Additional Specification Documents.pdf

PDF 2 MB Posted

Attached to
Generator Replacement Services Federal contract opportunity
Solicitation number
20342325Q00014
Issued by
Department of the Treasury Bureau of the Fiscal Service

About this file

These technical specification documents describe a comprehensive generator replacement project for the Armed Forces Retirement Home in Gulfport, Mississippi. The project involves replacing multiple generator sets, including diesel, natural gas, and propane-powered generators, along with associated equipment like medium voltage switchgear, circuit breakers, load banks, fuel systems, and control infrastructure. The technical specifications detail precise engineering requirements for generator capacities (ranging from standby to 25,000-gallon fuel storage), electrical characteristics (13.2 kV, 60 Hz, 0.8 power factor), and complex control systems that enable automatic load management, paralleling, and transfer between generator sets. The specifications outline rigorous performance standards, including seismic requirements, environmental conditions, cooling systems, starting mechanisms, and integrated control interfaces with detailed requirements for local and remote monitoring, alarms, and operational sequences.

View the file

Other files for this federal contract opportunity

Other files attached to Generator Replacement Services, newest first.
File Type Posted
Amendment 017.pdf PDF
Updated Construction Bid Documents.pdf PDF
Amendment 016.pdf PDF
Addendum Cover Sheet.pdf PDF
Amendment 015.pdf PDF
Amendment 014.pdf PDF
Amendment 013.pdf PDF
Amendment 012.pdf PDF
Amendment 011.pdf PDF
Operation Manual PLC-HMI Upgrade.pdf PDF
Electrical Site Plan - Power.pdf PDF
Backup Generation System Report.pdf PDF
SGP-1297 Kohler Power Systems.pdf PDF
Power Distribution One Line Diagram.pdf PDF
Kohler ATS and Switchgear SGP-1297 D.pdf PDF
Enlarged Generator Pad and Main Elec. Rm.pdf PDF
Amendment 010.pdf PDF
Amendment 009.pdf PDF
Amendment 008.pdf PDF
Amendment 007.pdf PDF
20342325Q00014 Updated.pdf PDF
Amendment 006.pdf PDF
Amendment 005.pdf PDF
Amendment 004.pdf PDF
Amendment 003.pdf PDF
Amendment 002.pdf PDF
Amendment 001.pdf PDF
20342325Q00014.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Armed Forces Retirement Home

Gulfport Generators Replacement | Specifications

Construction Bid Documents Addendum #1 Submission

TABLE OF CONTENTS 000110 - 1

TABLE OF CONTENTS

00 01 01 Project Title Page

00 01 10 Table of Contents

DIVISION 01 – GENERAL REQUIREMENTS – to be issued by AFRH with solicitation.

01 91 13 General Commissioning Requirements

DIVISION 02 – EXISTING CONDITIONS – to be issued by AFRH with solicitation.

DIVISION 22 – PLUMBING

22 05 48 Vibration and Seismic Controls for Plumbing Piping and Equipment

23 05 53 Identification for HVAC Piping and Equipment

22 11 13 Facility Fuel-Oil Piping

22 11 23 Facility Natural Gas Piping

22 12 13 Facility Fuel-Oil Pumps

23 13 23 Facility Aboveground Fuel-Oil Storage Tanks

DIVISION 26 – ELECTRICAL

26 01 00 Basic Electrical Requirements

26 02 00 Quality Requirements

26 05 00 Common Work Results for Electrical Systems

26 05 13 Medium Voltage Cable

26 05 19 Low Voltage Electrical Power Conductors and Cables

26 05 23 Control Voltage Electrical Power Cables

26 05 26 Grounding and Bonding for Electrical Systems

26 05 29 Hangers and Supports for Electrical Systems

26 05 33 Raceways and Boxes for Electrical Systems

26 05 44 Sleeves and Sleeve Seals for Electrical Raceways And Cabling

26 05 53 Identification for Electrical Systems

26 05 73.13 Short Circuit Studies

26 05 73.16 Coordination Studies

26 05 73.19 Arc Flash Hazard Analysis

26 08 00 Commissioning of Electrical Systems

26 13 13 Medium Voltage Circuit Breaker Switchgear

26 24 16 Panelboards

26 32 13.13 Diesel Engine Driven Generator Sets

26 32 13.16 Gas Engine Driven Generator Sets

26 32 13.19 Propane Engine Driven Generator Sets

26 32 14 Engine Generator Controls

26 36 00 Transfer Switches

26 40 40 Medium Voltage Load Bank

26 41 19 Lightning Protection System

DIVISION 33 – UTILITIES

32 30 00 Non-Conductive Fencing System

TABLE OF CONTENTS 000110 - 2

END OF TABLE OF CONTENTS

VIBRATION AND SEISMIC CONTROLS FOR PLUMBING PIPING AND

EQUIPMENT

220548 - 1

SECTION 220548 - VIBRATION AND SEISMIC CONTROLS FOR PLUMBING PIPING AND

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Restrained-spring isolators.

2. Housed-restrained-spring isolators.

3. Pipe-riser resilient support.

4. Resilient pipe guides.

5. Air-spring isolators.

6. Restrained-air-spring isolators.

7. Elastomeric hangers.

8. Spring hangers.

9. Snubbers.

10. Restraints - rigid type.

11. Restraints - cable type.

12. Restraint accessories.

13. Post-installed concrete anchors.

14. Concrete inserts.

15. Vibration isolation equipment bases.

B. Related Requirements:

1. Section 210548 "Vibration and Seismic Controls for Fire-Suppression Piping and

Equipment" for devices for fire-suppression equipment and systems.

2. Section 230548 "Vibration and Seismic Controls for HVAC" for devices for HVAC equipment and systems.

1.3 DEFINITIONS

A. Designated Seismic System: A plumbing component that requires design in accordance with

ASCE/SEI 7, Ch. 13 and for which the Component Importance Factor is greater than 1.0.

B. IBC: International Building Code.

C. OSHPD: Office of Statewide Health Planning and Development (for the State of California owned and regulated medical facilities).

220548 - 2

1.4 ACTION SUBMITTALS

A. Product Data: For each type of product.

1. Include rated load, rated deflection, and overload capacity for each vibration isolation device.

2. Include load rating for each wind-force-restraint fitting and assembly.

3. Illustrate and indicate style, material, strength, fastening provision, and finish for each type and size of vibration isolation device and seismic- and wind-force-restraint component.

4. Annotate types and sizes of seismic restraints and accessories, complete with listing markings or report numbers and load rating in tension and compression as evaluated by an agency acceptable to authorities having jurisdiction.

5. Annotate to indicate application of each product submitted and compliance with requirements.

6. Interlocking Snubbers: Include ratings for horizontal, vertical, and combined loads.

B. Shop Drawings:

1. Detail fabrication and assembly of equipment bases.

2. Vibration Isolation Base Details: Detail fabrication including anchorages and attachments to structure and to supported equipment. Include adjustable motor bases, rails, and frames for equipment mounting.

C. Delegated-Design Submittal:

1. For each seismic-restraint and wind-load protection device, including seismic-restrained mounting, pipe-riser resilient support, snubber, seismic restraint, seismic-restraint accessory, and concrete anchor and insert, that is required by this Section or is indicated on Drawings, submit the following:

a. Seismic and wind-load restraint, and vibration isolator, and isolation base selection: Select vibration isolators, seismic and wind-load restraints, and vibration isolation bases complying with performance requirements, design criteria, and analysis data.

b. Riser Supports: Include riser diagrams and calculations showing anticipated expansion and contraction at each support point, initial and final loads on building structure, spring deflection changes, and seismic loads. Include certification by professional engineer that riser system was examined for excessive stress and that none exists.

c. Concrete Anchors and Inserts: Include calculations showing anticipated seismic and wind loads. Include certification that device is approved by an NRTL for seismic reinforcement use.

d. Seismic Design Calculations: Submit all input data and loading calculations prepared in "Performance Requirements" Article in "Seismic Design Calculations"

Paragraph.

e. Wind-Load Design Calculations: Submit all static and dynamic loading calculations prepared in "Wind-Load Design Calculations" Paragraph in

"Performance Requirements" Article.

220548 - 3

f. Qualified Professional Engineer: All designated-design submittals for seismic and wind-load-restraint calculations are to be signed and sealed by qualified professional engineer responsible for their preparation.

2. Seismic- and Wind-Load-Restraint Detail Drawing:

a. Design Analysis: To support selection and arrangement of seismic and wind restraints. Include calculations of combined tensile and shear loads.

b. Details: Indicate fabrication and arrangement. Detail attachments of restraints to restrained items and to the structure. Show attachment locations, methods, and spacings. Identify components, list their strengths, and indicate directions and values of forces transmitted to the structure during seismic events. Indicate association with vibration isolation devices.

c. Coordinate seismic restraint and vibration isolation details with wind-restraint details required for equipment mounted outdoors. Comply also with requirements in other Sections for equipment mounted outdoors.

3. Product Listing, Preapproval, and Evaluation Documentation: By an agency acceptable to authorities having jurisdiction, showing maximum ratings of restraint items and the basis for approval (tests or calculations).

4. All delegated-design submittals for seismic- and wind-restraint detail Drawings are to be signed and sealed by qualified professional engineer responsible for their preparation.

5. Design Calculations for Vibration Isolation Devices: Calculate static and dynamic loading due to equipment weight and operating forces required to select proper vibration isolators, and to design vibration isolation bases.

6. Riser Supports: Include riser diagrams and calculations showing anticipated expansion and contraction at each support point, initial and final loads on building structure, and spring deflection changes. Include certification that riser system was examined for excessive stress and that none exists.

1.5 INFORMATIONAL SUBMITTALS

A. Coordination Drawings: Show coordination of vibration isolation and wind-load reinforcement device installation and seismic bracing for plumbing piping and equipment with other systems and equipment in the vicinity, including other supports and restraints, if any.

B. Qualification Data: For professional engineer and testing agency.

C. Welding certificates.

D. Field quality-control reports:

E. Seismic Qualification Data: Provide special certification for designated seismic systems as indicated in ASCE/SEI 7-16, Paragraph 13.2.2, "Special Certification Requirements for

Designated Seismic Systems" for all Designated Seismic Systems identified as such on

Drawings or in the Specifications.

1. Provide equipment manufacturer's written certification for each designated active plumbing seismic device and system, stating that it will remain operable following the design earthquake. Certification must be based on requirements of ASCE/SEI 7 and

220548 - 4

AHRI 1270, including shake table testing per ICC-ES AC156 or a similar nationally recognized testing standard procedure acceptable to authorities having jurisdiction, or experience data as permitted by ASCE/SEI 7-16.

2. Provide equipment manufacturer's written certification that components with hazardous contents maintain containment following the design earthquake by methods required in

ASCE/SEI 7-16.

3. Submit evidence demonstrating compliance with these requirements for approval to authorities having jurisdiction after review and acceptance by a licensed professional engineer.

4. The following plumbing systems and components are Designated Seismic Systems and require written special certification of seismic qualification by manufacturer:

a. Generator Fuel Piping.

F. Wind-Force Performance Certification: Provide special certification for plumbing components subject to high wind exposure and impact damage and designated on Drawings or in the

Specifications to require wind-force performance certification.

1. Provide equipment manufacturer's written certification for each designated plumbing device, stating that it will remain in place and operable following the design wind event and comply with all requirements of authorities having jurisdiction.

2. Certification must be based on ICC-ES or similar nationally recognized testing standard procedures acceptable to authorities having jurisdiction.

3. The following plumbing systems and components require special certification for high wind performance. Written special certification of resistance to the effects of high wind force and impact damage must be provided by manufacturer:

a. Exposed Generator Fuel Piping.

1.6 CLOSEOUT SUBMITTALS

A. Operation and Maintenance Data: For air-spring isolators and restrained-air-spring isolators to include in operation and maintenance manuals.

1.7 QUALITY ASSURANCE

A. Testing Agency Qualifications: An independent agency, with the experience and capability to conduct the testing indicated, be an NRTL as defined by OSHA in 29 CFR 1910.7, and be acceptable to authorities having jurisdiction.

B. Welding Qualifications: Qualify procedures and personnel in accordance with

AWS D1.1/D1.1M, "Structural Welding Code - Steel."

C. Seismic- and Wind-Load-Restraint Device Load Ratings: Devices to be tested and rated in accordance with applicable code requirements and authorities having jurisdiction. Devices to be listed by a nationally recognized third party that requires periodic follow-up inspections and has a listing directory available to the public. Provide third-party listing by one or more of the following: an agency acceptable to authorities having jurisdiction.

220548 - 5

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Delegated Design: Engage a qualified professional engineer, as defined in Section 014000

"Quality Requirements," to design seismic and wind-load control system.

1. Seismic and Wind-Load Performance: Equipment shall withstand the effects of earthquake motions and high wind events determined in accordance with ASCE/SEI 7-

16.

B. Seismic Design Calculations:

1. Perform calculations to obtain force information necessary to properly select seismic-restraint devices, fasteners, and anchorage. Perform calculations using methods acceptable to applicable code authorities and as presented in ASCE/SEI 7-16. Where

"ASCE/SEI 7" is used throughout this Section, it is to be understood that the edition referred to in this subparagraph is the edition intended as reference throughout the section text.

a. Data indicated below to be determined by Delegated-Design Contractor must be obtained by Contractor and must be included in individual component submittal packages.

b. Coordinate seismic design calculations with wind-load calculations for equipment mounted outdoors. Comply with requirements in other Sections in addition to those in this Section for equipment mounted outdoors.

c. Building Risk Category: III.

d. Building Site Classification: D.

2. Calculation Factors, ASCE/SEI 7-16, Ch. 13 - Seismic Design Requirements for

Nonstructural Components: All section, paragraph, equation, and table numbers refer to

ASCE/SEI 7-16 unless otherwise noted.

a. Horizontal Seismic Design Force Fp: Value is to be calculated by Delegated-

Design Contractor using Equation 13.3-1. Factors below must be obtained for this calculation.

1) SDS = Spectral Acceleration: Per Structural. Value applies to all components on Project.

2) ap = Component Amplification Factor: See Drawing Schedule for each component.

3) Ip = Component Importance Factor: See Drawing Schedule for each component.

4) Wp = Component Operating Weight: For each component. Obtain by

Delegated-Design Contractor from each component submittal.

5) Rp = Component Response Modification Factor: See Drawing Schedule for each component.

6) z = Height in Structure of Point of Attachment of Component for Base:

Determine from Project Drawings for each component by Delegated-Design

Contractor. For items at or below the base, "z" shall be taken as zero.

7) h = Average Roof Height of Structure for Base: Determine from Project

Drawings by Delegated-Design Contractor.

220548 - 6

b. Vertical Seismic Design Force: Calculated by Delegated-Design Contractor using method explained in ASCE/SEI 7-16, Paragraph 13.3.1.2.

c. Seismic Relative Displacement Dpl: Calculated by Delegated-Design Contractor using methods explained in ASCE/SEI 7-16, Paragraph 13.3.2. Factors below must be obtained for this calculation:

1) Dp = Relative Seismic Displacement that Each Component Must Be

Designed to Accommodate: Calculated by Delegated-Design Contractor in accordance with ASCE/SEI 7-16, Paragraph 13.3.2.

2) Ie = Structure Importance Factor: 1.5. Value applies to all components on

Project.

3) δxA = Deflection at Building Level x of Structure A: See Drawing Schedule for each component.

4) δyA = Deflection at Building Level y of Structure A: See Drawing Schedule for each component.

5) δyB = Deflection at Building Level y of Structure B: See Drawing Schedule for each component.

6) hx = Height of Level x to which Upper Connection Point Is Attached:

Determine for each component by Delegated-Design Contractor from

Project Drawings and manufacturer's data.

7) hy = Height of Level y to which Upper Connection Point Is Attached:

Determine for each component by Delegated-Design Contractor from

Project Drawings and manufacturer's data.

8) ΔaA = Allowable Story Drift for Structure A: See Drawing Schedules for each component.

9) ΔaB = Allowable Story Drift for Structure B: See Drawing Schedules for each component.

10) hsx = Story Height Used in the Definition of Allowable Drift Δa: See

Drawings Schedules for each component.

d. Component Fundamental Period Tp: Calculated by Delegated-Design Contractor using methods explained in ASCE/SEI 7-16, Paragraph 13.3.3. Factors below must be obtained for this calculation:

1) Wp = Component Operating Weight: Determined by Contractor from Project

Drawings and manufacturer's data.

2) g = Gravitational Acceleration: 32.17 fps2.

3) Kp = Combined Stiffness of the Component, Supports, and Attachments:

Determined by delegated-design seismic engineer..

C. Wind-Load Design Calculations:

1. Perform calculations to obtain force information necessary to properly select wind-load-restraint devices, fasteners, and anchorage. Perform calculations using methods acceptable to applicable code authorities and as presented in ASCE/SEI 7-05

ASCE/SEI 7-16. Where "ASCE/SEI 7" is used throughout this Section, it is to be understood that the edition referred to in this subparagraph is intended as referenced throughout the Section Text unless otherwise noted.

220548 - 7

a. Data indicated below that are specific to individual pieces of equipment must be obtained by Contractor and must be included in individual component submittal packages.

b. Coordinate design wind-load calculations with seismic load calculations for equipment requiring both seismic and wind-load reinforcement. Comply with requirements in other Sections in addition to those in this Section for equipment mounted outdoors.

2. Design wind pressure "p" for external sidewall-mounted equipment is to be calculated by

Delegated-Design Contractor using methods in ASCE/SEI 7-16, Ch. 30. Perform calculations according to one of the following, as appropriate:

a. PART 1: Low-Rise Buildings.

b. PART 2: Low-Rise Buildings (Simplified).

c. PART 3: Buildings with "h" less than 60 feet.

d. PART 4: Buildings with "h" greater than 60 feet and less than 160 feet.

e. PART 5: Open Buildings.

3. Design wind pressure "p" for rooftop equipment is to be calculated by Delegated-Design

Contractor using methods in ASCE/SEI 7-16, Ch. 30, PART 6: Building Appurtenances and Rooftop Structures and Equipment.

a. Risk Category: III.

b. h = Mean Roof Height: 16 ft.

c. V = Basic Wind Speed: 150 MPH.

d. Kd = Wind Directionality Factor: Per structural.

e. Exposure Category: B.

f. Kzt = Topographic Factor: Per structural.

g. Ke = Ground Elevation Factor: Per Structural.

h. Kz = Velocity Pressure Exposure Coefficient (Evaluated at Height z): Per

Structural.

i. Kh = Velocity Pressure Exposure Coefficient (Evaluated at Height h): Per

Structural.

j. qz = Velocity Pressure: Value calculated by delegated wind-load design contractor using methods detailed in ASCE/SEI 7-16 Section 26.10.1 or other source approved by authorities having jurisdiction.

k. qh = Velocity Pressure: Value calculated by delegated wind-load design contractor using methods detailed in ASCE/SEI 7-16 Section 26.10.1 or other source approved by authorities having jurisdiction.

l. G = Gust-Effect Factor: 0.85.

4. Design wind pressure "p" for external sidewall-mounted equipment is to be calculated by

Delegated-Design Contractor using methods in ASCE/SEI 7-10, Ch. 30. Perform calculations in accordance with one of the following, as appropriate:

a. PART 1: Low-Rise Buildings.

b. PART 2: Low-Rise Buildings (Simplified).

c. PART 3: Buildings with "h" greater than 60 feet.

d. PART 4: Buildings with "h" less than 160 feet.

e. PART 5: Open Buildings.

D. Consequential Damage: Provide additional seismic and wind-force restraints for suspended plumbing components or anchorage of floor, roof or wall mounted plumbing components as

220548 - 8 indicated in ASCE/SEI 7-16 so that failure of a non-essential or essential plumbing component will not cause the failure of any other essential architectural, mechanical or electrical building component.

E. Fire/Smoke Resistance: Seismic- and wind-load-restraint devices that are not constructed of ferrous metals must have a maximum flame-spread index of 25 and maximum smoke-developed index of 50 when tested by an NRTL in accordance with ASTM E84 or UL 723, and be so labeled.

F. Component Supports:

1. Load Ratings, features, and applications of all reinforcement components must be based on testing standards of a nationally recognized testing agency.

2. All component support attachments must comply with force and displacement resistance requirements of ASCE/SEI 7-16 Section 13.6.

2.2 RESTRAINED-SPRING ISOLATORS

A. Freestanding, Laterally Stable, Open-Spring Isolators with Vertical-Limit Stop Restraint: .

1. Housing: Steel housing with vertical-limit stops to prevent spring extension due to weight being removed.

a. Base with holes for bolting to structure with an elastomeric isolator pad attached to the underside. Bases shall limit floor load to 500 psig.

b. Top plate with threaded mounting holes.

c. Internal leveling bolt that acts as blocking during installation.

2. Restraint: Limit stop as required for equipment and authorities having jurisdiction.

3. Outside Spring Diameter: Not less than 80 percent of the compressed height of the spring at rated load.

4. Minimum Additional Travel: 50 percent of the required deflection at rated load.

5. Lateral Stiffness: More than 80 percent of rated vertical stiffness.

6. Overload Capacity: Support 200 percent of rated load, fully compressed, without deformation or failure.

2.3 HOUSED-RESTRAINED-SPRING ISOLATORS

A. Freestanding, Steel, Open-Spring Isolators with Vertical-Limit Stop Restraint in Two-Part

Telescoping Housing: .

1. Two-Part Telescoping Housing: A steel top and bottom frame separated by an elastomeric material and enclosing the spring isolators. Housings are equipped with adjustable snubbers to limit vertical movement.

a. Drilled base housing for bolting to structure with an elastomeric isolator pad attached to the underside. Bases shall limit floor load to 500 psig.

220548 - 9

b. Threaded top housing with adjustment bolt and cap screw to fasten and level equipment.

2. Outside Spring Diameter: Not less than 80 percent of the compressed height of the spring at rated load.

3. Minimum Additional Travel: 50 percent of the required deflection at rated load.

4. Lateral Stiffness: More than 80 percent of rated vertical stiffness.

5. Overload Capacity: Support 200 percent of rated load, fully compressed, without deformation or failure.

2.4 PIPE-RISER RESILIENT SUPPORT

A. All-Directional, Acoustical Pipe Anchor Consisting of Two Steel Tubes Separated by a

Minimum 1/2-inch- Thick Neoprene: .

1. Vertical-Limit Stops: Steel and neoprene vertical-limit stops arranged to prevent vertical travel in both directions.

2. Maximum Load Per Support: 500 psig on isolation material providing equal isolation in all directions.

2.5 RESILIENT PIPE GUIDES

A. Telescopic Arrangement of Two Steel Tubes or Post and Sleeve Arrangement Separated by a

Minimum 1/2-inch- Thick Neoprene: .

1. Factory-Set Height Guide with Shear Pin: Shear pin shall be removable and reinsertable to allow for selection of pipe movement. Guides shall be capable of motion to meet location requirements.

2.6 RESTRAINED-AIR-SPRING ISOLATORS

A. Freestanding, Single or Multiple, Compressed-Air Bellows with Vertical-Limit Stop Restraint: .

1.

2. Housing: Steel housing with vertical-limit stops to prevent spring extension due to weight being removed.

a. Base with holes for bolting to structure with an elastomeric isolator pad attached to the underside. Bases shall limit floor load to 500 psig.

b. Top plate with threaded mounting holes.

c. Internal leveling bolt that acts as blocking during installation.

3. Restraint: Limit stop as required for equipment and authorities having jurisdiction.

4. Minimum Additional Travel: 50 percent of the required deflection at rated load.

5. Lateral Stiffness: More than 80 percent of rated vertical stiffness.

6. Overload Capacity: Support 200 percent of rated load, fully compressed, without deformation or failure.

http://www.specagent.com/LookUp/?ulid=7650&mf=&src=wd

220548 - 10

7. Bellows Assembly: Upper and lower powder-coated steel sections connected by a replaceable, flexible, nylon-reinforced neoprene bellows or similar elastomeric material.

8. Maximum Natural Frequency: 3 Hz.

9. Operating Pressure Range: 25 to 100 psig.

10. Burst Pressure: At least three times manufacturer's published maximum operating pressure.

11. Automatic leveling valve.

2.7 ELASTOMERIC HANGERS

A. Elastomeric Mount in a Steel Frame with Upper and Lower Steel Hanger Rods: .

1. Frame: Steel, fabricated with a connection for an upper threaded hanger rod and an opening on the underside to allow for a maximum of 30 degrees of angular lower hanger-rod misalignment without binding or reducing isolation efficiency.

2. Damping Element: Molded, oil-resistant rubber, neoprene, or other elastomeric material with a projecting bushing for the underside opening preventing steel-to-steel contact.

2.8 SPRING HANGERS

A. Combination Coil-Spring and Elastomeric-Insert Hanger with Spring and Insert in

Compression: .

Frame: Steel, fabricated for connection to threaded hanger rods and to allow for a maximum of 30 degrees of angular hanger-rod misalignment without binding or reducing isolation efficiency.

1. Outside Spring Diameter: Not less than 80 percent of the compressed height of the spring at rated load.

2. Minimum Additional Travel: 50 percent of the required deflection at rated load.

3. Lateral Stiffness: More than 80 percent of rated vertical stiffness.

4. Overload Capacity: Support 200 percent of rated load, fully compressed, without deformation or failure.

5. Elastomeric Element: Molded, oil-resistant rubber or neoprene. Steel-washer-reinforced cup to support spring and bushing projecting through bottom of frame.

6. Adjustable Vertical Stop: Steel washer with neoprene washer "up-stop" on lower threaded rod.

7. Self-centering hanger-rod cap to ensure concentricity between hanger rod and support spring coil.

2.9 SNUBBERS

A. Description: Factory fabricated using welded structural-steel shapes and plates, anchor bolts, and replaceable resilient isolation washers and bushings.

1. Post-installed Concrete Anchor Bolts: Secure to concrete surface with post-installed concrete anchors. Anchors to be seismically prequalified in accordance with ACI 355.2 testing and designated in accordance with ACI 318-14 Ch. 17 for 2015 or 2018 IBC.

220548 - 11

Preset concrete inserts: Seismically prequalified in accordance with ICC-ES AC446 testing.

2. Anchors in Masonry: Design in accordance with TMS 402.

3. Resilient Isolation Washers and Bushings: Oil- and water-resistant neoprene.

4. Resilient Cushion: Maximum 1/4-inch air gap, and minimum 1/4 inch thick.

2.10 RESTRAINTS - RIGID TYPE

A. Description: Shop- or field-fabricated bracing assembly made of ANSI/AISI S110-07-S1 slotted steel channels, ANSI/ASTM A53/A53M steel pipe as per NFPA 13, or other rigid steel brace member. Includes accessories for attachment to braced component at one end and to building structure at the other end and other matching components and with corrosion-resistant coating;

rated in tension, compression, and torsion forces.

2.11 RESTRAINTS - CABLE TYPE

A. Seismic- and Wind-Load-Restraint Cables: ASTM A492 stainless steel cables. End connections made of steel assemblies with thimbles, brackets, swivel, and bolts designed for seismic restraining cable service; with fittings attached by means of poured socket, swaged socket or mechanical (Flemish eye) loop.

B. Restraint cable assembly and cable fittings must comply with ASCE/SEI 19. All cable fittings and complete cable assembly must maintain the minimum cable breaking force. U-shaped cable clips and wedge type end fittings do not comply and are unacceptable.

2.12 RESTRAINT ACCESSORIES

A. Hanger-Rod Stiffener: Steel tube or steel slotted-support-system sleeve with internally bolted connections to hanger rod. Non-metallic stiffeners are unacceptable.

B. Hinged and Swivel Brace Attachments: Multifunctional steel connectors for attaching hangers to rigid channel bracings and restraint cables.

C. Bushings for Floor-Mounted Equipment Anchor Bolts: Neoprene bushings designed for rigid equipment mountings, and matched to type and size of anchor bolts and studs.

D. Bushing Assemblies for Wall-Mounted Equipment Anchorage: Assemblies of neoprene elements and steel sleeves designed for rigid equipment mountings, and matched to type and size of attachment devices used.

E. Resilient Isolation Washers and Bushings: One-piece, molded, oil- and water-resistant neoprene, with a flat washer face.

2.13 POST-INSTALLED CONCRETE ANCHORS

A. Mechanical Anchor Bolts:

220548 - 12

1. Drilled-in and stud-wedge or female-wedge type in zinc-coated steel for interior applications and stainless steel for exterior applications. Select anchor bolts with strength required for anchor and as tested according to ASTM E488/E488M.

B. Adhesive Anchor Bolts:

1. Drilled-in and capsule anchor system containing PVC or urethane methacrylate-based resin and accelerator, or injected polymer or hybrid mortar adhesive. Provide anchor bolts and hardware with zinc-coated steel for interior applications and stainless steel for exterior applications. Select anchor bolts with strength required for anchor and as tested according to ASTM E488/E488M.

C. Provide post-installed concrete anchors that have been prequalified for use in seismic applications. Post-installed concrete anchors must comply with all requirements of

ASCE/SEI 7-16, Ch. 13.

1. Prequalify post-installed anchors in concrete in accordance with ACI 355.2 or other approved qualification testing procedures.

2. Prequalify post-installed anchors in masonry in accordance with approved qualification procedures.

D. Expansion-type anchor bolts are not permitted for equipment in excess of 10 hp, which is not vibration isolated.

1. Undercut expansion anchors are permitted.

2.14 CONCRETE INSERTS

A. Provide preset concrete inserts, which are seismically prequalified in accordance with ICC-

ES AC466 testing.

B. Comply with ANSI/MSS 58.

2.15 VIBRATION ISOLATION EQUIPMENT BASES

A. Steel Rails: Factory-fabricated, welded, structural-steel rails.

1. Design Requirements: Lowest possible mounting height with not less than 1-inch clearance above the floor. Include equipment anchor bolts and auxiliary motor slide rails.

a. Include supports for suction and discharge elbows for pumps.

2. Structural Steel: Steel shapes, plates, and bars complying with ASTM A36/A36M. Rails shall have shape to accommodate supported equipment.

3. Support Brackets: Factory-welded steel brackets on frame for outrigger isolation mountings and to provide for anchor bolts and equipment support.

B. Steel Bases: Factory-fabricated, welded, structural-steel bases and rails.

220548 - 13

1. Design Requirements: Lowest possible mounting height with not less than 1-inch clearance above the floor. Include equipment anchor bolts and auxiliary motor slide bases or rails.

a. Include supports for suction and discharge elbows for pumps.

2. Structural Steel: Steel shapes, plates, and bars complying with ASTM A36/A36M. Bases shall have shape to accommodate supported equipment.

3. Support Brackets: Factory-welded steel brackets on frame for outrigger isolation mountings and to provide for anchor bolts and equipment support.

C. Concrete Inertia Base: Factory-fabricated or field-fabricated, welded, structural-steel bases and rails ready for placement of cast-in-place concrete.

1. Design Requirements: Lowest possible mounting height with not less than 1-inch clearance above the floor. Include equipment anchor bolts and auxiliary motor slide bases or rails.

a. Include supports for suction and discharge elbows for pumps.

2. Structural Steel: Steel shapes, plates, and bars complying with ASTM A36/A36M. Bases shall have shape to accommodate supported equipment.

3. Support Brackets: Factory-welded steel brackets on frame for outrigger isolation mountings and to provide for anchor bolts and equipment support.

4. Fabrication: Fabricate steel templates to hold equipment anchor-bolt sleeves and anchors in place during placement of concrete. Obtain anchor-bolt templates from supported equipment manufacturer.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine areas and equipment to receive vibration isolation, wind-load control, and seismic control devices for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.

B. Examine roughing-in of reinforcement and cast-in-place anchors to verify actual locations before installation.

C. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 APPLICATIONS

A. Multiple Pipe Supports: Secure pipes to trapeze member with clamps approved for application by an agency acceptable to authorities having jurisdiction.

220548 - 14

B. Hanger-Rod Stiffeners: Install hanger-rod stiffeners where indicated or scheduled on Drawings to receive them and where required to prevent buckling of hanger rods due to seismic forces.

C. Strength of Support Assemblies: Where not indicated, select sizes of components so strength is adequate to carry static, wind load, and seismic load within specified loading limits.

3.3 INSTALLATION OF VIBRATION CONTROL, WIND-LOAD CONTROL, AND

SEISMIC-RESTRAINT DEVICES

A. Provide vibration-control devices for systems and equipment where indicated in Equipment

Schedules or Vibration-Control Device Schedules, where indicated on Drawings, or where the

Specifications indicate they are to be installed on specific equipment and systems.

B. Provide seismic-restraint and wind-load control devices for systems and equipment where indicated in Equipment Schedules or Seismic-Restraint Devices Schedules, where indicated on

Drawings, where the Specifications indicate they are to be installed on specific equipment and systems, and where required by applicable codes.

C. Coordinate location of embedded connection hardware with supported equipment attachment and mounting points and with requirements for concrete reinforcement and formwork specified in Section 033000 "Cast-in-Place Concrete."

D. Installation of vibration isolators, wind-load restraints, and seismic restraints must not cause any stresses, misalignment, or change of position of equipment or piping.

E. Comply with requirements in Section 077200 "Roof Accessories" for installation of roof curbs, equipment supports, and roof penetrations.

F. Equipment Restraints:

1. Install snubbers on plumbing equipment mounted on vibration isolators. Locate snubbers as close as possible to vibration isolators and bolt to equipment base and supporting structure.

2. Install resilient bolt isolation washers on equipment anchor bolts where clearance between anchor and adjacent surface exceeds 0.125 inch.

3. Install seismic-restraint and wind-load-restraint devices using methods approved by an agency acceptable to authorities having jurisdiction that provides required submittals for component.

G. Piping Restraints:

1. Comply with requirements in MSS SP-127.

2. Space lateral supports a maximum of 40 feet o.c., and longitudinal supports a maximum of 80 feet o.c.

3. Brace a change of direction longer than 12 feet.

H. Install seismic- and wind-load-restraint cables so they do not bend across edges of adjacent equipment or building structure.

220548 - 15

I. Install seismic- and wind-load-restraint devices using methods approved by an agency acceptable to authorities having jurisdiction that provides required submittals for component.

J. Install bushing assemblies for anchor bolts for floor-mounted equipment, arranged to provide resilient media between anchor bolt and mounting hole in concrete base.

K. Install bushing assemblies for mounting bolts for wall-mounted equipment, arranged to provide resilient media where equipment or equipment-mounting channels are attached to wall.

L. Attachment to Structure: If specific attachment is not indicated, anchor bracing to structure at flanges of beams, at upper truss chords of bar joists, or at concrete members.

M. Post-Installed Concrete Anchors:

1. Identify position of reinforcing steel and other embedded items prior to drilling holes for anchors. Do not damage existing reinforcing or embedded items during coring or drilling.

Notify Project structural engineer if reinforcing steel or other embedded items are encountered during drilling. Locate and avoid prestressed tendons, electrical and telecommunications conduit, and gas lines.

2. Do not drill holes in concrete or masonry until concrete, mortar, or grout has achieved full design strength.

3. Mechanical-Type Anchor Bolts: Protect threads from damage during anchor installation.

Heavy-duty sleeve anchors shall be installed with sleeve fully engaged in the structural element to which anchor is to be fastened.

4. Adhesive-Type Anchor Bolts: Clean holes to remove loose material and drilling dust prior to installation of adhesive. Place adhesive in holes proceeding from the bottom of the hole and progressing toward the surface in such a manner as to avoid introduction of air pockets in the adhesive.

5. Set anchors to manufacturer's recommended torque, using a torque wrench.

6. Install zinc-coated steel anchors for interior and stainless steel anchors for exterior applications.

3.4 INSTALLATION OF AIR-SPRING ISOLATORS

A. Independent Isolator Installation:

1. Install automatic leveling valve into each air isolator.

B. Pressure-Regulated Isolator Installation:

1. Coordinate the constant pressure-regulated air supply to air springs with the requirements for piping and connections specified in Section 221513 "General-Service Compressed-

Air Piping."

2. Connect all pressure regulators to a single dry, filtered facility air supply.

220548 - 16

3.5 ACCOMMODATION OF DIFFERENTIAL SEISMIC MOTION

A. Provide flexible connections in piping systems where they cross structural seismic joints and other point where differential movement may occur. Provide adequate flexibility to accommodate differential movement as determined in accordance with ASCE/SEI 7.

3.6 INSTALLATION OF VIBRATION ISOLATION EQUIPMENT BASES

A. Coordinate location of embedded connection hardware with supported equipment attachment and mounting points and with requirements for concrete reinforcement and formwork specified in Section 033000 "Cast-in-Place Concrete."

B. Coordinate dimensions of steel equipment rails, bases, and concrete inertia bases, with requirements of isolated equipment specified in this and other Sections. Where dimensions of bases are indicated on Drawings, they may require adjustment to accommodate actual isolated equipment.

3.7 ADJUSTING

A. Adjust isolators after system is at operating weight.

B. Adjust limit stops on restrained-spring isolators to mount equipment at normal operating height.

After equipment installation is complete, adjust limit stops so they are out of contact during normal operation.

3.8 FIELD QUALITY CONTROL

A. Testing Agency: Engage a qualified testing agency to perform tests and inspections.

B. Manufacturer's Field Service: Engage a factory-authorized service representative to test and inspect components, assemblies, and equipment installations, including connections.

C. Tests and Inspections:

1. Perform tests and inspections.

2. Provide evidence of recent calibration of test equipment by a testing agency acceptable to authorities having jurisdiction.

3. Schedule test with Owner, through Architect, before connecting anchorage device to restrained component (unless postconnection testing has been approved), and with at least seven days' advance notice.

4. Obtain Architect's approval before transmitting test loads to structure. Provide temporary load-spreading members.

5. Test at least four of each type and size of installed anchors and fasteners selected by

Architect.

6. Test to 90 percent of rated proof load of device.

7. Measure isolator restraint clearance.

8. Measure isolator deflection.

9. Verify snubber minimum clearances.

220548 - 17

10. Test and adjust restrained-air-spring isolator controls and safeties.

D. Remove and replace malfunctioning units and retest as specified above.

E. Units will be considered defective if they do not pass tests and inspections.

F. Prepare test and inspection reports.

END OF SECTION 220548

IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT 230553 - 1

SECTION 230553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Equipment labels.

2. Warning signs and labels.

3. Warning tape.

4. Pipe labels.

5. Stencils.

6. Valve tags.

7. Warning tags.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Samples: For color, letter style, and graphic representation required for each identification material and device.

C. Equipment-Label Schedule: Include a listing of all equipment to be labeled with the proposed content for each label.

D. Valve-numbering scheme.

E. Valve Schedules: Provide for each piping system. Include in operation and maintenance manuals.

PART 2 - PRODUCTS

2.1 EQUIPMENT LABELS

A. Plastic Labels for Equipment:

1. Material and Thickness: Multilayer, multicolor, plastic labels for mechanical engraving, 1/8 inch thick, with predrilled holes for attachment hardware.

2. Letter and Background Color: As indicated for specific application under Part 3.

3. Maximum Temperature: Able to withstand temperatures of up to 160 deg F.

4. Minimum Label Size: Length and width vary for required label content, but not less than

2-1/2 by 3/4 inch.`

IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT 230553 - 2

5. Minimum Letter Size: 1/4 inch for name of units if viewing distance is less than 24 inches, 1/2 inch for viewing distances of up to 72 inches, and proportionately larger lettering for greater viewing distances. Include secondary lettering two-thirds to three-fourths the size of principal lettering.

6. Fasteners: Stainless steel rivets or self-tapping screws.

7. Adhesive: Contact-type permanent adhesive, compatible with label and with substrate.

B. Label Content: Include equipment's Drawing designation or unique equipment number, Drawing numbers where equipment is indicated (plans, details, and schedules), and the

Specification Section number and title where equipment is specified.

2.2 WARNING SIGNS AND LABELS

A. Material and Thickness: Multilayer, multicolor, plastic labels for mechanical engraving, 1/8 inch thick, with predrilled holes for attachment hardware.

B. Letter and Background Color: As indicated for specific application under Part 3.

C. Maximum Temperature: Able to withstand temperatures of up to 160 deg F.

D. Minimum Label Size: Length and width vary for required label content, but not less than 2-1/2 by 3/4 inch.

E. Minimum Letter Size: 1/4 inch for name of units if viewing distance is less than 24 inches, 1/2 inch for viewing distances of up to 72 inches, and proportionately larger lettering for greater viewing distances. Include secondary lettering two-thirds to three-fourths the size of principal lettering.

F. Fasteners: Stainless steel rivets or self-taping screws.

G. Adhesive: Contact-type permanent adhesive, compatible with label and with substrate.

H. Arc-Flash Warning Signs: Provide arc-flash warning signs in locations and with content in accordance with requirements of OSHA and NFPA70E and other applicable codes and standards.

I. Label Content: Include caution and warning information plus emergency notification instructions.

2.3 WARNING TAPE

A. Material: Vinyl.

B. Minimum Thickness: 0.005 inch.

C. Letter, Pattern, and Background Color: As indicated for specific application under Part 3.

IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT 230553 - 3

D. Waterproof Adhesive Backing: Suitable for indoor or outdoor use.

E. Maximum Temperature: 160 deg F.

F. Minimum Width: 2 inches.

2.4 PIPE LABELS

A. General Requirements for Manufactured Pipe Labels: Preprinted, color coded, with lettering indicating service and showing flow direction in accordance with ASME A13.1.

B. Letter and Background Color: As indicated for specific application under Part 3.

C. Pretensioned Pipe Labels: Precoiled, semirigid plastic formed to partially cover circumference of pipe and to attach to pipe without fasteners or adhesive.

D. Self-Adhesive Pipe Labels: Printed plastic with contact-type, permanent-adhesive backing.

E. Pipe Label Contents: Include identification of piping service using same designations or abbreviations as used on Drawings. Also include:

1. Pipe size.

2. Flow-Direction Arrows: Include flow-direction arrows on distribution piping. Arrows may be either integral with label or applied separately.

3. Lettering Size: Size letters in accordance with ASME A13.1 for piping.

2.5 STENCILS

A. Stencils for Piping:

1. Lettering Size: Size letters in accordance with ASME A13.1 for piping.

2. Stencil Material: Aluminum, brass, or fiberboard.

3. Stencil Paint: Exterior, gloss, acrylic enamel in colors complying with recommendations in ASME A13.1 unless otherwise indicated. Paint may be in pressurized spray-can form.

4. Identification Paint: Exterior, acrylic enamel. Paint may be in pressurized spray-can form.

5. Letter and Background Color: As indicated for specific application under Part 3.

B. Stencils for Access Panels and Door Labels, Equipment Labels, and Similar Operational

Instructions:

1. Lettering Size: Minimum letter height of 1/2 inch for viewing distances of up to 72 inches and proportionately larger lettering for greater viewing distances.

2. Stencil Material: Aluminum Brass Fiberboard Fiberboard or metal.

3. Stencil Paint: Exterior, gloss, acrylic enamel. Paint may be in pressurized spray-can form.

4. Identification Paint: Exterior, acrylic enamel. Paint may be in pressurized spray-can form.

5. Letter and Background Color: As indicated for specific application under Part 3.

IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT 230553 - 4

2.6 VALVE TAGS

A. Description: Stamped or engraved with 1/4-inch letters for piping system abbreviation and 1/2-inch numbers.

1. Tag Material: stainless steel, 0.024-inch minimum thickness, with predrilled or stamped holes for attachment hardware.

2. Fasteners: Brass link chain or beaded chain or S-hook.

B. Letter and Background Color: As indicated for specific application under Part 3.

C. Valve Schedules: For each piping system, on 8-1/2-by-11-inch bond paper. Tabulate valve number, piping system, system abbreviation (as shown on valve tag), location of valve (room or space), normal-operating position (open, closed, or modulating), and variations for identification. Mark valves for emergency shutoff and similar special uses.

1. Include valve-tag schedule in operation and maintenance data.

2.7 WARNING TAGS

A. Description: Preprinted or partially preprinted accident-prevention tags of plasticized card stock.

1. Size: Approximately 4 by 7 inches.

2. Fasteners: Reinforced grommet and wire or string.

3. Nomenclature: Large-size primary caption, such as "DANGER," "CAUTION," or "DO

NOT OPERATE."

4. Letter and Background Color: As indicated for specific application under Part 3.

PART 3 - EXECUTION

3.1 PREPARATION

A. Clean piping and equipment surfaces of incompatible primers, paints, and encapsulants, as well as dirt, oil, grease, release agents, and other substances that could impair bond of identification devices.

3.2 INSTALLATION, GENERAL REQUIREMENTS

A. Coordinate installation of identifying devices with completion of covering and painting of surfaces where devices are to be applied.

B. Coordinate installation of identifying devices with locations of access panels and doors.

C. Install identifying devices before installing acoustical ceilings and similar concealment.

IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT 230553 - 5

D. Locate identifying devices so that they are readily visible from the point of normal approach.

3.3 INSTALLATION OF EQUIPMENT LABELS, WARNING SIGNS, AND LABELS

A. Permanently fasten labels on each item of mechanical equipment.

B. Sign and Label Colors:

1. White letters on an ANSI Z535.1 safety-blue background.

C. Locate equipment labels where accessible and visible.

D. Arc-Flash Warning Signs: Provide arc-flash warning signs on electrical disconnects and other equipment where arc-flash hazard exists, as indicated on Drawings, and in accordance with requirements of OSHA and NFPA 70E, and other applicable codes and standards.

3.4 INSTALLATION OF WARNING TAPE

A. Warning Tape Color and Pattern: Yellow background with black diagonal stripes.

B. Install warning tape on pipes and ducts, with cross-designated walkways providing less than 6

ft. of clearance.

C. Locate tape so as to be readily visible from the point of normal approach.

3.5 INSTALLATION OF PIPE LABELS

A. Piping Color Coding: Painting of piping is specified in Section 099123 "Interior Painting."

Section 099600 "High-Performance Coatings."

B. Install pipe labels showing service and flow direction with permanent adhesive on pipes.

C. Stenciled Pipe Label Option: Stenciled labels showing service and flow direction may be provided instead of manufactured pipe labels, at Installer's option. Install stenciled pipe labels, complying with ASME A13.1, on each piping system.

1. Identification Paint: Use for contrasting background.

2. Stencil Paint: Use for pipe marking.

D. Pipe-Label Locations: Locate pipe labels where piping is exposed or above accessible ceilings in finished spaces; machine rooms; accessible maintenance spaces such as shafts, tunnels, and plenums; and exterior exposed locations as follows:

1. Within 3 ft. of each valve and control device.

2. At access doors, manholes, and similar access points that permit view of concealed piping.

IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT 230553 - 6

3. Within 3 ft. of equipment items and other points of origination and termination.

4. Spaced at maximum intervals of 25 ft. along each run. Reduce intervals to 10 ft. in areas of congested piping, ductwork, and equipment.

E. Do not apply plastic pipe labels or plastic tapes directly to bare pipes conveying fluids at temperatures of 125 deg F or higher. Where these pipes are to remain uninsulated, use a short section of insulation or use stenciled labels.

F. Flow-Direction Arrows: Use arrows to indicate direction of flow in pipes, including pipes where flow is allowed in both directions.

G. Pipe-Label Color Schedule:

1. Flammable Fluids: Black letters on an ANSI Z535.1 safety-yellow background.

2. Combustible Fluids: White letters on an ANSI Z535.1 safety-brown background.

3.6 INSTALLATION OF VALVE TAGS

A. Install tags on valves and control devices in piping systems, except check valves, valves within factory-fabricated equipment units, shutoff valves, and HVAC terminal devices and similar roughing-in connections of end-use fixtures and units. List tagged valves in a valve schedule in the operating and maintenance manual.

B. Valve-Tag Application Schedule: Tag valves according to size, shape, and color scheme and with captions similar to those indicated in "Valve-Tag…

This is the start of the file's text. The full file is on GovTribe.