2021 Elevator_Inventory_Attachment 1.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- H335--Palo Alto Elevator Inspection Base +4OY
- Solicitation number
- 36C26121Q1024
About this file
This document contains an elevator inventory attachment and related federal contract opportunity notice. The elevator inventory attachment lists 68 elevators across various buildings, providing details on manufacturer, type, weight, speed, inspection dates, and maintenance history. The subsequent federal contract opportunity is a pre-solicitation notice for annual elevator inspection services for the elevators listed in the attachment. The solicitation will be posted on August 4, 2021 to SAM.gov as a firm fixed price SDVOSB set-aside, with no subcontracting allowed. The requirement is for the Department of Veterans Affairs National Cemetery Administration facilities in Palo Alto, California.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26121Q1024 0002.docx | DOCX document | |
| 36C26121Q1024 0001.docx | DOCX document | |
| Fillable Palo Alto Price Schedule revised 2021.08.10.xlsx | XLSX spreadsheet | |
| REVISED Elevator_Inventory_Attachment 1.xlsx | XLSX spreadsheet | |
| 36C26121Q1024_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Elevator Data
| STATION | BLDG | ELEV | TYPE | WEIGHT (lbs) | SPEED (fpm) | STOPS | 5-YEAR | PHONE I.D. | PHONE EXT. | Manufacturer | E-Power available | 2019 Semi | 2019 Annual | 2020 Semi | 2020 Annual | |
| 1 | PAD | 100 | P1 | Traction | 3500 | 350 | 4 | 12/18/17 | PAD-100-P1 | 64994 | Northern | Yes | 6/24/19 | defer | 11/2/20 | 1/8/20 |
| 2 | PAD | 100 | P2 | Traction | 3500 | 350 | 4 | 12/18/17 | PAD-100-P2 | 65023 | Northern | Yes | 6/24/19 | defer | 11/2/20 | 1/8/20 |
| 3 | PAD | 100 | P3 | Traction | 3500 | 350 | 4 | 12/18/17 | PAD-100-P3 | 65025 | Northern | Yes | 6/24/19 | defer | 11/2/20 | 1/8/20 |
| 4 | PAD | 100 | S1 | Traction | 4500 | 350 | 5 | 12/18/17 | PAD-100-S1 | 64802 | Northern | Yes | 6/24/19 | defer | 11/2/20 | 1/8/20 |
| 5 | PAD | 100 | S2 | Traction | 4500 | 350 | 5 | 12/18/17 | PAD-100-S2 | 64883 | Northern | Yes | 6/24/19 | defer | 11/2/20 | 1/8/20 |
| 6 | PAD | 100 | S3 | Traction | 4500 | 350 | 5 | 12/18/17 | PAD-100-S3 | 64833 | Northern | Yes | 6/24/19 | defer | 11/2/20 | 1/8/20 |
| 7 | PAD | 100 | S4 | Traction | 4500 | 350 | 5 | 12/18/17 | PAD-100-S4 | 64902 | Northern | Yes | 6/24/19 | defer | 11/2/20 | 1/8/20 |
| 8 | PAD | 100 | S5 | Traction | 4500 | 350 | 5 | 12/18/17 | PAD-100-S5 | 64918 | Northern | Yes | Out of Ser | defer | 11/2/20 | 1/8/20 |
| 9 | PAD | 100 | S6 | Traction | 8000 | 350 | 5 | 12/18/17 | PAD-100-S6 | 64945 | Northern | Yes | 6/24/19 | defer | 11/2/20 | 1/8/20 |
| 10 | PAD | 100 | S7 | Hydraulic | 2500 | 100 | 2 | 12/18/17 | PAD-100-S7 | 64960 | Northern | Yes | 6/24/19 | 1/6/20 | 11/2/20 | 1/8/20 |
| 11 | PAD | 100 | C2 | Hydraulic | 2500 | 150 | 2 | 8/8/2012 | PAD-100-C2 | 69904 | Northern | Yes | 6/24/19 | 1/6/20 | 11/2/20 | 1/8/20 |
| 12 | PAD | 100 | C3 | Hydraulic | 1500 | 150 | 2 | 8/8/2012 | PAD-100-C3 | 69905 | Northern | Yes | 6/24/19 | 1/6/20 | 11/2/20 | 1/8/20 |
| 13 | PAD | 100 | DW-1 | Traction | 150 | 100 | 4 | 8/8/2017 | N/A | N/A | Northern | NO | N/A | N/A | ||
| 14 | PAD | 101 | P1 | Traction | 4000 | 350 | 4 | 12/18/17 | PAD-101-P1 | 65146 | Northern | Yes | 6/24/19 | defer | 11/2/20 | 1/8/20 |
| 15 | PAD | 101 | P2 | Traction | 4000 | 350 | 4 | 12/18/17 | PAD-101-P2 | 65134 | Northern | Yes | 6/24/19 | defer | 11/2/20 | 1/8/20 |
| 16 | PAD | 105 | P1 | Hydraulic | 3000 | 100 | 2 | 2019 | PAD-105-P1 | 64356 | Elevator Controls | No | 6/24/19 | 1/6/20 | 11/2/20 | 1/8/20 |
| 17 | PAD | 105 | P2 | Hydraulic | 3000 | 100 | 2 | 2019 | PAD-105-P2 | 64357 | Elevator Controls | No | 6/24/19 | 1/6/20 | 11/2/20 | 1/8/20 |
| 18 | PAD | 4 | P8 | Traction | 4000 | 200 | 3 | 3/2/16 | PAD-4-P8 | 65236 | US Elevator | No | 6/24/19 | 1/6/20 | 11/2/20 | 1/8/20 |
| 19 | PAD | 4 | S9 | Traction | 5000 | 200 | 3 | 3/2/16 | PAD-4-S9 | 65325 | US Elevator | Yes | 6/24/19 | 1/6/20 | 11/2/20 | 1/8/20 |
| PAD | 5 | WCL#1 | Wheel Chair Lift | 660 | 22 | 2 | Savario | NO | 11/2/20 | |||||||
| 21 | PAD | 5 | P5 | Traction | 4000 | 200 | 4 | 3/2/16 | PAD-5-P5 | 69307 | US Elevator | No | 6/24/19 | 1/6/20 | 11/2/20 | 1/8/20 |
| 22 | PAD | 5 | P6 | Traction | 4000 | 200 | 4 | 3/2/16 | PAD-5-P6 | 68092 | US Elevator | No | 6/24/19 | 1/6/20 | 11/2/20 | 1/8/20 |
| 23 | PAD | 5 | S7 | Traction | 5000 | 200 | 4 | 3/2/16 | PAD-5-S7 | 67505 | US Elevator | Yes | 6/24/19 | 1/6/20 | 11/2/20 | 1/8/20 |
| 25 | PAD | 6 | P10 | Traction | 4000 | 200 | 3 | 3/2/16 | PAD-6-P10 | 65315 | US Elevator | No | 6/24/19 | 1/6/20 | 11/2/20 | 1/8/20 |
| 26 | PAD | 6 | S11 | Traction | 5000 | 200 | 3 | 3/2/16 | PAD-6-S11 | 68090 | US Elevator | Yes | 6/24/19 | 1/6/20 | 11/2/20 | 1/8/20 |
| 27 | PAD | 54 | F54 | Hydraulic | 4000 | 110 | 2 | 2/8/13 | PAD-54-F54 | 65791 | Dover | No | 6/24/19 | 1/6/20 | 11/2/20 | 1/8/20 |
| 28 | PAD | 8 | P1 | Hydraulic | 3000 | 150 | 2 | 2/8/13 | PAD-8-P1 | 65210 | TKE 2005 | Yes | 6/24/19 | 1/6/20 | 11/2/20 | 1/8/20 |
| 29 | PAD | 9 | P1 | Hydraulic | 3500 | 95 | 2 | 2019 | PAD-9-P1 | 63649 | TKE 2013 | No | 6/24/19 | 1/6/20 | 11/2/20 | 1/8/20 |
| 30 | PAD | 9 | P2 | Hydraulic | 3500 | 95 | 2 | 2019 | PAD-9-P2 | 63687 | TKE 2013 | No | 6/24/19 | 1/6/20 | 11/2/20 | |
| 31 | PAD | 10 | P1 | Hydraulic | TBD | Yes | defer | construction | ||||||||
| 32 | PAD | 500 | P1 | Hydraulic | 2 | 2019 | PAD-500-P1 | 68373 | No | defer | construction | |||||
| 33 | PAD | 500 | P2 | Hydraulic | 2 | 2019 | PAD-500-P2 | 68374 | Yes | defer | construction | |||||
| 34 | PAD | 500 | S1 | Hydraulic | 3 | 2019 | PAD-500-S1 | 68371 | No | defer | construction | |||||
| 35 | PAD | 500 | S2 | Hydraulic | 3 | 2019 | PAD-500-S2 | 68372 | Yes | defer | construction | |||||
| 36 | PAD | 520 | P1 | Hydraulic | 3500 | 100 | 2 | 2019 | PAD-520-P1 | 65230 | MCE 2010 | Yes | 6/24/19 | 1/6/20 | 11/2/20 | 1/8/20 |
| 37 | PAD | 520 | P2 | Hydraulic | 3500 | 100 | 2 | 2019 | PAD-520-P2 | 65695 | MCE 2010 | Yes | 6/24/19 | 1/6/20 | 11/2/20 | 1/8/20 |
| 38 | PAD | PS1 | P1 | Hydraulic | 4000 | 150 | 2 | 2019 | PAD-PS1-P1 | 64029 | MCE 2003 | No | 6/24/19 | 1/6/20 | 11/2/20 | 1/8/20 |
| 39 | PAD | PS1 | P2 | Hydraulic | 4000 | 150 | 4 | 2019 | PAD-PS1-P2 | MCE 2003 | No | 6/24/19 | 1/6/20 | 11/2/20 | 1/8/20 | |
| 40 | PAD | PS2 | P1 | Hydraulic | 4000 | 125 | 5 | 2019 | PS2 Elev 1 | 65330 | No | construction | construction | |||
| 41 | PAD | PS2 | P2 | Hydraulic | 4000 | 125 | 5 | 2019 | PS2 Elev 2 | 65330 | No | construction | construction | |||
| 42 | PAD | PS2 | P3 | Hydraulic | 4000 | 125 | 5 | 2019 | PS2 Elev 3 | 65330 | No | construction | construction | |||
| 43 | PAD | 710 | P1 | Hydraulic | 4000 | 2 | PAD-710-P1 | |||||||||
| 44 | PAD | 710 | P2 | Hydraulic | 4000 | 2 | PAD-710-P2 | |||||||||
| 45 | PAD | 710 | S1 | Hydraulic | 7000 | 3 | PAD-710-S1 | |||||||||
| 46 | PAD | 710 | S2 | Hydraulic | 7000 | 3 | PAD-710-S2 |
| 47 | MPD | 334 | P1 | Hydraulic | 4000 | 125 | 2 | 4/17/2019 | MPD-334-P1 | 22024 | Montgomery | Yes* | 6/25/19 | 11/4/20 | 1/9/20 |
| 48 | MPD | 334 | P2 | Hydraulic | 4000 | 125 | 2 | 4/17/2019 | MPD-334-P2 | 22013 | Montgomery | See Note | 6/25/19 | 11/4/20 | 1/9/20 |
| 49 | MPD | 334 | S3 | Hydraulic | 5000 | 125 | 4 | 4/17/2019 | MPD-334-S3 | 22008 | Montgomery | No | 6/25/19 | 11/4/20 | 1/9/20 |
| 50 | MPD | 347 | P1 | Hydraulic | 4000 | 100 | 2 | 4/17/2019 | MPD-347-P1 | 23347 | American/Crescent | No | 6/25/19 | 11/4/20 | 1/9/20 |
| 51 | MPD | 347 | P2 | Hydraulic | 4000 | 100 | 2 | 4/17/2019 | MPD-347-P2 | 23344 | American/Crescent | No | 6/25/19 | 11/4/20 | 1/9/20 |
| 52 | MPD | 349 | P3 | Hydraulic | 4000 | 100 | 2 | 4/17/2019 | MPD-349-P3 | 23349 | American/Crescent | No | 6/25/19 | 11/4/20 | 1/9/20 |
| 53 | MPD | 350 | P4 | Hydraulic | 4000 | 100 | 2 | 4/17/2019 | MPD-350-P4 | 23350 | American/Crescent | No | 6/25/19 | 11/4/20 | 1/9/20 |
| 54 | MPD | 351 | P5 | Hydraulic | 4000 | 100 | 2 | 4/17/2019 | MPD-351-P5 | 23351 | American/Crescent | No | 6/25/19 | 11/4/20 | 1/9/20 |
| 55 | MPD | 352 | P6 | Hydraulic | 4000 | 100 | 2 | 4/17/2019 | MPD-352-P6 | 23352 | American/Crescent | No | 6/25/19 | 11/4/20 | 1/9/20 |
| 56 | MPD | 410 | P1 | Hydraulic | 2 | 2019 | MPD-410-P1 | 22337 | No |
| 57 | LVD | 62 | P1 | Traction | 4000 | 350 | 7 | 12/14/17 | LVD-62-P1 | 31548 | Dover | Yes | 1/14/20 |
| 58 | LVD | 62 | P2 | Traction | 4000 | 350 | 7 | 8/13/2019 | LVD-62-P2 | 31549 | Dover | Yes | 1/14/20 |
| 59 | LVD | 62 | S3 | Traction | 5000 | 350 | 7 | 12/14/17 | LVD-62-S3 | 31550 | US Elevator | Yes | 1/14/20 |
| 60 | LVD | 64 | F4 | Traction | 5000 | 100 | 2 | 8/15/12 | LVD-64-F4 | 31554 | Otis | Yes | 1/14/20 |
| 61 | LVD | 65 | F7 | Hydraulic | 2400 | 50 | 2 | 8/15/12 | LVD-65-F7 | N/A | Freight Motion | No | 1/14/20 |
| 62 | LVD | 88 | P4 | Hydraulic | 3000 | 100 | 2 | 8/15/12 | LVD-88-P4 | Alarm Only | Dover | Yes | 1/14/20 |
| 63 | LVD | 90 | P5 | Hydraulic | 4000 | 100 | 2 | 8/15/12 | LVD-90-P5 | 31541 | Home Elevator | Yes | 1/14/20 |
| 64 | LVD | 90 | P6 | Hydraulic | 4000 | 100 | 2 | 8/15/12 | LVD-90-P6 | 31542 | Home Elevator | Yes | 1/14/20 |
| 65 | MTN | MtnView | P1 | Hydraulic | 3500 | 100 | 2 | 4/18/2020 | TBD | 6509610244 | No | 6/26/19 | 11/4/20 | 1/10/20 |
| 66 | MTN | MtnView | P2 | Hydraulic | 3500 | 100 | 2 | 4/18/2020 | TBD | 6509610205 | No | 6/26/19 | 11/4/20 | 1/10/20 |
| 67 | SJC | San Jose | P1 | Hydraulic | 2019 | TBD |
| 68 | SJC | San Jose | P2 | Hydraulic | 2019 | TBD |
| SJC | San Jose | P3 | Hydraulic | 2019 | TBD |
Note: Building 90 Elevators P5 P6 are both on emergency power using selector switch in machine room. Only one elevator can be operational on emergency power due to electrical load factor. Bldg. 334 MPD emergency power is manually switchable from P1 to P2.
Note: Annual elevator inspections are due in August. Semi annual inspections are due in February. Elevators C2, C3 are freight elevators by code and can only be ridden by freight moving personnel. ASME 17.6 1996 edition rule 207.
File details come from the government source that posted it. Updated .