3-03 - ITB 2026-001 Bid Sheet.xlsx
XLSX spreadsheet 18 KB Posted
- Solicitation number
- ITB 2026-001
- Issued by
- Tarrant County, Texas
About this file
This is a Proposal Form Exhibit 'A' bid sheet for the City of Burleson's Streambank Stabilization and Sanitary Sewer Relocation Project (ITB 2026-001) in Texas. The project encompasses approximately 400 linear feet of gabion wall construction and approximately 300 linear feet of new 24-inch wastewater main installation, including service reconnections, manholes, and abandonment of the existing main along the south bank of Little Booker Creek. The project has an expected duration of 180 calendar days. Bidders must provide unit prices and extensions for 22 line items organized across site preparation, sanitary sewer work, fencing, and streambank stabilization components, including lump sum items for mobilization, signs, clearing and grubbing, erosion control, traffic control, and bypass pumping, as well as unit-priced items for sewer pipes, fittings, gabion structures, and turf reinforcement materials in quantities ranging from 1 to 445 units depending on the item type.
The bid sheet requires contractors to submit both typed or written unit prices in dollars and cents format and corresponding extensions for each line item. Bidders must calculate total extensions by multiplying unit prices by estimated quantities, with major cost drivers including 310 cubic yards of gabion basket structure, 445 square yards of wire-reinforced turf reinforcement mat, 282 linear feet of 24-inch PVC sanitary sewer pipe, 320 square yards of 12-inch thick gabion mattresses, and 50 linear feet each of fence removal and new chain link fence installation. The form provides no information regarding specific pricing terms, set-asides, incumbent contractors, funding sources, or award dates within the bid sheet itself.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
PROPOSAL FORM EXHIBIT 'A'
City of Burleson Streambank Stabilization and Sanitary Sewer Relocation Project
| Item | ||||
| No. | Estimated | |||
| Quantity | Unit | Item Description | ||
| Total Unit Price Typed or Written in Words | Unit Price | Extension | ||
| 101 | 1 | LS | Site Preparation, Mobilization, Bonds, & Insurance |
Dollars and
| Cents Per Lump Sum | $ | $ | ||
| 102 | 1 | LS | Signs for Capital Projects |
Dollars and
| Cents Per Lump Sum | $ | $ | ||
| 103 | 1 | LS | Clearing and Grubbing |
Dollars and
| Cents Per Lump Sum | $ | $ | ||
| 104 | 1 | LS | Erosion Control and De-Watering |
Dollars and
| Cents Per Lump Sum | $ | $ | ||
| 105 | 1 | LS | Traffic Control |
Dollars and
| Cents Per Lump Sum | $ | $ | ||
| 106 | 1 | LS | By-pass Pumping |
Dollars and
| Cents Per Lump Sum | $ | $ | ||
| 107 | 2 | EA | 24" Sanitary Sewer Abandonment Plug |
Dollars and
| Cents Per Each | $ | $ |
| PROPOSAL FORM EXHIBIT 'A' |
City of Burleson Streambank Stabilization and Sanitary Sewer Relocation Project
| Item | ||||
| No. | Estimated | |||
| Quantity | Unit | Item Description | ||
| Total Unit Price Typed or Written in Words | Unit Price | Extension | ||
| 108 | 1 | EA | 10" Sanitary Sewer Abandonment Plug |
Dollars and
| Cents Per Each | $ | $ | ||
| 109 | 2 | EA | 4" Sanitary Sewer (Service) Abandonment Plug |
Dollars and
| Cents Per Each | $ | $ | ||
| 110 | 2 | EA | Abandon Manhole |
Dollars and
| Cents Per Each | $ | $ | ||
| 111 | 28 | CY | Sanitary Sewer Grouting |
Dollars and
| Cents Per Cubic Yard | $ | $ | ||
| 112 | 282 | LF | 24" PVC (ASTM F679) Sanitary Sewer Pipe |
Dollars and
| Cents Per Linear Foot | $ | $ | ||
| 113 | 45 | LF | 4" PVC Sanitary Sewer Service |
Dollars and
| Cents Per Linear Foot | $ | $ | ||
| 114 | 1 | EA | 4" Cleanout |
Dollars and
| Cents Per Each | $ | $ |
| PROPOSAL FORM EXHIBIT 'A' |
City of Burleson Streambank Stabilization and Sanitary Sewer Relocation Project
| Item | ||||
| No. | Estimated | |||
| Quantity | Unit | Item Description | ||
| Total Unit Price Typed or Written in Words | Unit Price | Extension | ||
| 115 | 4 | EA | 5' Diameter Watertight Sanitary Sewer Manhole |
Dollars and
| Cents Per Each | $ | $ | ||
| 116 | 50 | LF | Remove Fence |
Dollars and
| Cents Per Linear Foot | $ | $ | ||
| 117 | 50 | LF | 4' Chain Link Fence |
Dollars and
| Cents Per Linear Foot | $ | $ | ||
| 118 | 310 | CY | Gabion Basket Structure |
Dollars and
| Cents Per Cubic Yard | $ | $ | ||
| 119 | 80 | CY | Grout Backfill |
Dollars and
| Cents Per Cubic Yard | $ | $ | ||
| 120 | 320 | SY | 12" Thick Gabion Mattresses |
Dollars and
| Cents Per Square Yard | $ | $ | ||
| 121 | 70 | EA | Anchor For Mattress |
Dollars and
| Cents Per Each | $ | $ | ||
| 122 | 445 | SY | Wire-Reinforced Turf Reinforcement Mat |
Dollars and Cents Per Square Yard $ $
File details come from the government source that posted it. Updated .