About this file
This is a bid tabulation and quote schedule for Collier Area Transit (CAT) in Florida, documenting a solicitation for Four Bus Stop ADA Improvements at multiple locations throughout Collier County. The project encompasses ADA improvements at Bus Stop Sites #67, #27, #221, and #498, with a Request for Quote (RFQ) issued on January 17, 2024, and quotes due on February 2, 2024, at 2:00 p.m. A site visit is strongly encouraged but not mandatory. The solicitation specifies no pre-bid meeting and indicates the award will be based on the lowest lump sum quote. Each bus stop location includes distinct work items such as mobilization, maintenance of traffic, clearing and grubbing, concrete sidewalk installation, turf sod, sign relocation or installation, and as-built surveys. Bus Stop 67 represents the most comprehensive scope with additional items including a turf protection system, concrete gravity wall construction, bus shelter pad, and custom CAT logo design with glass art panel installation.
The award criteria for this solicitation is explicitly based on the lowest responsive lump sum quote from qualified vendors. Pricing is structured as separate lump sum totals for each of the four bus stop sites, with unit pricing required for individual line items including mobilization, traffic control, excavation, concrete work, turf installation, and survey services. The bid submittal requires proper authorization and signature from the vendor's representative, with the note that no proposal will be considered without a properly completed RFQ form. Three bid tabulation notifications were sent to prospective vendors, though download and submittal quantities are not specified in the available documentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Collier_Area_Transit_Bus_Stop_Improvements.pdf | ||
| 2026-_Provisions.pdf | ||
| Insurance_Requirements_Template.docx | DOCX document | |
| Final_Plans.pdf | ||
| ICE_w_backup.pdf | ||
| PO_Terms_and_Conditions.pdf | ||
| MOP_Bus_Stops_(002).pdf | ||
| Quick_Quotes_Instructions_Version_1_.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Tabulation
| Notifications Sent: 3 |
| Downloaded: |
| Submittals: |
Please fill out and sign this form along with your proposal. No proposal will be considered unless the RFQ form is properly signed.
| DATE SENT: January 17, 2024 |
| QUOTE DUE DATE: February 2, 2024 at 2:00 p.m. |
| SITE VISIT: Strongly encouraged that the vendors visit all sites on their own prior to providing pricing |
| PROJECT ADDRESS: Various see plan sheets |
| AWARD CRITERIA: Lowest Lump Sum Quote |
| Pre-Bid Meeting: N/A |
| 2023-014 Urban 07 BS - Bus Stop Improvements |
| Due: Friday, February 2, 2024 at 2:00pm |
| Summary Description | |
| Bus Stop Site #67 ADA Improvements as per plans | |
| Bus Stop Site #27 ADA Improvements as per plans | |
| Bus Stop Site #221 ADA Improvements as per plans | |
| Bus Stop Site #498 ADA Improvements as per plans | |
| TOTAL | - 0 |
| Responsive and Documents Verified |
Company Name:______________________________________________________
Authorized Bid Submittal Name: _________________________________________
Signature: ___________________________________________________________
Quantities Sheet
| Bus Stop 67 | |||||
| Pay Item No. | Description | Unit | Quantity | Unit Price | Amount |
| 101-1 | Mobilization | LS | 1 | ||
| 102-1 | Maintenance of Traffic | LS | 1 | ||
| 104-10 | Turf Protection System | EA | 1 | ||
| 110-1-1 | Clearing and Grubbing | LS | 1 | ||
| 110-4-10 | Removal of Existing Concrete | SY | 2.7 | ||
| 120-1 | Excavation | LS | 1 | ||
| 3470-1-61 | Concrete Class NS, Gravity Wall (Road Detail) | CY | 2.9 | ||
| 522-2 | Sidewalk (Concrete 4” Thick) | SY | 10.3 | ||
| 522-4 | Bus Shelter Pad - Concrete 6” Thick | SY | 8.7 | ||
| 570-1-2 | Performance Turf Sod | SY | 8 | ||
| 700-1-50 | Single Post Sign, Relocate | EA | 1 | ||
| CC-01 | Full-Color CAT Logo Design | LS | 1 | ||
| CC-02 | Installation of Glass Art Panel (Base-mounted) | LS | 1 | ||
| ASB-1 | As-Built Survey | LS | 1 | ||
| Bus Stop 67 Total (LS) |
| Bus Stop 27 | |||||
| Pay Item No. | Description | Unit | Quantity | Unit Price | Amount |
| 101-1 | Mobilization | LS | 1 | ||
| 102-1 | Maintenance of Traffic | LS | 1 | ||
| 104-10-3 | Sediment Barrier (Staked Silt Fence) | LF | 20 | ||
| 110-1-1 | Clearing and Grubbing | SY | 0 | ||
| 120-6 | Embankment | CY | 0 | ||
| 522-2 | Sidewalk Concrete 6" Thick | SY | 1.1 | ||
| 570-1-2 | Performance Turf Sod | SY | 3 | ||
| 700-1-50 | Single Post Sign, Relocate | EA | 1 | ||
| ASB-1 | As-Built Survey | LS | 1 | ||
| Bus Stop 27 Total (LS) | $ - 0 |
| Bus Stop 221 | |||||
| Pay Item No. | Description | Unit | Quantity | Unit Price | Amount |
| 101-1 | Mobilization | LS | 1 | ||
| 102-1 | Maintenance of Traffic | LS | 1 | ||
| 104-10-3 | Sediment Barrier (Staked Silt Fence) | LF | 20 | ||
| 110-1-1 | Clearing and Grubbing | SL | 0 | ||
| 120-6 | Embankment | CY | 6 | ||
| 522-2 | Sidewalk Concrete 6" Thick | SY | 1.1 | ||
| 570-1-2 | Performance Turf Sod | SY | 6 | ||
| 700-1-50 | Single Post Sign, Relocate | EA | 1 | ||
| ASB-1 | As-Built Survey | LS | 1 | ||
| Bus Stop 221 Total (LS) | $ - 0 |
| Bus Stop 498 | |||||
| Pay Item No. | Description | Unit | Quantity | Unit Price | Amount |
| 101-1 | Mobilization | LS | 1 | ||
| 102-1 | Maintenance of Traffic | LS | 1 | ||
| 104-10-3 | Sediment Barrier (Staked Silt Fence) | LF | 20 | ||
| 110-1-1 | Clearing and Grubbing | LS | 0 | ||
| 120-6 | Embankment | CY | 6 | ||
| 522-2 | Sidewalk Concrete 6" Thick | SY | 1.1 | ||
| 570-1-2 | Performance Turf Sod | SY | 6 | ||
| 700-1-40 | Single Post Sign, Install | EA | 0 | ||
| ASB-1 | As-Built Survey | LS | 1 | ||
| Bus Stop 498 Total (LS) | $ - 0 |