27C-411-29 Water Service Replacement Bid Docs.pdf
PDF 722 KB Posted
- Attached to
- 2026 Water Service Replacement
- Solicitation number
- BD-27-1459-BTV02-ENG1-131610
- Issued by
- Massachusetts
About this file
Summary
This is an Invitation for Bid document issued by the Town of Burlington Department of Public Works for the 2026 Water Service Replacement project (#27C-411-29) in Massachusetts. The project involves the abandonment and disposal of eight water services with the subsequent installation of eight 1-inch copper services totaling approximately 100 linear feet across Church Lane, Edgemont Avenue, Elm Avenue, and Pinevale Avenue. Sealed bids were due by August 6, 2026 at 9:30 AM at the Town Hall Annex, 25 Center Street, Burlington, Massachusetts. The contract is procured under Massachusetts General Law Chapter 30, Section 39M and requires bidders to demonstrate a minimum of five years' experience with five satisfactorily completed similar projects. The project schedule mandates commencement no later than September 7, 2026 with completion required by November 13, 2026. The bid form includes 13 line items encompassing copper tubing installation, curb boxes, corporation taps, unions, materials (loam, hydroseed, gravel, sand), excavation, concrete removal, and bituminous patching. Benjamin Jette, the Town's Designated Representative, serves as the primary point of contact for questions.
Bidders must submit a bid bond, cash, or certified check equal to 5 percent of the bid amount, with the successful bidder required to provide 100 percent Payment and Performance bonds. Prevailing wage rates as determined by the Massachusetts Department of Labor and Industries under Chapter 149, Sections 26-27G apply to all work. The contract award will be made to the lowest responsible and eligible bidder, with the successful contractor required to execute the formal agreement within 10 days of notice of award. Liquidated damages are assessed at $1,000 per calendar day for delays beyond the November 13, 2026 completion date. The specifications reference Commonwealth of Massachusetts Department of Transportation Standard Specifications for Highway and Bridges (2020 edition). Specifications and bid forms were available for reproduction at a cost of $50.00 after July 23, 2026, and specifications are available on the Town's website. Contractor references, certification of non-collusion and tax compliance, and proof of OSHA 10-hour safety training completion for all employees are required as part of the bid package.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TOWN OF BURLINGTON
DEPARTMENT OF PUBLIC WORKS
2026 Water Service Replacement # 27C-411-29
Department of Public Works
25 Center Street
Burlington MA 01803
August 6, 2026
Town of Burlington Public Works Construction
Department of Public Works Ch.30-39M
2026 Water Service Replacement
#27C-411-29
August 6, 2026 at 9:30 AM
Table of Contents
INVITATION FOR BID
PROJECT DESCRIPTION
INSTRUCTIONS TO BIDDERS
FORM OF GENERAL BID
ADDENDA
TOTAL BID PRICE
CONTRACTOR REFERENCES
CONTRACTOR CERTIFICATION
AGREEMENT
SPECIAL CONDITIONS
MEASUREMENT & PAYMENT
APPENDICIES –
Appendix A – 2026 Water Services Map
Appendix B – Standard Detail
Appendix C – Prevailing Wage Rates
2026 Water Service Replacement
INVITATION FOR BID
PUBLIC WORKS CONSTRUCTION
Sealed bids for 2026 Water Service Replacement must be received by Department of
Public Works, Town Hall Annex, 25 Center Street, Burlington, Massachusetts, 01803 until August 6, 2026 at 9:30 AM and will be publicly opened and read aloud at such time.
Specifications and bid forms are available on the Town’s website at:
https://www.burlington.org/Bids.aspx.
Specifications and bid forms may be obtained at the Department of Public Works, Town Hall Annex, 25 Center Street, Burlington, Massachusetts, 01803 after
Thursday, July 23, 2026 between 8:30 AM and 4:00 PM for a fifty ($50.00) dollar reproduction cost.
A bid bond of five (5) percent is required.
Successful bidder must provide 100% Payment and Performance bonds.
This project is bid according to MGL 30-39M.
Town’s Designated Representative and point of contact for questions is: Benjamin
Jette, bjette@burlington.org, (781)-528-5856
Prevailing wage must be paid per MGL 149 SECT. 26-27D https://www.burlington.org/ mailto:bjette@burlington.org
2026 Water Service Replacement
PROJECT DESCRIPTION
The work under this contract will include all equipment, labor, material, supplies, etc.
necessary to furnish the work described in this contract.
The work under this contract relates to water service replacements on Church Lane, Edgemont Ave, Elm Ave, and Pinevale Ave. The work description is as follows (See
Appendix A):
Abandonment and disposal of eight services and the subsequent installation of eight 1” copper services. Total length approximately one hundred linear feet
(100’)
2026 Water Service Replacement
INSTRUCTIONS TO BIDDERS
Receipt and Opening of Bids The Town of Burlington, Massachusetts, herein called the Owner, acting by and through its Department of Public Works, will receive sealed bids as specified in the invitation for Bids at which time bids will be publicly opened and read.
Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified will not be considered. The bidder agrees that this bid will be good and may not be withdrawn for a period of thirty (30) days, Saturdays, Sundays, and legal holidays excluded, after opening the bids.
Location and Work to be Done
The Location of the Work to be done is described in the project description.
The Contractor will furnish all labor, services, materials, equipment, plant, machinery, apparatus, appliances, tools, supplies, and all other things necessary to do all work required for the completion of each item of the Work and as herein specified.
The Work to be done and paid for under any item will not be limited to the exact extent mentioned or described but will include all incidental work necessary or customarily done for the completion of that item.
Preparation of Bid Each bid must be submitted on the prescribed form. All blank spaces for bid prices must be filled in, in ink or typewritten, in both words and figures.
Each bid must be submitted in a sealed envelope bearing on the outside the name of the bidder, address, and endorsed with the name of the project as specified in Receipt and Opening of Bids.
If forwarded by mail, the sealed envelope containing the bid must be enclosed in another envelope addressed as specified in Receipt and Opening of Bids.
The following sections need to be filled out and completed as part of the bid package;
Form of General Bid
Acknowledgement of Addenda, if any
Bid Form
Total Bid Price
Contractor Reference
Contractor Certification
2026 Water Service Replacement
Bid Opening Procedure The following list of requirements will apply to each filed bid. Bids not meeting all the requirements for timeliness and security will be rejected without opening;
bids not meeting signature and addenda requirements will be rejected prior to checking of bid amounts.
Bids will be filed at the place and before the time specified in Receipt and
Opening of Bids.
Properly executed bid security will be placed in a sealed envelope and will be attached to the outside of the envelope containing the bid.
Bid signatures will be checked.
The total dollar amount of each bid will be read, and the three apparent lowest bids will be selected for further consideration. These three apparent low bids will be read aloud for the benefit of the other bidders and the bid opening procedure will be closed. All those present at the bid opening may arrange a time to examine all bids after the bid opening and after the reading of the three apparent low bids.
Ability and Experience of Bidder
No award will be made to any bidder who cannot satisfy the Owner that they have sufficient ability and experience in this class of work and sufficient capital and resources to enable them to complete the work successfully within the time named. The Owner’s decision or judgment on these matters will be final, conclusive, and binding.
Bidder must have a minimum of five (5) years’ experience and have completed satisfactorily five (5) jobs within that time of similar size and scope.
All Subcontractors must have a minimum of five (5) years’ experience and have completed satisfactorily five (5) jobs within that time of similar size and scope.
The Contractor must submit with their bid proposal a list of five (5) jobs which they have successfully completed, giving the name and the address of these projects so they can be investigated prior to the award of the contract.
The Owner may make such investigations as they deem necessary, and the bidder must furnish to the Owner, under oath if so required, all such information and data for this purpose as the Owner may request.
2026 Water Service Replacement
Condition of Work
Each bidder must familiarize themselves fully with the conditions relating to the construction of the project and the employment of labor thereon. Failure to do so will not relieve a successful bidder of their obligation to furnish all material and labor necessary to carry out the provisions of this Contract. Insofar as possible the
Contractor, in carrying out their work, must employ such methods or means as will not cause any interruption of or interference with the work of any other
Contractor.
Addenda and Interpretations No interpretation of the bid documents will be made orally. Every request for such interpretation should be in writing addressed to the Town’s Designated
Representative listed in INVITATION TO BID and to be given consideration must be received at least seven (7) days prior to the date fixed for the opening of bids. Any and all such interpretations and any supplemental instructions will be in the form of written addenda to the Contract Documents. Failure of any bidder to receive any such addendum or interpretation will not relieve such bidder from any obligation under this bid as submitted. All addenda so issued will become part of the Contract Documents.
Laws and Regulations
The bidder’s attention is directed to the fact that all applicable State laws, municipal ordinances, and the rules and regulation of all authorities having jurisdiction over construction of the project will apply to the Contract throughout, and they will be deemed to be included in the Contract the same as though herein written out in full.
Bid Security Each bid must be accompanied by a BID BOND, CASH, or, CERTIFIED
CHECK, payable to the Town, in the amount stated in INVITATION FOR BID.
Such checks will be returned to all except the three (3) lowest responsible and eligible bidders within five (5) days, Saturday, Sundays, and legal holidays excluded, after the opening of bids, and the remaining checks will be returned promptly after the Owner and the accepted bidder have executed the Contract, or if no notice of intent to award has been presented to the selected contractor within thirty (30) days, Saturdays, Sundays and holidays excluded, after the date of the opening of bids, upon demand of the bidder at any time thereafter.
The said amount is fixed and agreed upon by and between the Contractor and the
Owner because of the impracticability and extreme difficulty of fixing and ascertaining the actual damages the Owner would in such event sustain, and said amount is agreed to be the amount of damages which the Owner would sustain and said amount will be retained from time to time by the Owner from current periodical estimates.
2026 Water Service Replacement
Right to Reject Bid
The Owner reserves the right to waive any informality or reject any and all bids and alternate bids, should the Owner deem it to be in the public interest to do so.
The Owner also reserves the right to reject the bid of any bidder that the Owner considers to be unqualified based on the criteria set forth herein.
Time for Completion
The bidder must agree to commence work and to fully complete the project within the time limit stated in SPECIAL CONDITIONS.
Comparison of Bids In the event that there is a discrepancy in FORM OF GENERAL BID between the lump sum or unit prices written in words and figures, the prices written in words will govern.
Rule for Award of Contract
The Contract will be awarded to “the lowest responsible and eligible bidder” for the Total Price Bid pursuant to General Laws Chapter 30, Section 39M, as amended. Such a bidder will possess the skill ability and integrity necessary for the faithful performance of the work, will be able to furnish labor that can work in harmony with all other elements of labor employed, or to be employed, in the work, and will otherwise comply with all applicable provisions of law. Bidder will execute formal agreement within ten (10) days of the Notice of Award.
