This document is a comprehensive asbestos and lead survey report prepared by EFI Global, Inc. for CSS Architects regarding the Elwyn G. Campbell Elementary School located at 145 Essex Street in New Bedford, Massachusetts. The survey, conducted on April 21-23, 2021, involved a pre-renovation inspection of the main building (constructed in the 1950s) and an addition (constructed in 1966) to identify and assess asbestos-containing materials (ACMs) and lead-based paint. The scope of work included mechanical, electrical, and plumbing (MEP) and cosmetic upgrades throughout both buildings, excluding roof and subgrade areas, with sampling performed in accordance with EPA, OSHA, and Massachusetts Department of Labor Standards regulations.
The laboratory analysis revealed multiple types of asbestos-containing materials in both buildings, including pipe insulation, boiler components, floor tiles, mastics, caulking, and glazing compounds. Some notable findings include asbestos detected in 9"x9" floor tiles with various color streaks, black mastics, and exterior caulking, with asbestos percentages ranging from 2% to 15% chrysotile. For lead paint testing, the report identified lead concentrations ranging from 1.4% to 4.9% by weight on a kitchen door and exterior door to Classrooms 1 and 2, with other samples showing lead concentrations below the laboratory detection limit. The report recommends proper removal and disposal of asbestos-containing materials by a licensed asbestos contractor and compliance with OSHA Lead in Construction Standards for surfaces with lead present.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BOSTON NORTH
EFI Global, Inc.
155 West Street | Suite 6 | Wilmington, MA 01887 | PHONE 978.688.3736 | FAX 978.688.5494 | FREE 800.659.1202
May 7, 2021
Ms. Kaja Savasta VIA EMAIL: ksavasta@cssarchitects.com Principal CSS Architects, Inc.
107 Audubon Road Building 2, Suite 300 Wakefield, MA 01880
RE: Asbestos & Lead Survey Report
Elwyn G. Campbell Elementary School, 145 Essex Street
New Bedford, MA 02745
EFI Project No. 020.01601
Dear Ms. Savasta:
EFI Global Inc. (EFI) is pleased to provide this survey report to CSS Architects for a pre-renovation asbestos and lead survey of the Elwyn G. Campbell Elementary School located at 145 Essex Street, New Bedford, Massachusetts (Site). EFI performed the survey on April 21-23, 2021. The pre-renovation survey included an inspection of the building for suspect asbestos-containing materials, and sampling of representative coatings for lead-based paint.
EFI is pleased to provide environmental consulting services to CSS Architects. If you have any questions regarding the contents of this report, or are in need of additional information, please do not hesitate to contact either of the undersigned at 800-659-1202. Thank you for this opportunity to serve your environmental needs.
Sincerely, Sincerely, Robert Thomson Jennifer L. Archacki Project Manager Environmental Service Line Principal mailto:ksavasta@cssarchitects.com
PRE-RENOVATION ASBESTOS SURVEY & LEAD TESTING REPORT
Elwyn G. Campbell Elementary School 145 Essex Street
New Bedford, Massachusetts, 02745
Prepared for:
Ms. Kaya Savasta
Principal
CSS Architects
107 Audubon Road
Building 2, Suite 300
Wakefield, Massachusetts 01880
Prepared by:
155 West Street, Suite 6 Wilmington, Massachusetts 01887
EFI Project Number: 020.01601
May 7, 2021
TABLE OF CONTENTS
EXECUTIVE SUMMARY
INTRODUCTION
2.0 ASBESTOS CONTAINING MATERIALS SURVEY
2.1 SAMPLING METHODOLOGY
2.2 Asbestos Containing Materials Findings
2.3 Asbestos Survey Limitations
2.4 Recommendations
3.0 LEAD-BASED PAINT INSPECTION AND METHODOLOGY
3.1 SUMMARY OF FINDINGS
3.2 REGULATORY IMPLICATIONS AND RECOMMENDATIONS
TABLES
TABLE 1 – MAIN BUILDING, INVENTORY OF ASBESTOS-CONTAINING
MATERIALS
TABLE 2 – ADDITION BUILDING, INVENTORY OF IDENTIFIED
ASBESTOS- CONTINING MATERIALS
ATTACHMENTS
ATTACHMENT A – PHOTOGRAPHS
ATTACHMENT B - ASBESTOS LABORATORY REPORT
ATTACHMENT C - LEAD PAINT LABORATORY REPORT
EFI Global, Inc. May 7, 2021
Ms. Kaja Savasta Elwyn G. Campbell Elementary School EFI Project No.: 020.01601 145 Essex Street, New Bedford, Massachusetts
EXECUTIVE SUMMARY
This report presents the findings of the pre-renovation survey for asbestos-containing materials (ACM) and lead paint testing at the Elwyn G. Campbell Elementary School located at 145 Essex Street, New Bedford, Massachusetts (Site). The building is comprised of the original (or main building) constructed in the 1950’s and an addition constructed in 1966. The site building is currently functioning as an elementary school.
The asbestos survey was performed by Massachusetts Department of Labor Standards (MassDLS) Asbestos
Inspectors Mr. Robert Thomson and Mr. John Young (License No.: AI031431 and AI900986), respectively. The scope of work for EFI’s survey included a walkthrough of the buildings to identify the types, locations, condition and approximate quantities of ACMs and lead painted surfaces that may be disturbed by planned renovation activities As part of the scope of work, EFI reviewed partial information from a 2006
AHERA reinspection report (limited to a material location inventory table and bulk sample results) prepared by Universal Environmental Consultants (UEC). Results from the AHERA report were incorporated into this survey where appropriate.
As described to EFI and reviewed on project drawings prepared by CSS Architects, the scope of work for the planned renovations includes mechanical, electrical and plumbing (MEP) and cosmetic upgrades throughout both buildings, except roof and subgrade areas. As such, a survey of the roof and subgrade areas was not performed as part of EFI’s scope of work. At the Client’s request, since the school is still in operation, destructive sampling methods were not utilized to inspect concealed areas at the time of the survey.
Based on the findings of the asbestos survey including a review of prior AHERA survey information, multiple types of ACMs were identified in both buildings. A list of materials confirmed or assumed to be ACM is presented in Section 2.2
The identified asbestos-containing materials (ACMs) should be properly removed and disposed by a Massachusetts-licensed Asbestos Contractor prior to disturbance by renovation activities. Additionally, any areas of the buildings that could not be thoroughly inspected using destructive sampling methods may require additional inspection once the building is vacant but prior to the start of renovations. Lastly, the federal Asbestos Hazard Emergency Response Act (AHERA) regulation requires all response actions in schools K-12, including asbestos removal, be designed and conducted by accredited persons to maintain compliance with the AHERA regulation.
