2025-11 Floor diagram.pdf

PDF 24 KB Posted

Attached to
Security Video Monitoring Workstation
Solicitation number
2025-11
Issued by
Kent County, Grand Rapids City, Michigan

About this file

The document is a floor diagram for a Security Video Monitoring Workstation project for the Interurban Transit Partnership (ITP) located in Michigan. The diagram depicts a detailed layout for a video monitoring wall and officer workstations, with specific dimensional specifications including a 10' wide x 9' tall wall with 3/4" OSB board backing, a 40" window, a 48" door, and a total width of 173". The floor plan is labeled "Not to Scale" and provides precise measurements for various elements of the proposed workstation.

The diagram appears to be part of a solicitation for a professional firm to design, manufacture, deliver, and install a security workstation for the Rapid Central Station. While specific pricing details are not present in this image, the diagram suggests a carefully planned workspace with considerations for video monitoring, officer work areas, and specific spatial requirements. The project completion date will be determined collaboratively between ITP and the winning contractor, indicating flexibility in the project timeline and implementation.

View the file

Other files

File Type Posted
Q&A Document 1.pdf PDF
2025-11 ADDENDUM 1.pdf PDF
2025-11 RFP Security Video Monitoring Workstation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Not to Scale

40” window

60” 10’ wide X 9’ tall wall With ¾” OSB bard backing

48” door

21” 4”

173”

Video Monitoring Wall

Officer Workstations

File details come from the government source that posted it. Updated .