Statutes Regulating Competitive Bidding Any bid that does not comply with the provisions of Massachusetts General Laws
Chapter 30, Section 39M as amended, need not be accepted and the Owner may reject every such bid.
Wage Rates
Prevailing Wage Rates as determined by the Commissioner of Department of
Labor and Industries under the provision of the Massachusetts General Laws, Chapter 149, Section 26 to 27G, as amended, apply to this project. It is the responsibility of the contractor, before bid opening to request if necessary, any additional information on Prevailing Wage Rates for those trades people who may be employed for the proposed work under this contract.
State schedules of Prevailing Wage Rates are included in the contract documents.
Specifications
All specifications and bid items are based on “Commonwealth of Massachusetts
Department of Transportation Standard Specifications for Highway & Bridges”
2020 edition, or latest revised.
2026 Water Service Replacement
Bid Items Not Guaranteed
The successful bidder is not guaranteed all items or the total bid price under this contract. Bidders must understand that like items may be bid under other contracts specifically packaged as one complete project. The successful bidder has no right to similar items bid under other projects. The Owner will specify where and when this contract will be applied to undertake a particular improvement.
Liquid Asphalt Adjustment
Per MGL 30-38A paving or Hot Mix Asphalt items bid under this contract (if any) as subject to liquid asphalt price adjustment. The basis of bid price for liquid asphalt adjustment or any other applicable adjustments permissible under this contract, will be made based upon the moth of the bid opening.
Tie Bids In the event of tied bids, wherein two or more responsive and responsible vendors provide the same bid price a coin toss will be used to break the tie.
Unforeseen Office Closure
If, at the time of the scheduled bid opening, Town Offices are closed due to uncontrolled events, the bid opening will be postponed until the next normal business day at the original time specified in the documents. Bids will be accepted until that date and time.
2026 Water Service Replacement
FORM OF GENERAL BID
Bid of ____________________________________ (hereinafter called “Bidder”)*
(____) a corporation, organized and existing under the laws of the state of ___________.
(____) a partnership
(____) a joint venture
(____) an individual doing business as ___________________________________
To the Town of Burlington, Massachusetts (hereinafter called “Owner”).
Bidder:
The bidder, in compliance with your invitation for bid, examined the Contract Documents and being familiar with all of the conditions surrounding the construction of the proposed project including the availability of materials and labor, hereby propose to furnish all labor, materials, and supplies, and to construct the project in accordance with the
Contract Documents within the time set forth in the agreement, and at the prices stated below. These prices are to cover all expenses incurred in performing the work required under the Contract Documents, or which this proposal is a part.
*Insert corporation, partnership or individual as applicable.
2026 Water Service Replacement
ADDENDA
Bidder acknowledges receipt of the following addenda:
No.______________________ Dated: ______________________
No.______________________ Dated: _______________________
No.______________________ Dated: ______________________
2026 Water Service Replacement
BID FORM
Item
Estimated
Qty. Unit
Unit
Price Item Total
1 1” Copper Tubing – Type K 100 LF $ $
2 1” Curb Box & Stop 8 EA $ $
3 1” Corporation & Tap 8 EA $ $
4 1” to 1” Union 8 EA $ $
5 ¾” x 1” Union 8 EA $ $
6 Loam Borrow 5 CY $ $
7 Hydroseed 10 SY $ $
8 Bituminous Patch 10 TON $ $
9 Gravel 20 CY $ $
10 Sand 10 CY $ $
11 Excavation and Disposal of
Existing Concrete Sidewalk 20 SY $ $
12 Remove Existing Concrete
Curbing and Replace with
Bituminous 35 LF $ $
13 Unclassified Excavation 5 CY $ $
2026 Water Service Replacement
TOTAL BID PRICE
Total Price Bid: $
Bid Price in Words:
Name:
Signature:
Title:
Company:
Address:
Phone:
This is an unofficial Bid Spec. Please sign up to be added to the bidders list here: https://www.burlington.org/Bids.aspx
2026 Water Service Replacement
CONTRACTOR REFERENCES
The undersigned offers the following information as evidence of their qualifications to perform the work as bid upon according to all the requirements of the plans and specifications.
1. Have been in business under present name for ___years.
2. The names and addresses of all persons interested in the bid (if made by a partnership or corporation) as Principals are as follows:
(Attach supplementary list if necessary)
3. The bidder is requested to state below what work of a similar character to that included in the proposed contract they have done, and give references that will enable the Owner to judge their experience, skill and business standing (add supplementary page if necessary).
# Completion
Date
Project Name Contract
Amount
Reference
Name
Telephone No.
4. Bank reference ____________________________
(Name)
(Bank)
(Address) (Telephone No.)
2026 Water Service Replacement
CONTRACTOR CERTIFICATION
NON-COLLUSION
I certify under penalties of perjury that this bid or proposal has been made and submitted under good faith and without collusion or fraud with any other person. As used in this certification, the word “person” means any natural person, business, partnership, corporation, union, committee, club, or other organization, entity, or group of individuals.
TAX COMPLIANCE
Pursuant to Massachusetts General Law Chapter 62C, Section 49A, I certify under the penalties of perjury that, to the best of my knowledge and belief, I am in compliance with all laws of the Commonwealth relating to taxes, reporting of employees and contractors, and withholding and remitting child support.
LABOR HARMONY / OSHA 10-HOUR
I will furnish labor that can work in harmony with all other elements of labor employed or to be employed in the work, and All employees to be employed in the work subject to this bid have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health administration that is at least 10 hours in duration.
Signature: __________________________________________________________
(Person Signing Bid)
(Name of Business)
2026 Water Service Replacement
AGREEMENT
THIS AGREEMENT, by and between the party of the first part, the Town of Burlington, hereinafter called “OWNER”, acting herein through its Town Administrator, and the party of the second part hereinafter called “CONTRACTOR”.
WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned, to be made and performed by the OWNER, the CONTRACTOR hereby agrees with the OWNER to commence and complete the project described by these bid documents hereinafter called the project, for the sum of the contract price and all extra work in connection therewith, under the terms as stated in the Contract
Documents; and at their (its and their) own proper cost and expense to furnish all the materials, supplies, machinery equipment, tools, superintendence, labor, insurance, and other accessories and services necessary to complete the said project in accordance with the conditions and prices stated in FORM OF GENERAL BID, GENERAL
CONDITIONS, Contract Documents as prepared by the Owner.
IN WITNESS WHEREOF, the parties to these presents have executed this contract.
Contract Price
AGREED:
Town of Burlington
Owner Date
Contractor
Contractor Date
Company Name:
Address:
In accordance with M.G.L. C. 44, Section 31C, this is to certify than an appropriation in the amount of this contract is available therefore and that the Town Administrator has been authorized to execute the contract and approve all requisitions and change orders.
Account # Town Accountant Date
2026 Water Service Replacement
SPECIAL CONDITIONS
1. All work under this contract must comply with the most recent edition of the
Town of Burlington Department of Public Works; Street Opening/Utility
Connection Rules & Regulations.
2. Prior to the commencement of any work the Contractor must obtain a Street
Opening permit from the DPW/Engineering Division.
3. All water service connections shall be live by the end of the day. No homes shall be without water for more than four hours.
4. Unless otherwise specified, the cost of the Police Detail Officer(s) will be paid for by the Town of Burlington. If the details are not properly canceled by the
Contractor in time, then the Contractor will be back charged for any charges occurred for any police details.
5. After installation of new gate boxes and structures, or adjustment of existing gate boxes and structures, all construction debris will be removed providing easy access if need arises. All work and labor needed to furnish and remove the construction debris out of the gate boxes and structures will be considered incidental and part of the gate box adjustment and structure adjustment, both less than and greater than six inches vertical, bid price.
6. All certified payroll slips must be submitted as part of the pay requisition package for each individual pay requisition request, for each contractor and sub-contractor that has performed work under this contract, up to date of the current pay requisition before the pay requisition will be processed and paid.
7. At the end of each week the Contractor must submit an itemized summary/quantities of items per street completed during the week. These quantities will be reviewed with the Town’s Designated Representative before the end of the day on Friday.
8. The Contractor shall have a designated Project Manager, or a designated
Foreman, in the field at all times while the work is taking place. The Project
Manager or designated Foreman shall have the authority to agree on quantities and items with the Engineer, and have decision making on behalf of the
Contractor. This person shall also be responsible for the location/relocation of all traffic signs and traffic control devices, as directed by the Engineer.
9. The awarded contractor MUST submit proof of completion for every employee that may come in contact with Asbestos Cement Pipe during the project, has
2026 Water Service Replacement completed the required “8 Hour OSHA II Asbestos Training: Asbestos Cement
Pipe (ACP) Worker Safety” safety course, per MassDEP asbestos regulation, 310
CMR 7.15. Asbestos cement pipe is expected to be encountered during this job.
10. Traffic Management under this contract must be considered at all times meaning the following points apply:
Two (2) way traffic must be maintained at all times
Complete compliance with the Traffic Management Plan standards set forth in the Town of Burlington Department of Public Works Street
Opening/Utility Connections Rules & Regulations
Detours not included as part of the Traffic Management Plan will be allowed only upon written authorization from the Owner and the
Contractor is responsible for supplying all necessary sign(s) and traffic barrels to which to attach the signs, for the detour.
Contractor is also responsible for carrying twenty five (25) separate traffic barrels to barricade the end of any side roads to prevent traffic from damaging the new road surface.
Emergency vehicles and hospital traffic must not be delayed in any way.
11. Attention is directed to the following parts of the contract:
Description Location in Contract
Preparation of Bid Instructions Bidders
Experience of Bidders Instructions to Bidders
Bid Security Instructions to Bidders
Execution, Correlation and Intent General Conditions; Article 1
Contract Administration General Conditions; Article 2
Superintendent General Conditions; Article 4, Section 8
Project/Progress Schedule General Conditions; Article 4, Section 9
Liquidated Damages General Conditions; Article 6
Project Plans Appendix A, B
Prevailing Wage Rates Appendix C
12. Summary Table of Important Contract Dates
Item Date
Bid Opening August 6, 2026
Commencement of Work No
Later Than
September 7, 2026
Completion of Work No Later
Than
November 13, 2026
Liquidated Damages Starting November 16, 2026
2026 Water Service Replacement
GENERAL CONDITIONS
ARTICLE 1
CONTRACT DOCUMENTS
1.1 DEFINITIONS
1.1.1 THE CONTRACT DOCUMENTS
The Contract Documents consist of the Owner-Contractor Agreement, the Conditions of the Contract (General, and other Conditions), the Drawings, the Specifications, all
Addenda issued prior to and all Change Orders issued after execution of the Contract, and all applicable laws, ordinances and regulations. The Contract Documents include Bidding
Documents such as the Advertisement or Invitation for Bid, the Instructions to Bidders, sample forms, the Contractor’s Bid or portions of Addenda relating to any of these, or any other documents, specifically enumerated in the Owner-Contractor Agreement.