EMSL reported that the paint on a Kitchen door and exterior door to Classrooms 1 and 2 s contains lead concentrations ranging from 1.4% to 4.9% by weight. The remaining samples were reported by EMSL as containing a lead concentration below the laboratory detection limit of 0.010 % by weight. Contractors performing work on surfaces where lead is present must comply with the OSHA Lead in Construction Standard, 29 CFR 1926.62, Lead.
INTRODUCTION
EFI Global (EFI) performed a pre-renovation survey for asbestos-containing materials (ACM) and lead paint testing at the Elwyn G. Campbell Elementary School located at 145 Essex Street, New Bedford, Massachusetts
(Site). At the time of the survey, the site was being utilized as an elementary school.
The asbestos survey was performed by Massachusetts Department of Labor Standards (MassDLS) Asbestos
Inspectors Mr. Robert Thomson and Mr. John Young. The scope of work for the planned renovations includes mechanical, electrical and plumbing (MEP) and cosmetic upgrades, throughout both buildings with the exception of the roof and subgrade areas (Project Area). Additionally, due to the fact that the school is still in operation, destructive sampling methods were not utilized to inspect concealed areas where hidden suspect materials may be present. Bulk samples of observed and accessible suspect ACMs and paint chips from representative painted surfaces were submitted for laboratory analysis to determine asbestos and lead content.
2.0 ASBESTOS CONTAINING MATERIALS SURVEY
2.1 SAMPLING METHODOLOGY
The asbestos survey was performed in accordance with EPA, OSHA and MassDEP regulations by USEPA accredited and Massachusetts Department of Labor Standards (MassDLS) Asbestos Inspectors Mr. Robert Thomson and Mr. John Young (License No.: AI031431 and AI900986), respectively. EFI conducted a thorough inspection of accessible areas of the Site. A total of 148 bulk samples of suspect ACMs were collected on-site and transported under chain of custody protocol to EMSL Analytical, in Woburn, Massachusetts, a Massachusetts-licensed laboratory. EMSL is accredited by the National Voluntary Laboratory Accreditation Program (NVLAP) for bulk asbestos fiber analysis, which is administered by the National Institute of Standards and Testing (NIST). Due to the fact that the site building is still in operation as an elementary school, destructive sampling methods/exploratory demolition was not performed on the interior and exterior of the buildings to evaluate the potential presence of hidden asbestos-containing materials. Bulk samples representing readily accessible individual homogenous areas of suspect materials were collected in a randomly distributed manner, in accordance with the methods outlined below.
The findings of this report are based upon review of a prior partial 2006 AHERA reinspection report provided to EFI, observations of accessible suspect materials and the analysis of representative bulk samples collected.
Samples were analyzed with a standard 3-day turnaround time using polarized light microscopy (PLM) in accordance with United States Environmental Protection Agency (USEPA) Method 600/R-93/116. The PLM/DS analytical method is modeled after 40 CFR Part 763, Subpart F, Attachment A: "Interim Method for the Determination of Asbestos in Bulk Insulation Samples." By using the PLM/DS method, a trained microscopist is able to identify and distinguish between asbestos group minerals and other fibrous materials such as cellulose (paper), mineral (rock), wood, or glass fiber. The quantity of each of these substances is estimated on a visual basis and recorded as a percent. If a material contains greater than or equal to one percent asbestos, it is considered to be an asbestos-containing material under Massachusetts Department of Environmental Protection (MassDEP) asbestos regulations.
Building materials exist in the form of thermal systems insulation (TSI), surfacing materials, and miscellaneous materials. Bulk samples representing individual homogenous areas of suspect ACM, (materials that are determined to be uniform in color and texture and installed in the same construction period) were collected in a randomly distributed manner, in accordance with the EPA sampling protocol outlined in 40 CFR 763:
(a) Surfacing materials (e.g., wall and ceiling plaster) - In a randomly distributed manner, collect bulk samples of surfacing materials, representative of each homogeneous area, and not assumed to be ACM.
(1) Collect at least three bulk samples from each homogeneous area that is less than or equal to
1,000 ft
(2) Collect at least five bulk samples from each homogeneous area that is greater than 1,000 ft but less than or equal to 5,000 ft2.
(3) Collect at least seven bulk samples from each homogeneous area that is greater than 5,000 ft
(b) Thermal systems insulation (e.g., pipe fitting insulation, tank insulation, etc.)
(1) In a randomly distributed manner, collect at a minimum, three (3) bulk samples of thermal systems insulation material, representative of each homogeneous area, and not assumed to be
ACM.
(2) Collect, at a minimum, one (1) bulk sample of patched thermal systems insulation, representative of each homogenous area, and not assumed to be ACM, providing the section of patch was less than 6 linear or square feet.
(3) Collect, at a minimum, three (3) representative bulk samples of each insulated mechanical system not assumed to be ACM, including, but not limited to cementitious material used on pipe fittings such as tees, elbows, or valves. Representative sampling was conducted in a manner sufficient as to identify whether each homogenous area is either asbestos or non-asbestos containing.
(4) Bulk samples are not required to be collected from any homogeneous area where the accredited asbestos inspector has determined that the thermal systems insulation is a non-suspect material (i.e., fiberglass, foam glass, rubber, or any other non-ACM).
(c) Miscellaneous materials (e.g., floor and ceiling tiles) - Collect, at a minimum, two (2) representative bulk sample of each miscellaneous material assumed to be ACM, including, but not limited to ceiling tiles, floor tiles, associated floor tile mastic, etc. Representative sampling was conducted in a manner sufficient as to identify whether each homogenous area is either asbestos or non-asbestos containing.
2.2 Asbestos Containing Materials Findings
Based on a review of the partial 2006 AHERA reinspection report information provided to EFI by the client, the following materials were identified as containing greater than or equal to 1% asbestos:
Pipe insulation
Boiler breeching duct insulation
Boiler components
HVAC flexible connectors
Caulk associated with horizontal and vertical masonry joints
Transite ceiling in crawl space
The following suspect ACMs sampled by EFI in the Main Building were reported by EMSL as containing greater than or equal to 1% asbestos, including suspect material not sampled but assumed ACM:
Mastic associated with 12” x 12”
Replacement floor tiles
Glazing compound associated with interior doors lights
Fire door insulation (assumed positive)
9’x9’ gray with white streak floor tile
9’x9’ gray with black streak floor tile
9” x 9” gray with pink streak floor tile
9” x 9” beige floor tile
Acoustical ceiling plaster
Black mastic associated with 12” x12” beige floor tile
9” x 9” floor tile beneath sinks (assumed positive)
Caulk associated with store front windows
Caulk associated with steel windows
Caulk associated with unit ventilator louvers
Exterior wood door caulk
The following suspect ACMs sampled by EFI in the Addition Building were reported by EMSL as containing greater than or equal to 1% asbestos, including suspect material not sampled but assumed ACM:
Glazing compound associated with interior doors
12” x 12” tan floor tile
Black mastic associated with 12” x 12” floor tile
Sink basin coating
Caulk associated with steel windows
Glazing compound on steel windows
Fire door insulation (assumed positive)
Mudded pipe fitting insulation (assumed positive)
Caulk associated with unit ventilator louvers
Stone windowsills
Glazing compound on exit doors
The following suspect ACMs from both buildings sampled by EFI were reported by EMSL as containing no detectable asbestos:
1’ x 1’ smooth finish ceiling tiles
1’ x 1’ dotted ceiling tiles
Glue daubs associated with ceiling tiles
Brown and green sheet good associated with unit ventilators
Mastic associated with brown and green sheet goods
12” x 12” replacement floor tiles
Black mastic associated with 9” x 9” floor tiles
Ceramic floor tile grout
Ceramic floor tile bedding mortar
2’ x 2’ ceiling tiles
2’ x 4’ ceiling tiles
12” x 12” beige floor tile
12”x 12” white floor tile and associate mastic
Mudded pipe fitting insulation on fiberglass insulation
Joint compound and associated gypsum board
Interior plaster soffit
Exterior Plaster Soffit
Wall base molding and associated adhesive
White store front caulk
Brown caulk associated with front door
Adhesive associated with metal wall panel
Caulk on metal doors
Accessible boiler insulation
Glazing compound on interior observation window
Tables 1 and 2 of this report present the identified ACMs by building including the locations, condition and approximate quantities of the materials. Photographs depicting observed suspect ACMs sampled by EFI are presented in Attachment A. A copy of the asbestos laboratory report is presented in Attachment B.
