25-00697-00-SW-Specifications.pdf
PDF 14 MB Posted
- Attached to
- EQL FY25 Sidewalk Improvements 25-00697-00-SW
- Solicitation number
- FY2026-ITB-184
- Issued by
- Champaign County, Illinois
About this file
This is a specifications document for the City of Urbana's Equity and Quality of Life FY25 Sidewalk Improvements project (Section 25-00697-00-SW) in Champaign County, Illinois. The project encompasses sidewalk construction and improvements at multiple locations including Cottage Grove at Silver Street and Brighton Drive, East Harding Drive from approximately 500 feet west of Vawter Street to Philo Road, and Vawter Street from approximately 150 feet south of East Harding Drive to its intersection. The work includes construction of new sidewalks, curb and gutter, driveway pavement, utility adjustments (including adjustments to storm sewer inlets, water valves, handholes, gas valves, and junction boxes), sign relocation, and drilling and grouting of tie bars. Specific contract items include adjusting inlets, water valves, handholes, gas valves, and junction boxes; removing inlets; relocating sign panels and posts; and installing tie bars. The contractor must submit a pre-construction meeting information package including subcontractor lists, shop drawings, erosion control plans, construction staging plans, traffic control plans, and progress schedules within five days of contract execution or begin work within ten days. A one-year warranty period applies from the date of completion and acceptance.
The contract is governed by the Illinois Department of Transportation Standard Specifications for Road and Bridge Construction (effective January 1, 2022), the Manual on Uniform Traffic Control Devices, and supplemental specifications and recurring special provisions as indicated on the check sheet. Prevailing wage rates per the Illinois Department of Labor apply to Champaign County. The contractor must comply with the City of Urbana noise ordinance restricting construction equipment operation between 8:00 p.m. and 7:00 a.m. Monday through Saturday and between 8:00 p.m. Saturday and 12:00 p.m. Sunday. Traffic control is specified as a lump sum payment item and must include weighted sandbags for barricades, safety ribbon protection for broken concrete and excavations, pedestrian sidewalk controls, and solar-powered arrow boards. The contractor must provide 24-hour advance notice to the Engineer before discontinuing or resuming operations and must coordinate with the City regarding construction traffic signal timings at signalized intersections. All traffic control plan approvals must be obtained before work begins at any location.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| EQL_FY25_Sidewalk_Improvements_25-00697-00-SW.pdf | ||
| 25-00697-00-SW-Plans.pdf | ||
| 25-00697-00-SW-Bid_Docs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Equity & Quality of Life Funds FY 25
Sidewalk Improvements
Section 25-00697-00-SW
4/17/2026
Specifications
TABLE OF CONTENTS
A. City of Urbana Special Provisions
a. General Contractual Conditions
b. Technical Provisions
B. IDOT Special Provisions
a. Index for Supplemental Specifications
b. BLR 11300 – Check Sheet for Recurring Special Provisions
c. BDE Special Provisions
d. BLRS Special Provisions
C. Standard Details
a. IDOT Highway Standards
SECTION A
City of Urbana Special Provisions
City of Urbana Equity and Quality of Life FY 25 Sidewalk Improvements
Section 25-00697-00-SW
04/15/2026 1
CITY OF URBANA
SPECIAL PROVISIONS
PART 1 – GENERAL CONTRACTUAL CONDITIONS
1.1 COORDINATION OF CONTRACT DOCUMENTS
1.2 PRE-CONSTRUCTION MEETING
1.3 GUARANTEE PERIOD
1.4 CONSTRUCTION AND MAINTENANCE NOISE
1.5 PREVAILING WAGE RATES
1.6 PROSECUTION OF THE WORK AND WORKING DAYS
PART 2 - TECHNICAL PROVISIONS
2.1 LOCATION OF PROJECT
2.2 DESCRIPTION OF WORK
2.3 INLETS TO BE ADJUSTED
2.4 WATER VALVES TO BE ADJUSTED
2.5 TRAFFIC CONTROL AND PROTECTION ....................................................................................................... 4-6
2.6 HANDHOLES TO BE ADJUSTED
2.7 GAS VALVES TO BE ADJUSTED ...................................................................................................................... 6-7
2.8 JUNCTION BOX TO BE ADJUSTED…………………………………………………………………………………………………….7
2.9 INLETS TO BE REMOVED (SPECIAL)
2.10 RELOCATE SIGN PANEL AND POST
2.11 DRILL AND GROUT #6 TIE BARS ……………………………………………………………………………………………………….8
04/15/2026 2
PART 1 – GENERAL CONTRACTUAL CONDITIONS
1.1 Coordination of Contract Documents
The following table supplements the hierarchy of contract documents according to Article 105.05 of the Standard Specifications.
Authorized Change Orders Hold over: Addenda to Contract Documents, Special
Provisions, Plans, Recurring Special Provisions, Supplemental Specifications, and Standard Specifications.
Addenda to Contract Documents Hold over: Special Provisions, Plans, Recurring Special Provisions, Supplemental Specifications, and Standard Specifications.
Special Provisions (1) Hold over: Plans, Recurring Special Provisions, Supplemental Specifications, and Standard Specifications.
Plans (2) Hold over: Recurring Special Provisions Supplemental Specifications, and Standard Specifications.
Notes:
(1) The term “Special Provisions” includes General Information, General Contractual Conditions, and Technical Provisions.
(2) Detail plans hold over Urbana Standard Details, and Urbana Standard Details hold over IDOT District or Highway Standards.
1.2 Pre-Construction Meeting
As soon as possible after receipt of the Notice to Proceed, the ENGINEER will schedule a Pre-construction Meeting for the project. The CONTRACTOR shall have his/her General Superintendent and Jobsite Superintendent present at the appropriate meeting to discuss all details of the project. At these meetings, the CONTRACTOR shall submit for approval information and drawings where appropriate on all major equipment and materials planned for use on the projects to the ENGINEER for approval.
Information shall be included on a minimum of the following items:
A. List of Subcontractors and Material Suppliers B. Shop Drawings C. Erosion Control Plan and Inlet Filter Systems D. Construction Staging and Access to Properties E. Traffic Control Plan F. Progress Schedule
1.3 Guarantee Period
The CONTRACTOR shall warrant all work performed for a period of one (1) year from the date of completion and acceptance by the OWNER.
1.4 Construction and Maintenance Noise
The contractor shall adhere to the City of Urbana noise ordinance Section 16-7 in scheduling work windows. According to the ordinance, it is unlawful to use any construction equipment to perform any
04/15/2026 3 construction or maintenance work associated with this project at any time between the hours noted below where such construction equipment is operated within six hundred (600) feet of any residence, hospital, or place of worship.
8:00 pm through 7:00 am Monday through Saturday 8:00 pm Saturday through 12:00 pm (noon) Sunday 8:00 pm Sunday through 7:00 am Monday
This time regulation shall not apply to sawing contraction joints, maintenance or operation of safety and traffic control devices such as barricades, signs and lighting, or to construction of an emergency nature.
Any arrow boards used for traffic control that is to remain in place overnight shall be of a non-motorized type in order to eliminate noise and comply with the City’s Ordinance.
Exception: Any machine or device or part thereof which is regulated by or becomes regulated by Federal or State of Illinois noise standards shall conform to those above standards. Such equipment shall be operated as designated above.
1.5 Prevailing Wage Rates
The current prevailing wage rates for Champaign County, Illinois are found on the Illinois Department of Labor (IDOL) website (https://labor.illinois.gov/laws-rules/conmed/current-prevailing-rates.html).
1.6 Prosecution of the Work and Working Days
Replace Article 108.03 of the Standard Specifications with the following:
The Contractor shall begin the work to be performed under the contract according to a satisfactory progress schedule or critical path schedule. If the Contractor has not submitted a satisfactory progress schedule or critical path schedule to the Engineer withing five days after the execution of the contract by the Department, then the Contractor shall begin the work to be performed under the contract not later than ten days after the execution of the contract by the Department. The work shall be prosecuted in such a manner and with such a supply of materials, equipment and labor as is considered necessary to ensure its completion according to the time specified in the contract.
The Contractor shall notify the Engineer at least 24 hours in advance of either discontinuing or resuming operations.
Add the following to the end of the first paragraph of Article 108.04 of the Standard Specifications:
The charging of working says may start later than ten days after the execution and approval of the contract according to a satisfactory progress schedule or critical path schedule.
04/15/2026 4
PART 2 - TECHNICAL PROVISIONS
The following Special Provisions supplement the “Standard Specifications for Road and Bridge Construction”, adopted January 1, 2022 the latest edition of the “Manual on Uniform Traffic Control Devices for Streets and Highways”, and the “Manual of Test Procedures for Materials” in effect on the date of invitation for bids, and the Supplemental Specifications and Recurring Special Provisions indicated on the Check Sheet included herein, which apply to and govern the construction of the City of Urbana’s EQUITY AND QUALITY OF LIFE FY 25 SIDEWALK IMPROVEMENTS and in case of conflict with any part, or parts, of said Specifications, the said Special Provisions shall take place and govern.
2.1 Location of Project
One (1) location in the City of Urbana selected in the fiscal year 2022 Equity and Quality of Life Program (EQLFY2022). Specifically, improvements lie along Cottage Grove, at Silver Street and at Brighton Drive, on East Harding Drive, from approximately 500’ west of Vawter Street east to Philo Road, and on Vawter Street from approximately 150’ south of East Harding Drive to it's intersection.
2.2 Description of Work
This work includes construction of new sidewalks, curb and gutter, driveway pavement, utility adjustments, and appurtenances.
2.3 Inlets To Be Adjusted
Description. This work shall consist of adjusting storm sewer inlets at the locations shown in the plans.
This work shall be in accordance with Section 602 of the Standard Specifications, Standard 604006, Standard 604051, Standard 604086, and the following.
Materials. All inlet adjustments shall use Cretex adjustment rings, or equivalent, approved by the Engineer.
Basis of Payment. This work shall be paid for at the contract unit price, each, for INLETS TO BE
ADJUSTED.
2.4 Water Valves To Be Adjusted
Description. This work includes all labor, equipment, and materials required to adjust any water valves to the proposed finished grade at locations shown in the plans. This work shall be in accordance with the applicable sections of the Standard Specifications and the Standard Specification for Water and Sewer Main Construction in Illinois, Fifth Edition and shall include any necessary excavating and backfilling to adjust the water valve to proper grade.
Basis of Payment. This work will be paid for at the contract unit price per EACH valve adjusted as
WATER VALVES TO BE ADJUSTED.
2.5 Traffic Control and Protection
Traffic Control shall be in accordance with the applicable sections of the Standard Specifications for Road and Bridge Construction, the applicable guidelines contained in the Illinois Manual on Uniform Traffic Control Devices for Streets and Highways, these Special Provisions, and any special details and Highway Standards contained herein and in the plans.
04/15/2026 5
Special attention is called to Articles 107.09, 107.14, and 107.15 of the Standard Specifications for Road and Bridge Construction, the following Highway Standards, and Recurring Special Provisions relating to traffic control:
Highway Standards:
701001-02 Off-Road Operations, 2L, 2W, More than 15’ (4.5M) Away 701006-05 Off-Road Operations, 2L, 2W, 15’ (4.5 M) To 24” (600 MM) From Pavement Edge 701602-10 Urban Lane Closure Multilane, 1W 2W With Nontraversable Median 701801-06 Sidewalk, Corner or Crosswalk Closure (2 of 2) 701901-11 Traffic Control Devices (3 of 3)
A Traffic Control Plan that covers all phases of each separate location shall be submitted for review.
Work may not begin at any location until Traffic Control Plan has been approved by the Engineer.
The Contractor shall provide and install as a minimum two weighted sandbags for each type II barricade and carrel. The type III barricades shall receive a minimum four weighted sandbags per barricade. Temporary sign supports shall also be weighted with a minimum of 4 sandbags. Cones shall not be utilized at any time for traffic control.
The Contractor shall place as a minimum four type II barricades or drums around each area of broken concrete, open areas or excavated areas. When the broken pavement, open holes, or excavated areas are on streets that are open to traffic, two barricades or drums shall be placed at the edge in the closed lane. The longitudinal distance between barricades shall not exceed 10 feet along the perimeter of an area or along the centerline of a closed lane. The Contractor shall protect all broken concrete, open excavations and fresh concrete with yellow safety ribbon along the perimeter as directed by the Engineer.
Any additional signage or special signs required by the Engineer shall be considered as incidental. This work will not be paid for separately but shall be included with TRAFFIC CONTROL AND
PROTECTION, (SPECIAL).
Contractor shall be responsible for coordinating with the City representative for construction traffic signal timings at all signalized intersections within the project limits. This work will not be paid for separately but shall be included with TRAFFIC CONTROL AND PROTECTION, (SPECIAL).
Advanced Notice. The City of Urbana will be responsible for notifying the public, the United States Postal Service and the emergency service agencies for road closures and changes in the traffic maintenance plans.
The contractor shall notify the City 72 hours in advance of implementing new or adjusting existing traffic control.
Access. If a proposed patch or driveway remove/replacement interferes with access to a private or commercial driveway, the contractor shall give at least 48 hours advanced notice to the Engineer of the driveway closure. If a private home or commercial business has one (1) entrance, all attempts must be made to do only half the drive (while maintaining access) at a time. If a private home or commercial business has two (2) or more entrances, at least one (1) entrance must remain open at all times.
Nearby on-street parking shall be maintained while the driveway is closed.
Solar Powered Arrow Boards. Arrow boards shall be used as required by the Standards and as directed by the Engineer. All arrow boards to be used on this project shall be solar powered.
04/15/2026 6
Pedestrian Sidewalk Control. The Contractor shall install, maintain, and remove necessary signs and barricades needed to direct pedestrians to usable sidewalks and walkways during the construction, and as directed by the Engineer. At each point of closure, a sufficient number of barricades shall be used to completely close the sidewalk to pedestrian movement. Where construction activities involve sidewalks on both sides of the street, the work shall be staged so that both are not out of service at the same time.
Public Safety and Convenience. The Contractor shall maintain entrances and side roads along the proposed improvement. Interference with traffic movements and inconvenience to owners of abutting property and the public shall be kept to a minimum. Any delays or inconveniences caused to the Contractor by complying with these requirements shall be considered as incidental to the contract and no additional compensation will be allowed.
Basis of Pavement. All work prescribed and referenced herein shall be paid for at the contract lump sum price for TRAFFIC CONTROL AND PROTECTION, (SPECIAL). This price shall include all labor, materials, transportation, handling, and incidental work necessary to furnish, install, relocate, maintain, and remove all traffic control devices as required and provide flaggers as needed.
The Contractor shall comply with these requirements and any progress delays caused by complying with these requirements shall be considered as included with the Traffic Control and Protection, Special.
2.6 Handholes To Be Adjusted
Description. This work shall consist of adjusting existing handhole elevations to match the final sidewalk grades. This work shall be performed in accordance with applicable portions of Sections 602, 603, and 814 of the Standard Specifications.
Care shall be taken to protect the existing conduits. Any modifications which may be required to the existing conduit entering the handhole shall be considered part of this work.
This work shall also include resetting the existing frame and lid and all necessary excavation and backfill.
Basis of Payment. The work described herein will be paid for at the contract unit price per each HANDHOLE TO BE ADJUSTED, which price shall include payment in full for all labor, materials, and equipment necessary to perform the work.
2.07 Gas Valves To Be Adjusted
Description. This item of work shall consist of furnishing all labor, equipment, and materials necessary to adjust gas valve in the locations shown on the plans. Gas valve adjustments shall meet requirements specified in Article 107.38 or as directed by the Engineer.
Basis of Payment. The work shall be paid for at the contract unit price per each for GAS VALVES TO
BE ADJUSTED.
2.08 Junction Box To Be Adjusted
Description. This item shall consist of resetting and bringing to grade a junction box at a location shown on the plans or as directed by the Engineer.
04/15/2026 7
The junction box shall be protected when removing the surrounding concrete sidewalk or brick pavers.
If the box is damaged it shall be replaced by the contractor at his own expense. After the concrete around the box has been removed, the box shall be raised to match the proposed sidewalk or brick paver grade using aggregate, which shall not be measured separately but included in the cost of adjusting junction boxes.
Basis of Payment. The work shall be paid for at the contract unit price per EACH for JUNCTION BOX TO BE ADJUSTED, which price shall be payment in full for all labor, materials, and equipment necessary to complete the work described above and as indicated on the drawings.
2.09 Inlets To Be Removed (Special)
Description. This item shall consist of furnishing all labor, equipment, and materials necessary to remove and dispose of existing inlets as shown on the plans.
This work shall be to remove the existing inlet that will be replaced by an inlet to maintain drainage.
Basis of Payment. The work shall be paid for at the contract unit price per EACH for INLETS TO BE REMOVED (SPECIAL), which price shall be payment in full for all labor, materials, and equipment necessary to complete the work described above and as indicated on the drawings.
2.10 Relocate Sign Panel and Post
Description. This item shall consist of removing and relocating existing sign panels and their wood or metal posts.
The sign and metal or wood posts shall be removed and re-used. Any holes left for the removal shall be backfilled with suitable material and the surface of the filled hole shall be treated to match the surrounding area. All items to be re-used shall be transported to the new location(s) specified in the plans.
The time between the removal of an existing sing and its reinstallation shall not exceed 45 minutes.
In the event of a regulatory sign (Stop Sign, Yield Sign, etc.) being relocated, a temporary regulatory sign must be present until the relocation has been completed.
Basis of Payment. The work shall be paid for at the contract unit price per EACH for RELOCATE SIGN PANEL AND POST, which price shall be payment in full for all labor, materials, and equipment necessary to complete the work described above and as indicated on the drawings.
New posts if required will be approved by the field engineer, and paid for according to Articles 728.06, 731.04, 729.05, and 730.06 of the IDOT Standard Specifications for Road and Bridge Construction.
2.11 Drill and Grout #6 Tie Bars
Description. This item shall consist of furnishing all labor, equipment, and materials necessary to drill and grout #6 Tie Bars between existing pavement and new concrete patches and new concrete curb and gutter.
This work shall be performed according to IDOT Standard Drawing 420001-10 and Article 442.06 & Article 420.05 of IDOT Standard Specifications. Tie bars shall be No. 6 tie bars, 24 in. long, embedded 8 inches at 36 inch centers according to Article 420.05.
04/15/2026 8
Depending on the length of the pavement to be replaced and the conditions of the existing pavement, the Engineer shall determine if tie bar installation will be required.
Basis of Payment. The work shall be paid for at the contract unit price per EACH for DRILL AND GROUT #6 TIE BARS which price shall be payment in full for all labor, materials, and equipment necessary to complete the work described above and as indicated on the drawings.
SECTION B
IDOT Special Provisions
BDE SPECIAL PROVISIONS
For the April 24 and June 12, 2026 Lettings
The following special provisions indicated by a “check mark” are applicable to this contract and will be included by the Project Coordination and Implementation Section of the Bureau of Design & Environment (BDE).
File Name # Special Provision Title Effective Revised 80099 1 Accessible Pedestrian Signals (APS) April 1, 2003 Jan. 1, 2022 80274 2 Aggregate Subgrade Improvement April 1, 2012 April 1, 2022 80192 3 Automated Flagger Assistance Devices Jan. 1, 2008 April 1, 2023 80173 4 Bituminous Materials Cost Adjustments Nov. 2, 2006 Aug. 1, 2017 80426 5 Bituminous Surface Treatment with Fog Seal Jan. 1, 2020 April 1, 2026 80475 6 Bridge Deck Concrete Overlays Jan. 1, 2026
* 80241 7 Bridge Demolition Debris July 1, 2009
* 5053I 8 Building Removal Sept. 1, 1990 Aug. 1, 2022
* 5026I 9 Building Removal with Asbestos Abatement Sept. 1, 1990 Aug. 1, 2022
80460 10 Cement, Finely Divided Minerals, Admixtures, Concrete, and Mortar Jan. 1, 2025 Jan. 1, 2026 80384 11 Compensable Delay Costs June 2, 2017 April 1, 2019
* 80198 12 Completion Date (via calendar days) April 1, 2008
* 80199 13 Completion Date (via calendar days) Plus Working Days April 1, 2008
80461 14 Concrete Barrier Jan. 1, 2025 80453 15 Concrete Sealer Nov. 1, 2023 80261 16 Construction Air Quality – Diesel Retrofit June 1, 2010 Jan. 1, 2025 80476 17 Deck Slab Repair Jan. 1, 2026
* 80029 18 Disadvantaged Business Enterprise Participation Sept. 1, 2000 Jan. 2, 2025 80467 19 Erosion Control Blanket Aug. 1, 2025 80229 20 Fuel Cost Adjustment April 1, 2009 Aug. 1, 2017 80452 21 Full Lane Sealant Waterproofing System Nov. 1, 2023 80433 22 Green Preformed Thermoplastic Pavement Markings Jan. 1, 2021 Jan. 1, 2022 80471 23 Guardrail Nov. 1, 2025 80472 24 High Friction Surface Treatment Nov. 1, 2025 80456 25 Hot-Mix Asphalt Jan. 1, 2024 April 1, 2026 80446 26 Hot-Mix Asphalt - Longitudinal Joint Sealant Nov. 1, 2022 Aug. 1, 2023 80438 27 Illinois Works Apprenticeship Initiative – State Funded Contracts June 2, 2021 April 2, 2024 80483 28 Inlet Filters April 1, 2026 80477 29 Longitudinal Tining Jan. 1, 2026 80450 30 Mechanically Stabilized Earth Retaining Walls Aug. 1, 2023 Aug. 1, 2025 80478 31 Modified Longitudinal Construction Joint Jan. 1, 2026 80464 32 Pavement Marking April. 1, 2025 Nov. 1, 2025 80468 33 Pavement Patching Aug. 1, 2025 80441 34 Performance Graded Asphalt Binder Jan. 1, 2023 April 1, 2026 80459 35 Preformed Plastic Pavement Marking June 2, 2024
* 3426I 36 Railroad Protective Liability Insurance Dec. 1, 1986 Jan. 1, 2022 80473 37 Raised Reflective Pavement Markers Nov. 1, 2025 80455 38 Removal and Disposal of Regulated Substances Jan. 1, 2024 April 1, 2026 80474 39 Residential Driveway Temporary Signal Nov. 1, 2025 80445 40 Seeding Nov. 1, 2022 80457 41 Short Term and Temporary Pavement Markings April 1, 2024 April 2, 2024 80462 42 Sign Panels and Appurtenances Jan. 1, 2025 Jan. 1, 2026 80479 43 Sinusoidal Rumble Strips Jan. 1, 2026 80469 44 Slope Wall Aug. 1, 2025 80448 45 Source of Supply and Quality Requirements Jan. 2, 2023 Jan. 1, 2026 80340 46 Speed Display Trailer April 2, 2014 Jan. 1, 2022 80127 47 Steel Cost Adjustment April 2, 2004 Nov. 1, 2025 80480 48 Structural Repair of Concrete Jan. 1, 2026 80397 49 Subcontractor and DBE Payment Reporting April 2, 2018 80391 50 Subcontractor Mobilization Payments Nov. 2, 2017 April 1, 2019 80463 51 Submission of Bidders List Information Jan. 2, 2025 Mar. 2, 2025
80482 52 Submission of Payroll Records – Federal Aid Contract April 1, 2026 80437 53 Submission of Payroll Records – State Contract April 1, 2021 April 1, 2026
80435 54 Surface Testing of Pavements – IRI Jan. 1, 2021 Jan. 1, 2023 80465 55 Surveying Services April 1, 2025 80481 56 Temporary Concrete Barrier Jan. 1, 2026 80466 57 Temporary Rumble Strips April 1, 2025 80470 58 Traffic Signal Backplate Aug. 1, 2025
* 20338 59 Training Special Provisions Oct. 15, 1975 Sept. 2, 2021 80429 60 Ultra-Thin Bonded Wearing Course April 1, 2020 Jan. 1, 2022 80439 61 Vehicle and Equipment Warning Lights Nov. 1, 2021 Nov. 1, 2022 80458 62 Waterproofing Membrane System Aug. 1, 2024 80302 63 Weekly DBE Trucking Reports June 2, 2012 Jan. 2, 2025 80454 64 Wood Sign Support Nov. 1, 2023 80427 65 Work Zone Traffic Control Devices Mar. 2, 2020 Jan. 1, 2026
* 80071 66 Working Days Jan. 1, 2002
Highlighted items indicate a new or revised special provision for the letting.
An * indicates the special provision requires additional information from the designer, which needs to be submitted separately.
The Project Coordination and Implementation Section will then include the information in the applicable special provision.
The following special provisions are in the 2026 Supplemental Specifications and Recurring Special Provisions.
File Name Special Provision Title New Location(s) Effective Revised
80447 Grading and Shaping Ditches Articles 214.03 & 214.04 Jan. 1, 2023
Check Sheet for Recurring Special Provisions
Page 1 of 2 BLR 11300 (Rev. 10/27/25)Printed 03/18/26
Local Public Agency
City of Urbana
County
Champaign
Section Number
25-00697-00-SW
Check this box for lettings prior to 01/01/2026
The Following Recurring Special Provisions Indicated By An "X" Are Applicable To This Contract And Are Included By Reference:
Recurring Special Provisions
Check Sheet # Page No.
1 Additional State Requirements for Federal-Aid Construction Contracts 87
2 Subletting of Contracts (Federal-Aid Contracts) 90
3 EEO 91
4 Specific EEO Responsibilities Non Federal-Aid Contracts 101
5 Required Provisions - State Contracts 106
6 Asbestos Bearing Pad Removal 112
7 Asbestos Waterproofing Membrane and Asbestos HMA Surface Removal 113
8 Temporary Stream Crossings and In-Stream Work Pads 114
9 Construction Layout Stakes 115
10 Use of Geotextile Fabric for Railroad Crossing 118
11 Subsealing of Concrete Pavements 120
12 Hot-Mix Asphalt Surface Correction 124
13 Pavement and Shoulder Resurfacing 126
14 Patching with Hot-Mix Asphalt Overlay Removal 127
15 Polymer Concrete 129
16 Reserved 131
17 Bicycle Racks 132
18 Temporary Portable Bridge Traffic Signals 134
19 Nighttime Inspection of Roadway Lighting 136
20 English Substitution of Metric Bolts 137
21 Calcium Chloride Accelerator for Portland Cement Concrete 138
22 Quality Control of Concrete Mixtures at the Plant 139
23 Quality Control/Quality Assurance of Concrete Mixtures 147
24 Reserved 163
25 Reserved 164
26 Temporary Raised Pavement Markers 165
27 Restoring Bridge Approach Pavements Using High-Density Foam 166
28 Portland Cement Concrete Inlay or Overlay 169
29 Portland Cement Concrete Partial Depth Hot-Mix Asphalt Patching 173
30 Longitudinal Joint and Crack Patching 176
31 Concrete Mix Design - Department Provided 178
32 Station Numbers in Pavements or Overlays 179
Printed 04/15/26
Page 2 of 2 BLR 11300 (Rev. 10/27/25)
Local Public Agency
City of Urbana
County
Champaign
Section Number
25-00697-00-SW
Printed 03/18/26
The Following Local Roads And Streets Recurring Special Provisions Indicated By An "X" Are Applicable To This Contract And Are Included By Reference:
Local Roads And Streets Recurring Special Provisions
Check Sheet # Page No.
LRS 1 Reserved 181
LRS 2 Furnished Excavation 182
LRS 3 Work Zone Traffic Control Surveillance 183
LRS 4 Flaggers in Work Zones 184
LRS 5 Contract Claims 185
LRS 6 Bidding Requirements and Conditions for Contract Proposals 186
LRS 7 Bidding Requirements and Conditions for Material Proposals 192
LRS 8 Reserved 198
LRS 9 Bituminous Surface Treatments 199
LRS 10 Reserved 203
LRS 11 Employment Practices 204
LRS 12 Wages of Employees on Public Works 206
LRS 13 Selection of Labor 208
LRS 14 Paving Brick and Concrete Paver Pavements and Sidewalks 209
LRS 15 Partial Payments 212
LRS 16 Protests on Local Lettings 213
LRS 17 Substance Abuse Prevention Program 214
LRS 18 Multigrade Cold Mix Asphalt 215
LRS 19 Reflective Crack Control Treatment 216
Printed 04/15/26
WORKING DAYS (BDE)
Effective: January 1, 2002
The Contractor shall complete the work within working days.
80071
VEHICLE AND EQUIPMENT WARNING LIGHTS (BDE)
Effective: November 1, 2021 Revised: November 1, 2022
Add the following paragraph after the first paragraph of Article 701.08 of the Standard Specifications:
The Contractor shall equip all vehicles and equipment with high-intensity oscillating, rotating, or flashing, amber or amber-and-white, warning lights which are visible from all directions. In accordance with 625 ILCS 5/12-215, the lights may only be in operation while the vehicle or equipment is engaged in construction operations.
80439
SECTION C
Standard Details
2 WO
W
WILDFL
WB
WMAIN
WV
WM
VPT
VPI
VPC
VC
VERT
VP
VEH
VLT
VV
VBOX
UTIL
USFL
USEL
USGS
UNDGND
TYP
T-A
TY
TRN
TRVL
TRVS
TSC
TSCB
TS
TR
TWP
TBS
TBR
TBE
TD
TBM
TEMP
TP
TB
TEL
T.R.
T
SMK
SURF
S.E. RUN.
e
STR
ST
STY
SS
SPBGR
STA
SR
SBI
STD
WITHOUT
WITH
WILDFLOWERS
WESTBOUND
WATER MAIN
WATER VALVE
WATER METER
VERTICAL POINT OF TANGENCY
VERTICAL POINT OF INTERSECTION
VERTICAL POINT OF CURVATURE
VERTICAL CURVE
VERTICAL
VENT PIPE
VEHICLE
VAULT
VALVE VAULT
VALVE BOX
UTILITY
UPSTREAM FLOWLINE
UPSTREAM ELEVATION
U.S. GEOLOGICAL SURVEY
UNDERGROUND
TYPICAL
TYPE A
TYPE
TURN
TRAVEL
TRANSVERSE
TRAFFIC SYSTEMS CENTER
TRAFFIC SIGNAL CONTROL BOX
TRAFFIC SIGNAL
TOWNSHIP ROAD
TOWNSHIP
TO BE SAVED
TO BE REMOVED
TO BE EXTENDED
TILE DRAIN
TEMPORARY BENCH MARK
TEMPORARY
TELEPHONE POLE
TELEPHONE BOX
TELEPHONE
TANGENT RUNOUT DISTANCE
TANGENT DISTANCE
SURVEY MARKER
SURFACE
SUPERELEVATION RUNOFF LENGTH
SUPERELEVATION RATE
STRUCTURE
STREET
STORY
STORM SEWER
STEEL PLATE BEAM GUARDRAIL
STATION
STATE ROUTE
STATE BOND ISSUE
STANDARD
CUBIC MILLIMETER
CUBIC METER
CROSS SECTION
COURSE
COUNTY HIGHWAY
COUNTY
CORRUGATED METAL PIPE
CORRUGATED
CORNER
CONTINUOUS
CONTINUED
CONSTRUCT
CONCRETE
COMMERCIAL ENTRANCE
COMMERCIAL BUILDING
COMBINATION
COAT OR COURT
CLOSED LID
CLOSED
CLAY PIPE
CITY STREET
CHISELED
CERTIFIED
CENTERS
CENTERLINE TO FACE
CENTERLINE TO EDGE
CENTERLINE OR CLEARANCE
CENTER TO CENTER
CATCH BASIN
CAST IRON PIPE
CABLE
BUILDING
BUFFALO BOX
BRICK
BOULEVARD
BOTTOM
BITUMINOUS
BINDER
BENCHMARK
BEGIN
BASELINE
BARRICADE
BARN
BACKPLATE
BACK TO BACK
BACK
AXIS OF ROTATION
AVENUE
AUXILIARY GAS VALVE (SERVICE)
AUXILIARY
ASPHALT
APARTMENT
AHEAD
AGGREGATE
AERIAL SURVEYS
ADJUST
ACRE
ACCESS CONTROL
ABOVE
mm m
XSECT
CSE
CH
CNTY
CMP
CORR
COR
CONT
CONTD
CONST
CONC
CE
C
COMB
CT
CLID
CLSD
CP
CS
CHSLD
CERT
CTS
CL-F
CL-E
CL
C-C
CB
CIP
CATV
BLDG
BBOX
BRK
BLVD
BTM
BIT
BIND
BM
BGN
BL
BARR
B
BKPL
B-B
BK
AX
AVE
AGS
AUX
ASPH
APT
AH
AGG
AS
ADJ
AC
A/C
ABV
HH
GW
GP
GUT
GND
GRVL
GR
GRAN
GIS
GV
GM
G
GALV
GAL
FRWAY
F&G
FR
FDN
FB
FL
FH
FE
OPT
FP
FAUS
FAS
FAP
FAI
FA
F-F
E
E
EXPWAY
EX
EXC
ENTR
EL
ELEC
E-E
E-CL
EOP
EB
EA
DCT
DRV
DI
DR
DSFL
DSEL
DBL
DOM
DIST
DIA
DET
DC
D
C&G
CULV
CU YD
HANDHOLE
GUY WIRE
GUY POLE
GUTTER
GROUND
GRAVEL
GRATE
GRANULAR
GEOGRAPHICAL INFORMATION SYSTEM
GAS VALVE
GAS METER
GARAGE
GALVANIZED
GALLON
FREEWAY
FRAME & GRATE
FRAME
FOUNDATION
FOOT BRIDGE
FLOW LINE
FIRE HYDRANT
FIELD ENTRANCE
FIBER OPTIC
FENCE POST
FEDERAL AID URBAN SECONDARY
FEDERAL AID SECONDARY
FEDERAL AID PRIMARY
FEDERAL AID INTERSTATE
FEDERAL AID
FACE TO FACE
OFFSET DISTANCE TO VERTICAL CURVE
EXTERNAL DISTANCE OF HORIZONTAL CURVE
EXPRESSWAY
EXISTING
EXCAVATION
ENTRANCE
ELEVATION
ELECRICAL
EDGE TO EDGE
EDGE TO CENTERLINE
EDGE OF PAVEMENT
EASTBOUND
EACH
DUCT
DRIVEWAY
DRAINAGE INLET OR DROP INLET
DRAINAGE OR DRIVE
DOWNSTREAM FLOWLINE
DOWNSTREAM ELEVATION
DOUBLE
DOMESTIC
DISTRICT
DIAMETER
DETECTOR
DEPRESSED CURVE
DEGREE OF CURVE
CURB & GUTTER
CULVERT
CUBIC YARD
STB
SQ YD
mm m
SQ FT
SD
SPL
SE
SB
SM
SOD
SIG
SW
SHLD
SH
S
SHAP
SEED
SEC
SANS
SAN
RTE
RDWY
RD
ROW
RT
RET
RESURF
REST
REP
RC
REM
REINF
RCCP
REF
RPS
RRS
RR
R
PR
PL
P.C.
PROJ
PGL
PROF
PE
PRM
PP
PCC
POLYETH
POT
PT
PRC
PI
PC
PNT
PED
PM
PAVEMENT
PAVED
PATTERN
OPEN LID
OIL AND CHIP
OFFSET
NORTHWEST
NORTHEAST
NORTHBOUND
NORMAL CROWN
NAIL & WASHER
NAIL & CAP
NAIL & BOTTLE CAP
MOTOR FUEL TAX
MODIFIED
MOBILE HOME
MIXTURE
MILLIMETER DIAMETER
MILLIMETER
MID-ORDINATE
METHOD
METER
MEDIAN
MATERIAL
MANHOLE
MAIL BOX
MACHINE
LUMP SUM
LONGITUDINAL
LONG CHORD
LITER OR CURVE LENGTH
LINEAL FEET OR LINEAR FEET
LIGHTING
LIGHT POLE
LIGHT DETECTION AND RANGING
LEFT
LANE
LANDSCAPING
KILOMETER
KILOGRAM
JOINT
IRON ROD
IRON PIPE
INVERT
INTERSECTION DESIGN STUDY
INSTALLATION
INLET
INCH DIAMETER
IMPROVEMENT
ILLINOIS
HOUSE
HORIZONTAL
HIGHWAY
HOT MIX ASPHALT
HECTARE
HEAVY DUTY
HEADWALL
HEAD
HATCHING
PVMT
PVD
PAT
OLID
O&C
O/S
NW
NE
NB
NC
N & W
N & C
N & BC
MFT
MOD
MBH
MIX
mm DIA mm
M
METH
m
MED
MATL
MH
MB
MACH
L SUM
LNG
LC
L
LF
LGT
LP
LIDAR
LT
LN
LS
km kg
JT
IR
IP
INV
IDS
INST
INL
IN DIA
IMP
IL
HSE
HORIZ
HWY
HMA
ha
HDUTY
HDW
HD
HATCH
STABILIZED
SQUARE YARD
SQUARE MILLIMETER
SQUARE METER
SQUARE FEET
SPECIAL DITCH
SPECIAL
SOUTHEAST
SOUTHBOUND
SOLID MEDIAN
SODDING
SIGNAL
SIDEWALK OR SOUTHWEST
SHOULDER
SHEET
SHED
SHAPING
SEEDING
SECTION
SANITARY SEWER
SANITARY
ROUTE
ROADWAY
ROAD
RIGHT-OF-WAY
RIGHT
RETAINING
RESURFACING
RESTAURANT
REPLACEMENT
REMOVE CROWN
REMOVAL
REINFORCEMENT
REINFORCED CONCRETE CULVERT PIPE
REFLECTIVE
REFERENCE POINT STAKE
RAILROAD SPIKE
RAILROAD
RADIUS or RESIDENTUAL
PROPOSED
PROPERTY LINE
PROPERTY CORNER
PROJECT
PROFILE GRADELINE
PROFILE
PRIVATE ENTRANCE
PRIME
POWER POLE OR PRINCIPAL POINT
PORTLAND CEMENT CONCRETE
POLYETHYLENE
POINT ON TANGENT
POINT OF TANGENCY
POINT OF REVERSE CURVE
CURVE
POINT OF INTERSECTION OF HORIZONTAL
POINT OF CURVATURE
POINT
PEDESTAL
PAVEMENT MARKING
Illinois Department of Transportation
APPROVED 2026
APPROVED 2026
ENGINEER OF DESIGN AND ENVIRONMENT
IS
S
U E
D -1
-9
January 1, January 1, ENGINEER OF POLICY AND PROCEDURES
1-1-21
(Sheet 1 of 9)
STANDARD 000001-09
AND PATTERNS
ABBREVIATIONS,
STANDARD SYMBOLS,DATE REVISIONS
signing items.
shared roadway symbol, and
Updated bike lane symbol, bike 1-1-26 and symbols.
Updated fonts, abbreviations, January 1, Structure To Be Adjusted
Structure To Be Cleaned
Structure To Be Filled
Structure To Be Removed
Reconstructed
Structure To Be
Valve Vault To Be Adjusted
Special Adjustment
Item To Be Abandoned
Item To Be Moved
Item To Be Relocated
Baseline
Centerline
Centerline Break Circle
Baseline Symbol
Centerline Symbol
PI Indicator
Point Indicator
Dashed Property Line
Solid Property/Lot Line
Section/Grant Line
County/Township Line
State Line
Iron Pipe Found
Iron Pipe Set
Survey Marker
Property Line Symbol
Riprap
Water Surface Indicator
Culvert End Section
Catch Basin
Swale
Roadway Ditch Flow
Summit
Manhole
Inlet
Headwall
Ditch Check
Flowline
Aggregate Ditch
Paved Ditch
Drainage Boundary Line
Grading & Shaping Ditches
Culvert Line
Main Structure To Be Filled
Structure To Be Filled Special
Structure To Be Reconstructed Special
Storm Sewer
Pipe Underdrain
(Half Size)
Horizontal Curve Data
Quarter Section Line
Quarter/Quarter Section Line
Channel or Stream Line
ADJUSTMENT ITEMS EX PR ALIGNMENT ITEMS EX PR
BOUNDARIES ITEMS EX PR
DRAINAGE ITEMS EX PR
Overflow
Sheet Flow
Hydrant Outlet
EXHYDRAULICS ITEMS PR
C
ADJ
F
FM
FSP
A
A
A
AB
M
REL
SP
REC
RSP
R
A
Frame and Grate To Be Adjusted
Frame and Lid To Be Adjusted
Domestic Service Box To Be Adjusted
Pavement Removal and Replacement
T
N
R
E
LP
Same Ownership Symbol (Half Size)
Northwest Quarter Corner (Half Size)
Section Corner (Half Size)
Southeast Quarter Corner (Half Size)
Chiseled Square Found
FLLF
e=
S.E. RUN=
E=
T.R.=
P.C. STA=
P.T. STA=
L=
P.I. STA=
D=
R=
T=
EX. CURVE
e=
S.E. RUN=
E=
T.R.=
P.C. STA=
P.T. STA=
L=
P.I. STA=
CURVE
D=
R=
T=
Illinois Department of Transportation
APPROVED 2026
APPROVED 2026
ENGINEER OF DESIGN AND ENVIRONMENT
IS
S
U E
D -1
-9
January 1, January 1, ENGINEER OF POLICY AND PROCEDURES
(Sheet 2 of 9)
STANDARD 000001-09
AND PATTERNS
ABBREVIATIONS,
STANDARD SYMBOLS,
Intermediate Contour
Index Contour
Approx. Intermediate Line
Approx. Index Line
CONTOUR ITEMS EX PR
FL
Cleaning & Grading Limits
Dike
Erosion Control Fence
Perimeter Erosion Barrier
Temporary Fence
Ditch Check Temporary
Ditch Check Permanent
Inlet & Pipe Protection
Sediment Basin
Erosion Control Blanket
Revetment Mat
Fabric Formed Concrete
Turf Reinforcement Mat
Mulch Temporary
Mulch Method 1
Mulch Method 2 Stabilized
Mulch Method 3 Hydraulic
Noise Attn./Levee
Fence
Base of Levee
Mailbox
Pay Telephone
Advertising Sign
Contour Mounding Line
Fence
Perennial Plants
Seeding Class 2
Seeding Class 2A
Seeding Class 4
Seeding Class 4 & 5 Combined
Seeding Class 5
Seeding Class 7
Seedlings Type 1
Seedlings Type 2
Sodding
Mowstake w/Sign
Tree Trunk Protection
Evergreen Tree
Shade Tree
Duct
Conduit
Electrical Aerial Cable
Electrical Buried Cable
Controller
Underpass Luminaire
Power Pole
Shrubs
Mowline
Fence Post
Field Line
Multiple Mailboxes
CONTROL ITEMS
EROSION & SEDIMENT
EX PR
IMPROVEMENT ITEMS
NON-HIGHWAY
EX PR
(contd.)
LANDSCAPING ITEMS
EXISTING
EX PR
LANDSCAPING ITEMS EX PR
LIGHTING EX PR
ITS Camera
Wind Turbine
Cellular Tower
Intelligent Transportation Systems
T
E
E
Illinois Department of Transportation
APPROVED 2026
APPROVED 2026
ENGINEER OF DESIGN AND ENVIRONMENT
IS
S
U E
D -1
-9
January 1, January 1, ENGINEER OF POLICY AND PROCEDURES
(Sheet 3 of 9)
STANDARD 000001-09
AND PATTERNS
Pull Point
Handhole
Heavy Duty Handhole
Junction Box
Light Unit Comb.
Electrical Ground
Traffic Flow Arrow
Light Unit-1
Keyed Long. Joint
Keyed Long. Joint w/Tie Bars
Sawed Long. Joint w/Tie Bars
Bituminous Shoulder
Bituminous Taper
Stabilized Driveway
Widening
RR Crossing
Raised Marker Amber 1 Way
Raised Marker Amber 2 Way
Raised Marker Crystal 1 Way
Two Way Turn Left
Shoulder Diag. Pattern
Skip-Dash White
Skip-Dash Yellow
Stop Line
Solid Line
Double Centerline
Dotted Lines
(Half Size)
High Mast Pole
Handicap Symbol
(contd.)
LIGHTING
EX PR
PAVEMENT (MISC.) EX PR
PAVEMENT MARKINGS EX PR
H
JJ
H
P P
Illinois Department of Transportation
APPROVED 2026
APPROVED 2026
ENGINEER OF DESIGN AND ENVIRONMENT
IS
S
U E
D -1
-9
January 1, January 1, ENGINEER OF POLICY AND PROCEDURES
(Sheet 4 of 9)
STANDARD 000001-09
AND PATTERNS
Urban Left Turn Arrow
Urban Right Turn Arrow
Urban Left Turn Only
Urban Right Turn Only
Urban Thru Only
Abandoned Railroad
Railroad
Railroad Point
Control Box
Crossing Gate
Flashing Signal
Railroad Cant. Mast Arm
Crossbuck
Removal Tic
Bituminous Removal
Hatch Pattern
Future ROW Corner Monument
ROW Marker
ROW Line
Easement
Temporary Easement
Urban Combination Left
Urban Combination Right Tree Removal Single
(contd.)
PAVEMENT MARKINGS
EX PR
RAILROAD ITEMS EX PR
EX PR
EX PR
REMOVAL ITEMS
RIGHT OF WAY ITEMS
RRPM 40' (12.2 m) o.c.
CL Multilane Div.
RRPM 80' (24.4 m) o.c.
CL Multilane Div.
RRPM 80' (24.4 m) o.c.
CL Multilane Div. Dbl.
CL Multilane Undiv.
Two Way Turn Left Line
RRPM 12.2 m (40') o.c.
CL 2Ln 2Way
RRPM 80' (24.4 m) o.c.
CL 2Ln 2Way
Urban LT & RT Turn Arrow
Urban Thru Arrow
Illinois Department of Transportation
APPROVED 2026
APPROVED 2026
ENGINEER OF DESIGN AND ENVIRONMENT
IS
S
U E
D -1
-9
January 1, January 1, ENGINEER OF POLICY AND PROCEDURES
(Sheet 5 of 9)
STANDARD 000001-09
AND PATTERNS
Rural Left Turn Arrow
Rural Right Turn Arrow
Rural Left Turn Only
Rural Right Turn Only
Rural Thru Only
Urban U-Turn
Urban Combined U-Turn
Rural Combination Left
Rural Combination Right
Bike Lane Symbol
Bike Lane Text
(contd.)
PAVEMENT MARKINGS
EX PR
Bike Path Shared
Bike Shared Roadway
Wrong Way Arrow
Lane Drop Symbol
Rural Thru Arrow
Rural Lt & Rt Turn Arrow
Illinois Department of Transportation
APPROVED 2026
APPROVED 2026
ENGINEER OF DESIGN AND ENVIRONMENT
IS
S
U E
D -1
-9
January 1, January 1, ENGINEER OF POLICY AND PROCEDURES
(Sheet 6 of 9)
STANDARD 000001-09
AND PATTERNS
ROAD
CLOSED
AHEAD
RIGHT LANE
CLOSED
AHEAD
LEFT LANE
CLOSED
AHEAD
DETOUR
AHEAD
Edge of Pavement and C&G Line
Bit Shoulders, Medians
Aggregate Shoulder
Sidewalks, Driveways
Guardrail
Guardrail Post
Traffic Sign
Corrugated Median
P.I. Indicator
Point Indicator
Earthworks Balance Point
Begin Point
Vert. Curve Data
Cone, Drum or Barricade
Barricade Type II
Barricade Type III
Barricade With Edge Line
Flashing Light Sign
Vertical Panels
Direction of Traffic
Ditch Profile Left Side
Ditch Profile Right Side
Roadway Profile Line
Storm Sewer Profile Left Side
Storm Sewer Profile Right Side
(Half Size)
Sign Flag
(Half Size)
One Way Arrow Lrg. W1-6-(O)
(Half Size)
Two Way Arrow Large W1-7-(O)
(Half Size)
Detour Ahead W20-2(O)
(Half Size)
Road Closed Ahead W20-3(O)
(Half Size)
Reverse Left W1-4L
(Half Size)
Reverse Right W1-4R
(Half Size)
Two Way Traffic Sign W6-3
(Half Size)
Lane Ends W4-2R(O)
(Half Size)
Lane Ends W4-2L(O)
(Half Size)
Road Construction Ahead W20-I103(O)
(Half Size)
Right Lane Closed Ahead W20-5R(O)
(Half Size)
Left Lane Closed Ahead W20-5L(O)
Slope Limit Line
Match Line
Typical Cross-Section Line
Access Control Line
Access Control Line & ROW
ROW with Fence
Access Control Line &
Excess ROW Line
(Half Size)
North Arrow with District Office
Cable Barrier
Concrete Barrier
Impact Attenuator
(contd.)
RIGHT OF WAY ITEMS
EX PR
ITEMS
ROADWAY PLAN
EX PR
ROADWAY PROFILES EX PR
SIGNING ITEMS EX PR
STA. 45+00
VPI
ELEV
L E
VPI
ELEV
L E
I
ROAD
AHEAD
CONSTRUCTION
ONE LANE
ROAD
AHEAD
(Half Size)
One Lane Road Ahead W20-4(O)
(contd.)
SIGNING ITEMS
EX PR
Illinois Department of Transportation
APPROVED 2026
APPROVED 2026
ENGINEER OF DESIGN AND ENVIRONMENT
IS
S
U E
D -1
-9
January 1, January 1, ENGINEER OF POLICY AND PROCEDURES
(Sheet 7 of 9)
STANDARD 000001-09
AND PATTERNS
ROAD CLOSED
TO
THRU TRAFFIC
STOP
HERE
ON
RED
STOP
HERE
ON
RED
KEEP
RIGHT
KEEP
LEFT
DETOUR
DETOUR
ONE WAY
ONE WAY
Cable Number
Left Turn Green
Left Turn Yellow
Signal Backplate
Walk/Don't Walk Letters
Walk/Don't Walk Symbols
Galv. Steel Conduit
Underground Cable
Detector Loop Line
Detector Loop Large
Detector Loop Small
Detector Loop Quadrapole
Bridge Pier
Box Culvert Barrel
Box Culvert Headwall
Bridge
Retaining Wall
Temporary Sheet Piling
(Half Size)
Left Turn Lane R3-I100L
(Half Size)
Keep Left R4-8AL
(Half Size)
Keep Right R4-7AR
(Half Size)
Stop Here On Red R10-6-AL
(Half Size)
Stop Here On Red R10-6-AR
(Half Size)
No Left Turn R3-2
(Half Size)
No Right Turn R3-1
(Half Size)
Road Closed R11-2
(Half Size)
Road Closed Thru Traffic R11-4
(Half Size)
Detour M4-10L-(O)
(Half Size)
Detour M4-10R-(O)
(Half Size)
One Way Left R6-1L
(Half Size)
One Way Right R6-1R
Signal Section 8'' (200 mm)
Signal Section 12'' (300 mm)
(contd.)
SIGNING ITEMS
EX PR STRUCTURES ITEMS EX PR
ITEMS
TRAFFIC SHEET
EX PR
ITEMS
TRAFFIC SIGNAL
EX PR
Detector Raceway
Aluminum Mast Arm
Steel Mast Arm
Veh. Detector Magnetic
Conduit Splice
Controller
Gulfbox Junction
Wood Pole
Temp. Signal Head
Handhole
Heavy Duty Handhole
Junction Box
Ped. Pushbutton Detector
Ped. Signal Head
Power Pole Service
Priority Veh. Detector
Signal Head
Signal Head w/Backplate
Signal Post
Cable TV
Electric Cable
Fiber Optic
Gas Pipe
Oil Pipe
Sanitary Sewer
Telephone Cable
Water Pipe
Double Handhole
Closed Circuit TV
Video Detector System
UTILITY ITEMS
UNDERGROUND
EX PR ABANDONED
C
H
J
"E"
V
C
H
J
V
G
Y
DW
W
G
Y
DW
W
ROAD
CLOSED
LANE
TURN
LEFT
Keep Left R4-8
Keep Right R4-7
ITEMS (contd.)
TRAFFIC SIGNAL
EX PR
Illinois Department of Transportation
APPROVED 2026
APPROVED 2026
ENGINEER OF DESIGN AND ENVIRONMENT
IS
S
U E
D -1
-9
January 1, January 1, ENGINEER OF POLICY AND PROCEDURES
(Sheet 8 of 9)
STANDARD 000001-09
AND PATTERNS
Controller
Double Handhole
Fire Hydrant
Handhole
Heavy Duty Handhole
Junction Box
Light Pole
Manhole
Power Pole
Splice Box Above Ground
Telephone Pole
Traffic Signal
Water Meter Valve Box
Above Ground
Telephone Splice Box
Deciduous Tree
Evergreen Tree
Stump
Stream or Drainage Ditch
Waters Edge
Water Surface Indicator
Water Point
Disappearing Ditch
Marsh
Marsh/Swamp Boundary
Bush or Shrub
Woods & Bush Line
Vegetation Line
Orchard/Nursery Line
GuyWire or Deadman Anchor
Profile Line
Aerial Power Line
Pipeline Warning Sign
Power Pole with Light
Sanitary Sewer Cleanout
Traffic Signal Control Box
Water Meter
VEGETATION ITEMS EX PRUTILITIES ITEMS EX PR
ITEMS
WATER FEATURE
EX PR
Monitoring Well (Gasoline) MW
H
J
TS
H
J
Illinois Department of Transportation
APPROVED 2026
APPROVED 2026
ENGINEER OF DESIGN AND ENVIRONMENT
IS
S
U E
D -1
-9
January 1, January 1, ENGINEER OF POLICY AND PROCEDURES
(Sheet 9 of 9)
STANDARD 000001-09
AND PATTERNS
SPACING, in. (mm)
(metric)
English
Size
Bar
(mm) in.
Dia.
(sq. mm)
sq. in.
Area
Sectional
Cross-
(kg/m) lbs./ft.
Weight
4 (100) (115)2
4 5 (125) (140)2
5 6 (150) (165)2
6 7 (175) (190)2
7 8 (200) (215)2
8 9 (225) 10 (250) 11 (275) 12 (300)
AREA OF STEEL PER FOOT (METER), sq. in. (sq. mm)
(10)
(9.5)
0.375
(71)
0.110
(13)
(12.7)
0.500
(129)
0.196
(16)
(15.9)
0.625
(199)
0.307
(19)
(19.1)
0.750
(284)
0.442
(0.560)
0.376
(0.944)
0.668
(1.552)
1.043
(2.235)
1.502
(710)
0.330
(617)
0.293
(1290)
0.588
(1122)
0.523
(568)
0.264
(1032)
0.470
(1990)
0.921
(1730)
0.819
(1592)
0.737
(507)
0.240
(921)
0.428
(1421)
0.670
(2840)
1.326
(2470)
1.179
(2272)
1.061
(2029)
0.964
(473)
0.220
(430)
0.203
(406)
0.189
(374)
0.176
(860)
0.392
(782)
0.362
(737)
0.336
(679)
0.314
(1327)
0.614
(1206)
0.567
(1137)
0.526
(1047)
0.491
(1893)
0.884
(1721)
0.816
(1623)
0.758
(1495)
0.707
(355)
0.165
(330)
0.155
(316)
0.147
(284)
0.132
(645)
0.294
(600)
0.277
(573)
0.261
(516)
0.235
(995)
0.461
(926)
0.433
(884)
0.409
(796)
0.368
(1420)
0.663
(1321)
0.624
(1262)
0.589
(1136)
0.530
(258)
0.120
(237)
0.110
(469)
0.214
(430)
0.196
(724)
0.335
(663)
0.307
(1033)
0.482
(947)
0.442
(22)
(25)
(29)
(32)
(36)
(22.2)
0.875
(25.4)
1.000
(28.7)
1.128
(32.3)
1.270
(35.8)
1.410
(387)
0.601
(510)
0.785
(645)
1.000
(819)
1.267
(1006)
1.561
(3.042)
2.044
(3.973)
2.670
(5.060)
3.400
(6.404)
4.303
(7.907)
5.313
(3870)
1.803
(5100)
2.355
(6450)
3.000
(8190)
3.801
(10060)
4.683
(3365)
1.603
(4435)
2.093
(5609)
2.667
(7122)
3.379
(8748)
4.163
(3096)
1.442
(4080)
1.884
(5160)
2.400
(6552)
3.041
(8048)
3.746
(2764)
1.311
(3543)
1.713
(4607)
2.182
(5850)
2.764
(7186)
3.406
(2580)
1.202
(3400)
1.570
(4300)
2.000
(5460)
2.534
(6707)
3.122
(2345)
1.110
(3091)
1.449
(3909)
1.846
(4964)
2.339
(6097)
2.882
(2211)
1.030
(2914)
1.346
(3686)
1.714
(4680)
2.172
(5749)
2.676
(2037)
0.962
(2684)
1.256
(3395)
1.600
(4311)
2.027
(5295)
2.498
(1935)
0.902
(2550)
1.178
(3225)
1.500
(4095)
1.901
(5030)
2.342
(1800)
0.848
(2372)
1.108
(3000)
1.412
(3809)
1.789
(4679)
2.204
(1720)
0.801
(2267)
1.047
(2867)
1.333
(3640)
1.689
(4471)
2.081
(1548)
0.721
(2040)
0.942
(2580)
1.200
(3276)
1.520
(4024)
1.873
(1407)
0.656
(1290)
0.601
(1855)
0.856
(1700)
0.785
(2345)
1.091
(2150)
1.000
(2978)
1.382
(2730)
1.267
(3658)
1.703
(3353)
1.561
REINFORCEMENT BARS - ENGLISH (METRIC)
Illinois Department of Transportation
APPROVED 2009
APPROVED 2009
ENGINEER OF DESIGN AND ENVIRONMENT
IS
S
U E
D -1
-9
January 1, January 1, ENGINEER OF POLICY AND PROCEDURES 1-1-07
STANDARD 001001-02
REINFORCEMENT BARS
AREAS OF
DATE REVISIONS
English (metric).
Switched units to 1-1-09
Soft converted English table.
Deleted metric table.
0.0052
0.0104
0.015625
0.0208
0.0260
0.03125
0.0365
0.0417
0.046875
0.0521
0.0573
0.0625
0.0677
0.0729
0.078125
0.0833
0.0885
0.09375
0.0990
0.1042
0.109375
0.1146
0.1198
0.1250
0.1302
0.1354
0.140625
0.1458
0.1510
0.15625
0.1615
0.1667
0.171875
0.1771
0.1823
0.1875
0.1927
0.1979
0.203125
0.2083
0.2135
0.21875
0.2240
0.2292
0.234375
0.2396
0.2448
0.2500
0.2552
0.2604
0.265625
0.2708
0.2760
0.28125
0.2865
0.2917
0.296875
0.3021
0.3073
0.3125
0.3177
0.3229
0.328125
0.3333
A B A B A B A B A B A B
DECIMAL OF AN INCH AND OF A FOOT
0.3385
0.34375
0.3490
0.3542
0.359375
0.3646
0.3698
0.3750
0.3802
0.3854
0.390625
0.3958
0.4010
0.40625
0.4115
0.4167
0.421875
0.4271
0.4323
0.4375
0.4427
0.4479
0.453125
0.4583
0.4635
0.46875
0.4740
0.4792
0.484375
0.4896
0.4948
0.5000
0.5052
0.5104
0.515625
0.5208
0.5260
0.53125
0.5365
0.5417
0.546875
0.5521
0.5573
0.5625
0.5677
0.5729
0.578125
0.5833
0.5885
0.59375
0.5990
0.6042
0.609375
0.6146
0.6198
0.6250
0.6302
0.6354
0.640625
0.6458
0.6510
0.65625
0.6615
0.6667
0.671875
0.6771
0.6823
0.6875
0.6927
0.6979
0.703125
0.7083
0.7135
0.71875
0.7240
0.7292
0.734375
0.7396
0.7448
0.7500
0.7552
0.7604
0.765625
0.7708
0.7760
0.78125
0.7865
0.7917
0.796875
0.8021
0.8073
0.8125
0.8177
0.8229
0.828125
0.8333
10 1
0.8385
0.84375
0.8490
0.8542
0.859375
0.8646
0.8698
0.8750
0.8802
0.8854
0.890625
0.8958
0.9010
0.90625
0.9115
0.9167
0.921875
0.9271
0.9323
0.9375
0.9427
0.9479
0.953125
0.9583
0.9635
0.96875
0.9740
0.9792
0.984375
0.9896
0.9948
1.0000
B = Inch Equivalents to Foot Fractions
A = Fractions of Inch or Foot
Illinois Department of Transportation
APPROVED 1997
APPROVED 1997
ENGINEER OF DESIGN AND ENVIRONMENT
IS
S
U E
D -1
-9
January 1, January 1, ENGINEER OF POLICY AND PROCEDURES
STANDARD 001006
AND OF A FOOT
DECIMAL OF AN INCH
DATE REVISIONS
New Standard.1-1-97 fabric.
Silt fence metal stake.
Wood post or metal stake.
Wood post or fabric.
Silt fence fence with fabric positioned as shown.
adjacent to end-post (stake) of second silt
Place end-post (stake) of first silt fence and drive both posts (stakes) 18 (450) into ground.
Rotate posts (stakes) together 180° clockwise
(Not applicable for J-hooks)
J-hook
S he et fl ow J-hook
S he et fl ow
(60 m)
200'
(typical).
metal stake
Wood post or fabric.
Continuous fence top with wire.
adjacently and bind at
Place posts (stakes) bank.
Top of pin.
Securing fabric.
Filter pin.
Securing
6 min.
12 (300) m a x of the aggregate shall be 1:4 (V:H).
traffic, the traffic approach slope clear zone and the road is open to
When the ditch check is within the* aggregate.
Coarse ditch.
Bottom of pin.
Securing
Flow fabric.
Filter
2*
1 1
Riprap
2* fabric.
Filter pin.
Securing
(300)
(300)
(300)
(300)
(300)
(1.5 m)
5'
Wood or metal stake
Fence fabric
Sheet flow
.2 m unless otherwise shown.
All dimensions are in inches (millimeters) protection.
shall also apply for inlet and pipe shown for perimeter erosion barriers
The installation details and dimensions
Wood or metal stake
Fence fabric
Sheet flow
.2 m
(150) trench to secure fabric.
Excavate, backfill and compact
STEP 1
STEP 2
ATTACHING TWO SILT FILTER FENCES
SILT FILTER J-HOOK PLACEMENT
J-HOOK
ELEVATION
SECTION B-B
AGGREGATE DITCH CHECK
ELEVATION
SECTION A-A
GENERAL NOTES
PERIMETER EROSION BARRIER
SILT FILTER FENCE AS A
TRENCH METHOD
SLICE METHOD
B
B
A
A
Illinois Department of Transportation
APPROVED 2013
APPROVED 2013
ENGINEER OF DESIGN AND ENVIRONMENT
IS
S
U E
D -1
-9
January 1, January 1, ENGINEER OF POLICY AND PROCEDURES 1-1-12
(Sheet 1 of 2)
STANDARD 280001-07
CONTROL SYSTEMS
TEMPORARY EROSION
DATE REVISIONS
on SEDIMENT BASIN ELEVATION
)�Corrected notation for flowline (1-1-13
SECTION A-A
Added SLICE METHOD to
Omitted hay/straw perimeter barrier.
Flow or rolled excelsior
Straw or hay bales
Flow
Flow
Spacers fence
Silt filter
30' (9.0 m)
20' (6.0 m) to
6' (1.8 m)
24 (600) to m in will improve if put into a series.
The performance of the basin directed by Engineer.
Outlet type as
Flow removed anytime the basins become 75% filled.
direction of the flow. Accumulated silt shall be
The long dimension should be parallel with the
.4 m
Flow
Tie down stakes
Flow
Bale ties hay bales
Straw or
Flow
Flow fence
Silt filter open grate
Manhole with
Flow
Spacers
Flow to excavation
Ground line prior ditch
Downside limits
Final excav.
Upside ditch slope or finished
Temporary
Final embankment limits toe ditch
Temporary toe ditch
Temporary ditch
Final Ditch�
INLET AND PIPE PROTECTION
ELEVATION
SEDIMENT BASIN
PLAN
TYPICAL CUT CROSS-SECTION TYPICAL FILL CROSS-SECTION
CUT & FILL SECTIONS
TEMPORARY DITCHES FOR
Illinois Department of Transportation
APPROVED 2013
APPROVED 2013
ENGINEER OF DESIGN AND ENVIRONMENT
IS
S
U E
D
-1 -9
January 1, January 1, ENGINEER OF POLICY AND PROCEDURES
(Sheet 2 of 2)
STANDARD 280001-07
CONTROL SYSTMES
TEMPORARY EROSION
(3) min. x t/38
Sawed groove joint sealer
Hot poured
(375) t/ t
(3.1 m)
"4
10'-1
(1.02 m)
3'-4" chairs supporting
Spotweld
(typ.)
2 (50) equal.
as detailed or approved thickness to form keyway
Sheet steel of suitable
(25) or approved equal
Type C metal joint
Side form
First pour t t/ than 3'-4" (1.02 m) cts.
place, spaced not more to securely hold joint in
Channel pin, size succicient
Side form t/
1.02 m cts. max.
chair at 3'-4"
0.0598x2 (1.5x50) t/
Side form
Form
First pour t t/
(375)
(6)4
(bar size + drilled hole
Preformed or t t/
First pour Second pour
Hot poured joint sealer
(200) m in
(TIE BAR GROUTED IN PLACE)
horizontal displacement (V:H).
of vertical displacement to units of
All slope ratios are expressed as units only)
(formed in place
Bar supports
OR MECHANICALLY INSERTED)
(TIE BAR FORMED IN PLACE
for keyed joints.
* 8 (203) min. pavement thickness
TYPE C METAL JOINT SECTION A-A
LONGITUDINAL SAWED JOINT
GENERAL NOTES
LONGITUDINAL CONSTRUCTION JOINT
JOINT
LONGITUDINAL KEYED
ALTERNATE
SUPPORTING CHAIR
ALTERNATE
SUPPORTING CHAIR
CONSTRUCTION JOINT
LONGITUDINAL
A
A (shown on support pins)
Tie bars at 36 (900) cts.
No. 6x30 (No. 19x750)
Tie bars at 36 (900) cts.
No. 6x24 (No. 19x600) cts.
Tie bars at 36 (900)
No. 6x30 (No. 19x750)
(1.02 m)
3'-4"
(64)
(64)
1(
(44)
(530)
(530)
(6)
CL
CL
(6)4
(bar size + drilled hole
Preformed or t t/
First pour Second pour
Hot poured joint sealer
(200) m in
(DOWEL BAR GROUTED IN PLACE)
MODIFIED LONGITUDINAL CONSTRUCTION JOINT
Dowel bars at 36 (900) cts.
No. 6x24 (No. 19x600)
(6)
CL
Illinois Department of Transportation
APPROVED 2026
APPROVED 2026
ENGINEER OF DESIGN AND ENVIRONMENT
IS
S
U E
D -1
-9
January 1, January 1, ENGINEER OF POLICY AND PROCEDURES 1-1-22
(Sheet 1 of 2)
STANDARD 420001-11
PAVEMENT JOINTS
DATE REVISIONS
hatching to tie bar in LCJ detail.
Added Modified LCJ detail and1-1-26 on Sheet 2.
Revised DOWEL BAR TABLE bars at 12 (300)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .