2027-WCSU-ITB-002 WSCB Boiler Replacement - Dwgs.pdf
PDF 1 MB Posted
- Solicitation number
- 2027-WCSU-ITB-002
- Issued by
- Fairfield County, Connecticut
About this file
This is a technical drawings document for Western Connecticut State University (WCSU) supporting an Invitation to Bid (ITB) for the replacement of an existing boiler at the Westside Classroom Building located on the Westside Campus in Danbury, Connecticut. The project encompasses all labor and materials required to complete the boiler replacement. The document provides the engineering specifications and technical plans necessary for bidders to accurately estimate project scope and costs.
The project is funded with $350,000 in state funding and is subject to Connecticut Department of Labor Prevailing Wage Rates requirements and state contract compliance regulations, including nondiscrimination statutes. The contract includes specific spending allocation goals for Small Business Enterprises (SBEs) and Minority Business Enterprises (MBEs), with an overall SBE goal of 10.45% ($36,567.00), an MBE sub-goal of 3.26% ($11,398.00), and an SBE-Only (Non-MBE) goal of 7.19% ($25,170.00). Selected contractors must demonstrate good faith effort in meeting these spending allocation goals. This project is subject to state contract compliance requirements and small business utilization targets in accordance with Connecticut state law.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DANBURY, CONNECTICUT 06810
BOILER REPLACEMENT
WESTERN CONNECTICUL STATE UNIVERSITY
CLASSROOM BUILDING
09 - 01 - 2026
M
12 25
N
O
P
Q
M
12 25
N
O
P
Q
EXIST.
BOILER
B#2
EXIST.
BOILER
B#1
EXIST.
P-4 (CHW)
EXIST.
P-3 (CHW)
Ø
20Ø 16Ø
14Ø14Ø
Ø
10Ø
EFD
EFD
EFD
60x24
60x
60x24 x2
80x36
EXISTING 8'x8'
O/A LOUVER
EXISTING 2'x5'
EXHAUST
LOUVER
EXIST. AHU-1
F.D.
24x20 24x12
EXIST. IN-LINE
SUPPLY FAN ISE-1
EXIST.
AHU-5
30x14
30x14 x1 x1
6"
CH
W
R
CH
W S
CH
W
S
6"6"
1"CHWS&R
3/4"HWR
6"CHWS
CH
W
S
4"HWS
3/4"HWS
EFD
F.D.
F.D.
5"HWS
G
G
G
1"CHWS&R
HWR
CHWR
EXIST. P-1 (HW)
EXIST. P-2 (HW)
HOT WATER COMPRESSION
TANK
CHILLED WATER
COMPRESSION
TANK
EXIST.
ROLAIRTROL
CHILLED WATER
SYSTEM MAKE -UP
WATER
DUPLEX AIR
COMPRESSOR FOR
PNEUMATIC CONTROL
EXIST.
ROLAIRTROL
ABANDONED OIL
PIPE TRENCH
DOMESTIC HOT
WATER
HEATERS (TYP.
OF TWO)
HOT WATER SYSTEM
MAKE -UP WATER
20"Ø BREECHING UP
10"Ø BREECHING UP
FUEL OIL
GAGE
2000 CFM
2000 CFM
CFM
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL EXISTING UTILITY LINES INCLUDING ELECTRICAL, SEWER, WATER, GAS, TELEPHONE, ETC. THE DRAWINGS SHOW DIAGRAMMATICALLY THE APPROXIMATE LOCATION OF UTILITIES WHERE INFORMATION IS AVAILABLE, BUT THE DRAWINGS ARE NOT EXACT AS TO THE QUANTITY, EXTENT OR LOCATION. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION DURING ALL PHASES OF THE WORK TO LOCATE, IDENTIFY, AND PROTECT EXISTING UTILITIES. THE CONTRACTOR SHALL RECORD LOCATION OF AND REPAIR DAMAGE TO EXISTING UTILITIES WHICH ARE ENCOUNTERED AS A RESULT OF WORK
UNDER THIS CONTRACT.
ANY EQUIPMENT REMOVED DURING DEMOLITION WORK MAY BE RETAINED BY THE OWNER AT HIS OPTION. ANY SUCH MATERIAL SHALL BE STORED IN THE BUILDING AT A LOCATION DESIGNATED BY THE OWNER. REMOVAL OF SUCH MATERIAL FROM THE JOB SITE SHALL BE THE
OWNER'S RESPONSIBILITY.
REMOVE AND REPLACE ALL EXISTING PIPE INSULATION FOR ON THE SUPPLY AND RETURN HEADERS.
ALL PIPES (NEW AND EXISTING) SHALL BE LABELED. CONTRACTOR SHALL MEASURE, RECORD AND SUBMIT REPORT FOR THE EXISTING HW
PUMPS (FLOW AND PRESSURE DROP) PRIOR TO ANY DEMOLITION.
2 - THE DEMOLITION DRAWINGS ARE INTENDED ONLY TO DEFINE THE GENERAL SCOPE OF DEMOLITION WORK AND TO ASSIST THE CONTRACTOR DURING BIDDING. THE DEMOLITION DRAWINGS MAY NOT SHOW EVERY ITEM WHICH MUST BE DISCONNECTED, REMOVED, OR RELOCATED IN ORDER TO FACILITATE NEW WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DEMOLITION
WORK REQUIRED WHETHER OR NOT SHOWN ON THE PLANS.
1 - PRIOR TO SUBMITTING BID, VISIT THE SITE AND IDENTIFY EXISTING CONDITIONS AND DIFFICULTIES THAT WILL AFFECT WORK TO BE PERFORMED. NO COMPENSATION WILL BE GRANTED FOR ADDITIONAL WORK CAUSED BY UNFAMILIARITY WITH SITE CONDITIONS THAT ARE VISIBLE OR READILY CONSTRUED BY EXPERIENCED OBSERVERS. INCLUDE IN THE BID ALL DEMOLITION WORK REQUIRED.
3 - COORDINATE AND SCHEDULE ALL WORK WITH THE OWNER TO MINIMIZE INCONVENIENCE TO THE BUILDING OCCUPANTS. ALL SERVICES AND SYSTEMS SERVING OCCUPIED AREAS OF THE BUILDING SHALL BE MAINTAINED IN OPERATION DURING WORKING SHIFTS.
4 - CONTRACTOR IS RESPONSIBLE FOR ANY TEMPORARY WORK REQUIRED TO KEEP THE BUILDING OCCUPIED DURING CONSTRUCTION.
5 - REMOVE AND/OR RELOCATE ALL EXISTING MECHANICAL WORK AS NECESSARY FOR THE PERFORMANCE OF THE WORK OF THIS
CONTRACT.
6 - REMOVE ALL DEMOLITION MATERIAL FROM THE JOB SITE UNLESS NOTED DIFFERENTLY.
7 - CONTRACTOR SHALL FIELD VERIFY LOCATION AND SIZE OF ALL EXISTING PIPING IN THE BOILER ROOM PRIOR TO ANY DEMOLITION.
8 - CONTRACTOR SHALL MEASURE AND RECORD EXISTING HW FLOWS PRIIOR TO ANY DEMOLITION. WHEN STARTING THE NEW BOILERS, CONTRACTOR SHALL RESTORE THE HW FLOWS TO THE RECORDED VALUES REPLACE EXISTING PIPE INSULATION ON THE MAIN
SUPPLY AND RETURN HEADER FROM THE BOILER TO THE AIR SEPARATOR. .
TAG ACTION
EXISTING HEATING BOILER AND ASSOCIATED PIPES, VALVES & ACCESSORIES SHALL BE REMOVED. CAP REMAINING OIL PIPE, HOT WATER SUPPLY & RETURN PIPING FOR FUTURE CONNECTION. EXISTING BOILER CONCRETE PAD SHALL REMAIN.
REPLACE BOILER IN KIND.
EXISTING AIR SEPARATOR AND ASSOCIATED PIPING SHALL REMAIN
EXISTING COLD WATER MAKE-UP PIPE SHALL REMAIN
EXISTING BOILER CONTROLS AND ASSOCIATED ACCESSORIES SHALL REMAIN. CONNECT NEW BOILER CONTOLS TO EXISTING.
EXISTING PUMPS SHALL REMAIN. UPGRADE CONTROLS.
EXISTING COMBUSTION AIR LOUVER AND DUCT SHALL REMAIN.
EXISTING GAS PIPE SHALL BE REMOVED. CAP REMAINING FOR FUTURE CONNECTION.
EXISTING BOILER FLUE EXHAUST SHALL BE REMOVED. TEMPORARILY CAP OPENING FOR FUTURE CONNECTION. EXISTING
BREACHING SHALL REMAIN
EXISTING COMPRESSION TANK AND ASSOCIATED PIPING SHALL REMAIN
EXISTING FLOOR DRAINEFD
RISE OR DROP
RISER DOWN
BRANCH-TOP CONNECTION
RISER UP
SHUTOFF VALVE
COLD WATER
EXISTING CHILLED WATER SUPPLY
HOT WATER RECIRCULATINGCHWR
CHWS
CW
HOT WATER HEATING SUPPLY
HOT WATER HEATING RETURNHWR
HWS
GAS SHUTOFF VALVE
POINT OF CONNECTIONPOC
G GAS PIPEG
OF ALL SYSTEMS TO AVOID CONFLICTS.
THE CONTRACTOR SHALL COORDINATE THE ROUTING AND INSTALLATION
DRAWINGS ARE DIAGRAMMATIC AND SHOW GENERAL INTENT OF WORK,
ALL CONTRACTORS MUST COORDINATE WITH OTHER TRADES OTHER
TRADES BEFORE PROCEEDING WITH ANY WORK.
2.
1.
THE EXISTING CONDITIONS PRIOR TO SUBMITTING HIS BID.
THE CONTRACTOR SHALL VISIT THE SITE AND FAMILIARIZE HIMSELF WITH3.
REQUIRED TO KEEP THE BUILDING OCCUPIED DURING THE CONSTRUCTION.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY TEMPORARY WORK
7. BRANCH TAKE-OFFS FOR FLUE AND COMBUSTION AIR SHALL BE
5. INSTALL PIPES TO ALLOW EASY ACCESS TO VALVES.
AT 45° ANGLES.
6. INSULATE ALL HOT WATER HEATING SUPPLY AND RETURN PIPING.
AND SIZES.
THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING PIPE LOCATIONS4.
EXIST.
BOILER
B#2
NEW
BOILER
B#1
EXIST.
P-4 (CHW)
EXIST.
P-3 (CHW)
Ø
20Ø 16Ø
14Ø
Ø
10Ø
EFD
EFD
EFD
60x24
60x
60x24 x2
80x36
EXISTING 8'x8'
O/A LOUVER
EXISTING 2'x5'
EXHAUST
LOUVER
EXIST. AHU-1
F.D.
24x20 24x12
EXIST. IN-LINE
SUPPLY FAN ISE-1
EXIST.
AHU-5
30x14
30x14 x1 x1
6"
CH
W
R
CH
W S
CH
W
S
6"6"
1"CHWS&R
3/4"HWR
6"CHWS
CH
W
S
4"HWS
3/4"HWS
EFD
F.D.
F.D.
5"HWS
1"CHWS&R
HWR
CHWR
EXIST. P-1 (HW)
EXIST. P-2 (HW)
HOT WATER COMPRESSION
TANK
CHILLED WATER
COMPRESSION
TANK
EXIST.
ROLAIRTROL
CHILLED WATER
SYSTEM MAKE -UP
WATER
DUPLEX AIR
COMPRESSOR FOR
PNEUMATIC CONTROL
EXIST.
ROLAIRTROL
ABANDONED OIL
PIPE TRENCH
DOMESTIC HOT
WATER
HEATERS (TYP.
OF TWO)
HOT WATER SYSTEM
MAKE -UP WATER
20"Ø BREECHING UP
10"Ø BREECHING UP
FUEL OIL
GAGE
2000 CFM
2000 CFM
CFM
CONCRETE
PAD (TYP.)
2. DISCONNECT, MOTOR STARTERS AND CONTROLS BY DIVISION 23
3. BOILER MANUFACTURER SHALL PROVIDE BACNET COMPATIBLE BOILER CONTROLS
1. POWER WIRING AND RACEWAY BY DIVISION 26. COORDINATE WITH ELECTRICAL CONTRACTOR
LOCATION
REMARKS:
TAG
B-1
MANUF. MODEL
Burner Capacity
REMARKS
59 1985RTS 28HE-8 SERIES
HIGH EFFICIENCY WATER BOILER
BOILER
HORSE-POWER
4. TIE BOILER CONTROLS INTO LOCAL BMS
MECHANICAL ROOM
CLASSROOM BUILDING
SMITH
CAST IRON BOILERS
GROSS
OUTPUT
(MBH) OIL
GPH
GAS
MBH
Heating Surface (Sq.Ft)
177.6
Furnace Volume (Cu.Ft)
28.44
Thermal Efficiency
OIL GAS
82.6 -
Combustion Efficiency
OIL GAS
83.5
Dia. Vent Conn.
12"
Burner - Gas/Oil
Burner Operation: Low -High--Low Model No.
C2-G-20A
H.P.
3/4
Power Flame
5"HWR
FOR BOILERS PIPING LAYOUT
SEE SCHEMATIC PIPING
DIAGRAM ON M1.2 DWG
THE CONTRACTOR SHALL
FIELD VERIFY ALL EXISTING PIPE
LOCATIONS AND SIZES.
Pump
LOCATION MODELAREA SERVED TYPE MANUFACTURER SERIES GPM PHVOLTS REMARKSHP
REMARKS:
1. UNIT SHALL BE SEISMICALLY SUPPORTED.
2. INSTALL ACCORDING TO MANUFACTURER'S RECOMMENDATIONS.
3. OPERATING
HEAD
(FT) MODEL
SUCTION DIFFUSER
SYS. SIDE SUCT. SIDE
Pump PLEVv
EFFICIENCY
Control
HEAD
(FT)
BP-1 BELL & GOSSETT 1,2,3,4,5- --MECHANICAL RM BOILER CIRC. PUMP CIRCULATING IN LINE 80 289212 12080.520-140 -3.6
RPM @
Duty point
Motor Speed
(RPM)
4. POWER WIRING AND RACEWAY BY DIVISION 26. COORDINATE WITH THE ELECTRICAL CONTRACTOR.
5. DISCONNECTS AND STARTING RELAYS FURNISHED BY DIVISION 23.
No.
Ecocirc XL 20-140
ALTERNATE#1
G
G
G
CONNECT NEW 12"dia BOILER VENT
TO EXISTING IN THIS AREA
CONNECT NEW 3"GAS PIPE TO
EXISTING IN THIS AREA. CONTRACTOR
SHALL FIELD VERIFY EXACT LOCATION
5. THIS CONTRACTOR SHALL PROVIDE THE GAS TRAIN FOR THE NEW BURNER, INCLUDING ISOLATION VALVES AND VENTLESS REGULATOR
VOLTS
PH
1 1,2,3,4,5
BP-2 BELL & GOSSETT 1,2,3,4,5- --MECHANICAL RM BOILER CIRC. PUMP CIRCULATING IN LINE 80 289212 12080.520-140 -3.6 -Ecocirc XL 20-140
M1.1
MECHANICAL RM.
PART PLAN
MECHANICAL
DEMOLITION &
NEW WORK
C O
PY
R
IG
H
T C
Th is d ra w in g is a n in st ru m en t o f s er vi ce a nd sh al l r em ai n th e pr op er ty of B em is
A ss oc ia te s L
LC
, w he th er th e pr oj ec t f or w hi ch it is in te nd ed is c on st ru ct ed o r n ot
Th is d ra w in g, a nd th e co nc ep ts a nd id ea s co nt ai ne d he re in
, s ha ll no t b e us ed
, c op ie d or re ta in ed w ith ou t t he ex pr es s w rit te n ap pr ov al o f B em is
A ss oc ia te s L
LC
Su bm is si on o r d is tri bu tio n of th is d ra w in g to m ee t o ff ic ia l r eg ul at or y re qu ire m en ts o r f or o th er p ur po se s i n co nn ec tio n w ith th e pr oj ec t i s n ot to b e co ns tru ed a s p ub lic at io n in d er og at io n of a ny o f t he ri gh ts o f
B em is A ss oc ia te s L
LC
A ny a br id ge m en t o r v io la tio n of th e rig ht s o f B em is A ss oc ia te s L
LC
sh al l b e pr os ec ut ed to th e fu lle st e xt en t p os si bl e un de r t he la w
D A
N B
U R
Y C
T
B O
IL
ER
R
EP
LA
C
EM
EN
T W
C
SU
C
LA
SS
R O
O M
B U
IL
D
IN
G
09-01-2026
PRV-1
EXISTING
PRESSURE REDUCING VALVE
P-1 P-2
EXISTING
DIFFERENTIAL PRESSURE
SENSOR CONTROLLER
DP
BP-1
NEW
BOILER
B#1
EXISTING
BOILER
B#2
EXISTING
ROLAIRTROL
EXISTING
COMPRESSION TANK
EXISTING
MODULATING VALVE
BURNERBURNER
HOUSEKEEPING PAD
(TYPICAL)
BP-2
ALTERNATE #1
P U
M P
R U
N S
TA
TU
S
P U
M P
E N
A B
LE
/D
IS
A
B
LE
H W
S T
E M
P
H W
R T
E M
P
H W
S T
E M
P
P U
M P
E N
A B
LE
/D
IS
A
B
LE
P U
M P
R U
N S
TA
TU
S
B O
IL
E
R R
E S
E T
TE
M
P
B O
IL
E
R S
TA
R
T / S
TO
P
HWR
HWR
HWS
HWS
HWS
RUN CONDITIONS: THE HOT WATER SYSTEM SHALL BE ENABLED WHEN OUTDOOR AIR TEMPERATURE IS LESS THAN 60°F (ADJ) AND AVERAGE ZONE LOAD IS GREATER THAN 10%. FOR FREEZE PROTECTION THE HOT WATER SYSTEM SHALL REMAIN ENABLED WHEN OUTDOOR AIR TEMPERATURE IS LESS THAN 35°F (ADJ). WHEN ENABLED THE HOT WATER SYSTEM SHALL RUN FOR A MINIMUM OF 20
MINUTES (ADJ).
BOILER CONTROL: THE BOILERS ARE SUBJECT TO THEIR HARDWIRED SAFETIES. WHEN THE SYSTEM IS ENABLED THE LEAD BOILER AND LEAD HOT WATER LOOP PUMP SHALL RUN. THE BOILERS SHALL BE CONFIGURED BY AN LOCHINVAR FACTORY QUALIFIED TECHNICIAN TO RUN IN CASCADE MODE. THE ROTATION AND STAGING OF THE BOILERS SHALL BE CONTROLLED BY THE CASCADE SEQUENCE INTEGRAL TO THE BOILERS. A NETWORK CONNECTION BETWEEN THE BOILERS SHALL BE PROVIDED AND WIRED BY TCC.
HOT WATER LOOP PUMPS: WHEN THE SYSTEM IS ENABLED, A SINGLE HOT WATER PUMP SHALL RUN. THE PUMP SPEED SHALL BE CONTROLLED TO MAINTAIN A SYSTEM DIFFERENTIAL OF 15 PSI (ADJ). THE PUMPS SHALL ROTATE ON ONE OF THE FOLLOWING SELECTABLE CONDITIONS, MANUALLY THROUGH SOFTWARE SWITCH, ON RUNTIME, DAILY, WEEKLY, OR MONTHLY. IF A PUMP IS COMMANDED ON, AND NO STATUS IS DETECTED, A PUMP FAILURE ALARM SHALL BE SENT. IF A PUMP HAS AN ON STATUS, AND IS NOT
COMMANDED ON, A PUMP IN HAND ALARM SHALL BE SENT.
HOT WATER SUPPLY TEMPERATURE CONTROL: THE HOT WATER SUPPLY TEMPERATURE SET POINT SHALL BE RESET TO OUTDOOR AIR TEMPERATURE BY THE BMS. EEEA HWS TEMPERATURE WELL SENSOR IS PROVIDED WITH THE BOILERS AND SHALL BE WIRED BY
TCC, MOUNTED BY OTHERS.
IF HOT WATER TEMPERATURE IS GREATER THAN 10°F (ADJ) BELOW SET POINT FOR MORE THAN 20 MINUTES (ADJ), A HOT WATER
SYSTEM TEMPERATURE FAIL ALARM SHALL BE SENT TO THE BMS.
THE NEW CONTROLS SHALL COMMUNICATE SEAMLESSLY WITH THE EXISTING ALERTON BUILDING MANAGEMENT SYSTEM
2 1/2" HW
5"HWS
5"HWR
4"HWR
4"HWR
4"HWS 4"HWS
CONNECT 4"HWS TO EXISTING
CONNECT 2 12"HW TO EXISTING
4"HWS IN THIS AREA
CONNECT 2 12"HW TO EXISTING
4"HWR IN THIS AREA
CONNECT 4"HWR TO EXISTING
4"HWS IN THIS AREA
2 1/2" HW
EXISTING
CIRCULATING
PUMP (typ.)
M1.2
TEMPERATURE
CONTROLS AND
PIPING
SCHEMATIC
DIAGRAMS
C O
PY
R
IG
H
T C
Th is d ra w in g is a n in st ru m en t o f s er vi ce a nd sh al l r em ai n th e pr op er ty of B em is
A ss oc ia te s L
LC
, w he th er th e pr oj ec t f or w hi ch it is in te nd ed is c on st ru ct ed o r n ot
Th is d ra w in g, a nd th e co nc ep ts a nd id ea s co nt ai ne d he re in
, s ha ll no t b e us ed
, c op ie d or re ta in ed w ith ou t t he ex pr es s w rit te n ap pr ov al o f B em is
A ss oc ia te s L
LC
Su bm is si on o r d is tri bu tio n of th is d ra w in g to m ee t o ff ic ia l r eg ul at or y re qu ire m en ts o r f or o th er p ur po se s i n co nn ec tio n w ith th e pr oj ec t i s n ot to b e co ns tru ed a s p ub lic at io n in d er og at io n of a ny o f t he ri gh ts o f
B em is A ss oc ia te s L
LC
A ny a br id ge m en t o r v io la tio n of th e rig ht s o f B em is A ss oc ia te s L
LC
sh al l b e pr os ec ut ed to th e fu lle st e xt en t p os si bl e un de r t he la w
D A
N B
U R
Y C
T
B O
IL
ER
R
EP
LA
C
EM
EN
T W
C
SU
C
LA
SS
R O
O M
B U
IL
D
IN
M
12 25
N
O
P
Q
M
12 25
N
O
P
Q
MECHANICAL ROOM PART PLAN - ELECTRICAL NEW WORK
SCALE: 1/4"=1'-0"
MECHANICAL ROOM PART PLAN - ELECTRICAL DEMOLITION
SCALE: 1/4"=1'-0"
EXIST.
BOILER
B#2
EXIST.
BOILER
B#1
EXIST. AHU-1
EXIST.
P-5
EXIST.
AHU-5
NEW
BOILER
B#1
BP-1
ELECTRICAL KEY NOTES - DEMOLITION
TAG DESCRIPTION
EXISTING BOILER #1 TO BE DISCONNECTED AND REMOVED BY HVAC CONTRACTOR. E.C. SHALL
DISCONNECT & REMOVE EXISTING BOILER AND CIRCULATION PUMP ELECTRICAL, MAKE SAFE FOR
INSTALLATION OF NEW.
ELECTRICAL DRAWING LEGEND
SYMBOLS
ABOVE FINISHED FLOOR (CENTERLINE OF DEVICE OR EQUIPMENT).
NOT TO SCALE.
GROUND.
NTS
GFCI
GND or G
CONDUIT.C
CIRCUIT BREAKER.C/B
AMPS.
ALTERNATING CURRENT.
AFF
A
AC
ABBREVIATIONS
AMERICAN WIRE GAUGE.AWG
JUNCTION BOX.JB
VARIABLE FREQUENCY DRIVE.VFD
EQUIPMENT POWER CONNECTION, EQUIPMENT TYPE AS
DESIGNATED.
MOTOR POWER CONNECTION, EQUIPMENT TYPE AS DESIGNATED.
INDICATES DEVICE WITH INTEGRAL GROUND FAULT
CIRCUIT INTERRUPTER.
EXISTING(E)
LOW VOLTAGE.LV
ELECTRICAL KEY NOTES - NEW WORK
TAG DESCRIPTION
NEW BOILER AND CIRCULATOR PUMP FURNISHED AND INSTALLED BY HVAC CONTRACTOR. E.C. SHALL CONNECT NEW BOILER #1 AND NEW CIRCULATOR PUMP BP-1 TO EXISTING BRANCH CIRCUITS MADE AVAILABLE BY REMOVAL, MODIFY / EXTEND EXISTING BRANCH CIRCUIT WIRING AND CONDUIT AS REQUIRED FOR CONNECTION TO NEW EQUIPMENT AND EXISTING EMERGENCY OFF SWITCH (MAINTAIN
CONTINUITY)
PHASE.Ø
TRANSFORMER.TX
1 - PRIOR TO SUBMITTING BID, VISIT THE SITE AND IDENTIFY EXISTING CONDITIONS AND DIFFICULTIES THAT WILL AFFECT WORK TO BE PERFORMED. NO COMPENSATION WILL BE GRANTED FOR ADDITIONAL WORK CAUSED BY UNFAMILIARITY WITH SITE CONDITIONS THAT ARE VISIBLE OR READILY CONSTRUED BY EXPERIENCED OBSERVERS. INCLUDE IN THE BID
ALL DEMOLITION WORK REQUIRED.
2 - tHE DEMOLITION DRAWINGS ARE INTENDED ONLY TO DEFINE THE GENERAL SCOPE OF DEMOLITION WORK AND TO ASSIST THE CONTRACTOR DURING BIDDING. THE DEMOLITION DRAWINGS MAY NOT SHOW EVERY ITEM WHICH MUST BE DISCONNECTED, REMOVED, OR RELOCATED IN ORDER TO FACILITATE NEW WORK. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR ALL DEMOLITION WORK REQUIRED WHETHER OR NOT SHOWN ON THE PLANS.
3 - REMOVE AND/OR RELOCATE ALL EXISTING ELECTRICAL WORK AS NECESSARY FOR THE PERFORMANCE OF THE WORK
OF THIS CONTRACT.
4 - EXISTING ELECTRICAL EQUIPMENT, WIRING, AND RACEWAYS SHALL NOT BE REUSED UNLESS SPECIFICALLY NOTED
OTHERWISE.
5 - REMOVE ALL DEMOLITION MATERIAL FROM THE JOB SITE UNLESS NOTED DIFFERENTLY. MATERIAL REQUESTED BY THE OWNER FOR SALVAGE SHALL BE DELIVERED TO THE OWNER'S DESIGNATED MATERIAL STORAGE AREA.
6 - PROVIDE WIRING AS REQUIRED AND RECONNECT EXISTING FIXTURES, DEVICES, OR EQUIPMENT THAT ARE TO REMAIN ACTIVE, BUT HAVE BEEN DISCONNECTED DURING DEMOLITION OF OTHER FIXTURES, DEVICES, OR EQUIPMENT.
ELECTRICAL DEMOLITION WORK NOTES GENERAL SPECIFICATION NOTES - POWER
1 - THE CONTRACTOR SHALL VERIFY AND OBTAIN ALL NECESSARY DIMENSIONS AT THE BUILDING.
2 - FINISHED WORK: THE INTENT OF THE SPECIFICATIONS AND DRAWINGS IS TO CALL FOR FINISHED WORK, COMPLETED, TESTED AND READY FOR OPERATION.
3 - GOOD PRACTICE: IT IS NOT INTENDED THAT THE DRAWINGS SHOW EVERY CONDUIT, JUNCTION BOX, FITTING OR MINOR DETAIL AND IT IS UNDERSTOOD THAT WHILE THE DRAWINGS MUST BE FOLLOWED AS CLOSELY AS CIRCUMSTANCES WILL PERMIT, THE SYSTEMS SHALL BE INSTALLED ACCORDING TO THE INTENT AND MEANING OF
THE CONTRACT DOCUMENTS AND IN ACCORDANCE WITH GOOD PRACTICE.
4 - ANY APPARATUS, APPLIANCE, MATERIAL OR WORK NOT SHOWN ON DRAWINGS BUT MENTIONED IN SPECIFICATIONS OR VICE VERSA, OR ANY INCIDENTAL ACCESSORIES NECESSARY TO MAKE THE WORK COMPLETE AND PERFECT IN ALL RESPECTS AND READY FOR OPERATION, EVEN IF NOT PARTICULARLY SPECIFIED, SHALL BE FURNISHED AND
INSTALLED BY CONTRACTOR AT NO ADDITIONAL COST TO OWNER.
5. CODES AND STANDARDS - COMPLY WITH ALL FEDERAL, STATE AND LOCAL CODES AND STANDARDS WHEREVER
APPLICABLE INCLUDING THE FOLLOWING:
2022 CONNECTICUT STATE BUILDING CODE, (2021 IBC WITH AMENDMENTS),
2022 CONNECTICUT FIRE SAFETY CODE , (2021 IFC WITH AMENDMENTS),
2022 CONNECTICUT STATE FIRE PREVENTION CODE (2021 NFPA 1 WITH AMENDMENTS),
2021 INTERNATIONAL ENERGY CONSERVATION CODE WITH AMENDMENTS,
2021 INTERNATIONAL PLUMBING CODE WITH AMENDMENTS,
2021 INTERNATIONAL MECHANICAL CODE WITH AMENDMENTS,
2020 NFPA 70 NATIONAL ELECTRICAL CODE WITH AMENDMENTS,
2019 NFPA 72 NATIONAL FIRE ALARM CODE,
ICC A117.1-2017 ACCESSIBLE AND USABLE BUILDINGS,
ADA.
NFPA,
UNDERWRITERS LABORATORIES,
FACTORY MUTUAL INSURANCE COMPANY,
NEMA STANDARDS.
6 - NOTE THAT THE DRAWINGS ARE DIAGRAMMATIC AND INDICATE THE GENERAL ARRANGEMENT OF THE ELECTRICAL
EQUIPMENT AND SYSTEMS, WITHOUT SHOWING EVERY DETAIL AND FITTING.
7 - RACEWAYS: PROVIDE EMT CONDUIT FOR ALL WIRING. EMT CONNECTORS AND COUPLINGS SHALL BE GALVANIZED STEEL SET-SCREW TYPE. PROVIDE GLAND COMPRESSION CONNECTORS AND COUPLINGS WHERE LOCATED IN DAMP AND WET LOCATIONS. PROVIDE FLEXIBLE STEEL CONDUIT FOR FINAL CONNECTIONS TO MOTOR DRIVEN EQUIPMENT.
8 - BRANCH CIRCUIT CONDUCTORS SHALL BE COPPER, RATED 600 VOLTS, 90 DEG.C., COLOR CODED, TYPE XHHW-2.
9 - WIRE SIZE #8 AWG AND LARGER SHALL BE STRANDED. WIRE OF SIZE SMALLER THAN #8 AWG SHALL BE SOLID.
10 - MINIMUM SIZE CONDUCTORS FOR POWER AND LIGHTING SHALL BE #12 AWG. PROVIDE MINIMUM #10 AWG SIZE FOR RUNS EXCEEDING 75' IN CONDUCTOR LENGTH, AND #8 AWG SIZE FOR RUNS EXCEEDING 150' IN CONDUCTOR
LENGTH. PROVIDE LARGER SIZE CONDUCTORS AS SCHEDULED OR AS NOTED ON THE DRAWINGS.
11 - RACEWAYS SHALL BE CONCEALED WHEREVER POSSIBLE IN ALL FINISHED AREAS.
12 - RACEWAYS SHALL BE RUN PARALLEL TO OR AT RIGHT ANGLES TO WALL LINES.
13 - RACEWAYS SHALL BE SUPPORTED FROM THE STRUCTURE BY STRAP HANGERS, ROD HANGERS, OR RACK
MOUNTED, OR OTHER APPROVED ELECTRICAL MOUNTING.
14 - OUTLET BOXES SHALL BE EQUIPPED WITH FIXTURE STUD OR STRAPS WHERE REQUIRED.
15- INSTALL BOXES IN ACCESSIBLE LOCATIONS AND AT UNIFORM HEIGHTS.
16 - SET BOXES AND COVERS SQUARE AND TRUE WITH BUILDING FINISH.
EXIST.
BOILER
B#2
EXIST. AHU-1
EXIST.
P-5
EXIST.
AHU-5
BP-2 (ADD ALT #1)
E1.1
MECHANICAL RM.
PART PLAN
ELECTRICAL
DEMOLITION &
NEW WORK
C O
PY
R
IG
H
T C
Th is d ra w in g is a n in st ru m en t o f s er vi ce a nd sh al l r em ai n th e pr op er ty of B em is
A ss oc ia te s L
LC
, w he th er th e pr oj ec t f or w hi ch it is in te nd ed is c on st ru ct ed o r n ot
Th is d ra w in g, a nd th e co nc ep ts a nd id ea s co nt ai ne d he re in
, s ha ll no t b e us ed
, c op ie d or re ta in ed w ith ou t t he ex pr es s w rit te n ap pr ov al o f B em is
A ss oc ia te s L
LC
Su bm is si on o r d is tri bu tio n of th is d ra w in g to m ee t o ff ic ia l r eg ul at or y re qu ire m en ts o r f or o th er p ur po se s i n co nn ec tio n w ith th e pr oj ec t i s n ot to b e co ns tru ed a s p ub lic at io n in d er og at io n of a ny o f t he ri gh ts o f
B em is A ss oc ia te s L
LC
A ny a br id ge m en t o r v io la tio n of th e rig ht s o f B em is A ss oc ia te s L
LC
sh al l b e pr os ec ut ed to th e fu lle st e xt en t p os si bl e un de r t he la w
D A
N B
U R
Y C
T
B O
IL
ER
R
EP
LA
C
EM
EN
T W
C
SU
C
LA
SS
R O
O M
B U
IL
D
IN
| Sheets and Views |
| Cover (36x24) |
File details come from the government source that posted it. Updated .