2.3 Asbestos Survey Limitations
EFI evaluated Project Areas of the buildings that were reasonably accessible at the time of the survey. As described to EFI and reviewed on project drawings prepared by CSS Architects, the scope of work for the planned renovations includes the entire school building with the exception of the roof and subgrade areas.
As such, the roof and subgrade areas were not included in the scope of this survey.
EFI’s survey scope of work included visual inspection and assessment of areas above suspended ceilings and wall areas where access panels were present. Areas such as behind wall panels, chalk boards, and otherwise inaccessible areas were not included in the survey. Additionally, due to the fact that the school is still in operation, destructive sampling methods were not used to thoroughly inspect concealed areas. Additional suspect ACMs may be present in these locations.
2.4 Recommendations
EFI recommends that all ACMs that will be impacted by the proposed renovation activities be properly removed, packaged, and disposed by a Massachusetts-licensed Asbestos Abatement Contractor. The abatement must be completed in accordance with all requirements of MassDLS asbestos regulations (454
CMR 28.00), MassDEP asbestos regulations (310 CMR 7.00 & 7.15); USEPA National Emissions Standard for
Hazardous Air Pollutant (NESHAP) regulations (40 CFR Part 61); AHERA regulations and OSHA regulations
(29 CFR 1926.1101), including all applicable local ordinances and policy statements.
Due to the fact that the site is currently in operation as an elementary school, destructive sampling was not conducted within the school building. EFI recommends additional inspection be performed within the Project
Area utilizing destructive investigative measures, prior to the commencement of renovation activities to thoroughly assess these areas for any concealed ACMs.
Additionally, since the site is a school building K-12 and is subject to the AHERA requirements outlined in 40
CFR Part 763, all response actions performed in the building require accredited persons to prepare a work plan/specification and conduct the abatement work.
If suspect ACMs other than the above-referenced materials are identified during renovation/demolition activities, EFI recommends that they be assumed ACM until sampled by a Massachusetts-licensed asbestos inspector and analyzed by a Massachusetts-licensed asbestos analytical laboratory. EFI is available to assist with abatement contractor oversight, work plan/specification development and air monitoring as required by applicable state and federal asbestos regulations.
3.0 LEAD PAINT TESTING AND METHODOLOGY
EFI performed testing for lead in paint from accessible interior and exterior surfaces at the Site buildings.
Paint chip samples within the Project Area were collected from representative painted/coated surfaces. Lead paint chips were submitted for analysis to EMSL with a standard 3-day turnaround time using atomic absorption spectrometry (AAS) in accordance with US EPA method SW846-7420.
3.1 SUMMARY OF FINDINGS
EMSL reported that the paint on a Kitchen door and exterior door to Classrooms 1 and 2 contain lead in concentrations ranging from 1.4% to 4.9% by weight. The remaining samples were reported by EMSL as containing a lead concentration below the laboratory detection limit of 0.010 % by weight. Contractors performing work on surfaces where lead is present must comply with the OSHA Lead in Construction Standard, 29 CFR 1926.62, Lead.
3.2 REGULATORY IMPLICATIONS AND RECOMMENDATIONS
Regulatory Implications
OSHA defines any detectable concentration of lead in paint as a potential lead exposure hazard to workers performing construction or demolition work that disturbs these surfaces, as even small concentrations of lead can result in unacceptable employee exposures. The level of exposure varies based upon the lead concentration, method of removal, and other workplace conditions. Since these conditions can vary greatly, the OSHA Lead Construction Standard (29 CFR 1926.62) requires exposure monitoring or the use of historical or objective monitoring data to ensure that employee exposures do not exceed the OSHA action level of 30 micrograms per cubic meter of air (μg/m3) and the OSHA permissible exposure limit (PEL) of 50 μg/m3.
OSHA requires that contractors monitor employee exposures if coated surfaces with paint containing lead are impacted during construction or demolition. Contractors and employers of staff who may disturb these materials are obligated to perform a negative exposure assessment in accordance with OSHA regulations to document that exposure to lead does not exceed the OSHA action level and the PEL.
OSHA states that the employer must treat employees as if they would be exposed above the PEL until the employer 1) performs an exposure assessment that documents that employees are not exposed above the
PEL or 2) can supply prior data regarding the same type of work which may exempt them from the standard.
The OSHA Lead Construction Standard applies to many construction activities including the following:
manual demolition of structures, manual scraping, manual sanding, and use of heat gun where lead-containing coatings or paints are present;
abrasive blasting enclosure movement and removal;
power tool cleaning;
lead burning;
using lead-containing mortar or spray painting with lead-containing paint;
abrasive blasting, rivet busting, or welding, cutting, or burning on any structure where lead-containing coatings or paint are present;
cleanup activities where dry expendable abrasive are used; and any other task the employer believes may cause exposure in excess of the PEL.
The contractor must provide respiratory protection, protective work clothing and equipment, change areas, hand washing facilities, biological monitoring, and training until an exposure assessment has determined that the work activity will result in an exposure below the PEL. Additional requirements under the standard include a written compliance program, as well as, record keeping.
The contractor must also characterize and dispose of all dust, debris, and blast media (if applicable) in accordance with US EPA and Massachusetts Department of Environmental Protection regulations. This includes waste characterization of dust, debris and blast media generated during paint removal activities via the toxicity characteristic leaching procedure (TCLP).
