la b am a

P h o n e:

-3 ja d en gi n ee rs .c o m

A

L

C A

-3 -E

AP

PR

DA

TE

RE

VI

SI

ON

NO

/2

2/

IS

SU

E

FO

R

BI

D

1.

NTS

NTS

CONTRACTION JOINT EXPANSION JOINT

TYPICAL MULTI USE TRAIL DETAILS

PLAN

NTS

CONCRETE MULTI USE TRAIL JOINT DETAILS

TYPICAL STEEL BOLLARD DETAIL

NTS

C10.0

NTS

SAND

GRAVEL

CONCRETE WALK SECTION

TYPICAL CONCRETE WALK DETAILS

NTS

TRENCH BACKFILL DETAILS

NTS

WEIR INLET DETAILS

NTS

TONGUE AND GROOVE CONTRACTION

CONCRETE PAVING JOINT DETAILS

NTS

EXPANSION JOINT

CONTRACTION JOINT 6" CONCRETE HEADER CURB

(OR APPROVED EQUAL)

NTS

NOTE:

1. CURB TO BE PLACED BY SLIP FORM METHOD OR APPROVED EQUAL.

2. TRAVERSE JOINTS TO BE FORMED IN CONCRETE INTEGRAL CURB

DIRECTLY OVER EACH TRAVERSE JOINT IN PAVING OR GUTTER.

3. CONTRACTION JOINTS TO BE PLACED AT 10' INTERVALS AND

EXPANSION JOINTS TO BE PLACED AT 50' INTERVALS.

4. GRADING AND SOD PLACEMENT SHALL BE INSTALLED TO ENSURE

POSITIVE SURFACE WATER DRAINAGE OVER TOP OF CURB.

5. EXPANSION JOINTS: USE PREMOULDED EXPANSION JOINT FILLER

CONFORMING TO ASTM D1751 OR D1752 (OR APPROVED EQUAL)

DRIVEWAY

CONCRETE

EROSION CONTROL LEGEND

SBA - SEDIMENT BARRIER (SILT FENCE, TYPE A)

SS - SOLID SOD/SEED AND MULCH

ALL AREAS REQD TO BE PERMANENTLY STABILIZED

IP - INLET PROTECTION

WTL - WATTLE

SS

SS

SS

SS

SBA

SBA

SBA

SBA

SS

SBA

IP

WTL

WTL

4 3

7 7

3 7

SBA

SS

4 5

RAINFALL INSPECTION NOTE:

SITE CONSTRUCTION DEBRIS DISPOSAL NOTE:

ER

OS

IO

N

CO

NT

RO

L

PL

AN

1" = 20'

W

ES

T 4T

H

ST

RE

ET

B

RI

DG

E

IM

PR

OV

EM

EN

TS

CI

TY

O F

GU

LF

S

HO

RE

S

JOB NO:

SCALE:

DATE:

DRAFTER:

SHEET:

26-2016.20

JULY 2026

KYR

G re en o R d N o rt h S te

C

F ai rh o p e, A la b am a

P .O

B o x

F ai rh o p e, A la b am a

P h o n e:

-3 ja d en gi n ee rs .c o m

A

L

C A

-3 -E

AP

PR

DA

TE

RE

VI

SI

ON

NO

/2

2/

IS

SU

E

FO

R

BI

D

1.

EROSION CONTROL NOTES:

1. ALL EROSION CONTROL MEASURES ARE TO BE INSTALLED AND MAINTAINED IN

ACCORDANCE WITH THE LATEST ADEM STANDARDS.

2. ALL AREAS LEFT UNATTENDED FOR LONGER THAN 13 DAYS SHALL BE COVERED

WITH SEASONAL TEMPORARY SEEDING AND MULCHING.

3. ALL SLOPES SHALL BE TRACKED PERPENDICULAR TO THE SLOPE.

4. NO WORK SHALL COMMENCE UNTIL ALL APPLICABLE EROSION CONTROL MEASURES

HAVE BEEN INSTALLED, INSPECTED BY THE PROJECT ENGINEER, AND APPROVED.

5. STORMWATER DETENTION POND OR SEDIMENT BASIN SHALL BE CONSTRUCTED,

INSPECTED, AND APPROVED PRIOR TO WORK ON ANY OTHER TASK, UNLESS

OTHERWISE APPROVED BY THE PROJECT ENGINEER.

6. ALL DISTURBED AREAS WILL BE PROPERLY STABILIZED. CONTRACTOR TO

COORDINATE WITH LANDSCAPE PLAN FOR FINAL PLANTING REQUIREMENTS.

7. 4" MIN TOPSOIL TO BE SPREAD ACROSS DISTURBED SURFACES ONCE FINAL

GRADING HAS BEEN ESTABLISHED. CONTRACTOR TO PROVIDE SEED/SOD AS PER

EROSION CONTROL PLAN AND STABILIZE DISTURBED AREAS PER ADEM

REQUIREMENTS.

8. BMP'S SHALL BE CLEANED OUT WHEN THEY REACH 13 FULL.

9. INACTIVE PROJECTS (MORE THAN 7 DAYS) SHALL BE MULCHED IF INACTIVE FOR

LESS THAN 60 DAYS. IF PROJECT TO REMAIN INACTIVE FOR MORE THAN 60 DAYS,

PROJECT SHALL BE SEEDED AND MULCHED.

10. CONTRACTOR SHALL USE ALL MEANS NECESSARY TO MINIMIZE DUST GENERATION

DUE TO CONSTRUCTION ACTIVITIES.

A DUMPSTER OF SUITABLE SIZE SHALL BE ON-SITE DURING ALL PHASES OF CONSTRUCTION

ACTIVITIES AND EMPTIED AT A SUITABLE PERMITTED DISPOSAL SITE AND REPLACED AS NEEDED THROUGHOUT THE DURATION OF THE PROJECT. ALL DISPOSAL SHALL MEET ALL LOCAL, STATE, AND FEDERAL CODES AND REGULATIONS.

ALL EROSION CONTROLS SHALL BE INSPECTED BY A QUALIFIED PERSON WITHIN 24 HOURS OF A

RAINFALL EVENT OF 3/4 INCH OR GREATER AND REPAIRED AS NEEDED.

( IN FEET )

1 inch = ft.

GRAPHIC SCALE

Professional Land Surveyors

SURVEY PROVIDED BY:

Wattier Surveying, Inc.

C11.0

ER

OS

IO

N

CO

NT

RO

L

DE

TA

IL

S

W

ES

T 4T

H

ST

RE

ET

B

RI

DG

E

IM

PR

OV

EM

EN

TS

CI

TY

O F

GU

LF

S

HO

RE

S

JOB NO:

SCALE:

DATE:

DRAFTER:

SHEET:

26-2016.20

JULY 2026

KYR

G re en o R d N o rt h S te

C

F ai rh o p e, A la b am a

P .O

B o x

F ai rh o p e, A la b am a

P h o n e:

-3 ja d en gi n ee rs .c o m

A

L

C A

-3 -E

AP

PR

DA

TE

RE

VI

SI

ON

NO

/2

2/

IS

SU

E

FO

R

BI

D

1.

NTS

SPECIFICATIONS

C12.0

Sheets and Views
1.0 COVER (24x36)
2.0 NOTES
2.1 LEGEND
2.2 QUANTITIES
3.0 TYP SEC (24x36)
4.0 EXIST (24x36)
5.0 DEMO (24x36) (1)
6.0 SITE (24x36)
7.0 GEO CNTRL (24x36)
8.0 GRADING (24x36)
9.0 P&P - 4TH
10.0 CIV DTLS 1 (24x36)
11.0 EROS CNTRL (24x36)
12.0 EROS DET (24x36)

File details come from the government source that posted it. Updated .