26-8635_Authorization_to_Advertise_FE.pdf
PDF 444 KB Posted
- Solicitation number
- 26-8635
- Issued by
- Collier County, Florida
About this file
Summary
This is an Authorization to Advertise document prepared by the Collier County Board of County Commissioners Procurement Services Division for solicitation 26-8635, a Request for Professional Services issued by the Engineering and Project Management Division on behalf of the Public Utilities Department. The solicitation seeks comprehensive design and construction administration services for the South County Water Reclamation Facility (SCWRF) Treatment Technology & Flow Management Improvements project in Naples, Florida. The selected firm will serve as Engineer of Record and provide preliminary design, geotechnical surveys, surveying, subsurface utility engineering, hydraulic and wastewater treatment process modeling, final design, permitting, bidding packages, opinion of probable costs, public involvement services, construction administration, and one-year construction warranty services. The project encompasses a comprehensive plant capacity expansion from 16 million gallons per day to 21.1 MGD average flow and 56 MGD peak flow, incorporating membrane bioreactor technology and multiple treatment system improvements. The pre-proposal conference is scheduled for February 19, 2026, at 10:00 A.M., with proposals due electronically through the Collier County Procurement Services Division Online Bidding System by March 9, 2026, at 3:00 P.M. EST. The design must be completed within one year of the Notice to Proceed, with construction targeted for completion by 2031.
Evaluation will follow the Consultants' Competitive Negotiation Act methodology, scoring submissions across six criteria: Ability of Professional Personnel (20 points), Certified Woman and/or Minority Business Enterprise status (5 points), Past Performance (25 points), Project Approach and Willingness to Meet Time and Budget Requirements (20 points), Location (10 points), and Recent, Current, and Projected Workloads (20 points), for a total of 100 points. Proposers must provide evidence of required business tax receipts, professional licenses, E-Verify enrollment certification, Florida Certificate of Authority, and appropriate insurance coverage including Commercial General Liability at $1,000,000 single limit with $2,000,000 aggregate, Worker's Compensation per Florida Statutes Chapter 440, Employer's Liability at $500,000 per occurrence, and Automobile Liability coverage. Performance bonds at 100 percent of contract value are required for projects exceeding $200,000, underwritten by a surety rated "A-" or better by A.M. Best Company. The preliminary cost estimate for capacity expansion improvements totals approximately $30.0 million; permitting fees will be paid by the Public Utilities Department for county permits and reimbursed by PUD for state and federal permits. No incumbent vendor is identified, and the contract will be governed by the Professional Services Agreement template (2025 Version 2) and Collier County Purchase Order Terms and Conditions, with compensation structured according to selected methodology and all prices remaining firm for the contract term.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Authorization to Advertise Date: ______________
Solicitation No.: Title:
Due Date and Time:
Utilizing Local Vendor Preference: Yes No Grant Funded: Yes No
By signing, I am acknowledging that I have reviewed the above referenced solicitation prior to being released to advertisement, and that the approach, scope and specifications are acceptable.
I also acknowledge that a cost estimate or opinion of cost was obtained, and that budgetary resources have been identified to fund any resulting award within the budgeted or reasonable Threshold.
The approach being taken with this solicitation and intended end use of the contract is intended to support the management and operational needs of the Division and takes other potential using Divisions’ needs into consideration (when applicable).
Required Signatures
Design Professional:
Project Manager:
Division Director:
Procurement Strategist:
Grants Office: Required grantor conditions have been provided in the solicitation, grantor approvals have been obtained, and the package appears compliant with federal/state funding requirements.
Sandra Srnka, Procurement Director
Procurement Services Division
February 4, 2026
26-8635 SCWRF Treatment Technology & Flow Management Improvements
March 9, 2026, at 3:00 PM (EST)
N/A
N/A
Docusign Envelope ID: 7AC525E3-9C4D-4A7E-97D8-BA9025920E3B
2/4/2026
2/4/2026
2/4/2026
2/4/2026
| 2026-02-04T14:51:51-0800 | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it. Updated .