About this file
The document is a comprehensive technical specification for the Southeast Drainage Retrofit Project for the City of Dania Beach, Florida, specifically focusing on drainage improvements in the southeastern part of the city. The project involves constructing drainage improvements including a conveyance drainage system consisting of pipes, inlets, exfiltration trenches, a new stormwater pump station, injection wells, injection well piping, milling and resurfacing, swale regrading, and pavement markings. The project area is bounded by SE 2nd Avenue to the west, SE 5th Avenue to the east, a portion of SE 4th Street to the north, and SE 7th Street to the south, located at 110 N. Beach Road. The specifications provide detailed technical requirements for materials, installation methods, testing, and quality control across multiple divisions including concrete, electrical, earthwork, utilities, and site improvements.
The project will be competitively bid with contractors required to possess appropriate licensing and comply with Broward County and City of Dania Beach ordinances. The technical specifications indicate a preference for Flygt pumps and controls, with a potential for approved equal substitutions after contract award. The contractor will be responsible for comprehensive site work including utility coordination, environmental protection, dust control, and restoration. The project includes specific requirements for submittals, testing, quality assurance, and documentation, with a focus on maintaining existing services, protecting adjacent properties, and ensuring minimal disruption to public infrastructure. The contract will likely be awarded to the lowest responsible bidder who can demonstrate technical capability and compliance with the extensive technical requirements outlined in the document.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TABLE OF CONTENTS
DIVISION 01 – GENERAL REQUIREMENTS
011000 Summary .................................................................................................011000-1 to 011000-18
011201 Measurement and Payment ........................................................................011201-1 to 011201-6
013100 Project Management and Coordination ....................................................013100-1 to 013100-20
013233 Photographic Documentation ....................................................................013233-1 to 013233-3
013300 Submittal Procedures ..................................................................................013300-1 to 013300-5
014000 Quality Requirements .................................................................................014000-1 to 0140005
014200 References .................................................................................................014200-1 to 014200-6
015000 Temporary Facilities ..................................................................................015000-1 to 015000-9
016000 Product Requirements ................................................................................016000-1 to 016000-6
017300 Execution ...................................................................................................017300-1 to 017300-4
017700 Closeout Procedures ..................................................................................017700-1 to 017700-4
017823 Operation and Maintenance Data ..............................................................017823-1 to 017823-7
DIVISION 02 – EXISTING CONDITIONS
024119 Selective Demolition ...............................................................................024119-1 to 024119-12
DIVISION 03 – CONCRETE
031000 Concrete Formwork ...................................................................................031000-1 to 031000-6
033000 Cast-in-Place Concrete ............................................................................033000-1 to 033000-10
DIVISION 22 – PLUMBING
220510 Submersible Storm Water Pumps ..............................................................220510-1 to 220510-7
220515 Pump Control System ..............................................................................220515-1 to 220515-15
221429 Sump Pumps ..............................................................................................221429-1 to 221429-2
DIVISION 26 – ELECTRICAL
260100 Basic Electrical Requirements ...................................................................260100-1 to 260100-8
260500 Basic Electrical Materials and Methods ....................................................260500-1 to 260500-5
260600 Grounding...................................................................................................260600-1 to 260600-3
260700 Equipment and Raceway Support Systems ................................................260700-1 to 260700-3
261100 Raceway .....................................................................................................261100-1 to 261100-6
261200 Instrumentation and Conductors 600 Volts & Under ................................261200-1 to 261200-6
261300 Outlets, Pull and Junction Boxes ..............................................................261300-1 to 261300 -2
261400 Switches and Receptacles ...............................................................................................261400-1
262200 Motors ........................................................................................................262200-1 to 262200-6
262650 Variable Frequency Drives ......................................................................262650-1 to 262650-12
262800 Overcurrent Protective Devices 600 Volts ................................................262800-1 to 262800-2
264200 Stationary Engine Generator Modifications ...............................................264200-1 to 264200-5
264390 Distribution, Power Panelboards ................................................................264390-1 to 264390-3
264600 Low Voltage Transformers – Dry Type ....................................................264600-1 to 264600-2
264960 Automatic transfer Switch .........................................................................264960-1 to 264960-3
269400 Control and Instrumentation Panel ............................................................269400-1 to 269400-3
269500 Electrical Testing .....................................................................................269500-1 to 269500-15
269900 Power system and Protection Relay Adjustment .......................................269900-1 to 269900-4
DIVISION 31 – EARTHWORK
311000 Site Clearing ...............................................................................................311000-1 to 311000-8
312000 Earthmoving .............................................................................................312000-1 to 312000-28
312200 Site Grading................................................................................................312200-1 to 312200-3
312319 Dewatering ..................................................................................................312319-1 to312319-5
312334 Excavation and Backfilling for Utilities .....................................................312334-1 to 312334-7
313116 Termite Control ..........................................................................................313116-1 to 313116-6
DIVISION 32 – EXTERIOR IMPROVEMENTS
321216 Asphalt Paving .........................................................................................321216-1 to 321216-22
321313 Concrete Paving........................................................................................321313-1 to 321313-30
321373 Concrete Paving Joint Sealants...................................................................321373-1 to 321373-8
321413 Precast Concrete Unit Paving .....................................................................321413-1 to 321413-6
321733 Parking Bumpers .......................................................................................321733-1 to 321733-2
321723 Pavement Markings ...................................................................................321723-1 to 321723-3
329000 Planting ....................................................................................................329000-1 to 329000-11
329119.13 Topsoil .........................................................................................329119.13-1 to 329119.13-2
329223 Sodding.......................................................................................................329223-1 to 329223-7
DIVISION 33 – UTILITIES
330520 Piping General ...........................................................................................330520-1 to 330520-8
334100 Storm Utility Drainage ............................................................................334100-1 to 334100-13
334400 Injection Wells............................................................................................334400-1 to 334400-9
END OF TABLE OF CONTENTS
DIVISION 01
GENERAL REQUIREMENTS
SECTION 011000
SUMMARY OF WORK
SOUTHEAST DRAINAGE RETROFIT PROJECT
011000 - 2
SECTION 011000 - SUMMARY OF WORK
PART 1 - GENERAL
1.01 SCOPE
A. The WORK to be performed under this Contract shall consist of furnishing and installing all tools, equipment, materials, supplies, and manufactured articles and furnishing all labor, transportation, and services, including fuel, power, water, and essential communications, and performing all work, or other operations required for the fulfillment of the Contract in strict accordance with the Contract Documents. The WORK shall be complete, and all work, materials, and services not expressly indicated or called for in the Contract Documents which may be necessary for the complete and proper construction of the WORK in good faith shall be provided by the
CONTRACTOR as though originally so indicated, at no increase in cost to the City of
Dania Beach (OWNER).
