About this file
This document is a Quarterly Usage Report for Q1 2025, specifically for a state contract (CTR068583) involving pavement raising and underseal services. The contract is with URETEK USA, located in Tomball, Texas, and primarily involves the Central Maintenance District Roadway Contracts in Arizona. The report details transactions for the Central Maintenance District, with specific interactions involving contacts Chad Hardin and Christa Wickland from URETEK USA.
The contract covers soil injection services for lifting asphalt pavement, with pricing structured by measurement ranges: up to 5 feet ($5.25/pound), over 5-10 feet ($6.95/pound), and over 10-20 feet ($5.25/pound). The report shows two primary purchase orders (PO0000732923-1 and PO0000705672-2) with varying quantities of soil injection services and associated mobilization costs. The first order included 500 pounds of soil injection up to 5 feet, with a total extended price of $55,115.29, while the second order involved 600 pounds up to 5 feet and 800 pounds between 5-10 feet, totaling $109,567.29. Additional line items include mobilization costs and penetrometer testing, with a standard one-way mobilization rate of $20 per mile.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2024 Q2 Usage Report.xlsx | XLSX spreadsheet | |
| 2024 Q1 Usage Report.xlsx | XLSX spreadsheet | |
| CTR068583_Contract_Amendment_Summary_Two__2_.pdf | ||
| CTR068583_VPR.pdf | ||
| 2024 Q3 Usage Report.xlsx | XLSX spreadsheet | |
| 2024 Q4 Usage Report.xlsx | XLSX spreadsheet | |
| 2025 Q2 Usage Report.xlsx | XLSX spreadsheet | |
| ACCEPTED_ANY_ALL_07.01.23-07.01.24.pdf | ||
| CTR068583_Contract_Amendment_Summary_One__1_.pdf | ||
| CTR068583_Contract_Documents.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
QUARTERLY USAGE REPORT - PRODUCTS AND SERVICES
Quarterly Usage Reports will be submitted to the appropriate Procurement Officer in accordance with the requirements specified in Special Terms and Conditions. The Department reserves the right to make additions, deletions and changes as deemed necessary.
Reporting Period: Q1 2025
| Contract ID/Code: | CTR068583 | Contact Name: | Chad Hardin | Alternate Contact Name: | Christa Wickland |
| Contract Label/Description: | Pavement Raising and Underseal Services | Contact Phone Number: | 832-349-2274 | Alternate Contact Phone Number: | 702-601-7469 |
| Contractor: | URETEK USA | Contact Email: | chardin@uretekusa.com | Alternate Contact Email: | cwickland@uretekusa.com |
| Contractor Address: | 13900 Humble Rd, Tomball, TX 77377 |
| Agency/Org/Unit | Customer Name | Delivery Address | PO Number or Identify as “P-Card” | Order Date | Contract Item Number | Contract Item Description | Part/Product Code | Quantity | Unit of Measure | Contract Unit Price | Contract Extended Price | Invoice Number |
| CNTRL MAINT DIST RDWY CONTRACTS | Charmaine Teehan | 2120 W HILTON AVE PHOENIX, Arizona 85009 | PO0000732923-1 | 2/18/25 | 864654-1 | Taxes | 1 | Total Cost | 3,258.11 | 3,258.11 | ||
| 864654-2 | Soil Injection to Lift Asphalt Pavement (Measured from Pavement Surface), up to 5 feet | 10,498.1 500 | Pound | 5.25 | 55,115.29 | |||||||
| 864654-3 | Soil Injection to Lift Asphalt Pavement (Measured from Pavement Surface), over 5 feet – 10 feet | 665.600 0 | Pound | 6.95 | 4,625.92 | |||||||
| 864654-4 | Soil Injection to Lift Asphalt Pavement (Measured from Pavement Surface), over 10 feet – 20 feet | 0 | Pound | 5.25 | 0 | |||||||
| 864654-5 | Central District-Mobilization, One Way | 20 | Mile | 20 | 400 | |||||||
| 864654-6 | Penetrometer Test per each transaction | 1 | Each | 250 | 250 | INV001648304 |
| CNTRL MAINT DIST RDWY CONTRACTS | Elizabeth Felix | 2120 W HILTON AVE PHOENIX, Arizona 85009 | PO0000705672-2 | 2/18/25 | 832785-1 | Taxes | 0 | Total Cost | 0 | 0 | |
| 832785-3 | Soil Injection to Lift Asphalt Pavement (Measured from Pavement Surface), over 5 feet – 10 feet | 0 | Pound | 6.95 | 0 | ||||||
| 832785-4 | Soil Injection to Lift Asphalt Pavement (Measured from Pavement Surface), up to 5 feet | 0 | Pound | 5.25 | 0 | ||||||
| 832785-5 | Soil Injection to Lift Asphalt Pavement (Measured from Pavement Surface), over 10 feet – 20 feet | 0 | Pound | 5.25 | 0 | ||||||
| 832785-6 | Central District-Mobilization, One Way | 0 | Mile | 20 | 0 | ||||||
| 868924-7 | Taxes | 1 | Total Cost | 10,080.19 | 10,080.19 | ||||||
| 868924-8 | Soil Injection to Lift Asphalt Pavement (Measured from Pavement Surface), up to 5 feet | 20,869.9 600 | Pound | 5.25 | 109,567.29 | ||||||
| 868924-9 | Soil Injection to Lift Asphalt Pavement (Measured from Pavement Surface), over 10 feet – 20 feet | 0 | Pound | 5.25 | 0 | ||||||
| 868924-10 | Soil Injection to Lift Asphalt Pavement (Measured from Pavement Surface), over 5 feet – 10 feet | 10,123.4 800 | Pound | 6.95 | 70,358.19 | ||||||
| 868924-11 | Central District-Mobilization, One Way. | 20 | Mile | 20 | 400 | INV001648315 |
Rev. 03/2025 mailto:chardin@uretekusa.commailto:cwickland@uretekusa.comhttps://app.az.gov/page.aspx/en/ord/order_manage_extranet/741551https://app.az.gov/page.aspx/en/ord/invoice_manage/1648304https://app.az.gov/page.aspx/en/ord/invoice_manage/1648315 Sheet2