This addendum addresses questions submitted by potential bidders for the Town of Wolcott's Road Resurfacing project through May 15, 2026. The Town of Wolcott solicited bids from qualified contractors for road resurfacing work encompassing labor, equipment, and materials for up to 5 miles of Town roadways. The Town clarified that no specific street list or detailed quantity breakdowns will be provided to bidders; contractors must base their Square Yard pricing estimates for reclaim, grade, and milling on the general scope of "up to 5 miles of roadways" as stated in the bid documents. No comparable pricing data from previous year work is available, as no similar work was performed in the prior year. Work must be performed in accordance with Connecticut Statutes governing Prevailing Wage Rates.
The addendum addresses critical project responsibilities and cost considerations for bidding contractors. The Town confirmed responsibility for bituminous curb removal, with saw cutting and removal of driveway aprons to be included in contractor pricing per Section 9.22 of DOT Form 918. Traffic control and maintenance of traffic protection, including police services if needed, will be the Town's responsibility. The Town will retain all reclaimed asphalt millings generated from the project. Notably, no escalation clause will be included in the contract, requiring bidders to provide fixed pricing for the duration of the engagement.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Town of Wolcott 26-10 Road Resurfacing – Labor, Equipment and Materials
ADDENDUM #1
The following questions have been posed thru 05/15/2026. Our answers are in RED.
Will a list of roads and or quantities be provided? No list. As stated in the Bid documents “up to 5 miles of roadways.”
Is there a street list for this contract? No list.
Not sure what we should be basing our Sq Yard pricing on for the Reclaim / Grade / Milling Square Yards as directed in the Bid documents
Will you please provide last year's pricing for any comparable work done in town.
No comparable work was performed last year.
Do you have rough quantities for the amount of work you want to do this year? No. As stated in the Bid documents up to 5 miles of roadways.
If the town is responsible for the bituminous curb removal, who is responsible for the saw cutting and removal of driveway aprons?
The cost for this item should include the items listed in Section 9.22 of DOT Form 918 which includes: Excavation, including saw cutting, removal of any existing sidewalk, or driveway, shall be made to the required depth below the finished grade, as shown on the plans or as directed by the Engineer. All soft and yielding material shall be removed and replaced with suitable material.
Who is responsible for maintenance protection of traffic and traffic control, are police required or will uniform traffic control be suitable? The town will be responsible for traffic control, including police, if needed.
Will the town keep the millings? Yes, the town will keep the millings.
Will an escalation clause be added to the bid? No, there will not be an escalation clause added.