1.02 WORK COVERED BY CONTRACT DOCUMENTS
A. The work of this contract comprises the construction of the drainage improvements including, but not limited to a conveyance drainage system of pipes, inlets, exfiltration trenches, a new stormwater pump station, injection wells, injection well piping, milling and resurfacing, swale regrading, and pavement markings.
B. The general location is as follows: SE 2nd Avenue to the west, SE 5th Avenue to the east, portion of SE 4th
Street to the north and SE 7th Street to the south.
1. 110 N. Beach Road, Dania Beach Florida.
1.03 NOTICE TO BIDDERS
A. The successful bidder, in order to be considered responsive, must possess the appropriate license. It should also be noted that the successful bidder will, at the time of the pre-work conference, be required to show that each of his subcontractors is in compliance with Chapter 9 of the Broward
County Code of Ordinances.
1.04 STANDARD SPECIFICATION
A. Except as noted, all materials and workmanship shall meet the requirements of the latest editions of the following publications, codes, and general requirements:
1. City of Dania Beach Ordinances and requirements for land development and utilities.
2. Broward County Highway Construction and Engineering Division "The Minimum Standards
Applicable to Public Rights-of-Way under Broward County Jurisdiction"(to be referred to as Broward County Highway Construction and Engineering Division
"Minimum Standards") (latest revision).
3. The Florida Department of Transportation "Standard Specifications for Road and Bridge
Construction", and its supplements.
4. The Florida Department of Transportation "Roadway and Traffic Design Standards";
5. The Florida Department of Transportation "Structures Standards", (latest revision).
SOUTHEAST DRAINAGE RETROFIT PROJECT
011000 - 3
1.05 SITE INVESTIGATION
A. The CONTRACTOR, by virtue of signing the Contract, acknowledges that he and all his subcontractors have satisfied themselves to the nature and location of the work, the general and local conditions including, but not restricted to: those bearing upon transportation; disposal, handling and storage of materials; access roads to the site; the conformation and conditions of the work area; and the character of equipment and facilities needed preliminary to and during the performance of the work. Failure on the part of the CONTRACTOR to completely or properly evaluate the site conditions shall not be grounds for additional compensation.
B. Soil boring information may be furnished to the CONTRACTOR for his general information. Such data is not warranted to be correct; the CONTRACTOR, by virtue of signing the Contract, acknowledges that he and his subcontractors have satisfied themselves as to the nature and extent of soil and (underground) water conditions on the project site. Unless approved in writing by the ENGINEER, no additional payment will be made to the CONTRACTOR because of differences between actual conditions and those shown by the boring logs.
1.06 WORK BY OTHERS
A. Concurrent Work by Other CONTRACTORS. The CONTRACTOR's attention is directed to the fact that work may be conducted at the site by other CONTRACTORS during the performance of the WORK under this Contract. The CONTRACTOR shall conduct its operations so as to cause little or no delay to WORK of such other CONTRACTORS, and shall cooperate fully with such
CONTRACTORS to provide continued safe access to their respective portions of the site, as required to perform work under their respective contracts.
B. Interference With Work On Utilities. The CONTRACTOR shall cooperate fully with all utility forces of the OWNER or forces of other public or private agencies engaged in the relocation, altering, or otherwise rearranging of any facilities which interfere with the progress of the WORK, and shall schedule the WORK so as to minimize interference with said relocation, altering, or other rearranging of facilities.
1.07 WORK SEQUENCE
A. The CONTRACTOR shall schedule and perform the work in such a manner as to result in the least possible disruption to the public's use of marina, roadways, driveways, and utilities. Utilities shall include but not be limited to water, sewerage, drainage structures, ditches and canals, gas, electric, television, cable and telephone. Prior to commencing with the WORK, CONTRACTOR shall perform a location investigation of existing underground utilities and facilities and shall have obtained all required permits and permissions, CONTRACTOR shall also deliver written notice to City of Dania Beach City Engineer (OWNER’S Representative), and the engineer of record
(ENGINEER), and property occupants (private and public) of all planned disruption to roadway, driveways, and utilities 72 hours in advance of disruption.
B. It may be acceptable to sequence portions of this project. CONTRACTOR shall be responsible to coordinate construction activities with CONTRACTOR of adjacent phases and sections.
C. CONTRACTOR shall sequence the work so as to minimize impact on neighboring properties.
CONTRACTOR shall notify the OWNER, schools, Post Office, residents, Broward
County Traffic Engineering, Emergency Service providers, etc. 14 days prior to disruption
SOUTHEAST DRAINAGE RETROFIT PROJECT
011000 - 4 of drive aisle or accessible path. If accessible path is disrupted an alternative path meeting
ADA requirements shall be provided during this period.
1.08 WORK SCHEDULE
A. Time is of the essence in completing this project. Because time is of the essence the
CONTRACTOR shall commit the necessary resources to this project to complete it in a timely manner. Those resources may include multiple working crews, working overtime, etc. Because time is of the essence the CONTRACTOR's construction progress will be monitored closely on a regular basis. The Construction progress will be measured with the construction schedule submitted by the CONTRACTOR. If the ENGINEER determines that the CONTRACTOR does not meet the CPM as specified in Section 013100, the CONTRACTOR will be required to commit those resources necessary to ensure the completion of the project in a timely manner including working overt ime, adding other work crews, etc. All costs incurred to implement measure to complete the work in timely manner will be borne by the CONTRACTOR at no additional cost to the OWNER.
B. SCHEDULE
1. CONTRACTOR shall submit scheduling information for the work as required in Section
"Schedules and Reports".
2. No separate payment shall be made for preparation and/or revision of the schedule.
1.09 COMPUTATION OF CONTRACT TIME
A. It is the CONTRACTOR's responsibility to provide clear and convincing documentation to the
ENGINEER as to the effect additional work will have with respect to additional contract time extension that may be justified. If additional quantities of work can be carried out concurrent with other existing construction activities without disrupting the critical path of the project, then no contract time extension will be granted. CONTRACTOR is obligated to provide documentation to the ENGINEER if additional elements of work affect the critical path of the project. If work set forth in the original scope of the project is deleted, the contract time may be reduced. This contract is a calendar day contract. While the CONTRACTOR may be granted time to suspend work operations for vacations or holidays, contract time will not be suspended.
During suspensions CONTRACTOR shall be responsible for all maintenance of traffic and liability without additional compensation from the OWNER.
1.10 CONTRACTOR USE OF PREMISES
A. The CONTRACTOR's use of the project site shall be limited to its construction operations.
Storage of materials will be arranged for by the CONTRACTOR and a copy of an agreement for use of other property shall be furnished to the ENGINEER.
SOUTHEAST DRAINAGE RETROFIT PROJECT
011000 - 5
1.11 PRE-CONSTRUCTION CONFERENCE
A. After the award of Contract a Pre-construction work Conference will be held between the CONTRACTOR, the ENGINEER, the OWNER, other interested Agencies, representatives of Utility Companies and others affected by the work. The time and place of this conference will be set by the ENGINEER. The CONTRACTOR shall bring with him to the conference a copy of his proposed work schedule for the approval by the ENGINEER of the proposed methods and manner of executing the work including sequences of operation and time schedule. The work shall be performed in accordance with such schedule or approved amendments thereto.
1.12 UTILITY LOCATIONS
A. As far as possible, all existing utility lines in the project area have been shown on the plans.
However, the OWNER does not guarantee that all lines are shown, or that said lines are in their true location. It shall be the CONTRACTOR's responsibility to identify and locate all underground or overhead utility lines or equipment affected by the project. No additional payment will be made to the CONTRACTOR because of discrepancies in actual and plan location of utilities and damages suffered as a result thereof.
B. The CONTRACTOR shall notify each utility company involved at least thirty (30) days prior to the start of construction to arrange for positive underground location, relocation or support of its utility where that utility may be in conflict with or endangered by the proposed construction. Relocation of water mains or other utilities for the convenience of the
CONTRACTOR shall be paid for by the CONTRACTOR. All charges by utility companies for temporary support of its utilities shall be paid for by the CONTRACTOR. All costs of permanent utility relocations to avoid conflict shall be the responsibility of the
CONTRACTOR and the utility company involved.
C. The CONTRACTOR shall schedule and coordinate his work in such a manner that he is not delayed by the utility companies relocating or supporting their utilities. No compensation will be paid to the CONTRACTOR for any loss of time or delay.
D. All overhead, surface or underground structures and/or utilities encountered are to be carefully protected from damage or displacement. All damage to said structures and/or utilities is to be completely repaired within a reasonable time; needless delay will not be tolerated. The OWNER reserves the right to remedy any damage by ordering outside parties to make repairs at the expense of the CONTRACTOR. All repairs made by the
CONTRACTOR are to be made to the satisfaction of the utility owner and shall be inspected by a representative of the utility owner and the ENGINEER.
E. The CONTRACTOR should be aware of the Sunshine State One Call Center, which has a free locating service for CONTRACTORS and excavators:
Within forty-eight hours before excavating, dial toll free 1-800-432-4770, and a locator will be dispatched to the work location. CONTRACTOR shall reasonably notify other utility companies not notified by Sunshine State One Call Center.
F. In the event that during the course of the Work CONTRACTOR encounters subsurface or concealed conditions or unknown physical conditions of an unusual nature at the
Project site which differ materially from those shown on the Contract Documents, which are not marked in the field by locating services or Utility Department, and which differ from
SOUTHEAST DRAINAGE RETROFIT PROJECT
011000 - 6 those ordinarily encountered and generally recognized as inherent in work of the character called for in the Contract Documents, CONTRACTOR, without disturbing the conditions and before performing any work affected by such conditions, shall, within twenty-four (24) hours of their discovery, notify the OWNER and the ENGINEER in writing of the existence of the aforesaid conditions. the OWNER and the ENGINEER shall, within two
(2) business days after receipt of CONTRACTOR’s written notice, investigate the site conditions identified by CONTRACTOR. Should the ENGINEER determine that the conditions of the Project site are not so materially different to justify a change in the terms of the Contract, the ENGINEER shall so notify the OWNER and the CONTRACTOR in writing, stating the reasons, and such determination shall be final and binding upon the parties hereto. No request by CONTRACTOR for a change to the Contract Price or Time under this provision shall be allowed if the CONTRACTOR has not given written notice in strict accordance with these provisions, or if it is made after the date certified by the
ENGINEER as the date of Substantial Completion.
1.13 LINE AND GRADE
A. The ENGINEER has provided vertical and horizontal control for layout of the work in the form of benchmarks and reference points located adjacent to the work. From these controls provided, the CONTRACTOR shall develop and make all detailed surveys needed for construction and shall establish all working points, lines and elevations necessary to perform the work. This surveying work shall be supervised by a Professional Surveyor & Mapper registered in the State of Florida. The CONTRACTOR shall not rely on any electronic files from the ENGINEER for any layout.
1.14 PROTECTION AND RESTORATION OF SURVEY MONUMENTS
A. The CONTRACTOR shall carefully protect from disturbance all survey monuments, stakes and benchmarks, whether or not established by him, and he shall not remove or destroy any surveying point until it has been properly witnessed by the ENGINEER. All major survey monuments that have been damaged by the CONTRACTOR such as section corners, 1/4 section corners, property corners or block control points shall be replaced at the CONTRACTOR's expense with markers of a size and type approved by the ENGINEER. The replacement shall be under the supervision of a Florida Registered Professional Surveyor & Mapper where directed by the ENGINEER. The CONTRACTOR shall document survey movements prior to construction and shall submit the location and type of all markers to the ENGINEER in writing.
1.15 EQUIPMENT
A. All equipment necessary and required for the proper construction of all facilities shall be on the construction site, in first-class working condition.
1.16 STORAGE SITES
A. The CONTRACTOR shall furnish, at his expense, properly zoned areas suitable for field office, material storage including but not limited to; earthen spoil suitable for fill and/or backfill and equipment service and storage. No material may be stored in the public right of way without prior authorization by the agency having jurisdiction. The CONTRACTOR shall keep these areas in a clean and orderly condition so as not to cause a nuisance or sight obstruction to motorists or pedestrians. Storage sites shall be fenced for Public Safety.
SOUTHEAST DRAINAGE RETROFIT PROJECT
011000 - 7
1.17 OWNERSHIP OF EXISTING MATERIALS
A. All materials removed or excavated from the job site shall remain the property of the OWNER until released by the Contract Administrator, at which time it shall become the property of the
CONTRACTOR, who shall dispose of it in a manner satisfactory to the ENGINEER. Where directed by the ENGINEER, the CONTRACTOR shall remove existing fences, trees, shrubs, etc. and places them on adjacent private property for future use by others.
1.18 EXCESS MATERIAL
A. Upon direction of the ENGINEER all vegetation, debris, concrete or other unsuitable materials shall be disposed of in areas provided by the CONTRACTOR and approved by the ENGINEER.
Any excess material desired to be retained by the OWNER shall be delivered and stored by the
CONTRACTOR to a designated area to be approved by the OWNER, at no extra cost to the
OWNER.
1.19 AUDIO-VISUAL PRECONSTRUCTION RECORD
A. General:
1. The CONTRACTOR shall engage the services of a professional electrographer.
The color audio-video tapes shall be prepared by a responsible commercial firm known to be skilled and regularly engaged in the business of preconstruction color audio-video tape documentation. The electrographer shall furnish to the ENGINEER a list of all equipment to be used for the audio-video taping i.e., manufacturer's name, model number, specifications and other pertinent information. Additional information to be furnished by the electrographer are the names and addresses of two references that the electrographer has performed color audio-video taping for on projects of a similar nature within the last 12 months.
2. Prior to beginning the work, the CONTRACTOR shall have a continuous color audio- video tape recording taken along the entire length of the project to serve as a record of preconstruction conditions. No construction shall begin prior to review and approval of the tapes covering the construction area by the ENGINEER. The
ENGINEER shall have the authority to reject all or any portion of the video tape not conforming to the specifications and order that it be redone at no additional charge.
The CONTRACTOR shall reschedule unacceptable coverage within five days after being notified. The ENGINEER shall designate those areas, if any, to be omitted from or added to the audio- video coverage.
B. Audio-Video Tapes:
1. Audio-Video tapes shall be new. Reprocessed tapes will not be acceptable. The tapes shall be one half inch, high energy, extended still frame capable video cassettes. They shall be interchangeable with the color video cassette player and shall be compatible for playback with a standard player-receiver, VHS format.
2. CONTRACTOR shall provide the ENGINEER and the OWNER with one complete set of tapes for each of the project area.
SOUTHEAST DRAINAGE RETROFIT PROJECT
011000 - 8
C. Equipment:
1. All equipment, accessories, materials and labor to perform this service shall be furnished by the
CONTRACTOR.
2. The total audio-video system shall reproduce bright, sharp, clear pictures with accurate colors and shall be free from distortion, tearing, rolls or any other form of imperfection.
The audio portion of the recording shall reproduce the commentary of the camera operator with proper volume and clarity and be free from distortion and interruptions.
3. When conventional wheeled vehicles are used, the distance from the camera lens to the ground shall not be less than twelve feet. In some instances, audio-video tape coverage may be required in areas not accessible by conventional wheeled vehicles. Such coverage shall be obtained by walking or special conveyance approved by the
ENGINEER.
4. The color video camera used in the recording system shall have a horizontal resolution of
300 lines at center, a luminance signal to noise ratio of 45 dB and a minimum illumination requirement of 25 foot-candles.
D. Recorded Information - Audio:
1. Each tape shall begin with the current date, project name and municipality and be followed by the general location, i.e., name of street, house address, viewing side and direction of progress. The audio track shall consist of an original live recording. The recording shall contain the narrative commentary of the electrographer, recorded simultaneously with his
fixed elevation video record of the zone of influence of construction.
E. Recorded Information - Video:
1. All video recordings must, by electronic means, display continuously and simultaneously generated with the actual transparent digital information to include the date and time of recording, and station numbers as shown on the drawings. The date information shall contain the month, day and year. The time information shall contain the hour, minutes and seconds. Additional information shall be displayed periodically. Such information shall include, but not be limited to, project name, contract number, name of street, house address, direction of travel and the viewing side. This transparent information shall appear on the extreme upper left hand third of the screen.
2. All taping shall be done during times of good visibility. No taping shall be done during precipitation, mist or fog. The recording shall only be done when sufficient sunlight is present to properly illuminate the subjects of recording and to produce bright, sharp video recordings of those subjects.
3. The rate of speed of the vehicle used during taping shall not exceed 10 miles per hour.
Panning, zoom-in and zoom-out rates shall be sufficiently controlled to maintain a clear view of the object.
SOUTHEAST DRAINAGE RETROFIT PROJECT
011000 - 9
4. Tape coverage shall include all surface features located within the zone influence of construction supported by appropriate audio coverage. Such coverage shall include, but not be limited to, existing driveways, sidewalks, curbs, pavements, ditches, mailboxes, landscaping, culverts, fences, signs and headwalls within the area covered.
F. Payment:
Compensation for the audio-video preconstruction record shall be included in the lump sum price bid for Item ‘Mobilization’.
1.20 ADJUSTING EXISTING VALVES, METERS, CATCH BASINS, AND MAINTENANCE
ACCESS STRUCTURES
A. It shall be the CONTRACTOR's responsibility to coordinate and have all adjustments made to existing water meters, valves, and structures encountered during construction, in order to meet all final grades, unless otherwise instructed by the ENGINEER or the respective utility owner. All valves and maintenance access structure shall be accessible during all phases of the work for emergency access. Omission of such structures from the Contract Plans does not relieve the
CONTRACTOR from making such adjustments as may be deemed necessary. The
CONTRACTOR shall take this provision into account when personally investigating the site prior to bidding. No additional payment shall be made for these adjustments.
1.21 CONFLICT STRUCTURES
A. The CONTRACTOR shall abide by the following criteria concerning conflicts between new drainage, water, or sewer construction and existing utilities.
1. The CONTRACTOR shall verify the location of all utilities suspected of being potential conflicts prior to ordering drainage or sewer structures for these locations and inform the
ENGINEER as to his findings.
2. The ENGINEER shall have full authority to direct the placement of conflict structures, the relocation of structures shown in the plans, and the addition, deletion, or relocation of any pipe shown in the plans in order to facilitate construction, expedite completion and avoid conflicts with existing utilities.
3. Where an existing utility is to pass through a conflict structure, the CONTRACTOR shall protect the utility from damage by whatever means the utility owner and the ENGINEER deem necessary.
4. In no case shall there be less than 0.5 feet between any two (2) pipe lines within the structure or between pipe lines and the structure.
1.22 ENVIRONMENTAL PROTECTION
A. The CONTRACTOR shall furnish all labor and equipment and perform all work required for the prevention of environmental pollution during and as a result of the work under this contract. The
CONTRACTOR shall be responsible for preparing and complying with the requirements of the
National Pollution Prevention Discharge Elimination System (NPDES) and Storm Water
Pollution Prevention Plan (SWPPP). For the purpose of this contract environmental pollution is
SOUTHEAST DRAINAGE RETROFIT PROJECT
011000 - 10 defined as the presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances of importance to human life, affect other species of importance to man, or degrade the utility of the environment for aesthetic and recreational purposes. The control of environmental pollution requires consideration of air, water, land and involves noise, solid waste management and management of radiant energy and radioactive materials, as well as other pollutants.
B. The CONTRACTOR shall take all steps necessary to protect water quality in the connected waters around the project and shall utilize such additional measures as directed by the
ENGINEER. Silt screens adjacent to outfall construction shall not be removed until the turbidity of the affected waters is equal to or lower than the ambient turbidity of undisturbed segments of adjacent surface waters.
1.23 BASIS OF PAYMENT
A. The CONTRACTOR's Professional Surveyor & Mapper will measure all "As-built" quantities for payment. In the event of disputes as to quantity, the ENGINEER shall make the final determination; no additional compensation will be made for surveying services. This work shall be supervised by a Florida Licensed Registered Professional Surveyor & Mapper.
B. The CONTRACTOR shall not be permitted to invoice for quantities of work beyond those contained in the contract and all previously approved change orders. Invoice for partial payment shall not be accepted by ENGINEER as complete without the following.
1. Certificate of payment to subcontractors.
2. Small Disadvantaged Business Enterprise Program Performance Report.
3. Updated Construction Schedule.
4. "As-built" drawings for the work being invoiced.
1.24 APPLICATION FOR PAYMENT FOR STORED MATERIALS
A. Application for payment for stored materials may not be made by the CONTRACTOR.
1.25 VIBRATORY COMPACTION
A. The use of vibratory compaction equipment shall be limited to a total gross weight of three (3) tons.
The use of vibratory equipment shall be limited to compacting backfill of utility trenches and subgrade of roadways only. If approved in writing by the ENGINEER, larger vibratory compaction equipment may be allowed if operated in a static mode only.
1.26 REPORTING OF DAMAGE CLAIMS
A. The CONTRACTOR shall keep the OWNER informed of any damage claims made against the
CONTRACTOR during the construction period. All claims for automobile damage, property damage/bodily injury will be reported to Engineer of Record and OWNER within 24 hours of receipt of notice. CONTRACTOR will conduct a timely investigation of the claim and determine if they will honor claim and or report to their insurance carrier.
CONTRACTOR will advise City of Dania Beach in writing of their decision/referral to carrier. The project is an improvement project. As such, the CONTRACTOR will have close contact with the community. The CONTRACTOR shall notify the City and the CONSULTANT
SOUTHEAST DRAINAGE RETROFIT PROJECT
011000 - 11 of any and all community concerns or claims arising from the CONTRACTOR’s operations. The claims referenced herein are exclusive of damages or property claims as outlined above.
1.27 PROJECT AND COMMUNITY COORDINATION
A. The CONTRACTOR shall comply with the OWNER Coordination requirements.
1.28 TECHNICAL PROVISIONS
1.28.1 SCOPE
A. Work under this contract includes furnishing materials, labor, tools, equipment, supervision and incidentals necessary to construct infrastructure improvements.
1.28.2 GENERAL
A. Provisions of this section shall comply with both the City of Dania Beach and Broward County
Engineer and development and construction requirements as applicable.
1.28.3 ITEMS SPECIFIED ON DRAWINGS
A. Items of material, equipment, machinery and the like may be specified on the Drawings and not in the Technical Specifications. Such items shall be provided by the CONTRACTOR in accordance with the General Notes on the Drawings.
1.28.4 FIELD LAYOUT OF THE WORK AND RECORD DRAWINGS
A. Field layout shall be performed as required by City of Dania Beach Building Department.
B. On completion of construction the CONTRACTOR shall provide two sets of Record
Drawings and one set of ACAD 2018 Format with all the As-Built information; all locations, dimensions and elevations of the constructed facilities, certified, signed and sealed thereon by a Professional
Land Surveyor registered in the State of Florida. All elevations shall refer to NGVD 1929
Datum. The cost of such field layout and recording work shall be the responsibility of the
CONTRACTOR. The as-built utility information shall meet the requirements of utility agency having authority.
C. All property block corners damaged or destroyed during construction shall be replaced by the
CONTRACTOR. CONTRACTOR shall submit a drawing to the engineer showing all block corners signed and sealed by a Professional Land Surveyor registered in the State of Florida.
1.28.5 SALVAGE
A. Any existing equipment or material, including but not limited to valves, pipes, fittings, couplings, etc., which is removed as a result of construction under this project may be designated as salvage by the CONTRACT ADMINISTRATOR, and if so, shall be delivered clean to the OWNER at a location directed by the CONTRACT ADMINISTRATOR. Any equipment or material not worthy of salvaging shall be disposed of by the CONTRACTOR at a suitable location
SOUTHEAST DRAINAGE RETROFIT PROJECT
011000 - 12 in accordance with all applicable regulations, ordinances and laws at no additional cost to the
OWNER.
1.28.6 POWER
A. The CONTRACTOR shall furnish and pay for all electrical power required for the construction, testing and trial operation, prior to final acceptance by the OWNER.
1.28.7 WATER SUPPLY
A. All water required for testing, flushing and construction shall be furnished by the OWNER and paid for by the CONTRACTOR. The quantity of water used shall be determined by reading the meter at the start and at the finish of construction. The CONTRACTOR shall make all arrangements and incur all expense involved in having the OWNER furnish and install the necessary water meters. Each water service line shall be provided with a vacuum relief or backflow preventer which shall meet the requirements of ASA A40.6, latest revision, and the local administrative authority.
1.28.8 MAINTENANCE -OF WATER AND SEWER SERVICE
A. The CONTRACTOR shall fully cooperate at all times with the OWNER in order to maintain the operation of the existing water and/or sewer system with the least amount of interference and interruption possible. The schedule, plans and work of the CONTRACTOR shall at all times be subject to alteration and revision if necessary for public health and safety considerations. The creation of a public nuisance will not be permitted.
B. It may be necessary to interrupt the operation of the existing water and/or sewer system. In all cases where the CONTRACTOR must cause an interruption, he shall prepare and submit to the
ENGINEER four (4) working days prior to commencing the work, a complete description of his proposed procedure and a time schedule which he will guarantee. At least twenty-four (24) hours prior to the time proposed for starting the work, the CONTRACTOR will be notified by the
ENGINEER whether or not the work will be permitted as proposed.
1. The ENGINEER reserves the right to require the CONTRACTOR to work 24 hours per day in all cases where, in his opinion, interference with operation of the system may result in dangerous health hazards or offensive conditions.
2. In no case will the CONTRACTOR be permitted to interfere with the existing system until all materials, supplies, equipment, tools and incidentals necessary to complete the work are on the site. Backup equipment on key equipment items shall be required on work necessitating interference with the existing system.
1.28.9 SITE RESTORATION
A. The CONTRACTOR shall remove all excess material and shall clean up and restore the site to its original condition or better. All damage, as a result of work under this Contract, done to existing structures, pavement, driveways, paved areas, curbs and gutters, sidewalks, shrubbery, grass, trees, fences, walls, utility poles, utility pipelines, conduits, drains, catch basins, flagstones, rocked graveled or stabilized areas or driveways, and including all obstructions not specifically named herein, shall be repaired, or replaced, as determined by the ENGINEER. Site restoration
SOUTHEAST DRAINAGE RETROFIT PROJECT
011000 - 13 shall be done in a timely manner as the work progresses. Site restoration work shall be completed on private property within 30 days after being disturbed.
B. All private property restoration due to grade differentials between back of sidewalk elevations and private property elevations shall be achieved by regrading private property, with or without back of sidewalk curbs or low retaining walls. Payment for private property restoration due to grade differentials shall be made at the unit price of such work performed as named in the Bid Schedule, including but not limited to clearing and grading, sod, limerock, asphalt, concrete, etc.
1.28.10 SANITARY FACILITIES
A. The CONTRACTOR shall provide temporary facilities at the site as directed by the ENGINEER.
1.28.11 STANDARDS
A. Wherever in these TECHNICAL SPECIFICATIONS or in the drawings certain standards or regulations are referred to by name and/or number, the applicable publication shall be the latest revision thereof. Reference by abbreviation is made in accordance with the Section 01070, "Abbreviations of Institutions."
1.28.12 QUALITY OF ITEMS
A. All material furnished for this project shall be new and unused. Any material which has become excessively weathered or damaged since manufacture shall not be considered as new.
ENGINEER shall be the sole judge as to what constitutes excessive weathering or damage.
1.28.13 TESTING
A. Governing agency standards may require during shop drawing review that materials, equipment and supplied meet given standards and testing to demonstrate conformance to the standards is a part of those standards. The cost of these tests shall be the obligation of the CONTRACTOR and no extra charge shall be made to the OWNER on account of such testing.
B. The OWNER must approve the selected recognized, independent testing laboratory to make tests on concrete, reinforcing steel, soils and other materials for the construction phase which the OWNER may decide to test for conformity with the TECHNICAL
SPECIFICATIONS. The CONTRACTOR shall supply the necessary samples for this testing without cost to the OWNER. The costs for actual testing shall be paid by the CONTRACTOR except for tests which fail to meet the minimum specified tolerances set forth in the drawings and the TECHNICAL SPECIFICATIONS. The cost of the tests that fail will be charged to the CONTRACTOR by deducting the cost from the Contract price or will be paid directly to the testing laboratory by the CONTRACTOR.
C. Construction in areas where installation and restoration must satisfy the additional requirements of a local, state or federal authority may require testing to demonstrate conformance. The
CONTRACTOR shall ascertain the extent of testing required by regulatory agencies within these areas. The CONTRACTOR is responsible for performing such tests, including but not limited to, tests of compaction, and all costs for these tests shall be the obligation of the
CONTRACTOR
and no extra charge shall be made to the OWNER on account of such testing.
SOUTHEAST DRAINAGE RETROFIT PROJECT
011000 - 14
1.28.14 UTILITY CROSSINGS
A. It is intended that wherever existing utilities must be crossed that the pipe may be deflected up to
75% of the manufacturer's recommended limits and adequate cover shall be used to adequately clear the obstruction. However, when in the opinion of the ENGINEER, this procedure is not feasible he may direct the use of fittings to clear a utility crossing as detailed on the Drawings.
The cost of such crossing including joint restraints shall be on the basis of the schedule of pay items applied.
B. Deflections and adjustments of the proposed water and/or sewer mains to avoid all other existing utilities shall be verified/determined in the field during construction.
C. The contractor is alerted to the fact that there are Dania Beach has several water main distribution lines (2”, 4”, 6”, 8” and 12”) throughout the project limits. Service connections to properties are via alleyways running in the east – west direction. In addition, the City also has water distribution lines along 4th Terrace, 5th Street, 6th Street, 7th Street, 2nd Avenue, 3rd Avenue, and 4th Avenue.
The contractor is alerted to the fact that the location of these water mains depicted on the plans is approximate. It is expected that several conflicts with the proposed drainage system will be unavoidable. As a result, the water lines will need to be deflected. As part of this project, the contractor shall perform water main deflections to avoid conflicts with the proposed drainage system. Prior to the installation of the proposed drainage system in the proximity of the water lines, the contractor shall coordinate with Dania Beach operations to locate the existing water main and to determine if a deflection is required. Once this is determined, the contractor shall perform the deflection as depicted on the plans.
1.28.15 BASIS OF MEASUREMENT
A. Where mains are to be paid for on a unit price per linear foot basis, the number of linear feet will be determined by measurement along the centerline of the pipe in place, including fittings.
B. Where items are to be paid for on a unit price per square yard basis, the number of square yards will be determined by measurement the actual square yards installed.
1.28.16 ADJUSTMENT AND RELOCATION OF EXISTING LINES
A. It is intended that wherever the drawings indicate that existing lines must be deflected, the pipe shall be deflected up to 75% of the manufacturer's recommended limits and the CONTRACTOR will be so directed by the ENGINEER. If the ENGINEER determines that the use of new pipe and fittings is required for deflection, the CONTRACTOR will be directed to use this method.
The price for either method shall be based upon the unit prices bid. This does not apply to connections to existing system
1.28.17 CONNECTION TO EXISTING SYSTEM
A. The CONTRACTOR shall perform all work necessary to locate, excavate and prepare for connection to the existing mains as shown on the Drawings. The cost of this work and for the actual connection to the existing main shall be based upon the unit prices for installing the pipe and appurtenances and shall not result in any additional cost to the CITY. The cost of ductile iron sleeves shall be included in the fitting’s unit price.
SOUTHEAST DRAINAGE RETROFIT PROJECT
011000 - 15
B. Additional valves used for the CONTRACTOR's convenience shall not be considered as an extra cost payable by the CITY for the tie-in to the existing system.
C. During all phases of the work, (i.e. installation, testing and restoration), the CONTRACTOR shall ensure at all times the safe operation of the existing water and/or sewage systems. Service to the customers shall be maintained with the least amount of interference and interruption as possible.
1.28.18 RELOCATIONS
A. The CONTRACTOR shall be responsible for the relocation of structures that are shown on the drawings, including, but not limited to, light poles, signs, fences, piping, conduits and drains that interfere with the proposed positioning of the water/sewer mains. The cost of all such relocations shall be included in the prices bid for the appropriate items. Such relocations shall be identified in advance of construction. CONTRACTOR shall coordinate all relocations with the appropriate utility.
1.28.19 UTILITIES
A. Existing utilities are shown on the Drawings insofar as information is reasonably available; however, it will be the responsibility of the CONTRACTOR to preserve all existing utilities whether shown on the Drawings or not. If utility conflicts are encountered by the CONTRACTOR during construction, he shall give sufficient notice to their owners so that they may make the necessary adjustments. Damage to any utility, which in the opinion of the OWNER is caused by carelessness on the part of the CONTRACTOR shall be repaired at the expense of the CONTRACTOR.
1.28.20 GUARANTEE
A. The CONTRACTOR shall guarantee the equipment, material and labor performed under the
Contract against any and all failures in proper use and operation for a period of one (1) year from date of written acceptance by the OWNER.
B. The CONTRACTOR shall also obtain warranties from manufacturers for each piece of equipment furnished so that the manufacturer's warranty fully covers the equipment for a period of one (1) year from the date of written acceptance by the OWNER.
1.28.21 PERFORMANCE OF WORK
A. The CONTRACTOR shall provide all labor and equipment required to complete all work specified herein and on the Drawings. In an emergency situation, if the OWNER determines that it must provide manpower and/or equipment to assist the CONTRACTOR in the satisfactory performance of the Contract terms and conditions, the OWNER shall be reimbursed by the CONTRACTOR at the applicable prevailing wage rates.
B. CONTRACTOR shall provide reasonable advance notice to the OWNER for approval of his/her intention to work overtime on weekdays or to work on the weekends.
1.28.22 BARRICADING (SAFETY)
A. The CONTRACTOR shall be responsible for the furnishing and maintaining of all required barricades, either the lighted or the reflector type or as required by Broward County, to ensure the public's safety during open trench work or for any other potentially unsafe or hazardous construction activities. Barricades shall be located and displayed in conformance with the most
SOUTHEAST DRAINAGE RETROFIT PROJECT
011000 - 16 stringent regulations required by the governing agencies. All costs for barricading, including any permits, shall be the responsibility of the CONTRACTOR.
B. All work in public rights-of-way and on private property shall be done in strict compliance with these specifications City of Dania Beach and Broward County Minimum Standards. Failure to so comply will result in cessation of operations and the removal of project related obstructions from the right-of-way.
1.29 PROJECT IDENTIFICATION AND SIGNAGE
1.29.1 REQUIREMENTS INCLUDED
A. Furnish, install and maintain project identification sign.
B. Provide temporary on-site informational signs to identify key elements of construction facilities.
C. Remove signs on completion of construction.
D. Allow no other signs to be displayed.
1.29.2 RELATED REQUIREMENTS
A. All applicable sections of the Specifications.
B. Conditions of the Contract.
1.29.3 PROJECT IDENTIFICATION SIGN
A. Two painted signs of not less than 32 square feet area each, with painted graphic content to…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .