25-8570_-_Bid_Schedule.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Goodland Pump Station Improvements
Solicitation number
25-8570
Issued by
Collier County, Florida

About this file

The document is a Bid Schedule for Bid No. 25-8570 issued by Collier County, Florida, for the Goodland Pump Station Improvements project. The bid encompasses a comprehensive infrastructure upgrade involving 19 distinct line items including mobilization, demolition, restoration, yard piping, pump assemblies, tank improvements, chemical storage systems, generator installation, mechanical and electrical upgrades, and a 500,000-gallon ground storage tank. The project requires substantial completion within 540 consecutive calendar days, with a final completion deadline 30 days after the Punch List is delivered. A non-mandatory pre-bid meeting is scheduled for September 17, 2025, at 10:00 a.m., and sealed bids are due by October 17, 2025, at 3:00 p.m. local time.

The total anticipated project estimate is $4,201,706.25, with an additional $250,000 Owner's Allowance for unforeseen conditions or directed work. Bidders must submit a 5% bid bond, be enrolled in the E-Verify program, and provide comprehensive insurance coverage including workers' compensation, general liability, automobile liability, and pollution liability. Performance and payment bonds for 100% of the contract award amount are required. The contract will be awarded to the lowest responsive and responsible bidder, with successful contractors needing to demonstrate appropriate professional licensing, contractor certifications, and compliance with Collier County's Vertical Construction Standards and IT Construction Standards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

25-XXXXXX Bid Schedule Construction ITB #25-8570 Goodland Pump Station Improvements

ITEM NODESCRIPTIONQUANTITYUNITSTOTAL
BASE BID: Includes all items described as the Base Bid in the Summary of Work as shown on the attached Drawings and Exhibits with no substitutions or limitations.
1Mobilization/Demobilization1Lump Sum
2General Requirements1Lump Sum
3Restoration1Lump Sum
4Demolition1Lump Sum
5Asphalt Driveway1Lump Sum
6Yard Piping1Lump Sum
7Recirculation Pump Assembly1Lump Sum
8Tank Drain Assembly1Lump Sum
9Pump Building Interior Piping Assembly1Lump Sum
10Vertical Turbine Pumps1Lump Sum
11Sodium Hypochlorite Pump Skid and Chemical Storage1Lump Sum
12Caustic Pump Skid and Chemical Storage1Lump Sum
13Generator1Lump Sum
14Fuel System Improvements1Lump Sum
15Mechanical HVAC Improvements1Lump Sum
16Electrical Improvements1Lump Sum
17Structural Improvements1Lump Sum
18500,000 Gallon Ground Storage Tank1Lump Sum
19Bypass Operations1Lump Sum
Total Bid$0.00
*Staff has allocated $250,000 in Owner's Allowance - for Owners Use as Directed. This Allowance will be used only at the Owner's direction to accomplish work due to unforeseen conditions and/or as directed by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owners Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change

File details come from the government source that posted it. Updated .