2025.01.29.Aberdeen.SD.Cost.Estimate.Set.pdf
PDF 4 MB Posted
- Attached to
- GRPS Commissioning Services - Multiple Sites
- Solicitation number
- RFP-GRP-250000001312-1
- Issued by
- Kent County, Grand Rapids City, Michigan
About this file
This is an architectural plan set for the Aberdeen Elementary School project, prepared by DLR Group. The plans show a comprehensive new elementary school facility with two floors totaling 62,923 square feet (40,715 SF on first floor, 22,208 SF on second floor). The design includes classroom spaces for Pre-K through 5th grade, specialized areas including a gymnasium, media center, cafeteria, art and music rooms, and support spaces. The site plan features stormwater management areas, playground spaces, athletic fields, separate bus and car drop-off zones, and 80 parking spaces. Building systems include multiple rooftop HVAC units ranging from 6-50 tons cooling capacity.
The facility design incorporates multiple specialized learning environments including Pre-K and Kindergarten classrooms (approximately 1,100 SF each), standard classrooms (870 SF), special education spaces, a 5,251 SF gymnasium, 2,038 SF media center, and a 2,280 SF cafeteria. Technical specifications show finished floor elevations of 711.33' (upper) and 698.00' (lower). The building sections indicate a two-story structure with floor-to-floor heights of 13'4" and an overall building height of approximately 28'2" to the top of parapet. The plans demonstrate compliance with educational facility requirements while providing modern amenities and adequate support spaces for elementary education programming.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCALE: 1”=30’
0’ 30’15’ 60’
STORMWATER
MANAGEMENT
NEW
CUSHIONED
TURF PLAY
AREA
HARDPLAY
SERVICE
BRIDGE W/
CANOPY
EXISTING
STAIR TO
REMAIN
OUTDOOR DINING /
CLASSROOM
BUS DROP CAR DROP
MONUMENT
SIGN
RESTORE EXISTING
ATHLETIC FIELDS
POST-CONSTRUCTION
EVELYN STREET
ABERDEEN STREET
D
IA
M O
N D
A V
E N
U E
E M
E R
A
LD
A V
E N
U E
PLANTINGS
NEW ELEMENTARY SCHOOL
FFE UPPER = 711.33'
FFE LOWER = 698.00'
HP = 699.00'SWALE
MAINTAIN
EXISTING
PLAYGROUND
TRASH
ENCLOSURE
INLET RIM =
695.00'
710.80'
TOTAL PARKING = 80 CARS
1108 SF
KINDERGARTEN
1102 SF
KINDERGARTEN
1100 SF
KINDERGARTEN
1100 SF
PRE-K
696 SF
SPEECH
(KINDERGARTEN) 1114 SF
PRE-K
64 SF
RR
66 SF
RR
64 SF
RR 81 SF
RR
64 SF
RR
64 SF
RR
5251 SF
GYMNASIUM
868 SF
2ND
870 SF
2ND/SWING
869 SF
2ND
884 SF
FLEX/MIX
USE SPACE
870 SF
3RD
874 SF
3RD
870 SF
3RD
653 SF
SPED
361 SF
BOYS
362 SF
GIRLS
66 SF
F RR
59 SF
RR
2038 SF
MEDIA
CENTER
259 SF
MEDIA WORK
ROOM
151 SF
MEDIA
OFFICE
64 SF
RR
159 SF
BOOK
EQUIPMENT
STORAGE
1100 SF
MUSIC
212 SF
INSTRUMENT
STORAGE
100 SF
GYM OFFICE
301 SF
GYM
STORAGE
209 SF
COMMONS
STORAGE
2280 SF
CAFETERIA
611 SF
SERVING
646 SF
KITCHEN
814 SF
MECHANICAL
201 SF
ELECTRICAL
1102 SF
ART
100 SF
STORAGE
100 SF
KILN
1051 SF
RECEIVING
369 SF
BOYS
369 SF
GIRLS
5366 SF
CIRCULATION
100 SF
VEST.
489 SF
STAIR
464 SF
STAIR
1825 LRC
225 BREAKOUT
64 SF
F RR
A5.0
TOTAL SQUARE FT: 62,923
1ST FLOOR:40,715
2ND FLOOR: 22,208
TOTAL CIRCULATION: 13,290
FIRST FLOOR - 7,173
SECOND FLOOR - 6,117
100 SF
GARDEN
ROOM
692 SF
CIRCULATION
147 SF
RESOURCE
STORAGE/SEATING
405 SF
RECESSED
STAGE/GENERAL
BUILDING
STORAGE
162 SF
CIRC.
OUTDOOR
DINING/
LEARNING
A5.0
A5.0
120 SF
HEALTH
OFFICE
198 SF
SICK BEDS
149 SF
REST ROOM
383 SF
RECEPTION
150 SF
PRINCIPAL
147 SF
V. PRINCIPAL
202 SF
ISS ROOM
226 SF
CONFERENCE
61 SF
RR
869 SF
1ST GRADE
64 SF
RR
870 SF
1ST GRADE
64 SF
RR
440 SF
SENSORY
ROOM/TIME-OUT/
TUTORIAL/OTPT
704 SF
SPED
871 SF
4TH GRADE
870 SF
4TH GRADE
886 SF
4TH/5TH
FLEX
361 SF
BOYS
369 SF
GIRLS
654 SF
SPED
64 SF
RR
871 SF
5TH
870 SF
5TH
872 SF
5TH
601 SF
WORK
ROOM/COAT
CLOSET
61 SF
RR
163 SF
TOILET W/
SHOWER
163 SF
SPECIAL
ED/PSYCH
OFFICE
4435 SF
CIRCULATION
231 SF
CIRCULATION
253 SF
VEST.
464 SF
STAIR
489 SF
STAIRS
119 SF
VAULT64 SF
RR
405 SF
ELEC. DIST
685 SF
SPED
64 SF
F RR
A5.0
1ST GRADE
307 SF
ITINERANT
OFFICES
202 SF
RESOURCE
210 SF
RESOURCE
56 SF
JAN
64 SF
RR
STORAGE/SEATING
245 SF
CIRC.
TOTAL SQUARE FT: 62,923
1ST FLOOR:40,715
2ND FLOOR: 22,208
TOTAL CIRCULATION: 13,290
FIRST FLOOR - 7,173
SECOND FLOOR - 6,117
A5.0
A5.0
24-25101-00 TBD
ABERDEEN ELEMENTARY SCHOOL
ABERDEEN SCHOOL - CONCEPT PLANS
T R
U E
N
0 10 20
SCALE: 1/16" = 1'=0"
T R
U E
N
SCALE: 1/16" = 1'-0"
OVERALL FLOOR PLAN, LEVEL 1
T R
U E
N
SCALE: 1/16" = 1'-0"
OVERALL FLOOR PLAN LEVEL 2
A5.0
A5.0
A5.0
A5.0
24-25101-00 TBD
ABERDEEN ELEMENTARY SCHOOL
ABERDEEN SCHOOL - CONCEPT PLANS
T R
U E
N
SCALE: 1/16" = 1'-0"
OVERALL ROOF PLAN
Level 01 0' - 0"
Level 02 13' - 4"
Level 03 26' - 8"
A5.0
T/ PARAPET
28' - 2"
VEST.
GIRLS MEDIA CENTER
Level 01 0' - 0"
Level 02 13' - 4"
Level 03 26' - 8"
A5.0
T/ PARAPET
28' - 2"
SPED
KINDERGARTEN
GYMNASIUM
GYM
STORAGE
INSTRUMENT
STORAGE
CAFETERIA
SERVING KITCHEN
26' - 6"
18' - 6"
Level 01 0' - 0"
Level 02 13' - 4"
Level 03 26' - 8"
A5.0
A5.0
T/ PARAPET
28' - 2"
33' - 10"
31' - 4"
SPEECH
(KINDERGARTEN)
STAIR
SPED
ITINERANT
OFFICES
PRE-KGYMNASIUM
RECESSED
STAGE/GENERAL
BUILDING
STORAGE
ELEC. DIST
MEDIA
CENTER
4TH GRADE
FLEX/MIX
USE SPACE
SPECIAL
ED/PSYCH
OFFICE
RESOURCE
24-25101-00 TBD
ABERDEEN ELEMENTARY SCHOOL
ABERDEEN SCHOOL - BUILDING SECTIONS
SCALE: 1/8" = 1'-0"
NORTH - SOUTH MEDIA CENTER SECTION
SCALE: 1/8" = 1'-0"
NORTH - SOUTH GYM/CAFETERIA SECTION
SCALE: 1/8" = 1'-0"
EAST - WEST BUILDING SECTION
24-25101-00 TBD
ABERDEEN ELEMENTARY SCHOOL
ABERDEEN SCHOOL - MASSING RENDERS
SCALE: 1/8" = 1'-0"
NE MASSING
SCALE: 1/8" = 1'-0"
SW MASSING
1108 SF
KINDERGARTEN
1101 SF
KINDERGARTEN
1100 SF
KINDERGARTEN
1100 SF
PRE-K
701 SF
SPEECH
(KINDERGARTEN)
1099 SF
PRE-K
127 SF
READING
RESOURCE
STORAGE
64 SF
RR
67 SF
RR
64 SF
RR
64 SF
RR
64 SF
RR
64 SF
RR
5180 SF
GYMNASIUM
870 SF
2ND
870 SF
2ND/SWING
870 SF
2ND
870 SF
FLEX/MIX
USE SPACE
870 SF
3RD
870 SF
3RD870 SF
3RD
785 SF
SPED
361 SF
RR
362 SF
RR
66 SF
F RR
59 SF
RR
2075 SF
MEDIA
CENTER
250 SF
MEDIA WORK
ROOM
151 SF
MEDIA
OFFICE
199 SF
RESOURCE/SPEECH
64 SF
RR
113 SF
ELEV
400 SF
RECESSED
STAGE/GENERAL
BUILDING
STORAGE
159 SF
BOOK
EQUIPMENT
STORAGE
120 SF
SOCIAL
WORKER
1100 SF
MUSIC
212 SF
INSTRUMENT
STORAGE
100 SF
GYM OFFICE
301 SF
GYM
STORAGE
194 SF
COMMONS
STORAGE
2251 SF
CAFETERIA
538 SF
SERVING
658 SF
KITCHEN
804 SF
MECHANICAL
199 SF
ELECTRICAL
100 SF
GARDEN
ROOM
1100 SF
ART
100 SF
STORAGE
100 SF
KILN
1050 SF
RECEIVING
369 SF
RR
369 SF
RR
6422 SF
CORRIDOR
121 SF
VEST.
445 SF
STAIR
438 SF
STAIR
192 SF
CORRIDOR
36 SF
ELEC. DIS.
1825 LRC
250 BREAKOUT
64 SF
F RR
TOTAL SQUARE FT: 63,000
1ST FLOOR:41,300
2ND FLOOR: 21,700
TOTAL CIRCULATION: 13,818
FIRST FLOOR - 7,731
SECOND FLOOR - 6,087
120 SF
HEALTH
OFFICE
198 SF
SICK BEDS
149 SF
REST ROOM
700 SF
SPED
343 SF
RECEPTION
150 SF
PRINCIPAL
147 SF
V. PRINCIPAL
209 SF
ISS ROOM
226 SF
CONFERENCE
61 SF
RR870 SF
1ST GRADE
64 SF
RR
870 SF
1ST GRADE
64 SF
RR
870 SF
1ST GRADE
405 SF
SENSORY
ROOM/TIME-OUT/
TUTORIAL/OTPT
700 SF
SPED
870 SF
4TH GRADE
870 SF
4TH GRADE
886 SF
4TH/5TH
FLEX
361 SF
RR
369 SF
RR
662 SF
SPED
56 SF
RR
871 SF
5TH
867 SF
5TH
872 SF
5TH
201 SF
RESOURCE/SPEECH
113 SF
ELEV.
600 SF
WORK
ROOM/COAT
CLOSET
61 SF
RR
64 SF
RR
199 SF
RESOURCE/SPEECH
199 SF
ELECTRICAL
(HEAD END
ROOM)
159 SF
TOILET W/
SHOWER
206 SF
SPECIAL
ED/PSYCH
OFFICE
4655 SF
CIRCULATION
231 SF
CIRCULATION
208 SF
VEST.
438 SF
STAIR
445 SF
STAIRS
123 SF
VAULT
64 SF
RR
43 SF
ELEC. DIST
43 SF
CUSTODIAL
155 SF
ITINERANT
OFFICE
150 SF
ITINERANT
OFFICE
64 SF
F RR
TOTAL SQUARE FT: 63,000
1ST FLOOR:41,300
2ND FLOOR: 21,700
TOTAL CIRCULATION: 13,818
FIRST FLOOR - 7,731
SECOND FLOOR - 6,087
24-25101-00 TBD
ABERDEEN ELEMENTARY SCHOOL
ABERDEEN CONCEPT PLANS
T R
U E
N
0 10 20
SCALE: 1/16" = 1'=0"
SCALE: 1/16" = 1'-0"
OVERALL FLOOR PLAN, LEVEL 1
SCALE: 1/16" = 1'-0"
OVERALL FLOOR PLAN LEVEL 2
RTU-1
50-Ton Cooling 650 MBH Heating
20,000 CFM
15 VAV Boxes
RTU-1
50-Ton Cooling 650 MBH Heating
20,000 CFM
15 VAV Boxes Locate on roof above wing.
RTU-2
30-Ton Cooling 400 MBH Heating
12,000 CFM
9 VAV Boxes
RTU-2
30-Ton Cooling 400 MBH Heating
12,000 CFM
9 VAV Boxes Locate on roof above wing.
RTU-3
6-Ton Cooling 100 MBH Heating
2,400 CFM
6 VAV Boxes Locate on roof above wing.
RTU-4
35-Ton Cooling 500 MBH Heating
14,000 CFM
15 VAV Boxes
RTU-4
35-Ton Cooling 500 MBH Heating
14,000 CFM
15 VAV Boxes Locate on roof above wing.
RTU-5
7.5-Ton Cooling 120 MBH Heating
3,000 CFM
Single-Zone VAV
ERU-5
20-Ton Cooling 300 MBH Heating
8,000 CFM
5 VAV Boxes
RTU-6
7.5-Ton Cooling 120 MBH Heating
3,000 CFM
Single-Zone VAV
RTU-5 RTU-6
ERU-1
RTU-1 (ON ROOF)
RTU-3 (ON ROOF)
RTU-2
(ON ROOF)
RTU-4 (ON ROOF)
| Sheets |
| A1.0 - ABERDEEN SCHOOL - CONCEPT PLANS |
| A1.1 - ABERDEEN SCHOOL - CONCEPT PLANS |
| A5.0 - ABERDEEN SCHOOL - BUILDING SECTIONS |
| A6.0 - ABERDEEN SCHOOL - MASSING RENDERS |
File details come from the government source that posted it. Updated .