Waste Disposal Implications
Waste disposal is governed by the EPA’s Resource Conservation and Recovery Act (RCRA) regulations, which distinguish between solid wastes and hazardous wastes. Solid wastes include general construction debris and are subject to minimum handling, transportation, and landfill disposal requirements under RCRA regulations. Hazardous wastes, including certain lead-containing materials, are subject to restrictions designed to prevent the hazardous materials from entering the environment. Lead waste is classified as hazardous or non-hazardous based on the results of the TCLP testing. The leachability test measures whether or not lead leaches from the waste in excess of the regulated level of 5.0 mg/L. If the results of the TCLP analysis exceed this level, the waste must be handled, transported and disposed as a hazardous waste in an approved waste site, reclamation facility or incinerator site. EPA’s regulations require the TCLP test be performed so that it represents the matrix and material of the waste stream.
Recommendations
It is recommended that lead TCLP samples be collected and analyzed prior to disposal. If the TCLP results for the building materials are below 5.0 mg/L, the materials can be disposed as construction debris. If the
TCLP results are greater than 5.0 mg/L, the materials must be disposed as a lead hazardous waste.
It is also recommended that construction or demolition personnel conducting work at the facility comply with applicable OSHA Lead Construction Standard requirements during all construction activities at the Site.
TABLE 1
Main Building
ASBESTOS-CONTAINING MATERIALS INVENTORY
Sample ID Material
Description Material Locations(s) Estimated
Quantity Analytical Result
Condition
AHERA 3yr Reinspection Report
Pipe insulation Crawlspace, boiler room, east and west wing corridors, rest room wet walls, staff restrooms, Stage, faculty lounge, front lobby, conference room, former nurse’s room, classroom 1 restroom and storage room, restrooms associated with classrooms 2, 3, 5 and 7, rooms S1, S2, S3 and S4, and pipe associated with classroom sinks
5,000 LF Previously Positive Per AHERA 3 Year Reinspection
Damaged
AHERA 3yr Reinspection Report
Boiler breeching duct
Boiler room 20 LF Previously Positive Per AHERA 3 Year Reinspection
Damaged
AHERA 3yr Reinspection Report
Boiler Components
Boiler Room 400 SF Previously Positive Per AHERA 3 Year Reinspection
Damaged
AHERA 3yr Reinspection Report
Caulk on horizontal and vertical masonry joint
Throughout interior and exterior of the building
NQ Previously Positive Per AHERA 3 Year Reinspection
Damaged
AHERA 3yr Reinspection Report
HVAC Flexible Connector
Stage 5 each Previously Positive Per AHERA 3 Year Reinspection
Good
AHERA 3yr Reinspection Report
Transite Ceiling Crawlspace 2,000 SF Previously Positive Per AHERA 3 Year Reinspection
Good
08A, 08B, 08C Mastic associated with 12” x 12” replacement floor tile
Throughout Main building classrooms and corridors
1,000 SF Positive NAD-3% Chrysotile Asbestos
Damaged
09A, 09B, 09C Glazing compound associated with interior door lights
Throughout main building, classrooms
67 Doors Positive 3% Chrysotile Asbestos
Damaged
10A, 10B, 10C 9” x 9” gray with white streak floor tile
Classrooms 2, 5, 6, 7, 10 and 14, room S6, kitchen storage room, faculty lounge, main office, 9,000 SF Positive 5% Chrysotile Asbestos
Damaged
Sample ID Material Description
Material Locations(s) Estimated
Analytical Result principal’s office, former nurse’s room and associated restrooms and classroom 1 storage room
12A, 12B, 12C 9” x 9” gray with black streak floor tile
West and east corridors, east west connector, classrooms 1, 9 and 12, speech room, rooms S1, S2, S3, S4 and S5, janitor’s closets, main lobby
9,000 SF Positive
16A, 16B, 16C 9” x 9” gray with pink streak floor tile
Classrooms 11, 3 and Audio/visual room
2,300 SF Positive
18A, 18B, 18C 9” x 9” beige floor tile
Classrooms 4, 13 and 14, kitchen and associated office and closets, library, classroom 3/4 connector
4,000 SF Positive 5% Chrysotile Asbestos
Damaged
20A, 20B, 20C Acoustical ceiling plaster
Kitchen 1,100 SF Positive 15% Chrysotile Asbestos
Good
26A, 26B, 26C Black mastic associated with 12” x12” beige floor tile*
Classroom 8 1,100 SF Positive 7% Chrysotile Asbestos
Good
Assumed Positive (not sampled)
9” x 9” floor tile beneath sinks
All classrooms 200 SF Assumed positive Good
Assumed Positive (not sampled)
Fire door insulation
Corridors and boiler room 10 doors Assumed positive Good
46A, 46B, 46C Store front window caulk
Front lobby 80 LF Positive 10% Chrysotile Asbestos
Damaged
49A, 49B, 49C Exterior caulk associated with steel windows
All windows of the Main Building
2000 LF, 31
window openings
Positive 10% Chrysotile Asbestos
Damaged
51A, 51B, 51c Exterior caulk on unit ventilator louvers
Classrooms 130 LF, 13 louvers
Positive 5% Chrysotile Asbestos
Damaged
52A, 52B, 52C Exterior wood door caulk
Throughout Main Building 10 Doors Positive 10% Chrysotile Asbestos
*12” x12” beige floor tile to be managed as asbestos containing waste material due to ACM mastic contamination.
