This document is a Bid Schedule for Bid No. 25-8570, issued by Collier County, Florida, for the Goodland Pump Station Improvements Project. The solicitation involves sealed bids to be received by October 17, 2025, at 3:00 p.m. local time, with a non-mandatory pre-bid meeting scheduled for September 17, 2025, at 10:00 a.m. in Naples, FL. The bid schedule includes 19 line items covering various construction aspects such as mobilization, demolition, pump assemblies, tank installations, electrical and mechanical improvements, and structural work. Each line item is listed as a lump sum, indicating comprehensive project components for the pump station upgrade.
The bid schedule includes a $250,000 Owner's Allowance, which can be used at the owner's discretion for unforeseen conditions or additional directed work. Bidders must register on the Collier County procurement portal to obtain complete project documents. The total bid amount is currently listed as $0.00, with the expectation that contractors will provide detailed pricing for the specified scope of work. Prospective bidders are required to subscribe to the online procurement platform to access full solicitation details and participate in the bidding process for this infrastructure improvement project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
25-XXXXXX Bid Schedule Construction ITB #25-8570 Goodland Pump Station Improvements
| ITEM NO | DESCRIPTION | QUANTITY | UNITS | TOTAL |
| BASE BID: Includes all items described as the Base Bid in the Summary of Work as shown on the attached Drawings and Exhibits with no substitutions or limitations. | ||||
| 1 | Mobilization/Demobilization | 1 | Lump Sum | |
| 2 | General Requirements | 1 | Lump Sum | |
| 3 | Restoration | 1 | Lump Sum | |
| 4 | Demolition | 1 | Lump Sum | |
| 5 | Asphalt Driveway | 1 | Lump Sum | |
| 6 | Yard Piping | 1 | Lump Sum | |
| 7 | Recirculation Pump Assembly | 1 | Lump Sum | |
| 8 | Tank Drain Assembly | 1 | Lump Sum | |
| 9 | Pump Building Interior Piping Assembly | 1 | Lump Sum | |
| 10 | Vertical Turbine Pumps | 1 | Lump Sum | |
| 11 | Sodium Hypochlorite Pump Skid and Chemical Storage | 1 | Lump Sum | |
| 12 | Caustic Pump Skid and Chemical Storage | 1 | Lump Sum | |
| 13 | Generator | 1 | Lump Sum | |
| 14 | Fuel System Improvements | 1 | Lump Sum | |
| 15 | Mechanical HVAC Improvements | 1 | Lump Sum | |
| 16 | Electrical Improvements | 1 | Lump Sum | |
| 17 | Structural Improvements | 1 | Lump Sum | |
| 18 | 500,000 Gallon Ground Storage Tank | 1 | Lump Sum | |
| 19 | Bypass Operations | 1 | Lump Sum | |
| Total Bid | $0.00 | |||
| *Staff has allocated $250,000 in Owner's Allowance - for Owners Use as Directed. This Allowance will be used only at the Owner's direction to accomplish work due to unforeseen conditions and/or as directed by the Owner. Inclusion of the Allowance as part of the Contract Price is not a guarantee that the Contractor will be paid any portion or the full amount of the Allowance. Expenditures of Owners Allowance will be made through Change Order with proper documentation of Time and Materials supporting the change |