2027-151_Equipment_and_Operator_Form.pdf

PDF 95 KB Posted

Attached to
DNR RFB Hill River Parking Pad
Solicitation number
2000018728
Issued by
Minnesota

About this file

This is an Equipment Specifications and Operator Experience Requirements form for Solicitation #2027-151, issued by the Minnesota Department of Natural Resources for the Hill River Parking Pad project in Aitkin County. The project involves establishing 200 feet of gravel road and a 2,500 square-foot gravel parking pad (50' x 50'). Contractors must submit bids electronically through the Swift Portal, with responses to the latest event version required to avoid rejection. A site visit is available by contacting Project Supervisor Derek Wagner at 218-429-3019 or derek.wagner@state.mn.us. All equipment must be thoroughly cleaned before entering the site to prevent invasive weed spread, and contractors are responsible for preventing rutting and compaction while ensuring equipment does not impede site use or access.

The form requires contractors to provide a detailed list of all equipment to be used, including specifications for trucks, excavators, graders, loaders, compactors, and skid-steer equipment with make, model, horsepower ratings, and capacity information. Operators must have a minimum of 150 hours of experience operating the specific equipment type assigned to the project. Unit pricing must include all costs associated with labor, materials, tools, transportation, equipment, and applicable taxes. The award will be made to the lowest responsible vendor meeting all specifications and terms, with the State reserving the right to award items separately, by grouping, or by total as deemed most advantageous. Direct Pay Permit 1114 does not apply to this project.

View the file

Other files

File Type Posted
DNR_RFB_Hill_River_Parking_Pad.pdf PDF
2027-151_Contractor_Qualification_Form.pdf PDF
2027-151_Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Equipment Specifications and Operator Experience Requirements Hill River Parking Pad Aitkin County / Aitkin Solicitation #2027-151

CONTRACTOR NAME:

EQUIPMENT SPECIFICATIONS REQUIRED

Equipment used must be thoroughly cleaned before entering the site to prevent spreading invasive weeds. The contractor must take every precaution to avoid rutting and compaction in the site. Equipment left on site must not impede use, access or other management at the site and is the sole responsibility of the contractor.

PROVIDE A DETAILED LIST OF ALL EQUIPMENT TO BE USED ON THIS PROJECT:

Truck

Make and Model Type (End, Side, Belly Dump) Capacity (CY LV)

Excavator/Power Shovel

Make and Model Horsepower Rating Bucket Capacity

Grader

Make and Model Horsepower Rating Blade Length (Feet)

Functioning slope meter installed (yes/no)

Loader

Make and Model Horsepower Rating Bucket Capacity Functioning and certified bucket scale installed?

(Yes/No)

Compactor

Make and Model Type (steel wheel or rubber tire)

Width of compacting surface

Skid – Steer

Make and Model Horsepower Rating

OPERATOR EXPERIENCE:

The operator(s) must have a minimum of 150 hours of experience in operating the type of equipment to be used on the project.

NAME OF OPERATOR #1: Estimated hours operating experience:

NAME OF OPERATOR #2: Estimated hours operating experience:

NAME OF OPERATOR #3: Estimated hours operating experience:

Signature of Contractor Title Date

File details come from the government source that posted it. Updated .