SF – square feet LF – linear feet NQ - not quantified
TABLE 2
ADDITION BUILDING
ASBESTOS-CONTAINING MATERIALS INVENTORY
Sample ID Material Description Material Locations(s) Estimated
Analytical
Result
31A, 31B, 31c 12” X 12” Tan floor tile Corridor and classrooms 16, 15/17, 18/20, and 19
8,000 SF Positive 2% Chrysotile Asbestos
32A, 32B, 32C Black mastic associated with 12” x 12” tan floor tile
Corridor and classrooms 16, 15/17, 18/20, and 19
8,000 SF Positive 10% Chrysotile Asbestos
Good
35A, 35B, 35C Sink basin Coating Classrooms 16, 15/17, 18/20, and 19
6 sinks Positive 10% Chrysotile Asbestos
Good
Assumed positive (not sampled)
Mudded fitting insulation on domestic water and heating lines
Corridor, classrooms, gymnasium, gymnasium storage room, restrooms and wall cavities
400 fittings Assumed Positive
Damaged
57A, 57B, 57C Exterior caulk associated with steel windows
All windows of the addition building
900 LF, 20
openings
Positive 2% Chrysotile Asbestos
Damaged
58A, 58B, 58C Exterior window glazing compound
All windows of the addition building
1,100 LF, 110
windowpanes
2% Chrysotile Asbestos
Damaged
60A, 60B, 60C Exterior caulk on unit ventilator louvers
Classrooms 16, 15/17, 18/20, and 19
60 LF, 6
Louvers
Positive 2% Chrysotile Asbestos
Damaged
61A, 61B, 61C Stone window sills All windows of the addition building
460 SF Positive 10% Chrysotile Asbestos
Damaged
64A, 64B, 64C Window Glazing Compound on interior wood doors
Throughout Addition building
17 Doors Positive 2% Chrysotile Asbestos
Damaged
65A, 65B, 65C Window Glazing Compound on exit doors
Throughout Addition building
10 Doors Positive 2% Chrysotile Asbestos
Damaged
Assumed positive (not sampled)
Fire door insulation Corridor 2 doors Assumed positive
Good
SF – square feet LF – linear feet
ATTACHMENT A
PHOTOGRAPHS
Ms. Kaya Savasta Elwyn G. Campbell Elementary School
Campbell Elementary School
Boilers, Main Building Boiler Room
Boiler Duct Insulation (Breeching), Main BuildingBoiler Room
Pipe Insulation, Main Building Boiler Room
Pipe Insulation on Water Lines, Main Building Boiler Room
Pipe Insulation on Fuel Lines, Main Building Boiler Room
Typical 9”x9” Gray with Black Streak Floor Tiles, Main Building Corridors
Typical Glue Daubs associated with 1’x1’ Dotted Ceiling Tiles, Main Building
Typical Pipe Insulation above Ceiling tiles Main Building
Typical Wood Door Glazing Compound, Main Building
Typical 9”x 9” Gray with Black Streak Floor Tile, Main Building Classrooms
Chalk Boards
Typical Sheet Good on Unit Ventilator, Main Building Classrooms
Caulk on Masonry Joints, Main Building
Caulk on Masonry Joint, Main Building
Typical 9”x9” Gray with White Streak Floor Tile, Main Building Classroom
Typical Pipe Insulation in Restroom Wet Wall, Main Building
Typical 9”x9” Gray with Pink Streak Floor Tile, Main Building Classroom
Typical 1’x1’ Dotted Ceiling Tile, Main Building Classrooms
Flexible Duct Connector, Main Building Stage Area
Typical 9”x9” Beige Floor Tile, Main Building Kitchen
Acoustical Ceiling Plaster, Main Building Kichen
Acoustical Ceiling Plaster, Main Building Kitchen
Typical 9”x9” Gray with White Streak Floor Tile, Main Building Kitchen Storage
Typical Exposed Pipe Insulation, Main Building
Typical 9”x9” Gray with White Streak Floor Tile, Main Building Faculty Room 1
Glazing Compound on Observation Window, Main Building Office
Typical 2’x2’ Ceiling Tile, Main Building Pricipals Office
Typical Ceramic Floor Tile, Main Building Restrooms
Typical 2’x2’ Ceiling Tile with 1’x1’ Dotted Ceiling tile and Glue Daubs Above, Main Building East-wing
Classrooms
Typical 12”x12” Tan Floor Tile, Addition Wing Classrooms and Corridors
Typical 2’x4’ Replacement Ceiling Tiles, Addition Wing Corridors and Classrooms
Typical 2’x4’ Dotted Ceiling Tiles, Addition Wing Corridors And Classrooms
Chalk Board, Addition Wing Classrooms
Typical Sink Basin Coating, Addition Wing Classrooms
Typical Mudded Pipe Fitting Insulation on Fiberglass, Addition Wing
Inaccessible Adhesive associated with Wood Paneling, Addition Wing Gymnasium
Ceramic Floor Tile, Addition Wing Restrooms
Main Entrance Store Front
Typical Steel Framed Window, Main Building
Typical Steel Framed Window, Main Building
Typical Wood Door, Main Building
Louver Associated with Unit Ventilator
L
Typical Steel Frame Window, Addition Wing
Exterior Plaster Sorffit Addition Wing
Adhesive Associated with Metal Wall Panel, Addition Wing Gymnasium Roof Level
Glazing Compound Associated with Wood Doors, Addition Wing
Metal Panels on Auditorium, Main Building Roof Level
ATTACHMENT B
ASBESTOS LABORATORY REPORT
EMSL Analytical, Inc.
5 Constitution Way, Unit A Woburn, MA 01801
Tel/Fax: (781) 933-8411 / (781) 933-8412 http://www.EMSL.com / bostonlab@emsl.com
132102934EMSL Order:
Customer ID: EAFI66
Customer PO:
Project ID:
Attention: Phone:Rob Thomson (978) 688-3736
Fax:EFI Global, Inc. (978) 688-5494
Received Date:155 West Street 04/23/2021 4:30 PM
Analysis Date:Suite 6 04/28/2021
Collected Date:Wilmington, MA 01887
Project: 020-01601 - Campbell Elementary School; 144 Essex Street; New Bedford, MA
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
01A
132102934-0001
None DetectedNon-fibrous (Other)5%Cellulose95%Brown/White
Fibrous
Homogeneous
Classroom 11 - 1x1
Smooth Finish Ceiling
Tile
01B
132102934-0002
None DetectedNon-fibrous (Other)5%Cellulose95%Brown/White
Fibrous
Homogeneous
East/West Corridor -
1x1 Smooth Finish
Ceiling Tile
01C
132102934-0003
None DetectedNon-fibrous (Other)5%Cellulose95%Brown/White
Fibrous
Homogeneous
Entry Lobby - 1x1
Smooth Finish Ceiling
Tile
02A
132102934-0004
None DetectedNon-fibrous (Other)5%Cellulose95%Brown/White
Fibrous
Homogeneous
Classroom 9 - 1x1
Dotted Ceiling Tile
02B
132102934-0005
None DetectedNon-fibrous (Other)5%Cellulose95%Brown/White
Fibrous
Homogeneous
East/West Corridor -
1x1 Dotted Ceiling
Tile
02C
132102934-0006
None DetectedNon-fibrous (Other)5%Cellulose95%Brown/White
Fibrous
Homogeneous
Classroom 1 - 1x1
Dotted Ceiling Tile
03A
132102934-0007
None DetectedNon-fibrous (Other)100%Brown
Non-Fibrous
Homogeneous
Classroom 9 - Glue
Daub on 1x1 Ceiling
Tile
03B
132102934-0008
None DetectedNon-fibrous (Other)100%Brown
Non-Fibrous
Homogeneous
East/West Corridor -
Glue Daub on 1x1
Ceiling Tile
03C
132102934-0009
None DetectedNon-fibrous (Other)100%Brown
Non-Fibrous
Homogeneous
Classroom 1 - Glue
Daub on 1x1 Ceiling
Tile
04A
132102934-0010
None DetectedNon-fibrous (Other)85%Cellulose15%Green
Non-Fibrous
Homogeneous
Unit Ventilator, Classroom 9 - Green
Sheet Good
04B
132102934-0011
None DetectedNon-fibrous (Other)85%Cellulose15%Green
Fibrous
Homogeneous
Unit Ventilator, Classroom 12 - Green
Sheet Good
04C
132102934-0012
None DetectedNon-fibrous (Other)85%Cellulose15%Blue/Green
Fibrous
Homogeneous
Unit Ventilator, Classroom 6 - Green
Sheet Good
05A
132102934-0013
None DetectedNon-fibrous (Other)97%Cellulose3%Brown/Black
Fibrous
Homogeneous
Unit Ventilator, Classroom 12 -
Mastic Assoc. w/
Sheet Good
05B
132102934-0014
None DetectedNon-fibrous (Other)97%Cellulose3%Brown/Black
Fibrous
Homogeneous
Unit Ventilator, Classroom 13 -
Mastic Assoc. w/
Sheet Good
05C
132102934-0015
None DetectedNon-fibrous (Other)97%Cellulose3%Brown/Black
Fibrous
Homogeneous
Classroom 13 -
Mastic Assoc. w/
Sheet Good
Initial report from: 04/28/2021 14:52:16
Page 1 of 13ASB_PLM_0008_0001 - 1.78 Printed: 4/28/2021 2:52 PM
Tel/Fax: (781) 933-8411 / (781) 933-8412 http://www.EMSL.com / bostonlab@emsl.com
132102934EMSL Order:
Customer ID: EAFI66
Customer PO:
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
06A
132102934-0016
None DetectedNon-fibrous (Other)85%Cellulose15%Brown/Red
Fibrous
Homogeneous
Classroom 1 - Brown
Sheet Good
06B
132102934-0017
None DetectedNon-fibrous (Other)85%Cellulose15%Brown/Red
Fibrous
Homogeneous
Classroom 7 - Brown
Sheet Good
06C
132102934-0018
None DetectedNon-fibrous (Other)85%Cellulose15%Brown/Red/Blue
Fibrous
Homogeneous
Classroom 9/10
Connector - Brown
Sheet Good
07A
132102934-0019
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Classroom 12/14
Connector - 12x12
Replacement Floor
Tile
07B
132102934-0020
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
Classroom 1/2
Connector - 12x12
Replacement Floor
Tile
07C
132102934-0021
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
Classroom 9/10
Connector - 12x12
Replacement Floor
Tile
08A
132102934-0022
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Classroom 12/14
Connector - Mastic
Assoc. w/ 12x12
Replacement Floor
Tile
08B
132102934-0023
5% ChrysotileNon-fibrous (Other)95%Black/Yellow
Non-Fibrous
Homogeneous
Classroom 1/2
Connector - Mastic
Assoc. w/ 12x12
Replacement Floor
Tile
08C
132102934-0024
Positive Stop (Not Analyzed)Classroom 9 - Mastic
Assoc. w/ 12x12
Replacement Floor
Tile
09A
132102934-0025
3% ChrysotileNon-fibrous (Other)97%Tan
Non-Fibrous
Homogeneous
Classroom 12
Connector Door -
Glazing Compound on Interior Door Lights
09B
132102934-0026
Positive Stop (Not Analyzed)Library - Glazing
Compound on Interior
Door Lights
09C
132102934-0027
Positive Stop (Not Analyzed)Room 56 - Glazing
Compound on Interior
Door Lights
10A
132102934-0028
5% ChrysotileNon-fibrous (Other)95%Gray
Non-Fibrous
Homogeneous
Classroom 14 - 9x9
Gray w/ White Streak
Floor Tile
10B
132102934-0029
Positive Stop (Not Analyzed)Classroom 7 - 9x9
Gray w/ White Streak
Floor Tile
10C
132102934-0030
Positive Stop (Not Analyzed)Room 56 - 9x9 Gray w/ White Streak Floor
Tile
11A
132102934-0031
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Classroom 14 - Black
Mastic Assoc. w/ 9x9
Gray w/ White Streak
Floor Tile
Page 2 of 13ASB_PLM_0008_0001 - 1.78 Printed: 4/28/2021 2:52 PM
Tel/Fax: (781) 933-8411 / (781) 933-8412 http://www.EMSL.com / bostonlab@emsl.com
132102934EMSL Order:
Customer ID: EAFI66
Customer PO:
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
11B
132102934-0032
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Classroom 7 - Black
Mastic Assoc. w/ 9x9
Gray w/ White Streak
Floor Tile
11C
132102934-0033
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Classroom 7 - Black
Mastic Assoc. w/ 9x9
Gray w/ White Streak
Floor Tile
12A
132102934-0034
5% ChrysotileNon-fibrous (Other)95%Gray
Non-Fibrous
Homogeneous
West Corridor by
Boys Room - 9x9
Gray w/ Black Streak
Floor Tile
12B
132102934-0035
Positive Stop (Not Analyzed)Classroom 1 - 9x9
Gray w/ Black Streak
Floor Tile
12C
132102934-0036
Positive Stop (Not Analyzed)Classroom 6 - 9x9
Gray w/ Black Streak
Floor Tile
13A
132102934-0037
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
West Corridor by
Boys Room - Black
Mastic Assoc. w/ 9x9
Gray w/ Black Streak
Floor Tile
13B
132102934-0038
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Classroom 1 - Black
Mastic Assoc. w/ 9x9
Gray w/ Black Streak
Floor Tile
13C
132102934-0039
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Classroom 6 - Black
Mastic Assoc. w/ 9x9
Gray w/ Black Streak
Floor Tile
14A
132102934-0040
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
West Wing Girls
Restroom - Ceramic
Floor Tile Grout
14B
132102934-0041
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
West Wing Boys
Restroom - Ceramic
Floor Tile Grout
14C
132102934-0042
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Staff Restroom, East/West Corridor -
Ceramic Floor Tile
Grout
15A
132102934-0043
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
West Wing Girls
Restroom - Ceramic
Floor Tile Tile
Bedding Mortar
15B
132102934-0044
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
West Wing Boys
Restroom - Ceramic
Floor Tile Tile
Bedding Mortar
15C
132102934-0045
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Staff Restroom, East/West Corridor -
Ceramic Floor Tile
Tile Bedding Mortar
16A
132102934-0046
5% ChrysotileNon-fibrous (Other)95%Gray
Fibrous
Homogeneous
Classroom 11 - 9x9
Gray w/ Pink Streak
Floor Tile
Page 3 of 13ASB_PLM_0008_0001 - 1.78 Printed: 4/28/2021 2:52 PM
Tel/Fax: (781) 933-8411 / (781) 933-8412 http://www.EMSL.com / bostonlab@emsl.com
132102934EMSL Order:
Customer ID: EAFI66
Customer PO:
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
16B
132102934-0047
Positive Stop (Not Analyzed)AV Room - 9x9 Gray w/ Pink Streak Floor
Tile
16C
132102934-0048
Positive Stop (Not Analyzed)Classroom 3 - 9x9
Gray w/ Pink Streak
Floor Tile
17A
132102934-0049
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Classroom 11 - Black
Mastic Assoc. w/ 9x9
Gray w/ Pink Streak
Floor Tile
17B
132102934-0050
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
AV Room - Black
Mastic Assoc. w/ 9x9
Gray w/ Pink Streak
Floor Tile
17C
132102934-0051
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Classroom 3 - Black
Mastic Assoc. w/ 9x9
Gray w/ Pink Streak
Floor Tile
18A
132102934-0052
5% ChrysotileNon-fibrous (Other)95%Tan
Fibrous
Homogeneous
Classroom 14 - 9x9
Beige Floor Tile
18B
132102934-0053
Positive Stop (Not Analyzed)Kitchen - 9x9 Beige
Floor Tile
18C
132102934-0054
Positive Stop (Not Analyzed)Classroom 4 - 9x9
Beige Floor Tile
19A
132102934-0055
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Classroom 14 - Black
Mastic Assoc. w/ 9x9
Beige Floor Tile
19B
132102934-0056
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Kitchen - Black Mastic
Assoc. w/ 9x9 Beige
Floor Tile
19C
132102934-0057
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Classroom 4 - Black
Mastic Assoc. w/ 9x9
Beige Floor Tile
21A
132102934-0058
5% ChrysotileNon-fibrous (Other)95%Red
Fibrous
Homogeneous
Faculty Room 2 - 9x9
Brown Floor Tile
21B
132102934-0059
Positive Stop (Not Analyzed)Faculty Room 2 - 9x9
Brown Floor Tile
21C
132102934-0060
Positive Stop (Not Analyzed)Faculty Room 2 - 9x9
Brown Floor Tile
22A
132102934-0061
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Faculty Room 2 -
Black Mastic Assoc.
w/ 9x9 Brown Floor
Tile
22B
132102934-0062
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Faculty Room 2 -
Black Mastic Assoc.
w/ 9x9 Brown Floor
Tile
22C
132102934-0063
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Faculty Room 2 -
Black Mastic Assoc.
w/ 9x9 Brown Floor
Tile
Page 4 of 13ASB_PLM_0008_0001 - 1.78 Printed: 4/28/2021 2:52 PM
Tel/Fax: (781) 933-8411 / (781) 933-8412 http://www.EMSL.com / bostonlab@emsl.com
132102934EMSL Order:
Customer ID: EAFI66
Customer PO:
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
20A
132102934-0064
15% ChrysotileNon-fibrous (Other)85%White
Fibrous
Homogeneous
Kitchen - Acoustical
Ceiling Plaster
20B
132102934-0065
Positive Stop (Not Analyzed)Kitchen - Acoustical
Ceiling Plaster
20C
132102934-0066
Positive Stop (Not Analyzed)Kitchen - Acoustical
Ceiling Plaster
20D
132102934-0067
Positive Stop (Not Analyzed)Kitchen - Acoustical
Ceiling Plaster
20E
132102934-0068
Positive Stop (Not Analyzed)Kitchen - Acoustical
Ceiling Plaster
23A
132102934-0069
None DetectedNon-fibrous (Other)30%Cellulose
Min. Wool
40%
30%
Gray/White
Fibrous
Homogeneous
Main Office Entry -
2x2 Ceiling Tile
23B
132102934-0070
None DetectedNon-fibrous (Other)30%Cellulose
Min. Wool
40%
30%
Gray/White
Fibrous
Homogeneous
Classroom 1 - 2x2
Ceiling Tile
23C
132102934-0071
None DetectedNon-fibrous (Other)30%Cellulose
Min. Wool
40%
30%
Gray/White
Fibrous
Homogeneous
Classroom 4 - 2x2
Ceiling Tile
24A
132102934-0072
None DetectedNon-fibrous (Other)35%Cellulose
Min. Wool
45%
20%
Gray/White
Fibrous
Homogeneous
Library - 2x4 Ceiling
Tile
24B
132102934-0073
None DetectedNon-fibrous (Other)35%Cellulose
Min. Wool
45%
20%
Gray/White
Fibrous
Homogeneous
Library - 2x4 Ceiling
Tile
24C
132102934-0074
None DetectedNon-fibrous (Other)35%Cellulose
Min. Wool
45%
20%
Gray/White
Fibrous
Homogeneous
Library - 2x4 Ceiling
Tile
25A
132102934-0075
None DetectedNon-fibrous (Other)100%Beige
Non-Fibrous
Homogeneous
Classroom 8 - 12x12
Beige Floor Tile
25B
132102934-0076
None DetectedNon-fibrous (Other)100%Beige
Non-Fibrous
Homogeneous
Classroom 8 - 12x12
Beige Floor Tile
25C
132102934-0077
None DetectedNon-fibrous (Other)100%Beige
Non-Fibrous
Homogeneous
Classroom 8 - 12x12
Beige Floor Tile
26A
132102934-0078
7% ChrysotileNon-fibrous (Other)93%Black
Fibrous
Homogeneous
Classroom 8 - Black
Mastic Assoc. w/
12x12 Beige Floor
Tile
26B
132102934-0079
Positive Stop (Not Analyzed)Classroom 8 - Black
Mastic Assoc. w/
12x12 Beige Floor
Tile
26C
132102934-0080
Positive Stop (Not Analyzed)Classroom 8 - Black
Mastic Assoc. w/
12x12 Beige Floor
Tile
27A
132102934-0081
None DetectedNon-fibrous (Other)85%Cellulose15%Tan
Fibrous
Homogeneous
Classroom 3 - Sink
Basin Coating
Page 5 of 13ASB_PLM_0008_0001 - 1.78 Printed: 4/28/2021 2:52 PM
Tel/Fax: (781) 933-8411 / (781) 933-8412 http://www.EMSL.com / bostonlab@emsl.com
132102934EMSL Order:
Customer ID: EAFI66
Customer PO:
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
27B
132102934-0082
None DetectedNon-fibrous (Other)85%Cellulose15%Tan
Fibrous
Homogeneous
Classroom 3 - Sink
Basin Coating
28A
132102934-0083
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Classroom 3 - 12x12
White Floor Tile
Beneath Sink
28B
132102934-0084
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Classroom 3 - 12x12
White Floor Tile
Beneath Sink
29A
132102934-0085
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Classroom 3 - Mastic
Assoc. w/ 12x12
White Floor Tile
Beneath Sink
29B
132102934-0086
None DetectedNon-fibrous (Other)100%Yellow
Non-Fibrous
Homogeneous
Classroom 3 - Mastic
Assoc. w/ 12x12
White Floor Tile
Beneath Sink
30A
132102934-0087
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
East/West Lobby -
Stone Window Sill
30B
132102934-0088
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Faculty Room 2 -
Stone Window Sill
30C
132102934-0089
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Classroom 12 - Stone
Window Sill
31A
132102934-0090
2% ChrysotileNon-fibrous (Other)98%Gray
Non-Fibrous
Homogeneous
Addition, Classroom
15 - 12x12 Tan Floor
Tile
31B
132102934-0091
Positive Stop (Not Analyzed)Addition, Classroom
16 - 12x12 Tan Floor
Tile
31C
132102934-0092
Positive Stop (Not Analyzed)Addition, Gym Lobby
- 12x12 Tan Floor Tile
32A
132102934-0093
10% ChrysotileNon-fibrous (Other)90%Black
Non-Fibrous
Homogeneous
Addition, Classroom
15 - Black Mastic
Assoc. w/ 12x12 Tan
Floor Tile
32B
132102934-0094
Positive Stop (Not Analyzed)Addition, Classroom
16 - Black Mastic
Assoc. w/ 12x12 Tan
Floor Tile
32C
132102934-0095
Positive Stop (Not Analyzed)Addition, Gym Lobby
- Black Mastic Assoc.
w/ 12x12 Tan Floor
Tile
33A
132102934-0096
None DetectedNon-fibrous (Other)20%Cellulose
Min. Wool
40%
40%
Gray/White
Fibrous
Homogeneous
Addition, Classroom
15 - 2x4 Dotted
Ceiling Tile
33B
132102934-0097
None DetectedNon-fibrous (Other)20%Cellulose
Min. Wool
40%
40%
Gray/White
Fibrous
Homogeneous
Addition, Corridor -
2x4 Dotted Ceiling
Tile
33C
132102934-0098
None DetectedNon-fibrous (Other)20%Cellulose
Min. Wool
40%
40%
Gray/White
Fibrous
Homogeneous
Classroom 19 - 2x4
Dotted Ceiling Tile
Page 6 of 13ASB_PLM_0008_0001 - 1.78 Printed: 4/28/2021 2:52 PM
Tel/Fax: (781) 933-8411 / (781) 933-8412 http://www.EMSL.com / bostonlab@emsl.com
132102934EMSL Order:
Customer ID: EAFI66
Customer PO:
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
34A
132102934-0099
None DetectedNon-fibrous (Other)20%Cellulose
Min. Wool
40%
40%
Gray/White
Fibrous
Homogeneous
Addition, Classroom
15 - 2x4 Fissured
Ceiling Tile
34B
132102934-0100
None DetectedNon-fibrous (Other)20%Cellulose
Min. Wool
40%
40%
Gray/White
Fibrous
Homogeneous
Addition, Corridor -
2x4 Fissured Ceiling
Tile
34C
132102934-0101
None DetectedNon-fibrous (Other)20%Cellulose
Min. Wool
40%
40%
Gray/White
Fibrous
Homogeneous
Addition, Classroom
19 - 2x4 Fissured
Ceiling Tile
35A
132102934-0102
10% ChrysotileNon-fibrous (Other)90%Gray
Non-Fibrous
Homogeneous
Addition, Classroom
15 - Sink Basin
Coating
35B
132102934-0103
Positive Stop (Not Analyzed)Addition, Classroom
16 - Sink Basin
Coating
35C
132102934-0104
Positive Stop (Not Analyzed)Addition, Classroom
19 - Sink Basin
Coating
36A
132102934-0105
None DetectedNon-fibrous (Other)60%Min. Wool40%Gray
Fibrous
Homogeneous
Addition, Classroom
15 - Mudded Fitting on Heat
36B
132102934-0106
None DetectedNon-fibrous (Other)60%Min. Wool40%Gray
Fibrous
Homogeneous
Addition, Corridor -
Mudded Fitting on
Heat
36C
132102934-0107
None DetectedNon-fibrous (Other)60%Min. Wool40%Gray
Fibrous
Homogeneous
Addition, Gym
Storage - Mudded
Fitting on Heat
37A
132102934-0108
None DetectedNon-fibrous (Other)60%Min. Wool40%Gray
Non-Fibrous
Homogeneous
Addition, Janitors
Closet - Mudded
Fitting on Water
37B
132102934-0109
None DetectedNon-fibrous (Other)60%Min. Wool40%Gray
Fibrous
Homogeneous
Addition, Gym
Storage Room -
Mudded Fitting on
Water
37C
132102934-0110
None DetectedNon-fibrous (Other)60%Min. Wool40%Gray
Fibrous
Homogeneous
Addition, Hallway
Outside Restrooms -
Mudded Fitting on
Water
38A
132102934-0111
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Divider Wall, Addition, Classroom 15 - Joint
Compound Above
Ceiling
38B
132102934-0112
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Divider Wall, Addition, Classroom 15 - Joint
Compound Above
Ceiling
38C
132102934-0113
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Divider Wall, Addition, Classroom 15 - Joint
Compound Above
Ceiling
39A
132102934-0114
None DetectedNon-fibrous (Other)90%Cellulose10%Tan/White
Fibrous
Homogeneous
Divider Wall, Addition, Classroom 15 -
Gypsum Board Above
Ceiling
39B
132102934-0115
None DetectedNon-fibrous (Other)90%Cellulose10%Tan/White
Fibrous
Homogeneous
Divider Wall, Addition, Classroom 15 -
Gypsum Board Above
Ceiling
Page 7 of 13ASB_PLM_0008_0001 - 1.78 Printed: 4/28/2021 2:52 PM
Tel/Fax: (781) 933-8411 / (781) 933-8412 http://www.EMSL.com / bostonlab@emsl.com
132102934EMSL Order:
Customer ID: EAFI66
Customer PO:
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
39C
132102934-0116
None DetectedNon-fibrous (Other)90%Cellulose10%Tan/White
Fibrous
Homogeneous
Divider Wall, Addition, Classroom 15 -
Gypsum Board Above
Ceiling
40A
132102934-0117
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Addition, Classroom
15 - Plaster Soffit
Base Coat
40B
132102934-0118
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Addition, Classroom
16 - Plaster Soffit
Base Coat
40C
132102934-0119
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Addition, Classroom
20 - Plaster Soffit
Base Coat
41A
132102934-0120
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Addition, Classroom
15 - Plaster Soffit
Finish Coat
41B
132102934-0121
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Addition, Classroom
16 - Plaster Soffit
Finish Coat
41C
132102934-0122
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Addition, Classroom
20 - Plaster Soffit
Finish Coat
42A
132102934-0123
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Addition, Classroom
15 - Wall Base
Molding
42B
132102934-0124
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Addition, Classroom
17 - Wall Base
Molding
42C
132102934-0125
None DetectedNon-fibrous (Other)100%Black
Non-Fibrous
Homogeneous
Addition, Classroom
20 - Wall Base
Molding
43A
132102934-0126
None DetectedNon-fibrous (Other)100%Brown
Non-Fibrous
Homogeneous
Addition, Classroom
15 - Adhesive on Wall
Base
43B
132102934-0127
None DetectedNon-fibrous (Other)100%Brown
Non-Fibrous
Homogeneous
Addition, Classroom
17 - Adhesive on Wall
Base
43C
132102934-0128
None DetectedNon-fibrous (Other)100%Brown
Non-Fibrous
Homogeneous
Addition, Classroom
20 - Adhesive on Wall
Base
44A
132102934-0129
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Addition, Boys