25300105R CAMPBELL ELEMENTARY CEILINGS AND LIGHTING-HAZMAT REPORTS.pdf

PDF 4 MB Posted

Attached to
Campbell Elementary School Ceilings and Lighting-Rebid GC
Solicitation number
25300105R-GC
Issued by
Bristol County, New Bedford City, Massachusetts

About this file

This document is a comprehensive asbestos and lead survey report prepared by EFI Global, Inc. for CSS Architects regarding the Elwyn G. Campbell Elementary School located at 145 Essex Street in New Bedford, Massachusetts. The survey, conducted on April 21-23, 2021, involved a pre-renovation inspection of the main building (constructed in the 1950s) and an addition (constructed in 1966) to identify and assess asbestos-containing materials (ACMs) and lead-based paint. The scope of work included mechanical, electrical, and plumbing (MEP) and cosmetic upgrades throughout both buildings, excluding roof and subgrade areas, with sampling performed in accordance with EPA, OSHA, and Massachusetts Department of Labor Standards regulations.

The laboratory analysis revealed multiple types of asbestos-containing materials in both buildings, including pipe insulation, boiler components, floor tiles, mastics, caulking, and glazing compounds. Some notable findings include asbestos detected in 9"x9" floor tiles with various color streaks, black mastics, and exterior caulking, with asbestos percentages ranging from 2% to 15% chrysotile. For lead paint testing, the report identified lead concentrations ranging from 1.4% to 4.9% by weight on a kitchen door and exterior door to Classrooms 1 and 2, with other samples showing lead concentrations below the laboratory detection limit. The report recommends proper removal and disposal of asbestos-containing materials by a licensed asbestos contractor and compliance with OSHA Lead in Construction Standards for surfaces with lead present.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BOSTON NORTH

EFI Global, Inc.

155 West Street | Suite 6 | Wilmington, MA 01887 | PHONE 978.688.3736 | FAX 978.688.5494 | FREE 800.659.1202

May 7, 2021

Ms. Kaja Savasta VIA EMAIL: ksavasta@cssarchitects.com Principal CSS Architects, Inc.

107 Audubon Road Building 2, Suite 300 Wakefield, MA 01880

RE: Asbestos & Lead Survey Report

Elwyn G. Campbell Elementary School, 145 Essex Street

New Bedford, MA 02745

EFI Project No. 020.01601

Dear Ms. Savasta:

EFI Global Inc. (EFI) is pleased to provide this survey report to CSS Architects for a pre-renovation asbestos and lead survey of the Elwyn G. Campbell Elementary School located at 145 Essex Street, New Bedford, Massachusetts (Site). EFI performed the survey on April 21-23, 2021. The pre-renovation survey included an inspection of the building for suspect asbestos-containing materials, and sampling of representative coatings for lead-based paint.

EFI is pleased to provide environmental consulting services to CSS Architects. If you have any questions regarding the contents of this report, or are in need of additional information, please do not hesitate to contact either of the undersigned at 800-659-1202. Thank you for this opportunity to serve your environmental needs.

Sincerely, Sincerely, Robert Thomson Jennifer L. Archacki Project Manager Environmental Service Line Principal mailto:ksavasta@cssarchitects.com

PRE-RENOVATION ASBESTOS SURVEY & LEAD TESTING REPORT

Elwyn G. Campbell Elementary School 145 Essex Street

New Bedford, Massachusetts, 02745

Prepared for:

Ms. Kaya Savasta

Principal

CSS Architects

107 Audubon Road

Building 2, Suite 300

Wakefield, Massachusetts 01880

Prepared by:

155 West Street, Suite 6 Wilmington, Massachusetts 01887

EFI Project Number: 020.01601

May 7, 2021

TABLE OF CONTENTS

EXECUTIVE SUMMARY

INTRODUCTION

2.0 ASBESTOS CONTAINING MATERIALS SURVEY

2.1 SAMPLING METHODOLOGY

2.2 Asbestos Containing Materials Findings

2.3 Asbestos Survey Limitations

2.4 Recommendations

3.0 LEAD-BASED PAINT INSPECTION AND METHODOLOGY

3.1 SUMMARY OF FINDINGS

3.2 REGULATORY IMPLICATIONS AND RECOMMENDATIONS

TABLES

TABLE 1 – MAIN BUILDING, INVENTORY OF ASBESTOS-CONTAINING

MATERIALS

TABLE 2 – ADDITION BUILDING, INVENTORY OF IDENTIFIED

ASBESTOS- CONTINING MATERIALS

ATTACHMENTS

ATTACHMENT A – PHOTOGRAPHS

ATTACHMENT B - ASBESTOS LABORATORY REPORT

ATTACHMENT C - LEAD PAINT LABORATORY REPORT

EFI Global, Inc. May 7, 2021

Ms. Kaja Savasta Elwyn G. Campbell Elementary School EFI Project No.: 020.01601 145 Essex Street, New Bedford, Massachusetts

EXECUTIVE SUMMARY

This report presents the findings of the pre-renovation survey for asbestos-containing materials (ACM) and lead paint testing at the Elwyn G. Campbell Elementary School located at 145 Essex Street, New Bedford, Massachusetts (Site). The building is comprised of the original (or main building) constructed in the 1950’s and an addition constructed in 1966. The site building is currently functioning as an elementary school.

The asbestos survey was performed by Massachusetts Department of Labor Standards (MassDLS) Asbestos

Inspectors Mr. Robert Thomson and Mr. John Young (License No.: AI031431 and AI900986), respectively. The scope of work for EFI’s survey included a walkthrough of the buildings to identify the types, locations, condition and approximate quantities of ACMs and lead painted surfaces that may be disturbed by planned renovation activities As part of the scope of work, EFI reviewed partial information from a 2006

AHERA reinspection report (limited to a material location inventory table and bulk sample results) prepared by Universal Environmental Consultants (UEC). Results from the AHERA report were incorporated into this survey where appropriate.

As described to EFI and reviewed on project drawings prepared by CSS Architects, the scope of work for the planned renovations includes mechanical, electrical and plumbing (MEP) and cosmetic upgrades throughout both buildings, except roof and subgrade areas. As such, a survey of the roof and subgrade areas was not performed as part of EFI’s scope of work. At the Client’s request, since the school is still in operation, destructive sampling methods were not utilized to inspect concealed areas at the time of the survey.

Based on the findings of the asbestos survey including a review of prior AHERA survey information, multiple types of ACMs were identified in both buildings. A list of materials confirmed or assumed to be ACM is presented in Section 2.2

The identified asbestos-containing materials (ACMs) should be properly removed and disposed by a Massachusetts-licensed Asbestos Contractor prior to disturbance by renovation activities. Additionally, any areas of the buildings that could not be thoroughly inspected using destructive sampling methods may require additional inspection once the building is vacant but prior to the start of renovations. Lastly, the federal Asbestos Hazard Emergency Response Act (AHERA) regulation requires all response actions in schools K-12, including asbestos removal, be designed and conducted by accredited persons to maintain compliance with the AHERA regulation.

