This Addendum 1 document pertains to Palm Beach County's Drainage Improvements/Repairs and Minor Continuing Services Construction Contract (Project No. 2026056) in Florida. The contract establishes a continuing services arrangement for maintenance, repair, and construction of drainage systems, miscellaneous concrete works, and minor construction projects throughout Palm Beach County on an as-needed basis through work orders issued by various county departments. The scope of work includes storm sewer cleaning and pumping, pipe installation (concrete, HDPE, and PVC culverts ranging from 15 to 72 inches), cured-in-place pipe (CIPP) lining, inlet and manhole construction/repair, concrete work, asphalt paving, landscaping, and related roadway improvements. The proposal form contains 151 pay items with quantities ranging from 2 to 25,000 units, with work to be performed in both the East and West districts of Palm Beach County. Contractors were required to submit sealed bids with unit prices for each line item, and the county indicated its intent to award the contract to multiple contractors rather than a single entity.
The county does not guarantee any specific volume of work during the contract period, and all quantities listed are approximate. Unit prices submitted by bidders must include all costs for survey layout, maintenance of traffic, mobilization, clearing and grubbing, and as-builts, with no cost increases permitted from year one to subsequent years. The document addresses contractor requests for information dated August 18, 21, and 25, 2026, clarifying that pipe cleaning for CIPP work is incidental to the CIPP pay items, point repairs and obstruction removal are paid separately, and bypass pumping is compensated on an as-needed basis at a negotiated price. All work must comply with Florida Department of Transportation Standard Specifications as amended by Palm Beach County. Contractors must provide a bid bond equal to 5 percent of the total bid amount and execute a contract bond within fourteen working days of receiving a letter of intent to award, with work commencing within fourteen calendar days of the notice to proceed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI Form.pdf | ||
| RFI Form.docx | DOCX document | |
| 2026056 Addendum 2.pdf | ||
| 2026056 Pay Item Worksheet - Addendum 1.xlsx | XLSX spreadsheet | |
| OSBD Schedules and Instructions.pdf | ||
| Alternate Format Availability.pdf | ||
| Qualifications and Experience Package Form.pdf | ||
| 2026056 Spec Book.pdf | ||
| Qualifications and Experience Package Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX
Bidding Forms
Cover Sheet........................................................................................................................................ Cover
Index ......................................................................................................................................................... A
Notice to Bidders ......................................................................................................................................B
Advertisement for Bid ...............................................................................................................................C
Submittals Requested with Bid .................................................................................................................D
Instructions to Bidders.......................................................................................................ITB-1 to ITB-13
Specifications / Provisions
Special Provisions..................................................................................................................SP-1 to SP-40
Special Provisions [Requests for Information (Contractor RFI’s)] .................................... SP-42 to SP-43
Technical Special Provisions .............................................................................................TSP-1 to TSP-2
Standard Specifications ....................................................................................................................... SS-1
General Provisions............................................................................................................. GP-1 to GP-151
Release / Permits / OSBD Forms
Driveway Construction Release ............................................................................................DE-1 to DE-2
Permits ...............................................................................................................................................PER-1
OSBD Forms .................................................................................................................... SBD-1 to SBD-7
Proposal
Proposal Form.............................................................................................................................. P-1 to P-9
Bid Forms / Requirements / Bid Bond
Palm Beach County Local Preference Ordinance & Cert. of Business Location ................... LP-1 to LP-2
Scrutinized Companies ........................................................................................................................ SC-1
Bid Bond................................................................................................................................BB-1 to BB-2
Certificate of Resolution......................................................................................................................CC-1
Contract Forms / Requirements / Construction Bond
Contract ...................................................................................................................................... C-1 to C-3
Public Construction Bond................................................................................................. PCB-1 to PCB-4
Certification of Sublet Work ..............................................................................................................SW-1
Certificate of Insurance.........................................................................................................................CI-1
Construction Coordination Forms ....................................................................... CONST-1 to CONST-11
A-A
Hknight Highlight
Hknight Highlight pbirkett Highlight
SP-41
August 18, 2026 at 8:51 a.m.
Johnson-Davis Inc.
jamsler@johnsondavis.com>
QUESTION: In reviewing the Pay Item Worksheet for the Drainage Improvements/Repairs and
Minor Continuing Services Construction Contract, would the County please consider adding Bid
Items for the following work: HDPE Pipe Culvert – 15" (Class I), HDPE Pipe Culvert – 15" (Class
SPECIAL PROVISIONS
RESPONSE TO CONTRACTORS REQUESTS FOR INFORMATION
August 25, 2026
Puris Corp-Inliner Solutions mark.cassineri@puriscorp.com
QUESTION: Please provide previous bid tabulations.
RESPONSE: This information can be obtained by submitting a public records request to ENG-ActionCenter@pbc.gov.
QUESTION: Please provide a copy of the current plan holders list.
RESPONSE: There is not a plan holders list.
QUESTION: Will there be an SBE contractor vendor list to work off of?
RESPONSE: The County’s Vendor Directory is posted online at https://pbc.gov/pbcvendors.
QUESTION: Will the Owner provide a disposal site for pipe cleaning debris at no cost to the
Contractor?
RESPONSE: No.
QUESTION: Will the Contractor be allowed to increase pricing from year 1 to subsequent years?
RESPONSE: No.
QUESTION: Does the Owner intend to award this contractor to a single or multiple Contractors?
RESPONSE: Multiple.
QUESTION: Will “Storm Sewer Cleaning” bid items be paid separately, or if the associated cleaning required for the “Pipe Liner CIP” work is considered incidental to and included in the
“Pipe Liner CIP” bid items?
RESPONSE: For the "Pipe Liner CIP" work, pipe cleaning is incidental and included in that pay item..
mailto:mark.cassineri@puriscorp.com https://pbc.gov/pbcvendors mailto:jamsler@johnsondavis.com
SP-42
II), HDPE Pipe Culvert – 30" (Class I), HDPE Pipe Culvert – 30" (Class II), Removal of Existing
Pipe – various sizes, Connection to Existing Drainage Structures – various pipe sizes, Maintenance of Traffic – Lump Sum, and Mobilization – Lump Sum.
RESPONSE: See SP-14 and updated P-pages.
August 21, 2026 at 8:52 a.m.
Insituform Technologies, LLC ebennett@azuria.com
QUESTION: The following parameters significantly impact liner thickness and bid pricing.
Please confirm: Fully deteriorated or partially deteriorated design basis, Groundwater level used for liner design, Soil load assumptions, Live load assumptions, and Safety factors required.
RESPONSE: The parameters for these items will be per FDOT sections 431 and 948.
QUESTION: The specifications indicate storm sewer cleaning may be directed by the Engineer under separate pay items. Please confirm whether pre-lining cleaning required for CIPP installation will be compensated separately or is incidental to the CIPP bid items.
RESPONSE: These will be incidental to the pay items. See previous response.
QUESTION: Please clarify whether point repairs, protruding tap removal, offset correction, root removal, or obstruction removal are included in the CIPP scope or will be paid separately. These items can materially affect productivity and risk.
RESPONSE: Paid separately.
QUESTION: Please identify required post-installation testing and sampling requirements, including: Coupon testing, Thickness verification, Flexural modulus, Flexural strength, and Leak testing.
RESPONSE: Thickness verification per onsite assigned inspector.
QUESTION: Equipment and mobilization costs vary significantly. Please confirm acceptable curing methods: Hot water, Steam, UV light?
RESPONSE: Curing means and methods are at the contractors discretion but must meet
FDOT standards and specification requirements.
QUESTION: Please identify any known access restrictions, MOT limitations, work hour restrictions, residential notification requirements, or roadway closure limitations affecting the
CIPP work.
RESPONSE: MOT beyond normal scope will be addressed per the contract. Work hours shall meet contract requirements. Notifications will be done by department.
mailto:ebennett@azuria.com
SP-43
QUESTION: The specifications contain pay items for storm sewer pumping and cleaning;
however, it is unclear whether bypass pumping associated with CIPP installation is included in the
CIPP bid items or paid separately. Please clarify.
RESPONSE: Bypass pumping will be paid separately on an as needed basis at a negotiated price.
TECHNICAL SPECIAL PROVISIONS
TSP-1
OVERVIEW
The purpose and intent of this bid is to establish a Drainage/Repair and Minor Construction
Continuing Services Contract to include maintenance of traffic, hauling and disposal and all equipment, material, labor, etc., as needed to complete Work Orders for construction of bid items.
Work Orders are likely to include construction and/or maintenance and repair of drainage systems including, miscellaneous concrete works and other minor construction projects required by various
County Departments on an as needed basis.
All work will be done according to the Florida Department of Transportation Standard
Specifications for Road and Bridge Construction, as amended herein by Palm Beach County, as well as all other applicable FDOT, County and contract standards.
The Contractor should fully understand that the Board of County Commissioners does not, hereunder, contract to do any specific amount of work during the contract period.
The locations for the construction projects on which the material will be used will vary, and may be at any point within the boundaries of Palm Beach County. The Contractor will not be expected to operate his equipment or personnel beyond the limits of Palm Beach County under this contract.
The Contractor is advised that all non-contiguous work sites within the same park, subdivision and/or intersection, where individual work locations are separated by no more than 1000', or as directed by the Engineer, shall be considered one job-site. User Divisions/Departments are responsible for issuing a single work order for projects meeting the above conditions and the
Contractor shall honor unit prices based upon the total work required.
DEFINITIONS
WEST DISTRICT: All areas of Palm Beach County west of 20 Mile Bend (Belle Glade)
EAST DISTRICT: All areas of Palm Beach County east of 20 Mile Bend
INSPECTIONS
The Director of the Road & Bridge Division, from time to time, may appoint representatives to inspect equipment used under this contract, observe personnel employed, and the general performance of the Contract. The representatives will not be authorized to revoke, alter, enlarge or relax the conditions of these specifications, approve or accept any portion of the completed work, issue instructions contrary to authority, reject defective equipment, report on inept personnel, nor suspend any work.
TECHNICAL SPECIAL PROVISIONS
TSP-2
CONTROL OF WORK
METHOD OF MEASUREMENT
The Method of Measurement for the various items associated with the project shall be in accordance with the units indicated in the proposal.
A-2000 POLYVINYL CHLORIDE (PVC) PIPE (12 TO 48 INCHES)*
A-2000 PVC pipe has been reviewed and found acceptable for use on Palm Beach County roadway construction projects. Installation shall be in accordance with manufacturer’s recommendations, FDOT Standard Specification 125 (Excavation for Structures and Pipe), 430 (Pipe Culverts and
Storm Sewers) and 948 (Miscellaneous Type of Pipe), and as amended herein by Palm Beach
County.
* When the pipe type is not specified in the pay items (Proposal pages) the Contractor shall notify the Engineer, in writing, and receive written approval prior to implementation.
PROPOSAL FORM
(COMPANY NAME)
(COMPANY ADDRESS)
(COMPANY CITY & STATE)
(COMPANY ZIP CODE)
CONTACT NAME ____________________________________________________________
PHONE NUMBER
FACSIMILE NUMBER
EMAIL ADDRESS
FEDERAL TAX I.D. # DATE SUBMITTED
FOR THE CONSTRUCTION OF: DRAINAGE IMPROVEMENTS/REPAIRS AND
MINOR CONTINUING SERVICES
CONSTRUCTION CONTRACT
PALM BEACH COUNTY PROJECT NO. 2026056
TO THE BOARD OF COUNTY COMMISSIONERS OF
PALM BEACH COUNTY, FLORIDA:
We, the undersigned (Contractor), hereby declare that no person or persons, firm or corporation, other than the undersigned, are interested in this Proposal as principals, and that this Proposal is made without collusion with any person, firm, or corporation, and that we are not on the
Scrutinized Companies List as stated on page SC-1, and we have carefully and to our full satisfaction examined the Contract Documents, and that we have made a full examination of the location of the proposed Work and the source of supply of Materials, and we hereby agree to furnish and pay for all necessary labor, Equipment, Materials and services, fully understanding that the quantities shown herein are approximate only and that we will fully complete all Work in accordance with the Contract Documents and the requirements under them of the Engineer, within the time limit specified in this Proposal for the following unit prices, to wit:
P-1A
FDOT ITEM
NUMBER
ITEM DESCRIPTION QTY UNITS UNIT PRICE AMOUNT
EMERGENCY RESPONSE ITEMS
1 N/A Emergency Response (< 6 Hours) 10 EA
2 N/A Emergency Response (6 Hours to 24 Hours) 20 EA
3 N/A Emergency Response (24 Hours to 72 Hours) 30 EA
SUBTOTAL (EMERGENCY RESPONSE)
ROADWAY ITEMS
4 110-1 Remove Existing Asphalt (Full Depth) (See Notes) 20,000 SY
5 120-1 Regular Excavation 10,000 CY
6 120-1 Shallow Excavation (Depth < 4 FT) 3,000 CY
7 120-6 Embankment (Compacted in Place) 2,500 CY
8 N/A Finish Existing Rock Base (Includes Prime Coat) 1,000 SY
9 N/A Finish Grading 20,000 SY
10 160-6 4" Base (Includes Prime Coat) 15,000 SY
11 160-6 6" Base (Includes Prime Coat) 20,000 SY
12 160-6 8" Base (Includes Prime Coat) 5,300 SY
13 285-704 Optional Base Group 4 500 SY
14 285-707 Optional Base Group 7 20,000 SY
15 285-710 Optional Base Group 10 500 SY
16 285-713 Optional Base Group 13 20,000 SY
17 334-1 Asphalt Driveway (1 1/2") (Includes 6" Base) 1,800 SY
18 327-70 Mill Existing Asphalt Pavement 30 1/2 Day
19 N/A Portable Milling Machine 250 HR
20 334-1-13 Superpave Asphaltic Concrete (SP-9.5 Traffic Level
C)
4,000 TN
21 334-1-13 Superpave Asphaltic Concrete (SP-12.5 Traffic Level
C)
4,000 TN
22 337-7-82 Asph. Concrete Friction Course (Traffic C) (1.0") (FC-
9.5) Rubber
4,000 TN
23 526-1-101 Remove Paver Brick 100 SY
24 526-1-101 Reset Paver Brick 100 SY
25 710-11 Traffic Paint (All Widths & Colors) See Notes 500 SF
26 701-1 Thermo Plastic Pavement Marking (all Widths &
Colors) See Notes
500 SF
SUBTOTAL (ROADWAY)
DRAINAGE ITEMS
27 430-94-1 Storm Sewer Cleaning (Exist.) (24" or Less) (See
SP's)
500 LF
28 430-94 Storm Sewer Cleaning (Exist.) (> 24" to 48") (See
SP's)
500 LF
29 N/A Storm Sewer Pumping (Exist. (24" or Less) (See SP's) 500 LF
30 N/A Storm Sewer Pumping (Exist.) (> 24" to 48") (See
SP's)
500 LF
31 N/A Connect pipe to existing drainage structure (24" or
Less)
20 EA
32 N/A Connect pipe to existing drainage structure (> 24" to
36")
20 EA
33 N/A Connect pipe to existing drainage structure (>36" to
48")
20 EA
34 N/A Connect pipe to existing drainage structure (>48" to
72")
20 EA
BID PROPOSAL
DRAINAGE IMPROVEMENTS / REPAIRS AND MINOR
CONSTRUCTION CONTINUING SERVICES CONTRACT
PBC PROJECT #2026056
P-2A
FDOT ITEM
NUMBER
ITEM DESCRIPTION QTY UNITS UNIT PRICE AMOUNT
BID PROPOSAL
DRAINAGE IMPROVEMENTS / REPAIRS AND MINOR
CONSTRUCTION CONTINUING SERVICES CONTRACT
PBC PROJECT #2026056
35 N/A Remove and dispose of existing pipes (24" or Less) 500 LF
36 N/A Remove and dispose of existing pipes (>24" to 36") 500 LF
37 N/A Remove and dispose of existing pipes (>36" to 48") 500 LF
38 N/A Remove and dispose of existing pipes (>48" to 72") 500 LF
39 425-1-311 Inlets (Curb) (Type P-1) (< 10') 20 EA
40 425-1-315 Inlets (Curb) (Type P-1) (Partial - Top Only) 30 EA
41 425-1-321 Inlets (Curb) (Type P-2) (< 10') 20 EA
42 425-1-325 Inlets (Curb) (Type P-2) (Partial - Top Only) 30 EA
43 425-1-351 Inlets (Curb) (Type P-5) (< 10') 20 EA
44 425-1-355 Inlets (Curb) (Type P-5) (Partial - Top Only) 30 EA
45 425-1-361 Inlets (Curb) (Type P-6) (< 10') 20 EA
46 425-1-365 Inlets (Curb) (Type P-6) (Partial - Top Only) 30 EA
47 425-1-521 Inlets (Ditch Bottom) (Type C) 40 EA
48 425-1-541 Inlets (Ditch Bottom) (Type D) 20 EA
49 425-1-910 Inlet (Closed Flume) (Type I) 40 EA
50 425-2-61 Manhole (Type P-8) (< 10') 40 EA
51 425-2-63 Manhole (Type 8) (Partial - Top Only) 20 EA
52 425-4/425-5 Adjust Existing Manhole or Inlet 50 EA
53 425-7 Manhole Cover (Replace) 20 EA
54 425-5 Manhole Cover (Adjust) 40 EA
55 425-5 Manhole Riser (1" to 2") 50 EA
56 425-5 Manhole Ring and Cover (24") (Traffic Rated) 50 EA
57 425-6 Adjust Valve Box 200 EA
58 425-6 Valve Box Cover (Replace) 20 EA
59 425-6 Valve Box Cover (Adjust) 20 EA
60 530-1100 Rip-Rap, Sand-Cement Bags 400 CY
61 530-3-8 Rip-Rap Rubble, Remove Existing and reinstall 50 CY
62 425-10 Yard Drain (Index 282) 10 EA
63 430-174-115 Concrete Pipe Culvert (15" RCP) 500 LF
64 430-174-118 Concrete Pipe Culvert (18" RCP) 1,000 LF
65 430-174-124 Concrete Pipe Culvert (24" RCP) 1,000 LF
66 430-174-130 Concrete Pipe Culvert (30" RCP) 1,000 LF
67 430-174-136 Concrete Pipe Culvert (36" RCP) 1,000 LF
68 430-174-142 Concrete Pipe Culvert (42" RCP) 1,000 LF
69 430-174-148 Concrete Pipe Culvert (48" RCP) 1,000 LF
70 430-174-160 Concrete Pipe Culvert (60" RCP) 1,000 LF
71 430-174-172 Concrete Pipe Culvert (72" RCP) 1,000 LF
72 430-174-115 HDPE Pipe Culvert (15" Class I) 1,000 LF
73 430-174-118 HDPE Pipe Culvert (18" Class I) 1,000 LF
74 430-174-124 HDPE Pipe Culvert (24" Class I) 1,000 LF
75 430-174-130 HDPE Pipe Culvert (30" Class I) 1,000 LF
76 430-174-136 HDPE Pipe Culvert (36" Class I) 1,000 LF
77 430-174-142 HDPE Pipe Culvert (42" Class I) 1,000 LF
78 430-174-148 HDPE Pipe Culvert (48" Class I) 1,000 LF
79 430-174-160 HDPE Pipe Culvert (60" Class I) 1,000 LF
80 430-174-115 A-2000 Pipe Culvert (15"PVC) 500 LF
81 430-174-118 A-2000 Pipe Culvert (18" PVC) 500 LF
82 430-174-124 A-2000 Pipe Culvert (24" PVC) 500 LF
83 430-174-130 A-2000 Pipe Culvert (30" PVC) 500 LF
84 430-982-123 Mitered End Section (Round) (15") 5 EA
P-3A
FDOT ITEM
NUMBER
ITEM DESCRIPTION QTY UNITS UNIT PRICE AMOUNT
BID PROPOSAL
DRAINAGE IMPROVEMENTS / REPAIRS AND MINOR
CONSTRUCTION CONTINUING SERVICES CONTRACT
PBC PROJECT #2026056
85 430-982-125 Mitered End Section (Round) (18") 10 EA
86 430-982-129 Mitered End Section (Round) (24") 10 EA
87 430-982-133 Mitered End Section (Round) (30") 10 EA
88 430-982-138 Mitered End Section (Round) (36") 10 EA
89 430-982-140 Mitered End Section (Round) (42") 10 EA
90 430-174-118 ADS Flared End (18" HDPE) 2 EA
91 430-174-124 ADS Flared End (24" HDPE) 2 EA
92 430-174-130 ADS Flared End (30" HDPE) 2 EA
93 430-174-136 ADS Flared End (36" HDPE) 2 EA
94 430-174-142 ADS Flared End (42" HDPE) 2 EA
95 430-174-148 ADS Flared End (48" HDPE) 2 EA
96 431-111-5 Pipe Liner, Cured in Place, 15" 500 LF
97 431-111-8 Pipe Liner, Cured in Place, 18" 3,000 LF
98 431-1124 Pipe Liner, Cured in Place, 24" 3,000 LF
99 431-1130 Pipe Liner, Cured in Place, 30" 2,000 LF
100 431-1136 Pipe Liner, Cured in Place, 36" 2,000 LF
101 431-1142 Pipe Liner, Cured in Place, 42" 1,000 LF
102 431-1148 Pipe Liner, Cured in Place, 48" 1,000 LF
103 431-1154 Pipe Liner, Cured in Place, 54" 1,000 LF
104 431-1160 Pipe Liner, Cured in Place, 60" 1,000 LF
105 431-1172 Pipe Liner, Cured in Place, 72" 1,000 LF
106 530-3 Rubble Rip-Rap 250 TN
107 530-74 #57 Coarse Aggregate (FDOT) 10 TN
108 430-x Sand Cement Endwall 15 CY
109 430-515-100 Straight Concrete Endwall (15") 5 EA
110 430-518-100 Straight Concrete Endwall (18") 5 EA
111 430-524-100 Straight Concrete Endwall (24") 5 EA
112 430-530-100 Straight Concrete Endwall (30") 5 EA
113 430-536-100 Straight Concrete Endwall (36") 5 EA
114 430-542-100 Straight Concrete Endwall (42") 5 EA
115 430-548-100 Straight Concrete Endwall (48") 5 EA
116 430-560-100 Straight Concrete Endwall (60") 5 EA
117 N/A Dewatering (6" Pump/Wellpoints) 250 ED
SUBTOTAL (DRAINAGE)
CONCRETE ITEMS
118 400-x Misc. Concrete (Includes Reinforcing Steel) 100 CY
119 121-70 Flowable Fill 500 CY
120 432-3-2 Chemical Grout Repair, Pipe, Non-Test, 18" 10 EA
121 432-3-4 Chemical Grout Repair, Pipe, Non-Test, 24" 10 EA
122 432-3-5 Chemical Grout Repair, Pipe, Non-Test, 30" 10 EA
123 432-3-6 Chemical Grout Repair, Pipe, Non-Test, 36" 10 EA
124 432-3-8 Chemical Grout Repair, Pipe, Non-Test, 48" 10 EA
125 433-1 Chemical Grout Repair, Manhole/ Inlet 50 EA
126 520-2-4 Concrete Curb (Type D) (See Notes) 10,000 LF
127 110-4-10 Concrete Curb Type D (Removal) 500 LF
128 520-1-10 Concrete Curb & Gutter (Type F) 20,000 LF
129 110-4-10 Concrete Curb & Gutter Type F (Removal) 11,000 LF
130 520-3 Concrete Valley Gutter 500 LF
131 110-4-10 Concrete Valley Gutter (Removal) 3,000 LF
132 520-2 Concrete Flush Header Curb (PBC Standard) 25 LF
P-4A
FDOT ITEM
NUMBER
ITEM DESCRIPTION QTY UNITS UNIT PRICE AMOUNT
BID PROPOSAL
DRAINAGE IMPROVEMENTS / REPAIRS AND MINOR
CONSTRUCTION CONTINUING SERVICES CONTRACT
PBC PROJECT #2026056
133 110-4-10 Concrete Flush Header Curb (Removal) 500 LF
134 522-1 Concrete Sidewalk (4" Thick) (< 10 SY) 2,000 SY
135 522-1 Concrete Sidewalk (4" Thick) (>10SY) 2,000 SY
136 522-2 Concrete Sidewalk (6" Thick) (Driveway) (< 10 SY) 1,000 SY
137 522-2 Concrete Sidewalk (6" Thick) (Driveway) ( >10 SY) 2,000 SY
138 522-2 Concrete Sidewalk (6" Thick) (Curb Ramps) 15,000 SY
139 527-2 Cast-In-Place Tactile Surface 20,000 SF
140 N/A Pumping or Hand Placement of Concrete (1/2 Day) 5 EA
141 N/A Pumping or Hand Placement of Concrete (1 Day) 5 EA
142 110-4-10 4" Concrete Removal 5,000 SY
143 110-4-10 6" Concrete Removal 5,000 SY
SUBTOTAL (CONCRETE)
LANDSCAPING ITEMS
144 570-1 Seed and Mulch 500 SY
145 570-2 Sodding (To Match Existing) (See Notes) 25,000 SY
SUBTOTAL (LANDSCAPING)
MISCELLANEOUS ITEMS
146 455-35 Temporary or Permanent Steel Sheet Piling 100 SF
147 N/A Premium for Conflict Condition 5 EA
148 N/A Premium to Increase Box Depth to > 10' 5 EA
149 N/A Premium to Increase Box from P to J 5 EA
150 110-7 Mail Boxes (Reset) 150 EA
151 104-11 Floating Turbidity Barrier 500 LF
SUBTOTAL (MISCELLANEOUS)
TOTAL BID
P-5A
FDOT ITEM
NUMBER
ITEM DESCRIPTION QTY UNITS UNIT PRICE AMOUNT
BID PROPOSAL
DRAINAGE IMPROVEMENTS / REPAIRS AND MINOR
CONSTRUCTION CONTINUING SERVICES CONTRACT
PBC PROJECT #2026056
Note # FDOT Item #
1 All
All
2 All
3 All
All drainage and drainage conveyance items.
5 522-x
6 522-2
7 520-
8 520-2-4
9 N/A
10 120-1
11 N/A
12 N/A
13 701-1 & 710-11
14 N/A
15 110-1 & 327-70
16 530-3
17 455-35
18 570-2
PAY ITEM FOOTNOTES
Dewatering (6" Pump/Wellpoints) Well Point equipment up to 150 points complete, include pump and associated jetting equipment. Well Point Equipment shall only be used in the prosecutin of work under this contract as requested by the appointed Palm Beach County Project Supervisor.
THE COUNTY DOES NOT GUARANTEE THE ACCURACY OF THE FORMULAS AND EXTENSIONS USED IN THIS SPREADSHEET.
Concrete Sidewalk Items - These items shall include all materials, labor and equipment.
Concrete Sidewalk (6" Thick) (Curb Ramps) - includes only areas of the ramps and transitions back to level sidewalk.
FDOT Item numbers are for information only.
THE ITEMS AND QUANTITIES ABOVE, SHALL GOVERN OVER THE PLANS.
PAY ITEM FOOTNOTES IN CONSTRUCTION PLANS SHALL ALSO BE INCLUDED IN ITEM UNIT PRICE.
All costs for Survey Layout, Maintenance of Traffic (MOT) and Mobilization shall be considered incidental to, and shall be included in, unit prices for the pay items.
The cost to construct curb pads shall be included in the unit price for each respective curb item.
All costs for Clearing & Grubbing shall be considered incidental to, and shall be included in, unit prices for the pay items.
All items shall include cost to furnish and install unless otherwise noted.
Concrete Curb Type D shall include Athletic Field Backstop Curbing.
Rubble Rip-Rap - Includes finish grading, filter fabric, installation, etc. All labor and materials, including restoration of the area, are incidental to this item.
Temporary or Permanent Steel Sheet Piling - Piling material shall be PZ27 or equal. All work shall be in accordance with FDOT Standard Specifications, Section 455, Structures Foundations. Per square foot price is for Temporary or
Permanent Sheet Piling actually installed and accepted by the County, including all labor, equipment and materials, cutting, splicing, dynamic and static testing, adjustments resulting from testing, removal oftemporary piling and restoration of the area.
Sodding - Pay Item shall include all work necessary to install and establish, including watering and fertilizing to sustain an established turf until final acceptance at no additional cost. Item shall also include the filling, leveling and repairing of any washed or eroded areas, as may be necessary.
Thermoplastic Pavement Marking and Traffic Paint - Includes all labor, equipment, materials, etc. required to furnish and install pavement marking in parking lots and other areas. All items, including parking space markings, lane lines, stop bars. handicapped symbols, directional arrows and messages, in any or all colors, shall be considered incidental to the pay item.
Portable Milling Machine, per hour, includes portable milling machine, all labor for actual milling and clean-up and satisfactory disposal of milled material. Payment shall be based upon actual hours for milling and clean-up. Disposal of milled material shall be considered incidental to per hour rate for Portable Milling Machine.
Remove Existing Asphalt, and Mill Existing Asphalt items - Include all equipment, labor, etc. for removal and disposal of existing asphalt pavement material. Unit Prices shall be based upon a 1" depth of milling. The contract prices will be adjusted in ½" increments for other milling depths.
Excavation includes cutting and capping irrigation lines.
Finish Existing Rock Base - Includes all labor, equipment and baserock material sufficient to level, lightly grade and compact the existing rock base prior to application of prime coat.
Finish Grading - Includes all labor, equipment and materials required for fine grading and shaping of areas disturbed by other operations. Finish Grading does not replace grading and shaping incidental to the items Sodding and Seeding and
Mulching.
As-builts are required for all drainage and drainage conveyance items. All costs for as-builts shall be considered incidental to, and shall be included in, unit prices for the pay items.
P-6A
PROJECT NO. 2026056 TOTAL BID
IN FIGURES
The Contractor acknowledges that Addenda ______ thru ______ have been received and that related costs are reflected in the submitted bid. Contractor has committed to ______% SBE participation as set forth on the Schedule 1 and Schedule 2 that are completed and submitted by
Contractor. Contractor shall comply with said goal if awarded the Contract.
The Contractor hereby certifies and agrees that the following information is correct: In preparing its response to the Solicitation, the Contractor has considered all proposals submitted from qualified, potential Subcontractors and suppliers, and has not engaged in "discrimination" as defined in the County’s Commercial Nondiscrimination Policy as set forth in Resolution R2025-
0748 as amended, to wit: discrimination in the solicitation, selection or commercial treatment of any Subcontractor, vendor, supplier or commercial customer on the basis of race, color, national origin, religion, ancestry, sex, age, marital status, familial status, sexual orientation, disability, or genetic information, or on the basis of any otherwise unlawful use of characteristics regarding the vendor's, supplier's or commercial customer's employees or owners; provided that nothing in this policy shall be construed to prohibit or limit otherwise lawful efforts to remedy the effects of discrimination that have occurred or are occurring in the County’s relevant marketplace of Palm
Beach County. Without limiting the foregoing, "discrimination" also includes retaliating against any person or other entity for reporting any incident of "discrimination." Without limiting any other provision of the solicitation, it is understood and agreed that, if this certification is false, such false certification will constitute grounds for the County to reject the proposal submitted by the
Contractor for this Solicitation, and to terminate any contract awarded based on the response. As part of its proposal, the Contractor shall provide to the County a list of all instances within the immediate past four (4) years where there has been a final adjudicated determination in a legal or administrative proceeding in the State of Florida that the Contractor discriminated against its
Subcontractors, vendors, suppliers or commercial customers, and a description of the status or resolution of that complaint, including any remedial action taken. As a condition of submitting a proposal to the County, the Contractor agrees to comply with the County’s Commercial
Nondiscrimination Policy as described in Resolution R2025-0748, as amended.
The Contractor further agrees to perform all force account Work, as provided for in the General
Provisions, and to execute the Contract and return to the County, along with a Contract Bond and
Certificate of Insurance within fourteen (14) Working Days of the date of the Letter of Intent to
Award and to commence Work with adequate forces and Equipment within fourteen (14) Calendar
Days of the date set forth in the Notice to Proceed and to fully complete all contracted Work under the same in accordance with Contract Documents within the Contract Time.
THE TIMELY COMPLETION OF THIS PROJECT IS CRITICAL TO THE HEALTH, SAFETY
AND WELFARE OF THE TRAVELING PUBLIC. It is the desire of Palm Beach County to expedite the construction and opening to traffic of the project. The Contractor shall be required to work such hours, weekends and/or Holidays to meet the required Contract schedules.
The Contractor shall complete in full all Work under this Contract in accordance with the Special
Provisions. It is further agreed that should the Contractor fail to complete all necessary Work under
P-7A this Contract within the above referenced time; then, due to the criticalness of the timely completion of this project, liquidated damages for failure to meet these provisions shall be in accordance with Section 8 of the General Provisions.
The Contractor further agrees to furnish a sufficient and satisfactory Bond, on the form herein provided, in accordance with Section 3 of the General Provisions.
The Contractor further agrees to bear the full cost of maintaining all Work until the final acceptance, as provided in the Contract Documents.
Accompanying this Proposal is a Proposal Guaranty (Bid Bond) made payable to Palm Beach
County, a Political Subdivision of the State of Florida, in the sum of 5% of amount Bid which is to be forfeited as liquidated damages if, in case this Proposal is accepted, the undersigned should fail to execute the attached Contract under the conditions of this Proposal. Otherwise, the Bid
Bond is to be returned to the Contractor upon the delivery of a satisfactory Contract Bond.
Company Name: Authorized Officer:
(Print)
Address: Signature:
P-8A
CONTRACTOR CERTIFICATION
PALM BEACH COUNTY
ENGINEERING AND PUBLIC WORKS DEPARTMENT
NPDES GENERAL PERMIT FOR STORM WATER DISCHARGES
FROM
ROADWAY CONSTRUCTION SITES
DRAINAGE IMPROVEMENTS / REPAIRS AND MINOR CONSTRUCTION
CONTINUING SERVICES CONTRACT
PALM BEACH COUNTY PROJECT NO. 2023055
“I certify under penalty of law that I understand the terms and conditions of the general National
Pollutant Discharge Elimination System (NPDES) permit that authorizes the storm water discharges associated with industrial activity from the construction site identified as part of this certification.”
Name of Contracting Firm:
By: Date:
Name and Title:
Address or P.O. Box:
City State Zip Code
Telephone:
Area Code Number
P-9A
File details come from the government source that posted it. Updated .