2-02 - ITB 2026-001 Plans.pdf
PDF 10 MB Posted
- Solicitation number
- ITB 2026-001
- Issued by
- Tarrant County, Texas
About this file
This is a set of construction plans for the City of Burleson, Texas, prepared by an engineering firm registered in Tarrant and Johnson Counties. The project, designated WW2401, involves streambank stabilization and sanitary sewer relocation along the south bank of Little Booger Creek. The scope of work includes construction of approximately 400 linear feet of gabion wall for streambank stabilization and installation of approximately 300 linear feet of new 24-inch wastewater main with associated services reconnections, manholes, and abandonment of the existing main. The project has an expected duration of 180 calendar days. The plans consist of nine sheets covering general notes, FEMA floodplain considerations, sewer plans and profiles, gabion layout, gabion plans and profiles, gabion sections, and gabion details. The plans were prepared under ITB 2026-001 and reviewed by the City Engineer as of December 5, 2025.
The document provided does not contain information regarding pricing terms, bid submission deadlines, set-asides, funding sources, or other contractual and financial requirements. Prospective bidders should consult the associated invitation to bid documents and related contract opportunity materials for complete information regarding project costs, payment terms, bonding requirements, and submission procedures.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 5-05 - ITB 2026-001 Bid Opening Link.pdf | ||
| 3-03 - ITB 2026-001 Bid Sheet.xlsx | XLSX spreadsheet | |
| 6-06 - W9 Form.pdf | ||
| 7-07 - Contractor Reference List.pdf | ||
| 1-01 -ITB 2026-001 Specifications Contract Documents.pdf | ||
| 4-04 - ITB 2026-001 Pre-Bid Meeting Link.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STREAMBANK STABILIZATION AND
SANITARY SEWER RELOCATION
CITY OF BURLESON, TEXAS
PUBLIC WORKS & ENGINEERING
AUGUST 2025
FIRM REGISTRATION #3629
500 North Akard Street Suite 3210 Dallas, Texas 75201 214.350.1500
TARRANT CO
JOHNSON CO
35W
U P
R R
Village CreekSW W
ILS
HIR
E B
LV
D
SW JO
HNSON AVE
HIDDEN CREEK PKWY
E RENFRO ST
NW RENFRO ST
CITY COUNCIL
CHRIS FLETCHER, MAYOR
VICTORIA JOHNSON
PHIL ANDERSON
ALEXA BOEDEKER
LARRY SCOTT
DAN McCLENDON, MAYOR PRO TEM
ADAM RUSSELL
CITY MANAGER
TOMMY LUDWIG
Reviewed by City Engineer DATE
CITY PROJECT NO. WW2401
OVERHEAD
ELECTRIC
Δ
Δ
SCALE H:1"=20'; V:1"=4'
OVERHEAD
ELECTRIC
| Sheets and Views |
| 1 Cover |
| 2 General Notes |
| 3 FEMA Floodplain |
| 4 Sewer P&P |
| 5 6_Sewer - 5 |
| 6 Gabion Layout |
| 7 Gabion P&P |
| 8 Gabion Sections |
| 9 Gabion Details |
| 2025-12-05T11:44:04-0600 | |
| Michelle McCullough, P.E.,CFM |
File details come from the government source that posted it. Updated .