EMSL reported that the paint on a Kitchen door and exterior door to Classrooms 1 and 2 s contains lead concentrations ranging from 1.4% to 4.9% by weight. The remaining samples were reported by EMSL as containing a lead concentration below the laboratory detection limit of 0.010 % by weight. Contractors performing work on surfaces where lead is present must comply with the OSHA Lead in Construction Standard, 29 CFR 1926.62, Lead.

INTRODUCTION

EFI Global (EFI) performed a pre-renovation survey for asbestos-containing materials (ACM) and lead paint testing at the Elwyn G. Campbell Elementary School located at 145 Essex Street, New Bedford, Massachusetts

(Site). At the time of the survey, the site was being utilized as an elementary school.

The asbestos survey was performed by Massachusetts Department of Labor Standards (MassDLS) Asbestos

Inspectors Mr. Robert Thomson and Mr. John Young. The scope of work for the planned renovations includes mechanical, electrical and plumbing (MEP) and cosmetic upgrades, throughout both buildings with the exception of the roof and subgrade areas (Project Area). Additionally, due to the fact that the school is still in operation, destructive sampling methods were not utilized to inspect concealed areas where hidden suspect materials may be present. Bulk samples of observed and accessible suspect ACMs and paint chips from representative painted surfaces were submitted for laboratory analysis to determine asbestos and lead content.

2.0 ASBESTOS CONTAINING MATERIALS SURVEY

2.1 SAMPLING METHODOLOGY

The asbestos survey was performed in accordance with EPA, OSHA and MassDEP regulations by USEPA accredited and Massachusetts Department of Labor Standards (MassDLS) Asbestos Inspectors Mr. Robert Thomson and Mr. John Young (License No.: AI031431 and AI900986), respectively. EFI conducted a thorough inspection of accessible areas of the Site. A total of 148 bulk samples of suspect ACMs were collected on-site and transported under chain of custody protocol to EMSL Analytical, in Woburn, Massachusetts, a Massachusetts-licensed laboratory. EMSL is accredited by the National Voluntary Laboratory Accreditation Program (NVLAP) for bulk asbestos fiber analysis, which is administered by the National Institute of Standards and Testing (NIST). Due to the fact that the site building is still in operation as an elementary school, destructive sampling methods/exploratory demolition was not performed on the interior and exterior of the buildings to evaluate the potential presence of hidden asbestos-containing materials. Bulk samples representing readily accessible individual homogenous areas of suspect materials were collected in a randomly distributed manner, in accordance with the methods outlined below.

The findings of this report are based upon review of a prior partial 2006 AHERA reinspection report provided to EFI, observations of accessible suspect materials and the analysis of representative bulk samples collected.

Samples were analyzed with a standard 3-day turnaround time using polarized light microscopy (PLM) in accordance with United States Environmental Protection Agency (USEPA) Method 600/R-93/116. The PLM/DS analytical method is modeled after 40 CFR Part 763, Subpart F, Attachment A: "Interim Method for the Determination of Asbestos in Bulk Insulation Samples." By using the PLM/DS method, a trained microscopist is able to identify and distinguish between asbestos group minerals and other fibrous materials such as cellulose (paper), mineral (rock), wood, or glass fiber. The quantity of each of these substances is estimated on a visual basis and recorded as a percent. If a material contains greater than or equal to one percent asbestos, it is considered to be an asbestos-containing material under Massachusetts Department of Environmental Protection (MassDEP) asbestos regulations.

Building materials exist in the form of thermal systems insulation (TSI), surfacing materials, and miscellaneous materials. Bulk samples representing individual homogenous areas of suspect ACM, (materials that are determined to be uniform in color and texture and installed in the same construction period) were collected in a randomly distributed manner, in accordance with the EPA sampling protocol outlined in 40 CFR 763:

(a) Surfacing materials (e.g., wall and ceiling plaster) - In a randomly distributed manner, collect bulk samples of surfacing materials, representative of each homogeneous area, and not assumed to be ACM.

(1) Collect at least three bulk samples from each homogeneous area that is less than or equal to

1,000 ft

(2) Collect at least five bulk samples from each homogeneous area that is greater than 1,000 ft but less than or equal to 5,000 ft2.

(3) Collect at least seven bulk samples from each homogeneous area that is greater than 5,000 ft

(b) Thermal systems insulation (e.g., pipe fitting insulation, tank insulation, etc.)

(1) In a randomly distributed manner, collect at a minimum, three (3) bulk samples of thermal systems insulation material, representative of each homogeneous area, and not assumed to be

ACM.

(2) Collect, at a minimum, one (1) bulk sample of patched thermal systems insulation, representative of each homogenous area, and not assumed to be ACM, providing the section of patch was less than 6 linear or square feet.

(3) Collect, at a minimum, three (3) representative bulk samples of each insulated mechanical system not assumed to be ACM, including, but not limited to cementitious material used on pipe fittings such as tees, elbows, or valves. Representative sampling was conducted in a manner sufficient as to identify whether each homogenous area is either asbestos or non-asbestos containing.

(4) Bulk samples are not required to be collected from any homogeneous area where the accredited asbestos inspector has determined that the thermal systems insulation is a non-suspect material (i.e., fiberglass, foam glass, rubber, or any other non-ACM).

(c) Miscellaneous materials (e.g., floor and ceiling tiles) - Collect, at a minimum, two (2) representative bulk sample of each miscellaneous material assumed to be ACM, including, but not limited to ceiling tiles, floor tiles, associated floor tile mastic, etc. Representative sampling was conducted in a manner sufficient as to identify whether each homogenous area is either asbestos or non-asbestos containing.

2.2 Asbestos Containing Materials Findings

Based on a review of the partial 2006 AHERA reinspection report information provided to EFI by the client, the following materials were identified as containing greater than or equal to 1% asbestos:

Pipe insulation

Boiler breeching duct insulation

Boiler components

HVAC flexible connectors

Caulk associated with horizontal and vertical masonry joints

Transite ceiling in crawl space

The following suspect ACMs sampled by EFI in the Main Building were reported by EMSL as containing greater than or equal to 1% asbestos, including suspect material not sampled but assumed ACM:

Mastic associated with 12” x 12”

Replacement floor tiles

Glazing compound associated with interior doors lights

Fire door insulation (assumed positive)

9’x9’ gray with white streak floor tile

9’x9’ gray with black streak floor tile

9” x 9” gray with pink streak floor tile

9” x 9” beige floor tile

Acoustical ceiling plaster

Black mastic associated with 12” x12” beige floor tile

9” x 9” floor tile beneath sinks (assumed positive)

Caulk associated with store front windows

Caulk associated with steel windows

Caulk associated with unit ventilator louvers

Exterior wood door caulk

The following suspect ACMs sampled by EFI in the Addition Building were reported by EMSL as containing greater than or equal to 1% asbestos, including suspect material not sampled but assumed ACM:

Glazing compound associated with interior doors

12” x 12” tan floor tile

Black mastic associated with 12” x 12” floor tile

Sink basin coating

Caulk associated with steel windows

Glazing compound on steel windows

Fire door insulation (assumed positive)

Mudded pipe fitting insulation (assumed positive)

Caulk associated with unit ventilator louvers

Stone windowsills

Glazing compound on exit doors

The following suspect ACMs from both buildings sampled by EFI were reported by EMSL as containing no detectable asbestos:

1’ x 1’ smooth finish ceiling tiles

1’ x 1’ dotted ceiling tiles

Glue daubs associated with ceiling tiles

Brown and green sheet good associated with unit ventilators

Mastic associated with brown and green sheet goods

12” x 12” replacement floor tiles

Black mastic associated with 9” x 9” floor tiles

Ceramic floor tile grout

Ceramic floor tile bedding mortar

2’ x 2’ ceiling tiles

2’ x 4’ ceiling tiles

12” x 12” beige floor tile

12”x 12” white floor tile and associate mastic

Mudded pipe fitting insulation on fiberglass insulation

Joint compound and associated gypsum board

Interior plaster soffit

Exterior Plaster Soffit

Wall base molding and associated adhesive

White store front caulk

Brown caulk associated with front door

Adhesive associated with metal wall panel

Caulk on metal doors

Accessible boiler insulation

Glazing compound on interior observation window

Tables 1 and 2 of this report present the identified ACMs by building including the locations, condition and approximate quantities of the materials. Photographs depicting observed suspect ACMs sampled by EFI are presented in Attachment A. A copy of the asbestos laboratory report is presented in Attachment B.

2.3 Asbestos Survey Limitations

EFI evaluated Project Areas of the buildings that were reasonably accessible at the time of the survey. As described to EFI and reviewed on project drawings prepared by CSS Architects, the scope of work for the planned renovations includes the entire school building with the exception of the roof and subgrade areas.

As such, the roof and subgrade areas were not included in the scope of this survey.

EFI’s survey scope of work included visual inspection and assessment of areas above suspended ceilings and wall areas where access panels were present. Areas such as behind wall panels, chalk boards, and otherwise inaccessible areas were not included in the survey. Additionally, due to the fact that the school is still in operation, destructive sampling methods were not used to thoroughly inspect concealed areas. Additional suspect ACMs may be present in these locations.

2.4 Recommendations

EFI recommends that all ACMs that will be impacted by the proposed renovation activities be properly removed, packaged, and disposed by a Massachusetts-licensed Asbestos Abatement Contractor. The abatement must be completed in accordance with all requirements of MassDLS asbestos regulations (454

CMR 28.00), MassDEP asbestos regulations (310 CMR 7.00 & 7.15); USEPA National Emissions Standard for

Hazardous Air Pollutant (NESHAP) regulations (40 CFR Part 61); AHERA regulations and OSHA regulations

(29 CFR 1926.1101), including all applicable local ordinances and policy statements.

Due to the fact that the site is currently in operation as an elementary school, destructive sampling was not conducted within the school building. EFI recommends additional inspection be performed within the Project

Area utilizing destructive investigative measures, prior to the commencement of renovation activities to thoroughly assess these areas for any concealed ACMs.

Additionally, since the site is a school building K-12 and is subject to the AHERA requirements outlined in 40

CFR Part 763, all response actions performed in the building require accredited persons to prepare a work plan/specification and conduct the abatement work.

If suspect ACMs other than the above-referenced materials are identified during renovation/demolition activities, EFI recommends that they be assumed ACM until sampled by a Massachusetts-licensed asbestos inspector and analyzed by a Massachusetts-licensed asbestos analytical laboratory. EFI is available to assist with abatement contractor oversight, work plan/specification development and air monitoring as required by applicable state and federal asbestos regulations.

3.0 LEAD PAINT TESTING AND METHODOLOGY

EFI performed testing for lead in paint from accessible interior and exterior surfaces at the Site buildings.

Paint chip samples within the Project Area were collected from representative painted/coated surfaces. Lead paint chips were submitted for analysis to EMSL with a standard 3-day turnaround time using atomic absorption spectrometry (AAS) in accordance with US EPA method SW846-7420.

3.1 SUMMARY OF FINDINGS

EMSL reported that the paint on a Kitchen door and exterior door to Classrooms 1 and 2 contain lead in concentrations ranging from 1.4% to 4.9% by weight. The remaining samples were reported by EMSL as containing a lead concentration below the laboratory detection limit of 0.010 % by weight. Contractors performing work on surfaces where lead is present must comply with the OSHA Lead in Construction Standard, 29 CFR 1926.62, Lead.

3.2 REGULATORY IMPLICATIONS AND RECOMMENDATIONS

Regulatory Implications

OSHA defines any detectable concentration of lead in paint as a potential lead exposure hazard to workers performing construction or demolition work that disturbs these surfaces, as even small concentrations of lead can result in unacceptable employee exposures. The level of exposure varies based upon the lead concentration, method of removal, and other workplace conditions. Since these conditions can vary greatly, the OSHA Lead Construction Standard (29 CFR 1926.62) requires exposure monitoring or the use of historical or objective monitoring data to ensure that employee exposures do not exceed the OSHA action level of 30 micrograms per cubic meter of air (μg/m3) and the OSHA permissible exposure limit (PEL) of 50 μg/m3.

OSHA requires that contractors monitor employee exposures if coated surfaces with paint containing lead are impacted during construction or demolition. Contractors and employers of staff who may disturb these materials are obligated to perform a negative exposure assessment in accordance with OSHA regulations to document that exposure to lead does not exceed the OSHA action level and the PEL.

OSHA states that the employer must treat employees as if they would be exposed above the PEL until the employer 1) performs an exposure assessment that documents that employees are not exposed above the

PEL or 2) can supply prior data regarding the same type of work which may exempt them from the standard.

The OSHA Lead Construction Standard applies to many construction activities including the following:

manual demolition of structures, manual scraping, manual sanding, and use of heat gun where lead-containing coatings or paints are present;

abrasive blasting enclosure movement and removal;

power tool cleaning;

lead burning;

using lead-containing mortar or spray painting with lead-containing paint;

abrasive blasting, rivet busting, or welding, cutting, or burning on any structure where lead-containing coatings or paint are present;

cleanup activities where dry expendable abrasive are used; and any other task the employer believes may cause exposure in excess of the PEL.

The contractor must provide respiratory protection, protective work clothing and equipment, change areas, hand washing facilities, biological monitoring, and training until an exposure assessment has determined that the work activity will result in an exposure below the PEL. Additional requirements under the standard include a written compliance program, as well as, record keeping.

The contractor must also characterize and dispose of all dust, debris, and blast media (if applicable) in accordance with US EPA and Massachusetts Department of Environmental Protection regulations. This includes waste characterization of dust, debris and blast media generated during paint removal activities via the toxicity characteristic leaching procedure (TCLP).

Waste Disposal Implications

Waste disposal is governed by the EPA’s Resource Conservation and Recovery Act (RCRA) regulations, which distinguish between solid wastes and hazardous wastes. Solid wastes include general construction debris and are subject to minimum handling, transportation, and landfill disposal requirements under RCRA regulations. Hazardous wastes, including certain lead-containing materials, are subject to restrictions designed to prevent the hazardous materials from entering the environment. Lead waste is classified as hazardous or non-hazardous based on the results of the TCLP testing. The leachability test measures whether or not lead leaches from the waste in excess of the regulated level of 5.0 mg/L. If the results of the TCLP analysis exceed this level, the waste must be handled, transported and disposed as a hazardous waste in an approved waste site, reclamation facility or incinerator site. EPA’s regulations require the TCLP test be performed so that it represents the matrix and material of the waste stream.

Recommendations

It is recommended that lead TCLP samples be collected and analyzed prior to disposal. If the TCLP results for the building materials are below 5.0 mg/L, the materials can be disposed as construction debris. If the

TCLP results are greater than 5.0 mg/L, the materials must be disposed as a lead hazardous waste.

It is also recommended that construction or demolition personnel conducting work at the facility comply with applicable OSHA Lead Construction Standard requirements during all construction activities at the Site.

TABLE 1

Main Building

ASBESTOS-CONTAINING MATERIALS INVENTORY

Sample ID Material

Description Material Locations(s) Estimated

Quantity Analytical Result

Condition

AHERA 3yr Reinspection Report

Pipe insulation Crawlspace, boiler room, east and west wing corridors, rest room wet walls, staff restrooms, Stage, faculty lounge, front lobby, conference room, former nurse’s room, classroom 1 restroom and storage room, restrooms associated with classrooms 2, 3, 5 and 7, rooms S1, S2, S3 and S4, and pipe associated with classroom sinks

5,000 LF Previously Positive Per AHERA 3 Year Reinspection

Damaged

AHERA 3yr Reinspection Report

Boiler breeching duct

Boiler room 20 LF Previously Positive Per AHERA 3 Year Reinspection

Damaged

AHERA 3yr Reinspection Report

Boiler Components

Boiler Room 400 SF Previously Positive Per AHERA 3 Year Reinspection

Damaged

AHERA 3yr Reinspection Report

Caulk on horizontal and vertical masonry joint

Throughout interior and exterior of the building

NQ Previously Positive Per AHERA 3 Year Reinspection

Damaged

AHERA 3yr Reinspection Report

HVAC Flexible Connector

Stage 5 each Previously Positive Per AHERA 3 Year Reinspection

Good

AHERA 3yr Reinspection Report

Transite Ceiling Crawlspace 2,000 SF Previously Positive Per AHERA 3 Year Reinspection

Good

08A, 08B, 08C Mastic associated with 12” x 12” replacement floor tile

Throughout Main building classrooms and corridors

1,000 SF Positive NAD-3% Chrysotile Asbestos

Damaged

09A, 09B, 09C Glazing compound associated with interior door lights

Throughout main building, classrooms

67 Doors Positive 3% Chrysotile Asbestos

Damaged

10A, 10B, 10C 9” x 9” gray with white streak floor tile

Classrooms 2, 5, 6, 7, 10 and 14, room S6, kitchen storage room, faculty lounge, main office, 9,000 SF Positive 5% Chrysotile Asbestos

Damaged

Sample ID Material Description

Material Locations(s) Estimated

Analytical Result principal’s office, former nurse’s room and associated restrooms and classroom 1 storage room

12A, 12B, 12C 9” x 9” gray with black streak floor tile

West and east corridors, east west connector, classrooms 1, 9 and 12, speech room, rooms S1, S2, S3, S4 and S5, janitor’s closets, main lobby

9,000 SF Positive

16A, 16B, 16C 9” x 9” gray with pink streak floor tile

Classrooms 11, 3 and Audio/visual room

2,300 SF Positive

18A, 18B, 18C 9” x 9” beige floor tile

Classrooms 4, 13 and 14, kitchen and associated office and closets, library, classroom 3/4 connector

4,000 SF Positive 5% Chrysotile Asbestos

Damaged

20A, 20B, 20C Acoustical ceiling plaster

Kitchen 1,100 SF Positive 15% Chrysotile Asbestos

Good

26A, 26B, 26C Black mastic associated with 12” x12” beige floor tile*

Classroom 8 1,100 SF Positive 7% Chrysotile Asbestos

Good

Assumed Positive (not sampled)

9” x 9” floor tile beneath sinks

All classrooms 200 SF Assumed positive Good

Assumed Positive (not sampled)

Fire door insulation

Corridors and boiler room 10 doors Assumed positive Good

46A, 46B, 46C Store front window caulk

Front lobby 80 LF Positive 10% Chrysotile Asbestos

Damaged

49A, 49B, 49C Exterior caulk associated with steel windows

All windows of the Main Building

2000 LF, 31

window openings

Positive 10% Chrysotile Asbestos

Damaged

51A, 51B, 51c Exterior caulk on unit ventilator louvers

Classrooms 130 LF, 13 louvers

Positive 5% Chrysotile Asbestos

Damaged

52A, 52B, 52C Exterior wood door caulk

Throughout Main Building 10 Doors Positive 10% Chrysotile Asbestos

*12” x12” beige floor tile to be managed as asbestos containing waste material due to ACM mastic contamination.

SF – square feet LF – linear feet NQ - not quantified

TABLE 2

ADDITION BUILDING

ASBESTOS-CONTAINING MATERIALS INVENTORY

Sample ID Material Description Material Locations(s) Estimated

Analytical

Result

31A, 31B, 31c 12” X 12” Tan floor tile Corridor and classrooms 16, 15/17, 18/20, and 19

8,000 SF Positive 2% Chrysotile Asbestos

32A, 32B, 32C Black mastic associated with 12” x 12” tan floor tile

Corridor and classrooms 16, 15/17, 18/20, and 19

8,000 SF Positive 10% Chrysotile Asbestos

Good

35A, 35B, 35C Sink basin Coating Classrooms 16, 15/17, 18/20, and 19

6 sinks Positive 10% Chrysotile Asbestos

Good

Assumed positive (not sampled)

Mudded fitting insulation on domestic water and heating lines

Corridor, classrooms, gymnasium, gymnasium storage room, restrooms and wall cavities

400 fittings Assumed Positive

Damaged

57A, 57B, 57C Exterior caulk associated with steel windows

All windows of the addition building

900 LF, 20

openings

Positive 2% Chrysotile Asbestos

Damaged

58A, 58B, 58C Exterior window glazing compound

All windows of the addition building

1,100 LF, 110

windowpanes

2% Chrysotile Asbestos

Damaged

60A, 60B, 60C Exterior caulk on unit ventilator louvers

Classrooms 16, 15/17, 18/20, and 19

60 LF, 6

Louvers

Positive 2% Chrysotile Asbestos

Damaged

61A, 61B, 61C Stone window sills All windows of the addition building

460 SF Positive 10% Chrysotile Asbestos

Damaged

64A, 64B, 64C Window Glazing Compound on interior wood doors

Throughout Addition building

17 Doors Positive 2% Chrysotile Asbestos

Damaged

65A, 65B, 65C Window Glazing Compound on exit doors

Throughout Addition building

10 Doors Positive 2% Chrysotile Asbestos

Damaged

Assumed positive (not sampled)

Fire door insulation Corridor 2 doors Assumed positive

Good

SF – square feet LF – linear feet

ATTACHMENT A

PHOTOGRAPHS

Ms. Kaya Savasta Elwyn G. Campbell Elementary School

Campbell Elementary School

Boilers, Main Building Boiler Room

Boiler Duct Insulation (Breeching), Main BuildingBoiler Room

Pipe Insulation, Main Building Boiler Room

Pipe Insulation on Water Lines, Main Building Boiler Room

Pipe Insulation on Fuel Lines, Main Building Boiler Room

Typical 9”x9” Gray with Black Streak Floor Tiles, Main Building Corridors

Typical Glue Daubs associated with 1’x1’ Dotted Ceiling Tiles, Main Building

Typical Pipe Insulation above Ceiling tiles Main Building

Typical Wood Door Glazing Compound, Main Building

Typical 9”x 9” Gray with Black Streak Floor Tile, Main Building Classrooms

Chalk Boards

Typical Sheet Good on Unit Ventilator, Main Building Classrooms

Caulk on Masonry Joints, Main Building

Caulk on Masonry Joint, Main Building

Typical 9”x9” Gray with White Streak Floor Tile, Main Building Classroom

Typical Pipe Insulation in Restroom Wet Wall, Main Building

Typical 9”x9” Gray with Pink Streak Floor Tile, Main Building Classroom

Typical 1’x1’ Dotted Ceiling Tile, Main Building Classrooms

Flexible Duct Connector, Main Building Stage Area

Typical 9”x9” Beige Floor Tile, Main Building Kitchen

Acoustical Ceiling Plaster, Main Building Kichen

Acoustical Ceiling Plaster, Main Building Kitchen

Typical 9”x9” Gray with White Streak Floor Tile, Main Building Kitchen Storage

Typical Exposed Pipe Insulation, Main Building

Typical 9”x9” Gray with White Streak Floor Tile, Main Building Faculty Room 1

Glazing Compound on Observation Window, Main Building Office

Typical 2’x2’ Ceiling Tile, Main Building Pricipals Office

Typical Ceramic Floor Tile, Main Building Restrooms

Typical 2’x2’ Ceiling Tile with 1’x1’ Dotted Ceiling tile and Glue Daubs Above, Main Building East-wing

Classrooms

Typical 12”x12” Tan Floor Tile, Addition Wing Classrooms and Corridors

Typical 2’x4’ Replacement Ceiling Tiles, Addition Wing Corridors and Classrooms

Typical 2’x4’ Dotted Ceiling Tiles, Addition Wing Corridors And Classrooms

Chalk Board, Addition Wing Classrooms

Typical Sink Basin Coating, Addition Wing Classrooms

Typical Mudded Pipe Fitting Insulation on Fiberglass, Addition Wing

Inaccessible Adhesive associated with Wood Paneling, Addition Wing Gymnasium

Ceramic Floor Tile, Addition Wing Restrooms

Main Entrance Store Front

Typical Steel Framed Window, Main Building

Typical Steel Framed Window, Main Building

Typical Wood Door, Main Building

Louver Associated with Unit Ventilator

L

Typical Steel Frame Window, Addition Wing

Exterior Plaster Sorffit Addition Wing

Adhesive Associated with Metal Wall Panel, Addition Wing Gymnasium Roof Level

Glazing Compound Associated with Wood Doors, Addition Wing

Metal Panels on Auditorium, Main Building Roof Level

ATTACHMENT B

ASBESTOS LABORATORY REPORT

EMSL Analytical, Inc.

5 Constitution Way, Unit A Woburn, MA 01801

Tel/Fax: (781) 933-8411 / (781) 933-8412 http://www.EMSL.com / bostonlab@emsl.com

132102934EMSL Order:

Customer ID: EAFI66

Customer PO:

Project ID:

Attention: Phone:Rob Thomson (978) 688-3736

Fax:EFI Global, Inc. (978) 688-5494

Received Date:155 West Street 04/23/2021 4:30 PM

Analysis Date:Suite 6 04/28/2021

Collected Date:Wilmington, MA 01887

Project: 020-01601 - Campbell Elementary School; 144 Essex Street; New Bedford, MA

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

01A

132102934-0001

None DetectedNon-fibrous (Other)5%Cellulose95%Brown/White

Fibrous

Homogeneous

Classroom 11 - 1x1

Smooth Finish Ceiling

Tile

01B

132102934-0002

None DetectedNon-fibrous (Other)5%Cellulose95%Brown/White

Fibrous

Homogeneous

East/West Corridor -

1x1 Smooth Finish

Ceiling Tile

01C

132102934-0003

None DetectedNon-fibrous (Other)5%Cellulose95%Brown/White

Fibrous

Homogeneous

Entry Lobby - 1x1

Smooth Finish Ceiling

Tile

02A

132102934-0004

None DetectedNon-fibrous (Other)5%Cellulose95%Brown/White

Fibrous

Homogeneous

Classroom 9 - 1x1

Dotted Ceiling Tile

02B

132102934-0005

None DetectedNon-fibrous (Other)5%Cellulose95%Brown/White

Fibrous

Homogeneous

East/West Corridor -

1x1 Dotted Ceiling

Tile

02C

132102934-0006

None DetectedNon-fibrous (Other)5%Cellulose95%Brown/White

Fibrous

Homogeneous

Classroom 1 - 1x1

Dotted Ceiling Tile

03A

132102934-0007

None DetectedNon-fibrous (Other)100%Brown

Non-Fibrous

Homogeneous

Classroom 9 - Glue

Daub on 1x1 Ceiling

Tile

03B

132102934-0008

None DetectedNon-fibrous (Other)100%Brown

Non-Fibrous

Homogeneous

East/West Corridor -

Glue Daub on 1x1

Ceiling Tile

03C

132102934-0009

None DetectedNon-fibrous (Other)100%Brown

Non-Fibrous

Homogeneous

Classroom 1 - Glue

Daub on 1x1 Ceiling

Tile

04A

132102934-0010

None DetectedNon-fibrous (Other)85%Cellulose15%Green

Non-Fibrous

Homogeneous

Unit Ventilator, Classroom 9 - Green

Sheet Good

04B

132102934-0011

None DetectedNon-fibrous (Other)85%Cellulose15%Green

Fibrous

Homogeneous

Unit Ventilator, Classroom 12 - Green

Sheet Good

04C

132102934-0012

None DetectedNon-fibrous (Other)85%Cellulose15%Blue/Green

Fibrous

Homogeneous

Unit Ventilator, Classroom 6 - Green

Sheet Good

05A

132102934-0013

None DetectedNon-fibrous (Other)97%Cellulose3%Brown/Black

Fibrous

Homogeneous

Unit Ventilator, Classroom 12 -

Mastic Assoc. w/

Sheet Good

05B

132102934-0014

None DetectedNon-fibrous (Other)97%Cellulose3%Brown/Black

Fibrous

Homogeneous

Unit Ventilator, Classroom 13 -

Mastic Assoc. w/

Sheet Good

05C

132102934-0015

None DetectedNon-fibrous (Other)97%Cellulose3%Brown/Black

Fibrous

Homogeneous

Classroom 13 -

Mastic Assoc. w/

Sheet Good

Initial report from: 04/28/2021 14:52:16

Page 1 of 13ASB_PLM_0008_0001 - 1.78 Printed: 4/28/2021 2:52 PM

Tel/Fax: (781) 933-8411 / (781) 933-8412 http://www.EMSL.com / bostonlab@emsl.com

132102934EMSL Order:

Customer ID: EAFI66

Customer PO:

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

06A

132102934-0016

None DetectedNon-fibrous (Other)85%Cellulose15%Brown/Red

Fibrous

Homogeneous

Classroom 1 - Brown

Sheet Good

06B

132102934-0017

None DetectedNon-fibrous (Other)85%Cellulose15%Brown/Red

Fibrous

Homogeneous

Classroom 7 - Brown

Sheet Good

06C

132102934-0018

None DetectedNon-fibrous (Other)85%Cellulose15%Brown/Red/Blue

Fibrous

Homogeneous

Classroom 9/10

Connector - Brown

Sheet Good

07A

132102934-0019

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Classroom 12/14

Connector - 12x12

Replacement Floor

Tile

07B

132102934-0020

None DetectedNon-fibrous (Other)100%Tan

Non-Fibrous

Homogeneous

Classroom 1/2

Connector - 12x12

Replacement Floor

Tile

07C

132102934-0021

None DetectedNon-fibrous (Other)100%Tan

Non-Fibrous

Homogeneous

Classroom 9/10

Connector - 12x12

Replacement Floor

Tile

08A

132102934-0022

None DetectedNon-fibrous (Other)100%Yellow

Non-Fibrous

Homogeneous

Classroom 12/14

Connector - Mastic

Assoc. w/ 12x12

Replacement Floor

Tile

08B

132102934-0023

5% ChrysotileNon-fibrous (Other)95%Black/Yellow

Non-Fibrous

Homogeneous

Classroom 1/2

Connector - Mastic

Assoc. w/ 12x12

Replacement Floor

Tile

08C

132102934-0024

Positive Stop (Not Analyzed)Classroom 9 - Mastic

Assoc. w/ 12x12

Replacement Floor

Tile

09A

132102934-0025

3% ChrysotileNon-fibrous (Other)97%Tan

Non-Fibrous

Homogeneous

Classroom 12

Connector Door -

Glazing Compound on Interior Door Lights

09B

132102934-0026

Positive Stop (Not Analyzed)Library - Glazing

Compound on Interior

Door Lights

09C

132102934-0027

Positive Stop (Not Analyzed)Room 56 - Glazing

Compound on Interior

Door Lights

10A

132102934-0028

5% ChrysotileNon-fibrous (Other)95%Gray

Non-Fibrous

Homogeneous

Classroom 14 - 9x9

Gray w/ White Streak

Floor Tile

10B

132102934-0029

Positive Stop (Not Analyzed)Classroom 7 - 9x9

Gray w/ White Streak

Floor Tile

10C

132102934-0030

Positive Stop (Not Analyzed)Room 56 - 9x9 Gray w/ White Streak Floor

Tile

11A

132102934-0031

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Classroom 14 - Black

Mastic Assoc. w/ 9x9

Gray w/ White Streak

Floor Tile

Page 2 of 13ASB_PLM_0008_0001 - 1.78 Printed: 4/28/2021 2:52 PM

Tel/Fax: (781) 933-8411 / (781) 933-8412 http://www.EMSL.com / bostonlab@emsl.com

132102934EMSL Order:

Customer ID: EAFI66

Customer PO:

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

11B

132102934-0032

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Classroom 7 - Black

Mastic Assoc. w/ 9x9

Gray w/ White Streak

Floor Tile

11C

132102934-0033

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Classroom 7 - Black

Mastic Assoc. w/ 9x9

Gray w/ White Streak

Floor Tile

12A

132102934-0034

5% ChrysotileNon-fibrous (Other)95%Gray

Non-Fibrous

Homogeneous

West Corridor by

Boys Room - 9x9

Gray w/ Black Streak

Floor Tile

12B

132102934-0035

Positive Stop (Not Analyzed)Classroom 1 - 9x9

Gray w/ Black Streak

Floor Tile

12C

132102934-0036

Positive Stop (Not Analyzed)Classroom 6 - 9x9

Gray w/ Black Streak

Floor Tile

13A

132102934-0037

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

West Corridor by

Boys Room - Black

Mastic Assoc. w/ 9x9

Gray w/ Black Streak

Floor Tile

13B

132102934-0038

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Classroom 1 - Black

Mastic Assoc. w/ 9x9

Gray w/ Black Streak

Floor Tile

13C

132102934-0039

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Classroom 6 - Black

Mastic Assoc. w/ 9x9

Gray w/ Black Streak

Floor Tile

14A

132102934-0040

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

West Wing Girls

Restroom - Ceramic

Floor Tile Grout

14B

132102934-0041

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

West Wing Boys

Restroom - Ceramic

Floor Tile Grout

14C

132102934-0042

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Staff Restroom, East/West Corridor -

Ceramic Floor Tile

Grout

15A

132102934-0043

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

West Wing Girls

Restroom - Ceramic

Floor Tile Tile

Bedding Mortar

15B

132102934-0044

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

West Wing Boys

Restroom - Ceramic

Floor Tile Tile

Bedding Mortar

15C

132102934-0045

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Staff Restroom, East/West Corridor -

Ceramic Floor Tile

Tile Bedding Mortar

16A

132102934-0046

5% ChrysotileNon-fibrous (Other)95%Gray

Fibrous

Homogeneous

Classroom 11 - 9x9

Gray w/ Pink Streak

Floor Tile

Page 3 of 13ASB_PLM_0008_0001 - 1.78 Printed: 4/28/2021 2:52 PM

Tel/Fax: (781) 933-8411 / (781) 933-8412 http://www.EMSL.com / bostonlab@emsl.com

132102934EMSL Order:

Customer ID: EAFI66

Customer PO:

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

16B

132102934-0047

Positive Stop (Not Analyzed)AV Room - 9x9 Gray w/ Pink Streak Floor

Tile

16C

132102934-0048

Positive Stop (Not Analyzed)Classroom 3 - 9x9

Gray w/ Pink Streak

Floor Tile

17A

132102934-0049

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Classroom 11 - Black

Mastic Assoc. w/ 9x9

Gray w/ Pink Streak

Floor Tile

17B

132102934-0050

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

AV Room - Black

Mastic Assoc. w/ 9x9

Gray w/ Pink Streak

Floor Tile

17C

132102934-0051

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Classroom 3 - Black

Mastic Assoc. w/ 9x9

Gray w/ Pink Streak

Floor Tile

18A

132102934-0052

5% ChrysotileNon-fibrous (Other)95%Tan

Fibrous

Homogeneous

Classroom 14 - 9x9

Beige Floor Tile

18B

132102934-0053

Positive Stop (Not Analyzed)Kitchen - 9x9 Beige

Floor Tile

18C

132102934-0054

Positive Stop (Not Analyzed)Classroom 4 - 9x9

Beige Floor Tile

19A

132102934-0055

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Classroom 14 - Black

Mastic Assoc. w/ 9x9

Beige Floor Tile

19B

132102934-0056

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Kitchen - Black Mastic

Assoc. w/ 9x9 Beige

Floor Tile

19C

132102934-0057

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Classroom 4 - Black

Mastic Assoc. w/ 9x9

Beige Floor Tile

21A

132102934-0058

5% ChrysotileNon-fibrous (Other)95%Red

Fibrous

Homogeneous

Faculty Room 2 - 9x9

Brown Floor Tile

21B

132102934-0059

Positive Stop (Not Analyzed)Faculty Room 2 - 9x9

Brown Floor Tile

21C

132102934-0060

Positive Stop (Not Analyzed)Faculty Room 2 - 9x9

Brown Floor Tile

22A

132102934-0061

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Faculty Room 2 -

Black Mastic Assoc.

w/ 9x9 Brown Floor

Tile

22B

132102934-0062

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Faculty Room 2 -

Black Mastic Assoc.

w/ 9x9 Brown Floor

Tile

22C

132102934-0063

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Faculty Room 2 -

Black Mastic Assoc.

w/ 9x9 Brown Floor

Tile

Page 4 of 13ASB_PLM_0008_0001 - 1.78 Printed: 4/28/2021 2:52 PM

Tel/Fax: (781) 933-8411 / (781) 933-8412 http://www.EMSL.com / bostonlab@emsl.com

132102934EMSL Order:

Customer ID: EAFI66

Customer PO:

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

20A

132102934-0064

15% ChrysotileNon-fibrous (Other)85%White

Fibrous

Homogeneous

Kitchen - Acoustical

Ceiling Plaster

20B

132102934-0065

Positive Stop (Not Analyzed)Kitchen - Acoustical

Ceiling Plaster

20C

132102934-0066

Positive Stop (Not Analyzed)Kitchen - Acoustical

Ceiling Plaster

20D

132102934-0067

Positive Stop (Not Analyzed)Kitchen - Acoustical

Ceiling Plaster

20E

132102934-0068

Positive Stop (Not Analyzed)Kitchen - Acoustical

Ceiling Plaster

23A

132102934-0069

None DetectedNon-fibrous (Other)30%Cellulose

Min. Wool

40%

30%

Gray/White

Fibrous

Homogeneous

Main Office Entry -

2x2 Ceiling Tile

23B

132102934-0070

None DetectedNon-fibrous (Other)30%Cellulose

Min. Wool

40%

30%

Gray/White

Fibrous

Homogeneous

Classroom 1 - 2x2

Ceiling Tile

23C

132102934-0071

None DetectedNon-fibrous (Other)30%Cellulose

Min. Wool

40%

30%

Gray/White

Fibrous

Homogeneous

Classroom 4 - 2x2

Ceiling Tile

24A

132102934-0072

None DetectedNon-fibrous (Other)35%Cellulose

Min. Wool

45%

20%

Gray/White

Fibrous

Homogeneous

Library - 2x4 Ceiling

Tile

24B

132102934-0073

None DetectedNon-fibrous (Other)35%Cellulose

Min. Wool

45%

20%

Gray/White

Fibrous

Homogeneous

Library - 2x4 Ceiling

Tile

24C

132102934-0074

None DetectedNon-fibrous (Other)35%Cellulose

Min. Wool

45%

20%

Gray/White

Fibrous

Homogeneous

Library - 2x4 Ceiling

Tile

25A

132102934-0075

None DetectedNon-fibrous (Other)100%Beige

Non-Fibrous

Homogeneous

Classroom 8 - 12x12

Beige Floor Tile

25B

132102934-0076

None DetectedNon-fibrous (Other)100%Beige

Non-Fibrous

Homogeneous

Classroom 8 - 12x12

Beige Floor Tile

25C

132102934-0077

None DetectedNon-fibrous (Other)100%Beige

Non-Fibrous

Homogeneous

Classroom 8 - 12x12

Beige Floor Tile

26A

132102934-0078

7% ChrysotileNon-fibrous (Other)93%Black

Fibrous

Homogeneous

Classroom 8 - Black

Mastic Assoc. w/

12x12 Beige Floor

Tile

26B

132102934-0079

Positive Stop (Not Analyzed)Classroom 8 - Black

Mastic Assoc. w/

12x12 Beige Floor

Tile

26C

132102934-0080

Positive Stop (Not Analyzed)Classroom 8 - Black

Mastic Assoc. w/

12x12 Beige Floor

Tile

27A

132102934-0081

None DetectedNon-fibrous (Other)85%Cellulose15%Tan

Fibrous

Homogeneous

Classroom 3 - Sink

Basin Coating

Page 5 of 13ASB_PLM_0008_0001 - 1.78 Printed: 4/28/2021 2:52 PM

Tel/Fax: (781) 933-8411 / (781) 933-8412 http://www.EMSL.com / bostonlab@emsl.com

132102934EMSL Order:

Customer ID: EAFI66

Customer PO:

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

27B

132102934-0082

None DetectedNon-fibrous (Other)85%Cellulose15%Tan

Fibrous

Homogeneous

Classroom 3 - Sink

Basin Coating

28A

132102934-0083

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Classroom 3 - 12x12

White Floor Tile

Beneath Sink

28B

132102934-0084

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Classroom 3 - 12x12

White Floor Tile

Beneath Sink

29A

132102934-0085

None DetectedNon-fibrous (Other)100%Yellow

Non-Fibrous

Homogeneous

Classroom 3 - Mastic

Assoc. w/ 12x12

White Floor Tile

Beneath Sink

29B

132102934-0086

None DetectedNon-fibrous (Other)100%Yellow

Non-Fibrous

Homogeneous

Classroom 3 - Mastic

Assoc. w/ 12x12

White Floor Tile

Beneath Sink

30A

132102934-0087

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

East/West Lobby -

Stone Window Sill

30B

132102934-0088

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Faculty Room 2 -

Stone Window Sill

30C

132102934-0089

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Classroom 12 - Stone

Window Sill

31A

132102934-0090

2% ChrysotileNon-fibrous (Other)98%Gray

Non-Fibrous

Homogeneous

Addition, Classroom

15 - 12x12 Tan Floor

Tile

31B

132102934-0091

Positive Stop (Not Analyzed)Addition, Classroom

16 - 12x12 Tan Floor

Tile

31C

132102934-0092

Positive Stop (Not Analyzed)Addition, Gym Lobby

- 12x12 Tan Floor Tile

32A

132102934-0093

10% ChrysotileNon-fibrous (Other)90%Black

Non-Fibrous

Homogeneous

Addition, Classroom

15 - Black Mastic

Assoc. w/ 12x12 Tan

Floor Tile

32B

132102934-0094

Positive Stop (Not Analyzed)Addition, Classroom

16 - Black Mastic

Assoc. w/ 12x12 Tan

Floor Tile

32C

132102934-0095

Positive Stop (Not Analyzed)Addition, Gym Lobby

- Black Mastic Assoc.

w/ 12x12 Tan Floor

Tile

33A

132102934-0096

None DetectedNon-fibrous (Other)20%Cellulose

Min. Wool

40%

40%

Gray/White

Fibrous

Homogeneous

Addition, Classroom

15 - 2x4 Dotted

Ceiling Tile

33B

132102934-0097

None DetectedNon-fibrous (Other)20%Cellulose

Min. Wool

40%

40%

Gray/White

Fibrous

Homogeneous

Addition, Corridor -

2x4 Dotted Ceiling

Tile

33C

132102934-0098

None DetectedNon-fibrous (Other)20%Cellulose

Min. Wool

40%

40%

Gray/White

Fibrous

Homogeneous

Classroom 19 - 2x4

Dotted Ceiling Tile

Page 6 of 13ASB_PLM_0008_0001 - 1.78 Printed: 4/28/2021 2:52 PM

Tel/Fax: (781) 933-8411 / (781) 933-8412 http://www.EMSL.com / bostonlab@emsl.com

132102934EMSL Order:

Customer ID: EAFI66

Customer PO:

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

34A

132102934-0099

None DetectedNon-fibrous (Other)20%Cellulose

Min. Wool

40%

40%

Gray/White

Fibrous

Homogeneous

Addition, Classroom

15 - 2x4 Fissured

Ceiling Tile

34B

132102934-0100

None DetectedNon-fibrous (Other)20%Cellulose

Min. Wool

40%

40%

Gray/White

Fibrous

Homogeneous

Addition, Corridor -

2x4 Fissured Ceiling

Tile

34C

132102934-0101

None DetectedNon-fibrous (Other)20%Cellulose

Min. Wool

40%

40%

Gray/White

Fibrous

Homogeneous

Addition, Classroom

19 - 2x4 Fissured

Ceiling Tile

35A

132102934-0102

10% ChrysotileNon-fibrous (Other)90%Gray

Non-Fibrous

Homogeneous

Addition, Classroom

15 - Sink Basin

Coating

35B

132102934-0103

Positive Stop (Not Analyzed)Addition, Classroom

16 - Sink Basin

Coating

35C

132102934-0104

Positive Stop (Not Analyzed)Addition, Classroom

19 - Sink Basin

Coating

36A

132102934-0105

None DetectedNon-fibrous (Other)60%Min. Wool40%Gray

Fibrous

Homogeneous

Addition, Classroom

15 - Mudded Fitting on Heat

36B

132102934-0106

None DetectedNon-fibrous (Other)60%Min. Wool40%Gray

Fibrous

Homogeneous

Addition, Corridor -

Mudded Fitting on

Heat

36C

132102934-0107

None DetectedNon-fibrous (Other)60%Min. Wool40%Gray

Fibrous

Homogeneous

Addition, Gym

Storage - Mudded

Fitting on Heat

37A

132102934-0108

None DetectedNon-fibrous (Other)60%Min. Wool40%Gray

Non-Fibrous

Homogeneous

Addition, Janitors

Closet - Mudded

Fitting on Water

37B

132102934-0109

None DetectedNon-fibrous (Other)60%Min. Wool40%Gray

Fibrous

Homogeneous

Addition, Gym

Storage Room -

Mudded Fitting on

Water

37C

132102934-0110

None DetectedNon-fibrous (Other)60%Min. Wool40%Gray

Fibrous

Homogeneous

Addition, Hallway

Outside Restrooms -

Mudded Fitting on

Water

38A

132102934-0111

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Divider Wall, Addition, Classroom 15 - Joint

Compound Above

Ceiling

38B

132102934-0112

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Divider Wall, Addition, Classroom 15 - Joint

Compound Above

Ceiling

38C

132102934-0113

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Divider Wall, Addition, Classroom 15 - Joint

Compound Above

Ceiling

39A

132102934-0114

None DetectedNon-fibrous (Other)90%Cellulose10%Tan/White

Fibrous

Homogeneous

Divider Wall, Addition, Classroom 15 -

Gypsum Board Above

Ceiling

39B

132102934-0115

None DetectedNon-fibrous (Other)90%Cellulose10%Tan/White

Fibrous

Homogeneous

Divider Wall, Addition, Classroom 15 -

Gypsum Board Above

Ceiling

Page 7 of 13ASB_PLM_0008_0001 - 1.78 Printed: 4/28/2021 2:52 PM

Tel/Fax: (781) 933-8411 / (781) 933-8412 http://www.EMSL.com / bostonlab@emsl.com

132102934EMSL Order:

Customer ID: EAFI66

Customer PO:

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

39C

132102934-0116

None DetectedNon-fibrous (Other)90%Cellulose10%Tan/White

Fibrous

Homogeneous

Divider Wall, Addition, Classroom 15 -

Gypsum Board Above

Ceiling

40A

132102934-0117

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Addition, Classroom

15 - Plaster Soffit

Base Coat

40B

132102934-0118

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Addition, Classroom

16 - Plaster Soffit

Base Coat

40C

132102934-0119

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Addition, Classroom

20 - Plaster Soffit

Base Coat

41A

132102934-0120

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Addition, Classroom

15 - Plaster Soffit

Finish Coat

41B

132102934-0121

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Addition, Classroom

16 - Plaster Soffit

Finish Coat

41C

132102934-0122

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Addition, Classroom

20 - Plaster Soffit

Finish Coat

42A

132102934-0123

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Addition, Classroom

15 - Wall Base

Molding

42B

132102934-0124

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Addition, Classroom

17 - Wall Base

Molding

42C

132102934-0125

None DetectedNon-fibrous (Other)100%Black

Non-Fibrous

Homogeneous

Addition, Classroom

20 - Wall Base

Molding

43A

132102934-0126

None DetectedNon-fibrous (Other)100%Brown

Non-Fibrous

Homogeneous

Addition, Classroom

15 - Adhesive on Wall

Base

43B

132102934-0127

None DetectedNon-fibrous (Other)100%Brown

Non-Fibrous

Homogeneous

Addition, Classroom

17 - Adhesive on Wall

Base

43C

132102934-0128

None DetectedNon-fibrous (Other)100%Brown

Non-Fibrous

Homogeneous

Addition, Classroom

20 - Adhesive on Wall

Base

44A

132102934-0129

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Addition, Boys

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .