2019803 Structures Plans_Part 2 of 2.pdf

PDF 9 MB Posted

Attached to
CR-880 and Sam Senter Rd over SFWMD Ocean Canal
Solicitation number
IFB 360 2019803 2
Issued by
Palm Beach County, Florida

About this file

This is a structural engineering plans document for Palm Beach County, Florida, detailing the design specifications for a bridge replacement and intersection improvement project at CR 880 at Sam Senter Road. The project involves the construction of a new bridge with five spans crossing the L-13 Canal, featuring precast Florida Slab Beams (FSBs), cast-in-place concrete decking, and associated approach slabs. The bridge structure includes five primary spans ranging from 24 feet to 36 feet 6 inches in length, with intermediate bents supported by prestressed concrete piles. The superstructure consists of concrete flat slabs with reinforced concrete traffic railings (36-inch single-slope design), expansion joints, and bearing pads. Estimated quantities include approximately 233 linear feet of expansion joints, 79 plain neoprene bearing pads (8-inch by 1-inch), and significant concrete and reinforcing steel requirements across all spans. The plans are dated November 5, 2024, with revisions through December 25, 2025, and represent sheet 48 of 95 in the complete project documentation.

The design incorporates detailed specifications for reinforcing bar placement, pile cap grouting procedures, and deck pouring sequences to manage deflection and camber during construction. The bridge includes three future utility conduits (2-inch diameter PVC) along Sam Senter Road for future infrastructure integration. Load rating analysis indicates a controlling strength rating of 67.8 tons for the FL-120 permit vehicle at location B (exterior edge moment) across spans 1, 2, and 5, with design compliance verified under AASHTO LRFD specifications as of January 2023. The project specifications reference multiple FDOT index standards and requires contractor submission of shop drawings and structural design calculations signed by a registered Florida engineer prior to installation of precast pile caps. Hydraulic grout curing requires a minimum 72-hour cure time before placing loads on pile caps, and specific attention is required to pile driving tolerances and elevation adjustments to ensure proper cap installation and alignment.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

E.H

ERIC HUSKEY, P.E. NO. 56593

Certificate of Authorization No. 1978 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

S.S.

2019803

A.A.CR 880 AT SAM SENTER ROAD

REPLACEMENT

INTERSECTION IMPROVEMENT AND BRIDGE

11/5/24

OF 95

CONC. PILE

18" PREST.

E

Q

S P

A C

E S

(T Y P

¡ INT BENT/ ¡ PILE

2 ~ 5F3 & 5F7 (E.F.)

1'-10"

CONC. PILE

18" PREST.

GROUT PORT

2" DIA. PVC

POCKET

GROUT

4'-0"

E

Q

S P

A C

E S

¡ INT BENT/ ¡ PILE

1 ~ 6F1 & 6F5 (E.F.)

2 ~ 5F3 & 5F7 (E.F.)

Ɔ

Ɔ

Ɔ

Ɔ

3 ~ 6F9

11"

4" DIA. PVC

GROUT PORT

¡ BEARING (TYP.)

C DA B

A B C D

¡ BEARING (TYP.)

¡ BEARING (TYP.)

¡ INT BENT/ ¡ PILE

DBL. 4F10

7 ~ 6F4, 6F8, & 6F12

7 ~ 6F2 & 6F6

4'-0"

T O

Ƅ

V A

R I E

S

T O

Ƅ

V A

R I E

S

7 ~ 6F2 & 6F6

7 ~ 6F4, 6F8, & 6F12

DBL. 4F11

"8

73 "

73"

13'-4

1 ~ 6F1 & 6F5 (E.F.)

73"

11'-1

16 "±

11'-1

CLEAR DOWELS

CENTER 6F BARS TO

BENT 2 ONLY. SHIFT

6F13 DOWELS AT INT

CLEAR DOWELS

CENTER 6F BARS TO

BENT 2 ONLY. SHIFT

6F13 DOWELS AT INT

(T

Y P

(T

Y P

:4

:1

P

M s t a n le y g r o u p .c o m g f s p r o j e c t s P a lm

B e a c h

C o u n t y .0

C

A D

D p la n s s t r u c t

B

B I n t B e n t D e t .d g n

BRIDGE NO. 934000

B1-21

DETAILS

INTERMEDIATE BENT

…"=1'-0"

SECTION A-A

(TYP.)

GROUT POCKET AND PORT DETAIL

SECTION B-B

LOC

BEARING LOCATIONS

INT BENT 2

INT BENT 3

INT BENT 4

INT BENT 5

A

1'-0"

B

1'-0"

1'-0½"

1'-1½"

1'-1½"

C

1'-0"

1'-1½"

1'-1½"

1'-0½"

D

1'-0"

11½" 10½"

10½" 10½"

10½" 11½"

PILE GROUTING NOTES

NOTES

Direction of Stationing

(T Y P

APPPROVAL IF ANY CHANGES ARE MADE TO THE PRECAST PILE CAPS AS SHOWN.

CALCULATIONS (SIGNED AND SEALED BY A REGISTERED FLORIDA ENGINEER) TO EOR FOR

INSTALLED. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AND STRUCTURAL DESIGN

9. CONTRACTOR IS PERMITTED TO CHANGE HOW THE PRECAST CAPS ARE CONSTRUCTED AND

ANY LOADS ON TOP OF THE CAP.

8. ALLOW THE HYDRAULIC GROUT TO CURE FOR A MINIMUM OF 72 HOURS BEFORE PLACING

GROUT PORTS SHALL BE SEALED.

GROUT FLOWS OUT OF THE TOP GROUT PORT. AFTER PUMPING OPERATIONS,

7. HYDRAULIC GROUT SHALL BE PUMPED INTO THE BOTTOM GROUT PORT UNTIL THE

POCKET. THE FORM SHALL BE FLUSH WITH THE BOTTOM OF THE CAP.

6. CONTRACTOR SHALL USE SACRIFICIAL FORMS TO FORM THE BOTTOM OF THE GROUT

CAPS SHALL BE INSTALLED LEVELED.

CONTRACTOR SHALL TAKE CARE NOT TO DAMAGE THE PRECAST CAPS. THE BOTTOM OF THE

5. CONTRACTOR SHALL LOWER THE PRECAST CAPS AND PLACE ON TOP OF THE PILES.

CAP TO THE EOR FOR REVIEW AND APPROVAL.

PORTS SHALL BE CAPPED OFF. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS OF PRECAST

DURING LIFTING OPERATIONS. LIFTING HOOKS SHALL BE CUT OFF OR CONCRETE LIFTING

4. CONTRACTOR SHALL INSTALL LIFTING POINTS IN THE CAPS SO THE CAPS DO NOT BEND

ALLOW FOR A 4" GAP BETWEEN THE PILE AND CAP (ALL SIDES).

3. CONTRACTOR SHALL INSTALL SPACERS BETWEEN THE TOP AND SIDES OF THE PILE TO

REINFORCEMENT AS NEEDED.

OF CAPS. CONTRACTOR SHALL VERIFY CAP DIMENSIONS, GROUT POCKET LOCATIONS AND ADJUST

2. CONTRACTOR SHALL WAIT UNTIL PILES HAVE BEEN DRIVEN BEFORE BEGINNING CONSTRUCTION

PLANS, CONTRACTOR SHALL NOTIFY EOR IMMEDIATELY.

IF PILES ARE NOT DRIVEN WITHIN TOLERANCES OF THE LOCATION AS SPECIFIED IN THE

LAYOUT SHEET. PILES SHALL BE DRIVEN PLUMB SO THE TOPS OF THE PILES ARE LEVELED.

1. CONTRACTOR SHALL TAKE CARE TO DRIVE ALL PILES AS INDICATED ON THE FOUNDATION

MADE IN THE CENTERLINE OF THE CAP.

VERTICAL ADJUSTMENTS SHOULD BE

SHOWN IN THE INT BENT SHEETS. THE

ACCOUNT FOR THE BENT ELEVATIONS AS

3. ADJUST THE TOP OF THE PILE CAP TO

GROUT PORTS.

2. ADJUST BARS 4F8 AND 4F9 TO CLEAR

INT BENT 2 TO INT BENT 5 SHEETS.

1. FOR LOCATION OF SECTIONS, SEE

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

E.H

ERIC HUSKEY, P.E. NO. 56593

Certificate of Authorization No. 1978 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

S.S.

2019803

A.A.CR 880 AT SAM SENTER ROAD

REPLACEMENT

INTERSECTION IMPROVEMENT AND BRIDGE

11/5/24

OF 95

"2 14'-3"2

16 ~ 12"x50" FSB's = 21'-5 "2 16 ~ 12"x50" FSB's = 21'-5

(TYP.)

(INDEX NO. 521-427)

TRAFFIC RAILING

36" SINGLE-SLOPE

1'-4"1'-4"

1'-4" 1'-4"

(TYP.)

(INDEX NO. 521-427)

TRAFFIC RAILING

36" SINGLE-SLOPE

INDEX NO. 630-010 (TYP.)

FUTURE UTILITIES PER

3~ 2" Ø PVC CONDUITS FOR

INDEX NO. 630-010 (TYP.)

FUTURE UTILITIES PER

3~ 2" Ø PVC CONDUITS FOR

SAM SENTER RD.

¡ CONSTRUCTION

SAM SENTER RD.

¡ CONSTRUCTION

2'-1" 2'-1"

SPANS 1 & 2)

(CONTINUOUS FOR

CONCRETE SLAB

CAST-IN-PLACE

(PRECAST UNIT) (TYP.)

FLORIDA SLAB BEAM (FSB)

T O

P P I N

G

C I P

C

O N

C R

E T

E

VARIES FROM 51'-3½" TO 125'-2¾" COPING-TO-COPING

SPAN 3 TYPICAL SECTION

"4 32'-1 "4

32'-1

Active Scale: 64

Drawing Scale: ƈ" = 1'

" COPING-TO-COPING2

151'-3

DIMENSION INCLUDES 1½" GAP BETWEEN FSB's DIMENSION INCLUDES 1½" GAP BETWEEN FSB's

VARIES FROM 25'-7¾" TO 62'-7Ƅ" VARIES FROM 25'-7¾" TO 62'-7Ƅ"

VARIES FROM 0.31% TO 1.89%

VARIES FROM 1.89% TO 2.00%VARIES FROM 1.89% TO 2.00%

SPANS 1 AND 2 - TYPICAL SECTION

VARIES FROM -0.31% TO 1.89%

PGL

¡ BRIDGE

¡ BRIDGE

PGL

(1 OF 2)

THROUGH BRIDGE DECK

TYPICAL SECTION

0'-0" TO 2'-3Ƃ

VARIES FROM VARIES FROM

0'-0" TO 2'-3Ƃ

VARIES FROM 22'-0" TO 24'-3¼" VARIES FROM 22'-0" TO 24'-3¼"

SHOULDER

VARIES FROM 10'-0" TO 10'-3¼"

SOUTHBOUND LANE

VARIES FROM 12'-0" TO 14'-0"

NORTHBOUND LANE

VARIES FROM 12'-0" TO 14'-0"

SHOULDER

VARIES FROM 10'-0" TO 10'-3¼"

RADIAL)

(MEASURED

RAILING

TRAFFIC

RADIAL)

(MEASURED

RAILING

TRAFFIC

"4 325'-7 "4

325'-7

RADIAL)

(MEASURED

RAILING

TRAFFIC

RADIAL)

(MEASURED

RAILING

TRAFFICSHOULDER

VARIES FROM 10'-3¼" TO 18'-1¾"

SOUTHBOUND LANE

VARIES FROM 14'-0" TO 43'-10ƃ"

NORTHBOUND LANE

VARIES FROM 14'-0" TO 43'-10ƃ"

SHOULDER

VARIES FROM 10'-3¼" TO 18'-1¾"

:0

:1

P

M s t a n le y g r o u p .c o m g f s p r o j e c t s P a lm

B e a c h

C o u n t y .0

C

A D

D p la n s s t r u c t

B

B

T y p ic a lS e c t io n .d g n

BRIDGE NO. 934000

B1-22 ‰"=1'

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

E.H

ERIC HUSKEY, P.E. NO. 56593

Certificate of Authorization No. 1978 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

S.S.

2019803

A.A.CR 880 AT SAM SENTER ROAD

REPLACEMENT

INTERSECTION IMPROVEMENT AND BRIDGE

11/5/24

OF 95

5 ~ 12"x55" FSB's = 18'-9"

1'-4"1'-4"

1'-4" 1'-4"

RAILING

TRAFFIC

RAILING

TRAFFIC

"2 12'-3 "2

12'-3

(PRECAST UNIT) (TYP.)

FLORIDA SLAB BEAM (FSB)

RAILING

TRAFFIC

T O

P P I N

G

C I P

C

O N

C R

E

SPAN 4 TYPICAL SECTION

Active Scale: 64

Drawing Scale: ƈ" = 1'

46'-8" COPING-TO-COPING

DIMENSION INCLUDES 1¼" GAP BETWEEN FSB's DIMENSION INCLUDES 1¼" GAP BETWEEN FSB's

SPAN 5 - TYPICAL SECTION

SHOULDER

10'-0"

SOUTHBOUND LANE

12'-0"

NORTHBOUND LANE

12'-0"

SHOULDER

10'-0"

SHOULDER

VARIES FROM 10'-0" TO 22'-2"

SOUTHBOUND LANE

12'-0"

NORTHBOUND LANE

12'-0"

SHOULDER

10'-0"

VARIES FROM 23'-4" TO 34'-11" 23'-4"

Slope: 2.00%Slope: 2.00%

Slope: 2.00%Slope: 2.00%

5 ~ 12"x55" FSB's = 18'-9"4'-8½"

(TYP.)

(INDEX NO. 521-427)

TRAFFIC RAILING

36" SINGLE-SLOPE

(TYP.)

(INDEX NO. 521-427)

TRAFFIC RAILING

36" SINGLE-SLOPE

INDEX NO. 630-010 (TYP.)

FUTURE UTILITIES PER

3~ 2" Ø PVC CONDUITS FOR

INDEX NO. 630-010 (TYP.)

FUTURE UTILITIES PER

3~ 2" Ø PVC CONDUITS FOR

23'-4" 23'-4"

CONCRETE SLAB

CAST-IN-PLACE

¡ BRIDGE

PGL

¡ BRIDGE

PGL

SAM SENTER RD.

¡ CONSTRUCTION

SAM SENTER RD.

¡ CONSTRUCTION

2'-4¼" 2'-4¼"

POINT

SLOPE BREAK

(2 OF 2)

THROUGH BRIDGE DECK

TYPICAL SECTION

VARIES FROM 46'-8" TO 58'-3" COPING-TO-COPING

RADIAL)

(MEASURED

RAILING

TRAFFIC

10'-0"

5.59%

TO

2.00%

FROM

VARIES

Slope:

:4

:3

P

M s t a n le y g r o u p .c o m g f s p r o j e c t s P a lm

B e a c h

C o u n t y .0

C

A D

D p la n s s t r u c t

B

B

T y p ic a lS e c t io n .d g n

BRIDGE NO. 934000

B1-23 ‰"=1'

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

E.H

ERIC HUSKEY, P.E. NO. 56593

Certificate of Authorization No. 1978 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

S.S.

2019803

A.A.CR 880 AT SAM SENTER ROAD

REPLACEMENT

INTERSECTION IMPROVEMENT AND BRIDGE

11/5/24

OF 95

N

B1-24

(1 OF 5)

FINISH GRADE ELEVATIONS

ˆ"=1'

132'-7"

24'-0" 24'-1"

"8 38'-6

24'-0" 36'-6" 24'-0"

1'-4"

STA. 10+20.77

SLAB 1

BEGIN APP.

STA. 10+30.77

¡ PILES

¡ END BENT 1

BEGIN BRIDGE

R=27.5'

STA. 10+54.77

¡ PILES

¡ INT BENT 2

STA. 10+78.77

¡ PILES

¡ INT BENT 3

STA. 11+15.27

¡ PILES

¡ INT BENT 4

STA. 11+39.27

¡ PILES

¡ INT BENT 5

STA. 11+63.35

¡ PILES

¡ END BENT 6

END BRIDGE

STA. 11+73.35

END APP. SLAB 2

LT. COPING

GUTTERLINE

LT. TRAFFIC RAILING

RT. COPING

GUTTERLINE

RT. TRAFFIC RAILING

¡ BRIDGE

¡ SAM SENTER RD./

°0 '0

1'-4"

¼

17.989

EL. 18.756

EL. 18.731

EL. 18.760

EL. 18.731

EL. 18.751

EL. 18.348

EL. 18.360

EL. 18.074

EL. 18.100

EL. 17.962

EL. 17.989

EL. 17.816

EL. 17.843

EL. 16.829

EL. 16.822

EL. 16.964 EL. 16.870

EL. 17.546

EL. 17.644

EL. 17.986

EL. 17.546

EL. 17.519

EL. 18.084

EL. 18.283

EL. 17.617

EL. 17.644

EL. 17.843

EL. 17.816

EL. 18.429

EL. 18.559

EL. 18.100

EL. 18.074

EL. 17.962

EL. 18.180

EL. 18.200

EL. 18.367

EL. 18.346

EL. 18.358

EL. 18.354

EL. 18.329

EL. 18.530

EL. 18.559

EL. 18.630

R=75'

R=75'

¡ FSB 4-1

¡ FSB 4-2

¡ FSB 4-3

¡ FSB 4-4

¡ FSB 4-5

¡ FSB 4-6

¡ FSB 4-7

¡ FSB 4-8

¡ FSB 4-9

¡ FSB 4-10

¡ FSB 3-2

¡ FSB 3-3

¡ FSB 3-4

¡ FSB 3-5

¡ FSB 3-6

¡ FSB 3-8

¡ FSB 3-9

¡ FSB 3-10

¡ FSB 3-11

¡ FSB 3-12

¡ FSB 3-1

T-LINE (TYP.)

10'-0" / T-LINE 3 SPA @ 3'-4"

" 4 38'-5

10'-0" / T-LINE 3 SPA @ 3'-4"

"8 38'-6

10'-0" / T-LINE 3 SPA @ 3'-4"

¡ FSB 3-7

:5

:1

P

M s t a n le y g r o u p .c o m g f s p r o j e c t s P a lm

B e a c h

C o u n t y .0

C

A D

D p la n s s t r u c t

B

B F in is h G r E

L .d g n

BRIDGE NO. 934000

N 0° 05' 36" W

10+20

Direction of Stationing

NOTES

(T Y P

FOR TYPICAL SUPERSTRUCTURE DIMENSIONS.

1. SEE FINISH GRADE ELEVATION SHEETS 2 AND 3

(T Y P

.3

.3

.3

.3

.2

.7

.8

.8

.0

.0

.0

.0

.0

.0

.0

.0

.5

%5 .5

1 2

12 13 14 15 16 17 18 19 20

21 22 23 24 25 26

1 2

27 28

T-LINE 6 SPA @ 4'-0"

SPAN 1/

T-LINE 6 SPA @ 4'-0"

SPAN 2/

T-LINE 6 SPA @ 4'-0"

SPAN 4/

T-LINE 6 SPA @ 4'-ƃ"

SPAN 5/

T-LINE 8 SPA @ 4'-6¾"

SPAN 3/

APP. SLAB NO. 1

APP. SLAB NO. 2

SUPERSTRUCTURE PLAN

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

E.H

ERIC HUSKEY, P.E. NO. 56593

Certificate of Authorization No. 1978 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

S.S.

2019803

A.A.CR 880 AT SAM SENTER ROAD

REPLACEMENT

INTERSECTION IMPROVEMENT AND BRIDGE

11/5/24

OF 95

0.31%-0.31%

(2 OF 5)

FINISH GRADE ELEVATIONS

B1-25 ‘"=1'

FSB 7

FSB 6

FSB 5

FSB 4

FSB 3

FSB 2

FSB 1

FSB 8

FSB 9

FSB 10

FSB 11

FSB 12

VARIES FROM 0.31% TO 1.89%

VARIES FROM 1.89% TO 2.00%VARIES FROM 1.89% TO 2.00%

VARIES FROM -0.31% TO 1.89%

FACE OF RAILING.

THE FRONT FACE OF RAILING TO BACK

RAILING DIMENSION IS MEASURED FROM

1. FOR RAILING NOT AT THE COPINGS, THE

FACE OF RAILING TO THE COPING EDGE.

DIMENSION IS MEASURED FROM THE FRONT

1. FOR RAILING AT THE COPING, THE RAILING

NOTE

NOTE

LT. COPING

RT. COPING

RT. COPING

LT. COPING RT. COPING

LT. COPING

TYPICAL SECTION THRU APPROACH SLAB 1

1'-4" 1'-4"

RAILING

TRAFFIC

RAILING

TRAFFIC

GUTTERLINE

RAILING

LT. TRAFFIC

GUTTERLINE

RAILING

RT. TRAFFIC

TYPICAL SECTION THRU SPANS 1 AND 2

RAILING

TRAFFIC

RAILING

TRAFFIC

GUTTERLINE

RAILING

RT. TRAFFIC

GUTTERLINE

RAILING

LT. TRAFFIC

TYPICAL SECTION THRU SPAN 3

TRAFFIC

RAILING

TRAFFIC

VARIES FROM 22'-0" TO 24'-3¼"

VARIES FROM 24'-3¼" TO 61'-11Ɔ" VARIES FROM 24'-3¼" TO 61'-11Ɔ"

" COPING-TO-COPING4

1VARIES FROM 125'-2¾" TO 129'-10

VARIES FROM 22'-0" TO 24'-3¼"

VARIES FROM

GUTTERLINE

RAILING

RT. TRAFFIC

2'-1"

"4 32'-1 "4

32'-1

2'-1""2 16 ~ 12"X50" FSB's = 21'-5 "2

16 ~ 12"X50" FSB's = 21'-5

VARIES FROM 61'-11Ɔ" TO 64'-11ƃ" VARIES FROM 61'-11Ɔ" TO 64'-11ƃ"

VARIERS FROM 51'-3½" TO 125'-2¾" COPING-TO-COPING

" COPING-TO-COPING2

151'-3

GUTTERLINE

LT. TRAFFIC

PGL

PGL

PGL

VARIES FROM

0'-0" TO 2'-3¾"0'-0" TO 2'-3Ƃ"

"2 11'-2 "2

11'-2

1'-4" 1'-4"

¡ BRIDGE

SAM SENTER RD./

¡ CONSTRUCTION

¡ BRIDGE

SAM SENTER RD./

¡ CONSTRUCTION

¡ BRIDGE

SAM SENTER RD./

¡ CONSTRUCTION

:5

:2

P

M s t a n le y g r o u p .c o m g f s p r o j e c t s P a lm

B e a c h

C o u n t y .0

C

A D

D p la n s s t r u c t

B

B F in is h G r E

L .d g n

BRIDGE NO. 934000

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

E.H

ERIC HUSKEY, P.E. NO. 56593

Certificate of Authorization No. 1978 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

S.S.

2019803

A.A.CR 880 AT SAM SENTER ROAD

REPLACEMENT

INTERSECTION IMPROVEMENT AND BRIDGE

11/5/24

OF 95

LT. COPING RT. COPING

RT. COPING

LT. COPING

(3 OF 5)

FINISH GRADE ELEVATIONS

B1-26 ‘"=1'

LT. COPING

RT. COPING

2.00% 2.00%

2.00% 2.00%

2.00% 2.00%

2.00% TO 5.59%

VARIES FROM

4.59% TO 5.59%

VARIES FROM

FSB 7

FSB 6

FSB 5

FSB 4

FSB 3

FSB 2

FSB 1

FSB 8

FSB 9

FSB 10

FACE OF RAILING TO THE COPING EDGE.

DIMENSION IS MEASURED FROM THE FRONT

1. FOR RAILING AT THE COPING, THE RAILING

NOTE

TYPICAL SECTION THRU APPROACH SLAB 2

1'-4" 1'-4"

RAILING

TRAFFIC

RAILING

TRAFFIC

GUTTERLINE

RAILING

LT. TRAFFIC

GUTTERLINE

RAILING

RT. TRAFFIC

1'-4"

1'-4"

RAILING

TRAFFIC

RAILING

TRAFFIC

GUTTERLINE

RAILING

RT. TRAFFIC

GUTTERLINE

LT. TRAFFIC

TYPICAL SECTION THRU SPAN 4

1'-4" 1'-4"

46'-8"

RAILING

TRAFFIC

RAILING

TRAFFIC

GUTTERLINE

RAILING

RT. TRAFFIC

22'-0"22'-0"

"8 72'-2

"8 12'-4 "8

12'-4

"8 72'-25 ~ 12"X55" FSB's = 18'-9" "8

75 ~ 12"X55" FSB's = 18'-8

22'-0"

TYPICAL SECTION THRU SPAN 5

22'-0"

CHANGE

SLOPE

" COPING-TO-COPING2

1VARIES FROM 58'-3" TO 60'-0

"2 1 14'-8

NOTE 2NOTES

CHANGE

SLOPE

2. MEASURED FROM NORTHWEST CORNER OF APP. SLAB 2.

1. MEASURED FROM NORTHWEST CORNER OF SPAN 5.

NOTE 1

14'-8½"

VARIES FROM 1'-4" TO

VARIERS FROM 46'-8" TO 58'-3" COPING-TO-COPING

VARIES FROM 22'-0" TO 34'-2"

VARIES FROM 34'-2" TO 36'-8½"

GUTTERLINE

RAILING

LT. TRAFFIC PGL

PGL

PGL

¡ BRIDGE

SAM SENTER RD./

¡ CONSTRUCTION

¡ BRIDGE

SAM SENTER RD./

¡ CONSTRUCTION

¡ BRIDGE

SAM SENTER RD./

¡ CONSTRUCTION

:0

:4

P

M s t a n le y g r o u p .c o m g f s p r o j e c t s P a lm

B e a c h

C o u n t y .0

C

A D

D p la n s s t r u c t

B

B F in is h G r E

L .d g

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

E.H

ERIC HUSKEY, P.E. NO. 56593

Certificate of Authorization No. 1978 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

S.S.

2019803

A.A.CR 880 AT SAM SENTER ROAD

REPLACEMENT

INTERSECTION IMPROVEMENT AND BRIDGE

11/5/24

OF 95

:0

:0

P

M s t a n le y g r o u p .c o m g f s p r o j e c t s P a lm

B e a c h

C o u n t y .0

C

A D

D p la n s s t r u c t

B

B F in is h G r E

L .d g n

BRIDGE NO. 934000

(4 OF 5)

FINISH GRADE ELEVATIONS B1-27

NOTES

1. Elevations shown are to top of concrete.

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

E.H

ERIC HUSKEY, P.E. NO. 56593

Certificate of Authorization No. 1978 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

S.S.

2019803

A.A.CR 880 AT SAM SENTER ROAD

REPLACEMENT

INTERSECTION IMPROVEMENT AND BRIDGE

11/5/24

OF 95

:0

:1

P

M s t a n le y g r o u p .c o m g f s p r o j e c t s P a lm

B e a c h

C o u n t y .0

C

A D

D p la n s s t r u c t

B

B F in is h G r E

L .d g n

BRIDGE NO. 934000

(5 OF 5)

FINISH GRADE ELEVATIONS B1-28

NOTES

1. Elevations shown are to top of concrete.

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

E.H

ERIC HUSKEY, P.E. NO. 56593

Certificate of Authorization No. 1978 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

S.S.

2019803

A.A.CR 880 AT SAM SENTER ROAD

REPLACEMENT

INTERSECTION IMPROVEMENT AND BRIDGE

11/5/24

OF 95

¡ BEARING

¡ BEARING

Direction of Stationing

FRAMING PLAN

SAM SENTER RD.

¡ CONSTRUCTION

¡ BEARING

(TYP.)

BEAM (FSB)

FLORIDA SLAB

SPAN 3

36'-6"

¡ FSB 3-1

¡ FSB 3-2

¡ FSB 3-3

¡ FSB 3-4

¡ FSB 3-5

¡ FSB 3-6

¡ FSB 3-7

¡ FSB 3-8

¡ FSB 3-9

¡ FSB 3-10

¡ FSB 4-1

¡ FSB 4-2

¡ FSB 4-3

¡ FSB 4-4

¡ FSB 4-5

¡ FSB 4-6

¡ FSB 4-7

¡ FSB 4-8

¡ FSB 4-9

¡ FSB 4-10

"2 11'-1 1'-1½"

¡ BEARING

SPAN 4

24'-0"

90°0'0" (TYP.)

90°0'0" (TYP.)

¡ EXP. JOINT

¡ EXP. JOINT

¡ EXP. JOINT

11+60

¡ FSB 3-11

¡ FSB 3-12

"x

F S

B 's

"x

F S

B 's

"x

F S

B 's

"x

F S

B 's

O

V E

R A

L

W I D

T H

O

V E

R A

D

T H

G

A P

(T

Y P

G

A P

(T

Y P

10+60

"2 11'-1"2

11'-1

STA. 10+78.77

¡ INT BENT 3

STA. 11+39.27

¡ INT BENT 5

STA. 11+15.27

¡ INT BENT 4

90°0'0" (TYP.) 90°0'0" (TYP.)

FOR DETAILS ON THE DIAPHRAGM.

1. SEE SUPERSTRUCTURE DETAILS SHEET 4 OF 6

ƃ

SPANS 3 AND 4 FLORIDA SLAB BEAM FRAMING PLAN

NOTE

:1

:1

P

M s t a n le y g r o u p .c o m g f s p r o j e c t s P a lm

B e a c h

C o u n t y .0

C

A D

D p la n s s t r u c t

B

B F r a m in g P la n .d g n

BRIDGE NO. 934000

1"=15'

B1-29

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

E.H

ERIC HUSKEY, P.E. NO. 56593

Certificate of Authorization No. 1978 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

S.S.

2019803

A.A.CR 880 AT SAM SENTER ROAD

REPLACEMENT

INTERSECTION IMPROVEMENT AND BRIDGE

11/5/24

OF 95

N

‘"=1'-0"

B1-30

SPANS 1 AND 2

(1 OF 5)

SUPERSTRUCTURE

GUTTERLINERT

LTCOPING

COPING RT

FLAT SLAB

CIP CONT.

LT GUTTERLINE

6'-1"

@ 6"

18 ~ 7S20

@ 6"

22 ~ 7S21

11 ~ 12 ~

6" 6" 6"

SPLICE (TYP.)

@ 6"

7S18

@ 6"

7S19

(M

X

S

X

(M

A X

S

(M

A X

S

S P

A N

E X

P J T

TRAFFIC RAILING (TYP.)

36" SINGLE SLOPE

1'-4"

S P

A N

E X

P J T

(H

A

F

¡ INT. BENT 3

4S1

(TYP. BOTH SIDES)

(T Y P

B O

T H

S I D

E S

(M A

X

S

S

(M A

X

S

S

(M A

X

(M A

X

(TYP. BOTH SIDES)

2'-6" MIN. LAP SPLICE

(TYP. BOTH SIDES)

(TYP. BOTH SIDES)

(TYP. BOTH SIDES)

OPEN JT.RAILING

(TYP. BOTH SIDES)

2'-6" MIN. LAP SPLICE

BENT 2

¡ INT.

(TYP. BOTH SIDES)

(TYP. BOTH SIDES) (61 BARS)

PAIRED WITH 7S BARS

4S16 @ TRAFFIC RAILING (FIELD BEND)

(TYP. BOTH SIDES) (49 BARS)

PAIRED WITH 4S2, 4S3, & 8S BARS

4S16 @ TRAFFIC RAILING (FIELD BEND)

E N

D

S

L A

B

(T

Y P

B O

T H

3'-2" MIN. LAP

FF OF APP. SLAB

¡ END BENT 1

BRIDGEBEGIN

(TYP.)

99 ~ 7S17 @ 6" (MAX.) (TOP)

6"

SIDES)

BOTH

8S7 (TYP.

¡ BENTS 1, 2, & 3

ROADWAY CROWN

¡ CONSTRUCTION SAM SENTER RD.

8S26-8S31 @ 3½"

8S32-8S37 @ 3½"

8S38-8S43 @ 3½"

124'-7¼" COPING-TO-COPING (MEASURED ALONG THE DECK EDGE)

51'-4" COPING-TO-COPING (MEASURED ALONG THE DECK EDGE)

" (MEASURED ALONG THE DECK EDGE)8

3123'-4

:3

:1

P

M s t a n le y g r o u p .c o m g f s p r o j e c t s P a lm

B e a c h

C o u n t y .0

C

A D

D p la n s s t r u c t

B

B S u p e r s t .d g n

BRIDGE NO. 934000

D ir e c t io n o f

S t a t io n in g

A A

(TRAFFIC RAILING REINFORCEMENT BARS 4V AND 4S NOT SHOWN FOR CLARITY)

PLAN - TOP REINFORCEMENTNOTE

1. SEE SUPERSTRUCTURE DETAILS (SHEET 1 OF 6) FOR SECTION A-A.

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

E.H

ERIC HUSKEY, P.E. NO. 56593

Certificate of Authorization No. 1978 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

S.S.

2019803

A.A.CR 880 AT SAM SENTER ROAD

REPLACEMENT

INTERSECTION IMPROVEMENT AND BRIDGE

11/5/24

OF 95

N

‘"=1'-0"

B1-31

SPANS 1 AND 2

(2 OF 5)

SUPERSTRUCTURE

FLAT SLAB

CIP CONT.

(TYP.)

SPLICE (TYP.)

" 6

102 ~ 7S17 @ 6" (MAX.)

X

X

X

S

X

S

X

S

(B O

T H

E

N D

S

(T

Y P

E X

P J T

¡ INT. BENT 3

9 ~ 12 ~

18 ~ 7S23 22 ~ 7S227S24

@ 6" @ 6" @ 6" @ 6"

7S25

(TYP.)

TRAFFIC RAILING

36" SINGLE SLOPE

X

S P

A N

E X

P J T

(H

A

1'-4"

6"

6" 6" 6"

S P

A N

S

(TYP. BOTH SIDES)

3'-2" MIN. LAPLTCOPING

(TYP. BOTH SIDES)

LT GUTTERLINE

(TYP. BOTH SIDES)

OPEN JT.RAILING

(M A

X

(T Y P

B O

T H

S I D

E S

S

(M A

X

FF OF APP. SLAB

¡ END BENT 1

BRIDGEBEGIN

BENT 2

¡ INT.

GUTTERLINERT

COPING RT

(TYP. BOTH SIDES)

(TYP. BOTH SIDES)

2'-6" MIN. LAP SPLICE

7S4

¡ BENTS 1, 2, & 3

ROADWAY CROWN

SAM SENTER RD.

¡ CONSTRUCTION

SIDES)

BOTH

7S11 (TYP.

6"

6'-1"

8S44-8S49 @ 3½"

8S50-8S55 @ 3½"

51'-4" COPING-TO-COPING (MEASURED ALONG THE DECK EDGE)

124'-7¼" COPING-TO-COPING (MEASURED ALONG THE DECK EDGE)

" (MEASURED ALONG THE DECK EDGE)8

3123'-4

S P

A N

S

A N

D

:3

:5

P

M s t a n le y g r o u p .c o m g f s p r o j e c t s P a lm

B e a c h

C o u n t y .0

C

A D

D p la n s s t r u c t

B

B S u p e r s t .d g n

BRIDGE NO. 934000

D ir e c t io n o f

S t a t io n in g

A A

(TRAFFIC RAILING REINFORCEMENT BARS 4V AND 4S NOT SHOWN FOR CLARITY)

PLAN - BOTTOM REINFORCEMENT

NOTE

1. SEE SUPERSTRUCTURE DETAILS (SHEET 1 OF 6) FOR SECTION A-A.

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

E.H

ERIC HUSKEY, P.E. NO. 56593

Certificate of Authorization No. 1978 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

S.S.

2019803

A.A.CR 880 AT SAM SENTER ROAD

REPLACEMENT

INTERSECTION IMPROVEMENT AND BRIDGE

11/5/24

OF 95

„"=1'-0" B1-32

SPAN 3

(3 OF 5)

SUPERSTRUCTURE

N

" COPING-TO-COPING2

151'-3

S H I

R

E Q

U I R

E D

T

O

C

L E

A R

B

A R

S

G

N

D

F

S B

B

A R

S

E

B

A R

S

P

A I R

T

H

B

A R

S

L

(T Y P

B E

T W

E E

N

E

A C

H

F

S B

B

A R

S

P

A I R

T

H

F

S B

B

A R

S

E

FSB (TYP.)

¡ FSB

FSBs)

BETWEEN

5B1 (TYP.

4 ~ BARS

LT GUTTERLINE RT GUTTERLINE

COPING LT COPING RT

S P

A N

E

X P

A N

S I O

N

J

O I N

T

I N

T E

R M

E D I A

T E

B

E N

T

E

X P

A N

S I O

N

J

O I N

T

I N

T E

R M

E D I A

T E

B

E N

B

A R

S

SHIFT TRANSVERSELY AS REQUIRED TO CLEAR BARS 5G1 AND FSB BARS 4K

69 ~ BARS 4L1 @ 9"± PAIRED WITH BARS 5B1

69 ~ BARS 5B1 @ 9"± PAIRED WITH BARS 4L1

69 ~ BARS 4L1 @ 9"± PAIRED WITH BARS 5B1

B

A R

S

S H I

R

E Q

U I R

E D

T

O

C

L E

A R

B

A R

S

D

F

S B

B

A R

S

E

B

A R

S

P

A I R

T

H

B

A R

S

L

1'-4"

2"

1'-4"

2"

1"

2"

SPLICE (TYP.)

2'-0" MIN. LAP

¡ FSB 3-12

¡ FSB 3-12¡ FSB 3-1

¡ FSB 3-1

SHOULDER

10'-0"

NORTHBOUND LANE

VARIES 12'-0" TO 14'-0"

SOUTHBOUND LANE

VARIES 12'-0" TO 14'-0"

SHOULDER

10'-0"

SAM SENTER RD.

¡ CONSTRUCTION

:2

:3

P

M s t a n le y g r o u p .c o m g f s p r o j e c t s P a lm

B e a c h

C o u n t y .0

C

A D

D p la n s s t r u c t

B

B S u p e r s t .d g n

BRIDGE NO. 934000

D ir e c t io n o f

S t a t io n in g

B B

PLANNOTE

1. SEE SUPERSTRUCTURE DETAILS (SHEET 2 OF 6) FOR SECTION B-B.

(TRAFFIC RAILING REINFORCEMENT BARS 4V AND 4P NOT SHOWN FOR CLARITY)

(REINFORCEMENT CALLED OUT ON THIS SHEET IS FOR THE C-I-P TOPPING)

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

E.H

ERIC HUSKEY, P.E. NO. 56593

Certificate of Authorization No. 1978 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

S.S.

2019803

A.A.CR 880 AT SAM SENTER ROAD

REPLACEMENT

INTERSECTION IMPROVEMENT AND BRIDGE

11/5/24

OF 95

„"=1'-0" B1-33

SPAN 4

(4 OF 5)

SUPERSTRUCTURE

N

1'-4"

SHOULDER

10'-0"

NORTHBOUND LANE

12'-0"

SOUTHBOUND LANE

12'-0"

SHOULDER

10'-0"

S H I

R

E Q

U I R

E D

T

O

C

L E

A R

B

A R

S

D

F

S B

B

A R

S

E

B

A R

S

P

A I R

T

H

B

A R

S

B

A R

S

B

A R

S

S H I

R

E Q

U I R

E D

T

O

C

L E

A R

B

A R

S

D

F

S B

B

A R

S

E

B

A R

S

P

A I R

T

H

B

A R

S

L

S P

A N

E

X P

A N

S I O

N

J

O I N

T

I N

T E

R M

E D I A

T E

B

E N

T

E

X P

A N

S I O

N

J

O I N

T

I N

T E

R M

E D I A

T E

B

E N

T

LT GUTTERLINE RT GUTTERLINE

FSBs)

BETWEEN

5B1 (TYP.)

4 ~ BARS

FSB (TYP.)

¡ FSB

(T Y P

B E

T W

E E

N

E

A C

H

F

S B

B

A R

S

P

A I R

T

H

F

S B

B

A R

S

E

SHIFT TRANSVERSELY AS REQUIRED TO CLEAR BARS 5G1 AND FSB BARS 4K

63 ~ BARS 4L1 @ 9"± PAIRED WITH BARS 5B1

46'-8" COPING-TO-COPING

63 ~ BARS 5B1 @ 9"± PAIRED WITH BARS 4L1

2"

63 ~ BARS 4L1 @ 9"± PAIRED WITH BARS 5B1

SPLICE (TYP.)

2'-0" MIN. LAP1"

2"

¡ FSB 4-10

¡ FSB 4-10¡ FSB 4-1

¡ FSB 4-1

SAM SENTER RD.

¡ CONSTRUCTION

:2

:2

P

M s t a n le y g r o u p .c o m g f s p r o j e c t s P a lm

B e a c h

C o u n t y .0

C

A D

D p la n s s t r u c t

B

B S u p e r s t .d g n

BRIDGE NO. 934000

D ir e c t io n o f

S t a t io n in g

C C

PLAN

NOTE

1. SEE SUPERSTRUCTURE DETAILS (SHEET 2 OF 6) FOR SECTION C-C. (TRAFFIC RAILING REINFORCEMENT BARS 4V AND 4P NOT SHOWN FOR CLARITY)

(REINFORCEMENT CALLED OUT ON THIS SHEET IS FOR THE C-I-P TOPPING)

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

E.H

ERIC HUSKEY, P.E. NO. 56593

Certificate of Authorization No. 1978 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

S.S.

2019803

A.A.CR 880 AT SAM SENTER ROAD

REPLACEMENT

INTERSECTION IMPROVEMENT AND BRIDGE

11/5/24

OF 95

„"=1'-0" B1-34

N

SPAN 5

(5 OF 5)

SUPERSTRUCTURE

46'-8"

44'-0"1'-4" 1'-4"

GUTTERLINERT

GUTTERLINELT COPING RT

COPING LT

FLAT SLABCIP

6"

6"

(M

A X

(M

A X

(M

A X

S

(M

A X

S

(M

A X

S

46 ~ 4S6 @ 1'-0" (MAX.)

(M

A X

(M

A X

COPING RT

GUTTERLINERT

6" (MAX.)

6 ~ 4S9 @

93~ 6S17 @ 6" (MAX.)

6" (MAX.)

6 ~ 6S18 @

4S8

4S7

3'-11"

S P

A N

6" (MAX.)

8 ~ 4S10 @

4"

RAILING (TYP.)

TRAFFIC SLOPE

36" SINGLE

4"

E X

P J T

¡ INT. BENT 5

E X

P J T

(H

A

(M

A X

S

4 ~ 8S12 @ 3½"

4S4

4S5

4 ~ 8S12 @ 3½"

RAILING (TYP.)

TRAFFIC SLOPE

36" SINGLE

S P

A N

(37 BARS)

PAIRED WITH 4S BARS

RAILING (FIELD BEND)

4S11 @ TRAFFIC

6S19

8 ~

(MAX.)

@ 6"

6S13

CIP FLAT SLAB

(M

A X

6"

LT GUTTERLINE

FF OF APPROACH SLAB

¡ END BENT 6

END BRIDGE

FF OF APPROACH SLAB

¡ END BENT 6

END BRIDGE

¡ INT. BENT 5

(T Y P

B O

T H

E N

D S

4S1

3 SPACES AT 6"

COPING LT

6S16

6S13

4S1

¡ BENTS 5 & 6

ROADWAY CROWN

¡ CONSTRUCTION SAM SENTER RD.

E X

P

J T

E X

P J T

(H

A

(T Y P

B O

T H

E N

D S

:2

:4

P

M s t a n le y g r o u p .c o m g f s p r o j e c t s P a lm

B e a c h

C o u n t y .0

C

A D

D p la n s s t r u c t

B

B S u p e r s t .d g n

BRIDGE NO. 934000

D ir e c t io n o f

S t a t io n in g

(TRAFFIC RAILING REINFORCEMENT BARS 4V AND 4S NOT SHOWN FOR CLARITY)

DD

PLAN - BOT. REINFORCEMENT

PLAN - TOP REINFORCEMENT

NOTE

1. SEE SUPERSTRUCTURE DETAILS (SHEET 5 OF 6) FOR SECTION D-D.

D D

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

E.H

ERIC HUSKEY, P.E. NO. 56593

Certificate of Authorization No. 1978 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

S.S.

2019803

A.A.CR 880 AT SAM SENTER ROAD

REPLACEMENT

INTERSECTION IMPROVEMENT AND BRIDGE

11/5/24

OF 95

SUPERSTRUCTURE SECTION A-A

SUPERSTRUCTURE SECTION A-A

B1-35 ‚"=1'

NOTES

COPING LINE

COPING LINE L

I

M A

T C

H

10'-0"

SHLDR. LANE

SAM SENTER RD.

¡ CONSTRUCTION

LANE

10'-0"

LANE SHLDR.

(SEE NOTE 1)

BARS 4V

22 ~ 7S22 @ 6" (BOT.)

22 ~ 7S21 @ 6" (TOP)

18 ~ 7S23 @ 6" (BOT.)

18 ~ 7S20 @ 6" (TOP)

12 ~ 7S24 @ 6" (BOT.)

12 ~ 7S19 @ 6" (TOP)

9 ~ 7S25 @ 6"

9 ~ 7S18 @ 6" (TOP)

(BOT.)

6" (BOT.)

6" (TOP)

6" (BOT.)

6" (TOP)

6" (BOT.)

6" (TOP)

6" (BOT.)

6" (TOP)

¡ CROWN

¡ BRIDGE/

(TOP AND BOT.)

102 ~ 7S17 @ 6" (MAX.)

6" (BOT.)

6" (TOP)

22 ~ 7S22 @ 6" (BOT.)

22 ~ 7S21 @ 6" (TOP)

6" (BOT.)

6" (TOP)

18 ~ 7S23 @ 6" (BOT.)

18 ~ 7S20 @ 6" (TOP)

12 ~ 7S24 @ 6" (BOT.)

12 ~ 7S19 @ 6" (TOP)

6" (BOT.)

6" (TOP)

6" (BOT.)

6" (TOP)

L I

A

T C

H

@ 6" (TOP)

9 ~ 7S18

@ 6" (BOT.)

9 ~ 7S25

@ 6" (TOP)

9 ~ 7S18

@ 6" (BOT.)

9 ~ 7S25

BARS 4S16

BARS 4S16 CIP FLAT SLAB

SPANS 1 AND 2

(1 OF 6)

SUPERSTRUCTURE DETAILS

(INDEX NO. 521-427)

TRAFFIC RAILING

36" SINGLE-SLOPE

SEE INDEX 630-010

3 ~ 2" CONDUITS

(INDEX NO. 521-427)

TRAFFIC RAILING

36" SINGLE-SLOPE

SEE INDEX 630-010

3 ~ 2" CONDUITS

VARIES FROM 14'-0" TO 43'-10ƃ" VARIES FROM 14'-0" TO 43'-10ƃ"

VARIES FROM 14'-0" TO 43'-10ƃ"

0.31% TO 1.89%

VARIES FROM

2. SEE SUPERSTRUCTURE (SHEETS 1 AND 2 OF 5) FOR SECTION A-A.

REFER TO INDEX 521-427, INCLUDED IN THIS DRAWING SET.

FOR DETAILS AND PLACEMENT OF BARS 4S AND 4V, 1.

& 7S6

BARS 7S4, 7S5

7S13, 7S14, & 7S15

BARS 7S11, 7S12,

8S9 & 8S10

BARS 8S7, 8S8,

& 4S3

BARS 4S1, 4S2,

& 4S3

BARS 4S1, 4S2,

8S9 & 8S10

BARS 8S7, 8S8,

SIDES OF SLAB)

(TYP. BOTH

BARS 8S27

SIDES OF SLAB)

(TYP. BOTH

BARS 8S29

7S13, 7S14, & 7S15

BARS 7S11, 7S12

& 7S6

BARS 7S4, 7S5

ITEM UNIT QUANTITY

LF

CF

LF

LB

CY

Expansion Joints - Poured Joint with Backer Rod

Plain Neoprene Pads - 8"x1"

Concrete Traffic Railing, Bridge (36" Single-Sloped)

Reinforcing Steel (Superstructure)

Class II Concrete (Superstructure) - Flat Slab

ESTIMATED QUANTITIES FOR BRIDGE SUPERSTURCTURE - SPAN 1

N/A

33,180

2. Quantities for Expansion Joints are per joint.

1. Quantities for Plain Neoprene pads are per bearing line.

ITEM UNIT QUANTITY

LF

CF

LF

LB

CY

Expansion Joints - Poured Joint with Backer Rod

Plain Neoprene Pads - 8"x1"

Concrete Traffic Railing, Bridge (36" Single-Sloped)

Reinforcing Steel (Superstructure)

Class II Concrete (Superstructure) - Flat Slab

ESTIMATED QUANTITIES FOR BRIDGE SUPERSTURCTURE - SPAN 2

N/A

N/A

22,119

2. Quantities for Expansion Joints are per joint.

1. Quantities for Plain Neoprene pads are per bearing line.

(T Y P

SIDES OF SLAB)

BARS 4S (TYP. BOTH

-0.31% TO 1.89%

VARIES FROM

0.31% TO 1.89%

VARIES FROM

VARIES FROM 51'-4" TO 124'-7¼" COPING-TO-COPING (MEASURED ALONG THE DECK EDGE)

VARIES FROM 51'-4" TO 124'-7¼" COPING-TO-COPING (MEASURED ALONG THE DECK EDGE)

:3

:1

P

M s t a n le y g r o u p .c o m g f s p r o j e c t s P a lm

B e a c h

C o u n t y .0

C

A D

D p la n s s t r u c t

B

B S u p e r s t D e t .d g

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

E.H

ERIC HUSKEY, P.E. NO. 56593

Certificate of Authorization No. 1978 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

S.S.

2019803

A.A.CR 880 AT SAM SENTER ROAD

REPLACEMENT

INTERSECTION IMPROVEMENT AND BRIDGE

11/5/24

OF 95

SHIFT TRANSVERSELY AS REQUIRED TO CLEAR BARS 5G1 AND FSB BARS 4K

69 ~ BARS 5B1 @ 9"±

6½" C.I.P. OVERLAY

SUPERSTRUCTURE SECTION B-B

SUPERSTRUCTURE SECTION C-C

SPANS 3 AND 4

(2 OF 6)

SUPERSTRUCTURE DETAILS B1-36

1/4"=1'

1'-4"

"4 32'-1 "4

32'-1 "2 15 SPACES @ 4'-3ƀ" = 21'-5 2'-1"

(TYP.)

DETAIL B-B

(TYP.)

DETAIL A-A

1'-4"

SHIFT TRANSVERSELY AS REQUIRED TO CLEAR BARS 5G1 AND FSB BARS 4K

62 ~ BARS 5B1 @ 9"±2"

6½" C.I.P. OVERLAY

(TYP.)

DETAIL A-A

(TYP.)

DETAIL B-B

¡ FSB (TYP.)

FSB (TYP.)

(TYP.)

(INDEX NO. 521-427)

TRAFFIC RAILING

36" SINGLE-SLOPE

(TYP. BETWEEN FSBs)

BARS 5G1

(TYP. BETWEEN FSBs)

4 ~ BARS 5B1

BARS 5A1

COPING LINE

(SEE NOTE 1)

BARS 4V

(SEE NOTE 1)

BARS 4S (TYP.)

(SEE NOTE 1)

BARS 4S (TYP.)

FSB (TYP.)

(TYP.)

(INDEX NO. 521-427)

TRAFFIC RAILING

36" SINGLE-SLOPE

(SEE NOTE 1)

BARS 4V

¡ FSB (TYP.)

(TYP. BETWEEN FSBs)

BARS 5G1

COPING LINE

(TYP. BETWEEN FSBs)

4 ~ BARS 5B1

46'-8" COPING-TO-COPING

" COPING-TO-COPING2

151'-3

VARIES FROM 1.89% TO 2.00% VARIES FROM 1.89% TO 2.00%

VARIES FROM 1.89% TO 2.00% VARIES FROM 1.89% TO 2.00%

2'-0" MIN. LAP1"

BARS 5A2

2"

"4 32'-3 2'-4"

SHOULDER

10'-0"

NORTHBOUND LANE

12'-0"

SOUTHBOUND LANE

12'-0"

SHOULDER

10'-0"

2"

2'-0" MIN. LAP1"

BARS 5A2 BARS 5A1

"2 15 SPACES @ 4'-3ƀ" = 21'-52'-1"

SHOULDER

10'-0"

NORTHBOUND LANE

VARIES FROM 12'-0" TO 14'-0"

SOUTHBOUND LANE

VARIES FROM 12'-0" TO 14'-0"

SHOULDER

10'-0"

¡ BRIDGE / CROWN

¡ BRIDGE / CROWN

3. SEE SUPERSTRUCTURE DETAILS (3 OF 6) FOR DETAILS A-A AND B-B.

SECTION B-B AND SECTION C-C.

2. SEE SUPERSTRUCTURE (SHEETS 3 AND 4 OF 5) FOR

TO INDEX 521-427 INCLUDED IN THIS DRAWING SET.

FOR DETAILS AND PLACEMENT OF BARS 4S AND 4V REFER 1.

NOTES

"8 12'-4 "8

12'-4 4 SPACES @ 4'-8Ɓ" = 18'-9" "2

12'-34 SPACES @ 4'-8Ɓ" = 18'-9""2

12'-3

:3

:1

P

M s t a n le y g r o u p .c o m g f s p r o j e c t s P a lm

B e a c h

C o u n t y .0

C

A D

D p la n s s t r u c t

B

B S u p e r s t D e t .d g

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

E.H

ERIC HUSKEY, P.E. NO. 56593

Certificate of Authorization No. 1978 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

S.S.

2019803

A.A.CR 880 AT SAM SENTER ROAD

REPLACEMENT

INTERSECTION IMPROVEMENT AND BRIDGE

11/5/24

OF 95

B1-37 1"=1'

SPANS 3 AND 4

(3 OF 6)

SUPERSTRUCTURE DETAILS

C-I-P TOPPING

COPING LINE

½"

FSB

BARS 5A1 AND 5A2

2" CL.

INDEX 521-427

BARS 4V

INDEX 521-427

TRAFFIC RAILING

36" SINGLE-SLOPE

M I N

½

C O

V E

R

½

TOPPING

C-I-P

(TYP.)

FSB

BARS 5A1 AND 5A2

CLEAR (TYP.)

1¼" MIN.

AND BACKER ROD NOTES

SEE BEAM GAP BACKER ROD DETAIL

BARS 5B1

BARS 5G1

BARS 5B1BARS 5B1 (TYP.)

BARS 5B1

VARIES

MIN.

½"

M A

X

½

M I N

OF FLANGES

GAP AT TOP

FSB

SEE NOTES

BACKER ROD,

TOP OF FLANGE (TYP.)

:3

:2

P

M s t a n le y g r o u p .c o m g f s p r o j e c t s P a lm

B e a c h

C o u n t y .0

C

A D

D p la n s s t r u c t

B

B S u p e r s t D e t .d g n

BRIDGE NO. 934000

BEAM GAP BACKER ROD DETAIL

BEAM GAP BACKER ROD NOTES

DETAIL B-B

AT POCKETS

DETAIL A-A

CONCRETE PARAPET AT COPINGS

BARS 5A1 AND 5A2)

(PAIRED WITH

BARS 4L1

SEE BRIDGE TYPICAL SECTIONS FOR BEAM GAP SPACING.5.

THE BACKER ROD MAY REMAIN IN PLACE AFTER TOPPING CONCRETE PLACEMENT.4.

CONSTRUCTION ADHESIVE.

CONCRETE PLACEMENT AND TO BE MORTAR TIGHT USING A COMPATIBLE

SECURE THE BACKER ROD TO PREVENT DISPLACEMENT DURING TOPPING 3.

BACKER ROD DETAIL.

INSTALL THE BACKER ROD FROM THE TOP DOWN TO THE POSITION SHOWN IN THE2.

IN THE BACKER ROD DETAIL.

BETWEEN ADJACENT FSBS. MEASURE GAP AT THE TOP OF THE FLANGES AS SHOWN

DIAMETER 50% LARGER THAN THE FIELD VERIFIED MAXIMUM WIDTH OF THE GAP

OF ASTM C1330 OR ASTM D5249, TYPES 1 OR 3, WITH A MINIMUM UNCOMPRESSED

GAP BETWEEN ADJACENT FSBS. USE A BACKER ROD MEETING THE REQUIREMENTS

USE A BACKER ROD TO FORM THE BOTTOM OF THE CAST IN PLACE TOPPING AT THE 1.

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

E.H

ERIC HUSKEY, P.E. NO. 56593

Certificate of Authorization No. 1978 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

S.S.

2019803

A.A.CR 880 AT SAM SENTER ROAD

REPLACEMENT

INTERSECTION IMPROVEMENT AND BRIDGE

11/5/24

OF 95

1"=1'

SPANS 3 AND 4

(4 OF 6)

SUPERSTRUCTURE DETAILS B1-38

W

W /2W /2

¡ BEARING

¡ FSB***

2"±

C-I-P TOPPING

FSB

BARS 5E (TYP.)

BENT CAP

BARS 5A1 AND 5A2

٭٭"6 ٭٭"6

DIM A/2٭

2" CL. (TYP.)

� BEARING

FSB (TYP.)

C-I-P TOPPING

2½"2½"

INDEX 458-110

WITH BACKER ROD,

POURED JOINT

EXPANSION JOINT -

PREFORMED JOINT FILLER

EXPANDED POLYSTYRENE

� INTERMEDIATE BENT

INTERMEDIATE BENT CAP

BARS 5A1 AND 5A2

٭٭"½1-'1 ٭٭"½1-'1

AND 5A2 (TYP.)

BARS 5A1

٭٭"6

DIM A/2٭

2" CL. (TYP.)

� BEARING

FSB (TYP.)

C-I-P TOPPING

2½"

INDEX 458-110

WITH BACKER ROD,

POURED JOINT

EXPANSION JOINT -

EXPANDED POLYSTYRENE

� INTERMEDIATE BENT

INTERMEDIATE BENT CAP

BARS 5A1 AND 5A2

٭٭"¼0-'1 ٭٭"½1-'1

AND 5A2 (TYP.)

BARS 5A1

FLAT SLAB

BARS 5B1 BARS 5B1

BARS 5B1)

(PAIRED WITH

BARS 4L1

BARS 5G1

BARS 5B1

BARS 5B1

FSB BEARING PAD

1"x8"xX" PAD

MARK 5 AND 6)

PAD (BEARING PAD

FLAT SLAB BEARING

EXPANDED POLYSTYRENE

WITH BARS 5B1)

BARS 4L1 PAIRED

PAD (TYP.)

FSB BEARING

FILLER (TYP.)

PREFORMED JOINT

POLYSTYRENE

EXPANDED

OR PREFORMED JOINT FILLER

SHORT SECTION OF BACKER ROD

PREFORMED JOINT FILLER

SYSTEM, INDEX 458-110

ROD EXPANSION JOINT

POURED JOINT WITH BACKER

:4

:3 s t a n le y g r o u p .c o m

G F

S p r o j e c t s P a lm

B e a c h

C o u n t y .0

C

A D

D p la n s s t r u c t

B

B S u p e r s t D e t .d g n

BRIDGE NO. 934000

* MEASURED PERPENDICULAR TO BEAM END.*

* SEE POUR EXPANSION JOINT DATA TABLE.

pad

ELEVATION

PLAN

pad pad

A T I O

N I N

G

D I R

E C

T I

60° ≤ Ø < 90° SIMILAR

Ø = 90° SHOWN;***

BEARING PAD DETAIL

DETAIL C-C

(REINFORCING WITHIN FSB NOT SHOWN FOR CLARITY)

DETAIL D-D

2" CL.

ALONG ¡ POCKET AT SPAN ENDS

DETAIL E-E

NO.

SPAN

NO.

BEAM

MARK

BEARING PAD

(in)

W pad

FSB BEARING PAD DATA TABLE

1 TO 12 1 50

1 TO 10 2 554

Table Date 8-15-23

AT INTERMEDIATE BENT 3 ALONG ¡ BEAM

BARS 4L1

(REINFORCING WITHIN FSB NOT SHOWN FOR CLARITY)

(INTERMEDIATE BENT 5 OPPOSITE HAND)

AT INTERMEDIATE BENT 4 ALONG ¡ BEAM

(INTERMEDIATE BENTS WITH EXPANSION JOINTS SHOWN)

(SEE SUPERSTRUCTURE DETAIL SHEET (5 OF 6) FOR FLAT SLAB BEARING DATA TABLE)

INDIVIDUAL PADS.

WIDTH EQUAL TO FULL LENGTH OF PILE CAP INSTEAD OF

THE CONTRACTOR MAY USE A SINGLE BEARING PAD WITH A 2.

SPECIFICATION 932.

MODULUS G = 150 PSI AND IN ACCORDANCE WITH

PROVIDE PLAIN ELASTOMERIC BEARING PADS WITH A SHEAR 1.

NOTES

BEAM GAP BACKER ROD, SEE NOTES

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

E.H

ERIC HUSKEY, P.E. NO. 56593

Certificate of Authorization No. 1978 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

S.S.

2019803

A.A.CR 880 AT SAM SENTER ROAD

REPLACEMENT

INTERSECTION IMPROVEMENT AND BRIDGE

11/5/24

OF 95

B1-39 ‚"=1'

(TYP.)

SEE INDEX 630-010

3 ~ 2" CONDUITS

BARS 8S12

BARS 8S12

BARS 4S

6" (MAX)

8 ~ 6S19 @

@ 6"

6 ~ 6S18

93 ~ 6S17 @ 6" (MAX)

12'-0" 10'-0" 1'-4"12'-0"1'-4"

¡ CROWN

¡ BRIDGE/

SHLDR.SHLDR. LANE LANE

SUPERSTRUCTURE SECTION D-D

@ 6"

6 ~ 4S9

3 SPA.

(MAX.) 6" EA

46 ~ 4S6 @ 1'-0" (MAX.)

Slope: 0.02 Ft/FtSlope: 0.02 Ft/Ft

CIP FLAT SLABBARS 6S13

6S15 & 6S16

BARS 6S146" 6"

6"

BARS 4S1

BARS 4S7

COPING LINE

(SEE NOTE 1)

BARS 4V

VARIES FROM 10'-0" TO 22'-2"

SPAN 5

(5 OF 6)

SUPERSTRUCTURE DETAILS

¡ CROWN

SAM SENTER RD./

¡ CONSTRUCTION

BARS 4S48

6" (MAX.)

8 ~ 4S10 @

521-427) (TYP.)

(INDEX NO.

TRAFFIC RAILING

36" SINGLE-SLOPE

** MEASURED PERPENDICULAR TO BEAM END.

* SEE POUR EXPANSION JOINT DATA TABLE.

ITEM UNIT QUANTITY

LF

CF

LF

LB

CY

Expansion Joints - Poured Joint with Backer Rod

Plain Neoprene Pads - 8"x1"

Concrete Traffic Railing, Bridge (36" Single-Sloped)

Reinforcing Steel (Superstructure)

Class II Concrete (Superstructure) - Flat Slab

ESTIMATED QUANTITIES FOR BRIDGE SUPERSTURCTURE - SPAN 5

N/A

9,320

2. Quantities for Expansion Joints are per joint.

1. Quantities for Plain Neoprene pads are per bearing line.

4S11

BARS

& 4S5

4S3, 4S4, BARS 4S2,

2" CL.

Dim A٭

POLYSTYRENE

EXPANDED

� BEARING

BRIDGE)٭٭

1'-0" (BEGIN

BRIDGE)٭٭

1'-0" (ENDEND BENT 1 CAP

¡ PILE CAP

BEGIN OR END BRIDGE/

(END BENT 1 SHOWN - END BENT 6 OPPOSITE HAND)

AT BEGIN/END BRIDGE ALONG ¡ FLAT SLAB

DETAIL F-F

EXP. MATERIAL (TYP.)

1" PREMOLDED

1"x8"xW.pad

(BEARING MARK 3 AND 7)

FLAT SLAB BEARING PAD

APPROACH SLAB

AND 4S10)

(BARS 4S6, 4S7, 4S8, 4S9,

7S20, AND 7S21

BARS 7S17, 7S18, 7S19,

(BARS 4S1, 4S4, AND 4S5)

BARS 4S1 AND 8S7

C-I-P FLAT SLAB

AND 6S18)

7S11 (BARS 6S13

BARS 7S4 AND

6S18, AND 6S19)

7S25 (BARS 6S17,

7S23, 7S24, AND

BARS 7S17, 7S22,

EXP. MATERIAL (TYP.)

1" PREMOLDED

AND 4S10)

(BARS 4S6, 4S7, 4S8, 4S9,

7S20, AND 7S21

BARS 7S17, 7S18, 7S19,

(BARS 4S1, 4S4, AND 4S5)

BARS 4S1 AND 8S7

C-I-P FLAT SLAB

AND 6S18)

7S11 (BARS 6S13

BARS 7S4 AND

6S18, AND 6S19)

7S25 (BARS 6S17,

7S23, 7S24, AND

BARS 7S17, 7S22,

DETAIL G-G

BENT 2 CAP

INTERMEDIATE

� BEARING

1'-0"**1'-0"**

1"x8"xW.pad (TYP.)

(BEARING MARK 4)

FLAT SLAB BEARING PAD

INDEX 458-110

BACKER ROD,

POURED JOINT WITH

EXPANSION JOINT -

(SEE DETAIL)

V-GROOVE

1/2" TOOLED

¡ INTERMEDIATE BENT

(DO NOT OVERFILL)

SEAL

V-GROOVE

1/2" TOOLED

BRIDGE DECK

V-GROOVE JOINT DETAIL

BAR DESIGNATIONS IN PARENTHESES ARE FOR END BENT 6.3.

SEE SUPERSTRUCTURE (SHEET 5 OF 5) FOR SECTION D-D.2.

TO INDEX 521-427, INCLUDED IN THIS DRAWING SET.

FOR DETAILS AND PLACEMENT OF BARS 4S AND 4V, REFER1.

NOTES

¡ INTERMEDIATE BENT 2

VARIES FROM 46'-8" TO 58'-0" COPING-TO-COPING (MEASURED ALONG THE DECK EDGE)

:4

:1

P

M s t a n le y g r o u p .c o m g f s p r o j e c t s P a lm

B e a c h

C o u n t y .0

C

A D

D p la n s s t r u c t

B

B S u p e r s t D e t .d g

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

E.H

ERIC HUSKEY, P.E. NO. 56593

Certificate of Authorization No. 1978 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

S.S.

2019803

A.A.CR 880 AT SAM SENTER ROAD

REPLACEMENT

INTERSECTION IMPROVEMENT AND BRIDGE

11/5/24

OF 95

B1-40 1"=1'

(6 OF 6)

SUPERSTRUCTURE DETAILS

½ " ½

" DIM. A @ 70° F

(DEFLECTION DUE TO SELF WEIGHT AND BARRIERS)

(DEFLECTION DUE TO SELF WEIGHT AND BARRIERS)

24'-0" 24'-0"

24'-1"

12'-0½"12'-0½"

.3

.1

.1

MINIMUM OF 21 DAYS PRIOR TO CASTING TOPPING CONCRETE.

PROPOSE MODIFIED DIMENSIONS AS REQUIRED AND SUBMIT TO THE ENGINEER FOR APPROVAL A

MORE THAN ± 1" FROM THE THEORETICAL "NET BEAM CAMBER @ 120 DAYS" SHOWN IN THE TABLE, OF THE TOPPING CASTING. IF THE PREDICTED CAMBERS BASED ON FIELD MEASUREMENTS DIFFER

SHALL MONITOR BEAM CAMBERS FOR THE PURPOSE OF PREDICTING CAMBER VALUES AT THE TIME

THE VALUES GIVEN IN THE TABLE ARE BASED ON THEORETICAL BEAM CAMBERS. THE CONTRACTOR

SPAN 4SPANS 1 AND 2 CONTINUOUS SPAN

SPAN 1 SPAN 2

2 3 41

MATERIAL

POURED JOINT

ROD

BACKER

12'-0"12'-0"12'-0"12'-0"

SLAB

OR APPROACH

FSB, C-I-P SLAB,

BENT 2 BENT 3 BENT 4 BENT 5

BRIDGE

END

BRIDGE

BEGIN

APPROACH SLAB

FSB, C-I-P SLAB, OR

EJEJEJ

SPAN 3 SPAN 5

= POUR SEQUENCE NUMBER

(TYP.)

OF POUR

DIRECTION

CONTINUOUS UNIT.

ADJACENT POURS IN THE

IS REQUIRED BETWEEN

A MINIMUM OF 72 HOURS

:1

:5 s t a n le y g r o u p .c o m g f s p r o j e c t s P a lm

B e a c h

C o u n t y .0

C

A D

D p la n s s t r u c t

B

B S u p e r s t D e t .d g n

BRIDGE NO. 934000

EXPANSION JOINT DETAIL

B

E A

R

IN

B

G I N

S

P A

N

DIM. D

� SPAN

B

E A

R

D

S

P A

N

CAMBER NOTE - SPANS 3 AND 4

B

E A

R

E A

R

SPANS 3 AND 4 DEAD LOAD DEFLECTION DIAGRAM

SPANS 1 AND 2 DEAD LOAD DEFLECTION DIAGRAM

B E

G I N

B

R I D

G E

B

E A

R

T

B

E N

T

I N

T

B

E N

T

B

E A

R

E A

R

D

B

R I D

G E

I N

T

B

E N

T

� SPAN

SPAN 5 DEAD LOAD DEFLECTION DIAGRAM

� SPAN� SPAN

MOVEMENT

TOTAL DESIGN

LOCATION

@ 70°F

DIM. "A"

PER 10°F

DIM. "A" ADJUSTMENT

INDEX 458-110

POURED EXPANSION JOINT DATA TABLE

END BENT 1

INT BENT 3

INT BENT 4

2"

2"

2" Ƅ" ƅ"

Ƅ"

0.0469"

2" ¼"INT BENT 5

2" ƃ"END BENT 6

Table Date 8-25-23

Expansion Joint. Work this table with Standard Plans Index 458-110.

Dim. "A" adjustment per 10°F shown is measured perpendicular to �

NOTE:

0.0311"

0.0261"

0.0208"

0.0104"

DECK POURING SEQUENCE

SEQUENCE NOTE:

DECK POURING

NO.

SPAN

LOCATION

NO.

BEAM

FOR FLORIDA SLAB BEAMS

CAMBER AND DEFLECTION DATA TABLE

(in.)

OF BEAM) @ 120 DAYS

(PRESTRESS - DEAD LOAD

NET BEAM CAMBER

@ 120 DAYS (in.)

DUE TO TOPPING CASTING

DEAD LOAD DEFLECTION

DIM. D

(in.)

OF BEAM) @ RELEASE

(PRESTRESS - DEAD LOAD

NET BEAM CAMBER

0.5669 1.3183 -0.4478

0.2263 0.5021 -0.0693

1-12

1-10

Table Date 8-25-23

NO.

BENT

MARK

BEARING PAD

(in)

W pad

FLAT SLAB BEARING PAD DATA TABLE Table Date 8-27-24

3 5

5 6

6 7

123'-4Ƅ"

73'-4Ɔ"

51'-4"

46'-8"

57'-3ƃ"

NOTE

G = 150 PSI AND IN ACCORDANCE WITH SPECIFICATION 932.

PROVIDE PLAIN ELASTOMERIC BEARING PADS WITH A SHEAR MODULUS 1.

ITEM UNIT QUANTITY

LF

CF

LF

LB

CY

Expansion Joints - Poured Joint with Backer Rod

Plain Neoprene Pads - 8"x1"

Concrete Traffic Railing, Bridge (36" Single-Sloped)

Reinforcing Steel (Substructure)

Class II Concrete (Superstructure) - Overlay

ESTIMATED QUANTITIES FOR BRIDGE SUPERSTURCTURE - SPAN 3

13212 diaphargms, copings, and overlay pockets.

4. Concrete quantities includes the quantities for the

3. Quantities for Expansion Joints are per joint.

2. Quantities for Plain Neoprene pads are per bearing line.

1. Quantities are for Span 3.

ITEM UNIT QUANTITY

LF

CF

LF

LB

CY

Expansion Joints - Poured Joint with Backer Rod

Plain Neoprene Pads - 8"x1"

Concrete Traffic Railing, Bridge (36" Single-Sloped)

Reinforcing Steel (Substructure)

Class II Concrete (Superstructure) - Overlay

ESTIMATED QUANTITIES FOR BRIDGE SUPERSTURCTURE - SPAN 4

diaphargms, copings, and overlay pockets.

4. Concrete quantities includes the quantities for the

3. Quantities for Expansion Joints are per joint.

2. Quantities for Plain Neoprene pads are per bearing line.

1. Quantities are for Span 4.

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

E.H

ERIC HUSKEY, P.E. NO. 56593

Certificate of Authorization No. 1978 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

S.S.

2019803

A.A.CR 880 AT SAM SENTER ROAD

REPLACEMENT

INTERSECTION IMPROVEMENT AND BRIDGE

11/5/24

OF 95DATA TABLE

BEAM DETAILS

1"=1'

B1-41

Bent 4

Intermediate�

Bent 5

Intermediate�

1'-1½" 1'-1½" 1'-1½"

Edge of Beam

18 Sp. @ 2" = 3'-0"

Bent 3

Intermediate�

1'-1½"

9"

4'-2"

9"16 Sp. @ 2" = 2'-8" "2

4'-7"

"2

:4

:3

P

M s t a n le y g r o u p .c o m g f s p r o j e c t s P a lm

B e a c h

C o u n t y .0

C

A D

D p la n s s t r u c t

B

B

D a t a

T a b le

.d g n

BRIDGE NO. 934000

TYPE 1 22 STRANDS

STRAND DESCRIPTION: Use 0.60 Diameter, Grade 270, Low Relaxation Carbon Steel Strands stressed at 44 kips each. Area per strand equals 0.217 sq. in.

Direction of Stationing

END 1 END 2 END 1 END 2

SPAN 3 SPAN 4

- fully bonded strands.

STRAND DEBONDING LEGEND

strand.

length shall be measured along the debonded

NOTE: On beams with skewed ends the debonded

DIMENSION NOTES

at mid-height of the beam.

along the centerline. Dimension "R" is calculated sheet with a single asterisk (*) are measured ll longitudinal beam dimensions shown on this A *

STRAND PATTERNS

Ø=90° (TYP.)

V2V1S2S1

REINFORCING STEEL

NO.

4K

DIM Y

6Y2

DIM Y

6Y1

DIM DNO.

4D3

DIM D

4D24D1

DIM DDIM RDIM LEND 2END 1

ANGLE Ø

END 2END 1

CASE

PLAN VIEWSTND.

PTRN.

TYPERelease28 Day

STRENGTHS (psi)

CONCRETE PROPERTIES

CLASS

LOCATION

Table Date 12-01-22FLORIDA SLAB BEAM - TABLE OF VARIABLES

DIM EDIM W

DIMENSIONS*

BEAM

NO.

SPAN

NO.

BEAM

TYPE

BEAM

DIM C

3C

NO. NO.DIM ENO.

5E1 5E2

2-11

FSB 12x50

FSB 12x50

FSB 12x50

V1

V1

V1

1 1

1 1

90 90

90 4'-2"

4'-2"

4'-2"

35'-4Ƅ"

35'-4Ƅ"

35'-4Ƅ"

Ɗ"

Ɗ"

Ɗ"

3'-9½"

3'-9½"

3'-9½"

2'-1"

2'-1"

2'-1"

2'-1"

2'-1"

2'-4"

2'-1"

2'-1"

2'-1"

70 4'-6"

2'-9½"

2'-9½"

2'-9½"

2'-9½"

2'-9½"

2'-9½"

NO. OF BAR SPACES (4K)

NOTE: Work this sheet with Standard Plans Index 450-450 and 450-451.

BAR SPACING (4K) *

TYPE 2 15 STRANDS

FSB 12x55 V1 8500 6000 1 1 90 90 4'-7" 68 4'-2½" 2'-3½" 2'-3½"20 -- 44 4'-3½" 3'-2½" 3'-2½" 128 8 6 10 81 6000 2 1 1 90 90 Ɓ" 2'-3½" -- 10

FSB 12x55 V1 8500 6000 2 1 1 90 90 4'-7" Ɓ" 68 4'-2½" 2'-3½" 2'-3½" 2'-3½"20 44 - 4'-3½" 3'-2½" 3'-2½" 128 8 6 10 8

10 FSB 12x55 V1 8500 6000 2 1 1 90 90 4'-7" Ɓ" 68 4'-2½" 2'-3½" 2'-3½" 2'-3½"20 -- 44 4'-3½" 3'-2½" 3'-2½" 128 8 6 10 8

2-9

32 3'-10½"

3'-10½"

22'-10Ɓ"

22'-10Ɓ" 4'-5"

6½"6½" 6½"

22'-10Ɓ"

6½" � Bearing (Typ.)

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

E.H

ERIC HUSKEY, P.E. NO. 56593

Certificate of Authorization No. 1978 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

S.S.

2019803

A.A.CR 880 AT SAM SENTER ROAD

REPLACEMENT

INTERSECTION IMPROVEMENT AND BRIDGE

11/5/24

OF 95

10 12

8'-0" 2'-0"

PT STA. 99+38.81

A

.0

CR 880

¡ CONSTRUCTION

121110

OVERLAY

ASPHALT

LIMIT OF

RAILING

LT. TRAFFIC

GUTTERLINE

RAILING

RT. TRAFFIC

GUTTERLINE

OVERLAY

ASPHALT

LIMITS OF

OVERLAY

ASPHALT

LIMIT OF

RAILING

RT. TRAFFIC

GUTTERLINE

D ir e c t io n o f

S t a t io n in g

73'-8" R

Direction of Stationing

(INDEX 521-427)

TRAFFIC RAILING

36" SINGLE-SLOPE

(INDEX 521-427)

TRAFFIC RAILING

36" SINGLE-SLOPE

(INDEX 521-427)

TRAFFIC RAILING

36" SINGLE-SLOPE

N

N

N

N

STA. 10+00.00

¡ SAM SENTER RD.

STA. 99+19.00

¡ CR 880

L1=10'-0"

L2=10'-0"

L2=10'-0"

M1 1' -4

M2

1'-4"

M

M

1'-4"

STA. 10+20.77

APP. SLAB 1

BEGIN

STA. 11+73.35

APP. SLAB 2

END

L1=10'-0"

8'-0"

26'-2"R

73'-8"R

°0 '0

(T Y P

LT. COPING

LT. COPING

RT. COPING

RT. COPING

¡ BRIDGE

SAM SENTER RD./

¡ CONSTRUCTION

LOCATION

M2M1

DIMENSIONS

ANGLE Ø

L1 L2

APPROACH SLAB TABLE OF DIMENSIONS

90° 0' 0"

90° 0' 0"

10'-0"10'-0"

10'-0" 10'-0"

Table Date 8-20-23

Approach Slab 2

Approach Slab 1 sidewalks.

Dimensions L1 & L2 are measured along gutter line and inside face of railing on raised

Dimension Notes:

1'-4"

1'-4" 1'-4"

1'-4"

N1 N2 N3 N4

129'-10¼" 123'-11¾"

56'-2ƃ" 58'-8½"N/A N/A

N/A N/A

NOTES

STA. 10+30.77

¡ END BENT 1

BEGIN BRIDGE

END APP. SLAB 1

STA. 11+63.35

¡ END BENT 6

END BRIDGE

BEGIN APP. SLAB 2

1. WORK THIS SHEET WITH FDOT INDEX NO. 400-090.

(1 OF 2)

APPROACH SLAB

OVERLAY

ASPHALT

LIMIT OF

OVERLAY

ASPHALT

LIMIT OF

ITEM UNIT QUANTITY

Concrete Traffic Railing, Bridge (36" Single-Sloped)

Reinforcing Steel

Class II (Bridge Deck) Concrete

LF

CY

CY

ESTIMATED QUANTITIES FOR BRIDGE APP. SLAB No. 1

ITEM UNIT QUANTITY

Concrete Traffic Railing, Bridge (36" Single-Sloped)

Reinforcing Steel

Class II (Bridge Deck) Concrete

LF

CY

CY

ESTIMATED QUANTITIES FOR BRIDGE APP. SLAB No. 2

RAILING

LT. TRAFFIC

GUTTERLINE

521-427)

(INDEX

RAILING

TRAFFIC

SLOPE

36" SINGLE-

"8

APPROACH SLAB 2 PLAN

APPROACH SLAB 1 PLAN

Wingwall Plan View

End Bent 1

:4

:5

P

M s t a n le y g r o u p .c o m g f s p r o j e c t s P a lm

B e a c h

C o u n t y .0

C

A D

D p la n s s t r u c t

B

B

A p p r o a c h S la b .d g n

BRIDGE NO. 934000

1"=15'

B1-42

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

E.H

ERIC HUSKEY, P.E. NO. 56593

Certificate of Authorization No. 1978 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

S.S.

2019803

A.A.CR 880 AT SAM SENTER ROAD

REPLACEMENT

INTERSECTION IMPROVEMENT AND BRIDGE

11/5/24

OF 95

NOTES

TRAFFIC RAILING NOT SHOWN FOR CLARITY.2.

WORK THIS SHEET WITH FDOT INDEX NO. 400-090.1.

1"=10' B1-43

CROWN

SAM SENTER RD./

¡ CONSTRUCTION

¡ END BENT 1

BEING BRIDGE/

SPLICE (TYP.)

3'-10" MIN. LAP

SPLICE (TYP.)

3'-10" MIN. LAP

3" COVER

(M

A X

(B

O T

(M

A X

(T

O P

164 ~ 8A2 @ 9" (MAX.) (BOT.)

123 ~ 5A1 @ 1'-0" (MAX.) (TOP)

5 ~ 8A4 @ 9" (MAX.) (BOT.)

4 ~ 5A3 @ 1'-0" (MAX.) (TOP) 5 ~ 8A4 @ 9" (MAX.) (BOT.)

4 ~ 5A3 @ 1'-0" (MAX.) (TOP)

BEGIN APP SLAB 1

(M

A X

(B

O T

(M

A X

(T

O P

(M

A X

(B

O T

(M

A X

(T

O P

(M

A X

(B

O T

(M

A X

(T

O P

(M

A X

(T

O P

C

CROWN

SAM SENTER RD./

¡ CONSTRUCTION

¡ END BENT 6

END BRIDGE/

END APP SLAB 2

9" (BOT.)

12" (TOP)

(M

A X

(T

O P

(M

A X

(B

O T

78 ~ 8A2 @ 9" (MAX.) (BOT.)

59 ~ 5A1 @ 1'-0" (MAX.) (TOP)

SPLICE (TYP.)

3'-10" MIN. LAP1" (MIN.) (TYP.)

N

(MAX.) (TOP)

3 ~ 5C1 @ 12"

3" (TYP.)

8A6 (BOT.)

5A5 (TOP)

8A4 (BOT.)

5A3 (TOP)

APPROACH SLAB 2 PLAN - REINFORCEMENT DETAILS

APPROACH SLAB 1 PLAN - REINFORCEMENT DETAILS

(2 OF 2)

APPROACH SLAB

5C1

2" (M

AX.

TOP

3 ~ 5C1 @

12" (MAX.) (TOP)

:5

:0

P

M s t a n le y g r o u p .c o m g f s p r o j e c t s P a lm

B e a c h

C o u n t y .0

C

A D

D p la n s s t r u c t

B

B

A p p r o a c h S la b .d g

10 11

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

E.H

ERIC HUSKEY, P.E. NO. 56593

Certificate of Authorization No. 1978 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

S.S.

2019803

A.A.CR 880 AT SAM SENTER ROAD

REPLACEMENT

INTERSECTION IMPROVEMENT AND BRIDGE

11/5/24

OF 95

SLAB 1

APPROACH

SLAB 2

APPROACH

SAM SENTER RD.

CONTRUCTION¡

B1-44

SLOPE PROTECTION

RUBBLE RIPRAP

1"=30'

A A

1:2.5 TO 1:2.8 (TYP.)

SLOPE VARIES FROM

A A

INSTALLED (TYP.)

RUBBLE RIPRAP TO BE

APPROX. LIMITS OF NEW

SECTION A-A

(MIN.)

(M

IN

END BENT CAP

FILTER FABRIC

2'-0"

4'-0"

2'-4"

SLOPE

TOE OF

EL. -3.42 TO -1.42

VARIES FROM

1:2.5 (V:H) TO 1:2.8 (V:H)

CANAL SLOPE VARIES FROM

2'-9"

1'-0"

EL. 14.08

STONE

BEDDING

SECTION B-B

(MIN.)

(M

IN

END BENT CAP

FILTER FABRIC

2'-0"

4'-0"

2'-4"

SLOPE

TOE OF

EL. -3.42 TO -1.42

VARIES FROM

1:2.5 (V:H) TO 1:2.8 (V:H)

CANAL SLOPE VARIES FROM

2'-9"

1'-0"

EL. 14.08

STONE

BEDDING

N O

T E

TYPE A

RUBBLE RIPRAP

PA…