2025 Q2 Usage Report.xlsx

XLSX spreadsheet 36 KB Posted

Attached to
Master Agreement AZ|CTR068583
Contract number
CTR068583
Issued by
Arizona

About this file

The document is a Quarterly Usage Report for Q2 2025, detailing contract CTR068583 for Pavement Raising and Underseal Services. The contract involves URETEK USA (located in Tomball, TX) and multiple agencies within the Arizona state transportation infrastructure, specifically including Holbrook Maintenance, Central Maintenance District Roadway Contracts, and Tucson South Maintenance. The report covers usage across different Arizona maintenance districts, with contact information for Chad Hardin and Christa Wickland from URETEK USA.

The contract provides soil injection services for lifting asphalt pavement, with pricing structured by measurement ranges: up to 5 feet ($5.25/pound), 5-10 feet ($6.95/pound), and 10-20 feet ($5.25/pound). Additional services include mobilization (200 miles, one-way) and penetrometer testing ($250 per transaction). The quarterly report documents four separate purchase orders ranging from April to June 2025, with total service volumes including thousands of pounds of soil injection across different pavement depth ranges. Invoices for these services range from INV001692299 to INV001747734, with each order including a tax component and varying mobilization and testing charges.

View the file

Other files

File Type Posted
2024 Q2 Usage Report.xlsx XLSX spreadsheet
2025 Q1 Usage Report.xlsx XLSX spreadsheet
2024 Q3 Usage Report.xlsx XLSX spreadsheet
2024 Q4 Usage Report.xlsx XLSX spreadsheet
ACCEPTED_ANY_ALL_07.01.23-07.01.24.pdf PDF
CTR068583_Contract_Amendment_Summary_One__1_.pdf PDF
CTR068583_Contract_Documents.pdf PDF
2024 Q1 Usage Report.xlsx XLSX spreadsheet
CTR068583_Contract_Amendment_Summary_Two__2_.pdf PDF
CTR068583_VPR.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

QUARTERLY USAGE REPORT - PRODUCTS AND SERVICES

Quarterly Usage Reports will be submitted to the appropriate Procurement Officer in accordance with the requirements specified in Special Terms and Conditions. The Department reserves the right to make additions, deletions and changes as deemed necessary.

Reporting Period: Q2 2025

Contract ID/Code:CTR068583Contact Name:Chad HardinAlternate Contact Name:Christa Wickland
Contract Label/Description:Pavement Raising and Underseal ServicesContact Phone Number:832-349-2274Alternate Contact Phone Number:702-601-7469
Contractor:URETEK USAContact Email:chardin@uretekusa.comAlternate Contact Email:cwickland@uretekusa.com
Contractor Address:13900 Humble Rd, Tomball, TX 77377
Agency/Org/UnitCustomer NameDelivery AddressPO Number or Identify as “P-Card”Order DateContract Item NumberContract Item DescriptionPart/Product CodeQuantityUnit of MeasureContract Unit PriceContract Extended PriceInvoice Number
HOLBROOK MAINTENANCESusan Axsom2407 NAVAJO BLVD, STE A HOLBROOK, Arizona 86025PO0000747568-24/4/25880738-1Taxes1Total Cost3,766.343,766.34
880738-2Soil Injection to Lift Asphalt Pavement (Measured from Pavement Surface), up to 5 feet1,844.03Pound5.259,681.16
880738-3Soil Injection to Lift Asphalt Pavement (Measured from Pavement Surface), over 5 feet – 10 feet5,296.64Pound6.9536,811.65
880738-4Soil Injection to Lift Asphalt Pavement (Measured from Pavement Surface), over 10 feet – 20 feet2,086.36Pound5.2510,953.38
880738-5Northeast District-Mobilization, Once Way200Mile204000INV001692299
CNTRL MAINT DIST RDWY CONTRACTSTeehan Charmaine2120 W HILTON AVE PHOENIX, Arizona 85009PO0000705672-25/5/25875744-1Taxes1.00Total Cost3,301.323,301.32
875744-2Soil Injection to Lift Asphalt Pavement (Measured from Pavement Surface), up to 5 feet2,920.00Pound5.2515,330.00
875744-3Soil Injection to Lift Asphalt Pavement (Measured from Pavement Surface), over 5 feet – 10 feet6,198.22Pound6.9543,077.63
875744-4Soil Injection to Lift Asphalt Pavement (Measured from Pavement Surface), over 10 feet – 20 feet0Pound5.250
875744-5Central District-Mobilization, One Way20Mile20400
875744-6Penetrometer Test per each transaction1Each250.00250.00INV001713106
CNTRL MAINT DIST RDWY CONTRACTSTeehan Charmaine2120 W HILTON AVE PHOENIX, Arizona 85009PO0000745128-16/9/25879072-1Taxes1.00Total Cost3,486.383,486.38
879072-2Soil Injection to Lift Asphalt Pavement (Measured from Pavement Surface), up to 5 feet2,981.80Pound5.2515,654.45
879072-3Soil Injection to Lift Asphalt Pavement (Measured from Pavement Surface), over 5 feet – 10 feet6,470.20Pound6.9544,967.89
879072-4Soil Injection to Lift Asphalt Pavement (Measured from Pavement Surface), over 10 feet – 20 feet0Pound5.250
879072-5Central District-Mobilization, One Way200Mile204000
879072-6Penetrometer Test per each transaction1Each250.00250.00INV001740699
Tucson South MaintenanceFelix Elizabeth1444 W GRANT RD BLDG #5 TUCSON, Arizona 85745-1403PO0000774961-16/17/25909797-1Soil Injection to Lift Asphalt Pavement (Measured from Pavement Surface), up to 5 feet6,382.40Pound33,507.60
909797-2Soil Injection to Lift Asphalt Pavement (Measured from Pavement Surface), over 5 feet – 10 feet4,085.60Pound28,394.92
909797-3Soil Injection to Lift Asphalt Pavement (Measured from Pavement Surface), over 10 feet – 20 feet347.2Pound1,822.80
909797-4Southcentral District-Mobilization, One Way200Mile204000
909797-5Taxes1.00Total Cost3,829.873,829.87INV001747734

Rev. 03/2025 mailto:chardin@uretekusa.commailto:cwickland@uretekusa.comhttps://app.az.gov/page.aspx/en/ord/invoice_manage/1692299https://app.az.gov/page.aspx/en/ord/invoice_manage/1713106https://app.az.gov/page.aspx/en/ord/invoice_manage/1740699https://app.az.gov/page.aspx/en/ord/invoice_manage/1747734 Sheet2

Sheet3 image1.jpeg

File details come from the government source that posted it. Updated .