1.1.2 THE CONTRACT
The Contract Documents form the Contract for Construction. This Contract represents the entire and integrated agreement between the parties hereto and supersedes all prior negotiations, representations, or agreements, either written or oral. The Contract may be amended or modified only by a written Change Order.
1.1.3 THE WORK
The Work comprises the completed construction required by the Contract Documents and includes all labor necessary to produce such construction, and all materials and equipment incorporated in such construction.
1.1.4 THE PROJECT
The project is the total construction of which the Work performed under the Contract
Documents may be the whole or a part.
1.1.5 OR EQUAL
The use of the words “Or Equal” following the name of any manufacturer, vendor or proprietary product will be understood to mean that articles or materials may be substituted which, in the opinion of the Owner, are equal in quality, durability, appearance, strength, design and performance to the articles or materials named or described and will perform adequately in providing a first-class facility.
When submitting shop drawing information on articles or materials which are being proposed as substitutes for specified items, the Contractor must clearly identify them as such. If the articles or materials are accepted as equal to those on which dimensions on the drawings are based, any dimensional variance from those shown and/or specified must be shown on the shop drawings prepared by the Contractor, illustrating the manner in which conformity to dimensions and design is to be obtained. All such drawings will
2026 Water Service Replacement be subject to the approval of the Owner and the installation of the article will not proceed without first obtaining said approval.
1.2 EXECUTION, CORRELATION AND INTENT
1.2.1
By executing the Contract, the Contractor represents that they have visited the site, familiarized themselves with the local conditions under which the Work is to be performed, and correlated their observations with the requirements of the Contract
Documents.
1.2.2
The intent of the Contract Documents is to include all items necessary for the proper execution and completion of the Work. The Contract Documents are complementary, and what is required by any one will be as binding as if required by all. Work not covered in the Contract Documents will not be required unless it is consistent therewith and is reasonably inferable there from as being necessary to produce the intended results. Words and abbreviations which have well-known technical or trade meanings are used in the
Contract Documents in accordance which such recognized meanings.
1.2.3 The Notice to Proceed will come in the form of a written letter to the Contractor. Once the written Notice to Proceed has been received by the Contractor, that date will be the legal start date for work under the Contract.
In the event of a failure to issue a Notice to Proceed written document specifying the commencement date, the pre-construction meeting date will serve as the Notice to
Proceed date.
1.3 OWNERSHIP AND USE OF DOCUMENTS
1.3.1
All Drawings, Specifications and copies thereof furnished by the Owner are and will remain the Owner’s property. They are to be used only with respect to this Project and are not to be used on any other project without prior written consent of the Owner. With the exception of one contract set for each party to the Contract, such documents are to be returned or suitably accounted for to the Owner at the completion of the Work.
Submission or distribution to meet official regulatory requirements or for other purposes in connection with the Project is not to be construed as publication in derogation of any reserved rights.
2026 Water Service Replacement
ARTICLE 2
ADMINISTRATION
2.1 ADMINISTRATION OF THE CONTRACT
2.1.1
The Owner or its Designated Representative will visit the site at intervals appropriate to the stage of construction to familiarize themselves generally with the progress and quality of the Work and to determine in general if the Work is proceeding in accordance with the
Contract Documents. However, the Owner’s Designated Representative will not be required to make exhaustive or continuous on-site inspections to check the quality or quantity of the Work.
2.1.2
The Owner will at all times have access to the Work whenever it is in preparation and progress. The Contractor must provide facilities for such access so the Owner may perform its functions under the Contract Documents.
2.1.3
The Owner will make payments for completed work, as approved by the Owner, in accordance with M.G.L. Ch. 30, Sec. 39G. A five percent retainage will be deducted from periodic payments to the Contractor.
2.1.4
The Owner will render information necessary for the proper execution or progress of the
Work within twenty (20) days of any request by the contractor or in accordance with any time limit agreed upon.
2.1.5
The Owner will have authority to reject Work which does not conform to the Contract
Documents. Whenever, in the Owners opinion, considers it necessary or advisable for the implementation of the intent of the Contract Documents, the Owner will have authority to require special inspection or testing of the Work whether or not such Work is then fabricated, installed or completed. Any such rejection of work will not relieve the
Contractor of the responsibility for maintaining protection of the Work and the Owner’s property.
2.1.6
The Owner or its Designated Representative will review and approve or take other appropriate action upon Contractor’s submittals such as Shop Drawings, Product Data and Samples, but only for conformance with the design concept of the Work and with the information given in the Contract Documents. Such action will be taken with reasonable
2026 Water Service Replacement promptness so as to cause no delay. The Owner’s approval of a specific item will not indicate approval of an assembly of which the item is a component.
2.1.7 The Owner will conduct inspections to determine the date of Substantial Completion and
Final Completion, will review written warranties and related documents required by the
Contract and assembled by the Contractor, and will issue a final Certificate for Payment.
2026 Water Service Replacement
ARTICLE 3
OWNER
3.1 DEFINITION
3.1.1
The Owner is the person or entity identified as such in the Owner-Contractor Agreement and is referred to throughout the Contract Documents as if singular in number and masculine in gender. The term Owner means the Town of Burlington or its designated representative.
3.2 INFORMATION AND SERVICES REQUIRED OF THE OWNER
3.2.1
The Owner will, at the time of execution of the Agreement and any subsequent Change
Orders, certify for the Contractor that financial arrangements have been made to fulfill the Owner’s obligations under the Contract.
3.2.2
The Owner will furnish all documents describing the work.
3.2.3
Except as provided in Subparagraph 4.7.1. Owner will secure and pay for necessary approvals, easements, assessments and charges required for the construction, use or occupancy of permanent structures or for permanent changes in existing facilities.
3.2.4
Information or services under the Owner’s control will be furnished by the Owner with reasonable promptness to avoid delay in the orderly progress of the Work.
3.2.5
The Owner will furnish the Contractor with three (3) copies of all Drawings and
Specifications and revisions issued during the progress of the Work; all additional copies will be furnished upon request at the cost of reproduction.
3.2.6
The Owner, through its Designated Represented, will forward all instructions directly to the Contractor.
3.3 OWNER’S RIGHT TO STOP THE WORK
3.3.1
2026 Water Service Replacement
If the Contractor fails to correct defective Work as required by the Owner or fails to carry out the Work in accordance with the Contract Documents or if the Owner will for any other reason so require, the Owner, by a written order signed personally or by an agent specifically so empowered by the Owner in writing, may order the Contractor to stop the
Work, or any portion thereof, until the cause for such order has been eliminated or until further written notice from the Owner; however, this right of the Owner to stop the Work will not give rise to any duty on the part of the Owner to exercise this right for the benefit of the Contractor or any other person or entity. The Contractor must resume the Work after such stoppage promptly upon written notice to do so from the Owner. If such stoppage is required through no fault of the Contractor, the Contract Time (and the dates for achieving Substantial Completion and Final Completion) will be extended by a period equal to the period of the stoppage, and the Contractor will be compensated for its reasonable and justifiable cost incurred as a result of such stoppage.
3.4 OWNER’S RIGHT TO CARRY OUT THE WORK
3.4.1
If the Contractor defaults or neglects to carry out the Work in accordance with the
Contract Documents and fails within seven days after receipt of written notice from the
Owner to commence and continue correction of such default or neglect with diligence and promptness, the Owner may, without prejudice to any other remedy they may have, perform such work or cause such work to be performed and/or make good such deficiencies. In such case an appropriate Change Order will be issued deducting from the payments then or thereafter due the Contractor the cost of correcting such deficiencies, including compensation for additional services made necessary by such default, neglect or failure. If the payments then or thereafter due the Contractor are not sufficient to cover the amount, the Contractor must pay the difference to the Owner.
3.5 OWNER’S RIGHT TO TERMINATE CONTRACT
3.5.1 The Town reserves the right to terminate this Contract at their discretion with thirty (30) days written notice to the contractor. In the event of Contract termination, all finished or unfinished work, or un-used material, already paid for under Contract prices, will become the property of the Town of Burlington.
2026 Water Service Replacement
ARTICLE 4
CONTRACTOR
4.1 DEFINITION
4.1.1
The Contractor is the person or entity identified as such in the Owner-Contractor
Agreement and is referred to throughout the Contract Documents as if singular in number and masculine in gender. The term Contractor means the Contractor or their authorized
4.2 REVIEW OF CONTRACT DOCUMENTS
4.2.1
The Contractor must carefully study and compare the Contract Documents and must at once report to the Owner any error, inconsistency or omission they may discover. The
Contractor will not be liable to the Owner for any damage resulting from errors, inconsistencies or omissions in the Contract Documents which The Contractor discovers but will be liable for damage to the extent The Contractor reasonably should have but failed to discover such errors, inconsistencies or omissions. The Contractor will perform no portion of the Work at any time without Contract Documents or, where required, approved Shop Drawings, Product Data or Samples for such portion of the Work.
4.3 SUPERVISION AND CONSTRUCTION PROCEDURES
4.3.1
The Contractor must supervise and direct the Work, using their best skill and attention which will not be less than such state of skill and attention generally rendered by the contracting profession for projects similar to the Project in scope, difficulty and location.
The Contractor must maintain adequate supervisory personnel at the Site during the performance of the Work. The Contractor will be solely responsible for all construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under the Contract.
4.3.2
The Contractor will be responsible to the Owner for the acts and omissions of their employees, Subcontractors and their agents and employees, and other persons performing any of the Work under a contract with the Contractor. This obligation will also extend to the presence on the Site of suppliers of materials or equipment, their employees, contractors, and agents engaged in the work.
4.3.3
2026 Water Service Replacement
The Contractor will not be relieved from their obligations to perform the Work in accordance with the Contract Documents either by the activities or duties of the Owner in its administration of the Contract.
4.4 LABOR AND MATERIALS
4.4.1
Unless otherwise provided in the Contract Documents, the Contractor will provide and pay for all labor, materials, equipment, tools, construction equipment and machinery, water, heat, utilities, transportation, and other facilities and service necessary for the proper execution and completion of the Work, whether temporary or permanent and whether or not incorporated or to be incorporated in the Work.
4.4.2
The Contractor will at all times enforce strict discipline and good order among their employees and will not employ on the Work any unfit person or anyone not skilled in the task assigned to them including all persons on the Site controlled directly or indirectly by the Contractor.
4.5 WARRANTY
4.5.1
The Contractor warrants to the Owner that all materials and equipment furnished under this Contract will be new and of recent manufacture unless otherwise permitted in writing by the Owner and that all Work will be of good quality, free from faults and defects and in conformance with the Contract Documents. All Work not conforming to these requirements, including substitutions not properly approved and authorized, may be considered defective and, promptly after written notification of non-conformance, will be repaired or replaced by the Contractor with Work conforming to such requirements. If required by the Owner, the Contractor will furnish satisfactory evidence as to the kind and quality of materials and equipment.
4.6 TAXES
4.6.1
The Contractor will pay all applicable sales, consumer, use and other similar taxes for the
Work or portion thereof provided by the Contractor which are legally enacted at the time bids are received, whether or not yet effective.
4.7 PERMITS, FEES AND NOTICES
4.7.1
Unless otherwise expressly provided in the SPECIAL CONDITIONS, the Contractor will secure and pay for all permits and fees, licenses and inspections necessary for the proper execution and completion of the Work which are customarily secured after execution of the Contract and which are legally required at the time the bids are received, and the
2026 Water Service Replacement same will at all times be the property of the Owner and will be delivered to the Owner upon completion of the Project.
4.7.2
The Contractor must give all notices and comply with all federal, state and local laws, ordinances, rules, regulations and lawful orders of any public authority bearing on the performance of the Work. The Contractor must provide the Owner with reproductions of all permits, licenses and receipts for any fees paid. The Owner represents that it has disclosed to the Contractor all orders and requirements known to the Owner of any public authority particular to this Contract.
4.7.3
If the Contractor observes that any of the Contract Documents are at variance with applicable laws, statutes, codes and regulations in any respect, the Contractor must promptly notify the Owner in writing, and any necessary changes must be accomplished by appropriate Modification.
4.7.4
If the Contractor performs any Work which they know or should know is contrary to such laws, ordinances, rules and regulations, and without such notice to the Owner, the
Contractor will assume full responsibility therefore and will bear all costs attributable thereto.
4.8 SUPERINTENDENT
4.8.1
The Contractor must employ a competent superintendent and necessary assistants who will be in attendance at the Project site at all times during the progress of the Work. The superintendent will represent the Contractor and all communications given to the superintendent will be as binding as if given to the Contractor. Important communications will be confirmed in writing. Other communications will be so confirmed on written request in each case.
4.9 PROGRESS SCHEDULE
4.9.1
The Contractor, immediately after being awarded the Contract, must prepare and submit for the Owner’s information an estimated progress schedule for the Work. The progress schedule must be related to the entire Project to the extent required by the Contract
Documents, and will provide for expeditious and practicable execution of the Work.
No work will start without the Project schedule. The Contractor must submit the project schedule five days prior to start the work.
4.10 DOCUMENTS AND SAMPLES AT THE SITE
2026 Water Service Replacement
4.10.1
The Contractor must maintain at the site for the Owner one record copy of all Drawings, Specifications, Addenda, Change Orders and other Modifications, and “As-Built”
Drawings and Specifications in good order and marked currently to record all changes made during construction, and approved Shop Drawings, Product Data and Samples.
These will be available to the Owner upon completion of the Work.
4.11 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
4.11.1
Shop Drawings are drawings, diagrams, schedules and other data specially prepared for the Work by the Contractor or any Subcontractor, manufacturer, supplier or distributor to illustrate some portion of the Work.
4.11.2
Product Data are illustrations, standard schedules, performance charts, instructions, brochures, diagrams and other information furnished by the Contractor to illustrate a material, product or system for some portion of the Work.
4.11.3
Samples are physical examples which illustrate materials, equipment or workmanship and establish standards by which the Work will be judged.
4.11.4
The Contractor must review, approve and submit, with reasonable promptness and in such sequence as to cause no delay in the Work or in the work of the Owner or any separate contractor, all Shop Drawings, Product Data and Samples required by the
Contract Documents.
4.11.5
By approving and submitting Shop Drawings, Product Data and Samples, the Contractor represents that they have determined and verified all material, field measurements, and field construction criteria related thereto, or will do so, and that they have checked and coordinated the information contained within such submittals with the requirements of the Work and of the Contract Documents.
4.11.6
The Contractor will not be relieved of responsibility for any deviation from the requirements or the Contract Documents by the Owner’s approval of Shop Drawings, Product Data or Samples or the Owners’ approval of the same unless the Contractor has specifically informed the Designated Representative in writing of such deviation at the time of submission and the Designated Representative has given written approval to the specific deviation. The Contractor will not be relieved from responsibility from errors or
2026 Water Service Replacement omissions in the Shop Drawings, Product Data or Samples by the Owner’s approval thereof.
4.11.7
The Contractor must direct specific attention, in writing or on resubmitted Shop
Drawings, Product Data or Samples, to revisions other than those requested by the Owner or its Designated Representative on previous submittals.
Designated Representative
4.11.8
No portion of the Work requiring submission of a Shop Drawing, Product Data or
Sample will be commenced until the submittal has been approved by the Owner or
Designated Representative . All such portions of the Work will be in accordance with approved submittals.
4.12 USE OF SITE
4.12.1
The Contractor will confine operations at the site to areas permitted by law, ordinances, permits and the Contract Documents and must not unreasonably encumber the site with any materials or equipment.
4.13 CUTTING AND PATCHING OF WORK
4.13.1
The Contractor will be responsible for all cutting, fitting or patching that may be required to complete the Work or to make its several parts fit together properly.
4.13.2
The Contractor must not damage or endanger any portion of the Work or the work of the
Owner or any separate contractors by cutting, patching or otherwise altering any work or by excavation. The Contractor must not cut or otherwise alter the work of the Owner or any separate contractor except with the written consent of the Owner and of such separate contractor. The Contractor must not unreasonably withhold from the Owner or any separate contractor their consent to cutting or otherwise altering the Work.
4.14 CLEANING UP
4.14.1
The Contractor at all times will keep the premises free from accumulation of waste materials or rubbish caused by their operations. At the completion of the Work the
Contractor will remove all their waste materials and rubbish from and about the Project in full compliance with all applicable laws and regulations as well as all their tools, construction equipment, machinery and surplus materials and the Project must be thoroughly cleaned and ready for immediate occupancy by the Owner.
2026 Water Service Replacement
4.14.2
If the Contractor fails to clean up at the completion of the Work, the Owner may do so as provided in Paragraph 3.4 and the cost thereof will be charged to the Contractor.
4.15 COMMUNICATIONS
4.15.1
The Contractor must forward all communications to the Owner’s designated
4.15.2
The Contractor will at all times have a designated representative in the field that is authorized to act on behalf and make decisions for the Contractor under this contract agreement.
4.16 ROYALTIES AND PATENTS
4.16.1
The Contractor must pay all royalties and license fees. The Contractor must defend all suits or claims for infringement of any patent rights and will save the Owner harmless from loss on account thereof, except that the Owner will be responsible for all such loss when a particular design, process or the product of a particular manufacturer or manufacturers is specified, but if the Contractor believes or has reason to believe that the design, process or product specified is an infringement of a patent, the Contractor will be responsible for such loss unless they promptly give such information to the Owner, and thereafter the Owner insists on the use of the design, process or products specified.
4.17 INDEMNIFICATION
4.17.1
To the fullest extent permitted by law, the Contractor will indemnify and hold harmless the Owner, the Designated Representative, and their agents and employees from and against all claims, damages, losses and expenses, including but not limited to attorney’s fees, arising out of or resulting from the performance of the Work, provided that any such claim, damage, loss or expense (1) is attributable to bodily injury, sickness, disease or death, or to injury or destruction of tangible property (other than the Work itself) including the loss of use resulting there from, and (2) is caused in whole or in part by any negligent act or omission of the Contractor, any Subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by a party indemnified there under. Such obligation will not be construed to negate, abridge, or otherwise reduce any other right or of indemnity which would otherwise exist as to any party or person described in this
Paragraph 4.17.
2026 Water Service Replacement
4.17.2
In any and all claims against the Owner the Designated Representative or any of their agents or employees by any employee of the Contractor, any Subcontractor anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, the indemnification obligation under this Paragraph 4.17 will not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for the Contractor or any Subcontractor under workers’ or workmen’s compensation acts, disability benefit acts or other employee benefit acts.
4.17.3
The obligations of the Contractor under this paragraph 4.17 will not extend to the liability of the Owner, the Designated Representative , their agents or employees, arising out of
(1) the preparation or approval of maps, drawings, opinions, reports, surveys, change orders, designs or specifications, or (2) written directions or instructions given by the
Owner, the Designated Representative , their agents or employees, provided they are the sole cause of the injury or damage.
2026 Water Service Replacement
ARTICLE 5
INSURANCE
Contractor must provide insurance as specified below:
General Liability Includes:
Comprehensive form
Premises/Operations
Underground Explosion & Collapse
Hazard
Products / Completed Operations
Independent Contractors
Broad From Property Damage
Personal Injury
Each Occurrence $1,000,000
Aggregate $2,000,000
Automobile Liability Includes:
All Owned Vehicles
Hired Vehicles
Non-owned Vehicles
Bodily Injury & Property
Damage Combined
$1,000,000
Workers Compensation & Employers Liability As Required by State of
Massachusetts
Each Accident $100,000
Bodily Injury by Disease
(Policy Limit)
$500,000
Bodily Injury by Disease
(Each Employee)
$100,000
Additional Insurance / Requirements The Town of Burlington Will be named as
Additional Insured
2026 Water Service Replacement
ARTICLE 6
LIQUDATED DAMAGES
6.1 LIQUDATED DAMAGES
If the Contractor neglects, fails or refuses to complete the work as herein specified, or any proper extension thereof granted by the Owner, then the Contractor does hereby agree, as a part consideration for the awarding of this Contract, to pay to Owner the amount of $1,000 per day, not as a penalty but as liquidated damages for such breach of
Contract as hereinafter set forth, for each and every calendar day that the Contract will be in default after the date stipulated in the Contract for completing the work.
2026 Water Service Replacement
MEASUREMENT & PAYMENT
Item 1: 1” Copper Tubing – Type K The work under this item must conform to the relevant provisions of the Standard
Specifications for Highway & Bridges and the following:
The work consists of the installation of one (1) inch type K copper tubing.
The copper tubing shall be manufactured by The Mueller Streamline Company, or approved equal.
Measurement and payment for this item will be made based on the unit of measurement and unit price listed on the Bid Form.
Item 2: 1” Curb Box & Stop
This price will be full compensation for furnishing and installing mechanical joint restraints, excavation, placing and removing decking, sheeting and bracing, furnishing new valve and box, installing the new valve and box, setting, bedding, backfilling, compacting, jointing, adjusting boxes, sidewalk and surface restoration and all other work required or incidental to the satisfactory completion of the items. The work must be completed to the following specifications:
A. The curb stop shall be manufactured by The Mueller Company, model number P-
25209N one (1) inch, or…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .