This is a roadway plans document prepared by Palm Beach County Engineering and Public Works for the CR-880 and Sam Senter Road intersection improvements and bridge replacement project over the SFWMD Ocean Canal (Project No. 2019803). The project encompasses roadway reconstruction, bridge replacement, and intersection improvements along CR-880 and Sam Senter Road in Palm Beach County, Florida. The plans, prepared by Stanley Consultants Group (Amin Ahmed, P.E. No. 52564) and approved on August 22, 2024, detail multiple roadway segments with construction stations ranging from approximately 76+00 to 118+85.53 on CR-880 and 10+00 to 14+00 on Sam Senter Road. The project includes two bridge replacements with approach slabs, three turnout details for canal access, intersection improvements with concrete gravity wall barriers and guardrails (TL-3 specification), roadway widening and resurfacing, shoulder reconstruction, and pavement work including 2-inch miscellaneous asphalt overlay on 4 to 4.5-foot wide pavement sections. Drainage improvements are incorporated throughout, including four control structures (S-10, S-11, S-12, S-13, S-14, S-15) with 18-inch and 36-inch reinforced concrete pipe installations and trapezoidal ditch construction with 1:4 side slopes and 5-foot bottom widths.

The construction plans detail extensive earthwork requirements totaling 13,840 cubic yards of regular excavation and 39,165 cubic yards of embankment for CR-880, with an additional 270 cubic yards of regular excavation, 58 cubic yards of regular embankment, 168 cubic yards of canal excavation, and 105 cubic yards of canal embankment for Sam Senter Road. The roadway designs incorporate NAVD 1988 datum elevation references with vertical curves and superelevation transitions to maintain grade continuity. The project involves coordination with multiple property owners including U.S. Sugar Corporation, King Ranch Inc., the South Florida Water Management District (SFWMD), Highland Glades Water Control District, and New Hope Sugar Company. Engineering cross-sections and profiles at regular 50-foot intervals document existing ground conditions and proposed construction grades, with benchmark elevations established for survey reference. The plans indicate utilization of rigid inclusions for roadway and shoulder reconstruction in select areas, FDOT-compliant barrier systems and guardrail terminations, and coordination with utility relocations including electrical, telecommunications, and drainage infrastructure upgrades throughout the project corridor.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DITCH

DITCH

T/B

T/B

B/B

B/B

T/B

T/B B/B

B/B

S/B

T/B

EOP

EOP

T/B

W/L

W/L

S/B

T/B

EOP

EOP

T/B

U N P

A V E

D R

O A

D

90 91

13 KV OE

OH CATV

OH TEL

PUBLIC R/W PER RPB 7 PG. 186

U.S. SUGAR CORPORATION

PARCEL B (ORB 27063 PG.1015)

00-38-44-04-00-000-5000

00-38-44-04-00-000-1020

SECTION 4/44/38

SFWMD L-13 (OCEAN CANAL R/W)

24" RCP

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

1"=40'

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

8.5 10.5

10.5 8.5

10.5

N

ROADWAY\PLANRD03.DGN

M A

T C

H

L I N

E

S

T A

.0

CR 880

¡ CONSTRUCTION CR 880

R/W LINE

ROADWAY PLAN

M A

T C

H

L I N

E

S

T A

.0

SFWMD R/W LINE

SFWMD R/W LINE

GUARDRAIL

EXISTING

REMOVE

GUARDRAIL TL-3

4.5' WIDE

PAVEMENT

2" MISC.

GUARDRAIL TL-3

4' WIDE

PAVEMENT

2" MISC.

24.00' RT

+23.02

TL-3

GUARDRAIL

4.5' WIDE

PAVEMENT

2" MISC.

0 10 40

Feet

.1

.9

.5

.7

DENOTES SHOULDER CONSTRUCTION

LEGEND:

e = 7.70%

PI STA. = 92+59.01

T = 750.63

L = 1,430.43

R = 1,910.00

PC STA. = 85+08.38

PT STA. = 99+38.81

R = 1,910.00

PI STA. = 87+96.08, 9.74' LT

L = 647.82

PC STA. = 84+69.40, 12.00' RT

PT STA. = 91+23.02, 24.00' RT

T = 327.05

CURVE 2 DATA:

EDGE OF TRAVELWAY

CURVE 2

TRAVELWAY

EDGE OF

SFWMD L-13 CANAL

FOR TURNOUT NUMBER 1

CONSTRUCTION INFORMATION

SEE TURNOUT DETAILS FOR

SWALE BOTTOM

+50.00

END SWALE

USING RIGID INCLUSIONS

DENOTES ROADWAY RECONSTRUCTION

USING RIGID INCLUSIONS

DENOTES SHOULDER RECONSTRUCTION

CR 880 CURVE 1 DATA:

¡ CONSTRUCTION

¡ CONSTRUCTION CURVE 1

.0

.0

.0

.0

.0

.0

.0

.0

CURVE 2

TRAVELWAY

PT EDGE OF

.0

BY OTHERS

TO BE REPLACED

GUY ANCHORS

UTILITY POLE

BY OTHERS

TO BE REPLACED

GUY ANCHOR

UTILITY POLE

ROADWAY PROFILE

SCALE

1" = 4' Vertical

1" = 40' Horizontal

ROADWAY\PROFRD03.DGN

M A

T C

H

L I N

E

S

T A

.0

91+0090+0089+0088+0087+00

M A

T C

H

L I N

E

S

T A

.0

CR 880

92+00

AT ¡ CONSTRUCTION

EXISTING GRADE

LINE

GRADE

PROFILE

.2

.7

.8

.7

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

1"=40'

A.A.

D.H.

A.A.

08/22/24

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

2019803

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

(+) 0.25%

V P I

.0

E L

.8

(+) 0.00%

FULL SUPERELEVATION (+.077)

(+) 0.25%

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

1"=40'

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

DITCH

DITCH

T/B

B/B

B/B

T/B

T/B

T/B

B/B

B/B

T/B

S/B

EOP

EOP

T/B

W/L

W/L

T/ B

S /B

EOP

T/B

94 95

13 KV OE

OH CATV

OH TEL

U.S. SUGAR CORPORATION

PARCEL B (ORB 27063 PG.1015)

00-38-44-03-00-000-3000

SFWMD TRACT NO. CF-100-015 5' NORTHERLY

FROM EDGE OF PAVEMENT (ORB 10362 PG.1201)

PUBLIC R/W PER RPB 7 PG. 186

8.5

8.5

10.5

10.5

10.5

8.5

8.5

10.5

10.5 10.5

N

M A

T C

H

L I N

E

S

T A

.0

ROADWAY\PLANRD04.DGN

ROADWAY PLAN

M A

T C

H

L I N

E

S

T A

.0

R/W LINE

CR 880

¡ CONSTRUCTION CR 880

SFWMD R/W LINE

GUARDRAIL TL-3

GUARDRAIL

EXISTING

REMOVE

4' WIDE

PAVEMENT

2" MISC.

4.5' WIDE

PAVEMENT

2" MISC.

GUARDRAIL TL-3

0 10 40

Feet

.5

.7

.5

.0

DENOTES SHOULDER CONSTRUCTION

LEGEND:

SFWMD L-13 CANAL

e = 7.70%

PI STA. = 92+59.01

T = 750.63

L = 1,430.43

R = 1,910.00

PC STA. = 85+08.38

PT STA. = 99+38.81

FOR TURNOUT NUMBER 1

CONSTRUCTION INFORMATION

SEE TURNOUT DETAILS FOR

SWALE BOTTOM

+50.00

BEGIN SWALE

USING RIGID INCLUSIONS

DENOTES ROADWAY RECONSTRUCTION

USING RIGID INCLUSIONS

DENOTES SHOULDER RECONSTRUCTION

CR 880 CURVE 1 DATA:

¡ CONSTRUCTION

¡ CONSTRUCTION CURVE 1

.0

.0

.0

.0

.0

.0

.0

.0

BY OTHERS

TO BE REPLACED

GUY ANCHORS

UTILITY POLE

BY OTHERS

TO BE REPLACED

GUY ANCHORS

UTILITY POLE

ROADWAY PROFILE

SCALE

1" = 4' Vertical

1" = 40' Horizontal

ROADWAY\PROFRD04.DGN

M A

T C

H

L I N

E

S

T A

.0

96+0095+0094+0093+0092+00

M A

T C

H

L I N

E

S

T A

.0

CR 880 97+00

AT ¡ CONSTRUCTION

EXISTING GRADE

LINE

GRADE

PROFILE

.7

.0

.8

E 806191.42 N 852340.61

STA 192+56.42, 27.33' RT

CR 880 B/L SURVEY

ELV. 17.04 (NAVD88)

SFWMD BRASS DISK "L13-9"

BENCHMARK:

E 806512.79 N 852441.14

STA 195+97.49, 17.72' RT

CR 880 B/L SURVEY

ELV. 19.46 (NAVD88)

NAIL AND TIN-TAB

BENCHMARK:

.8

STA 92+48.75, 6.74' RT

CR 880 C/L CONSTRUCTION

STA 95+86.12, 2.92' LT

CR 880 C/L CONSTRUCTION

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

1"=40'

A.A.

D.H.

A.A.

08/22/24

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

2019803

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

V

P I

.0

E L

.8

(+) 0.00%

400' V.C.

.8

.7

.7

.7

.7

.7

.7

.6

.6

.6

.5

.5

.5

.4

.4

.3

.2

.2

.1

E L

.8

V P

C

.0

K = 1076

FULL SUPERELEVATION (+.077)

(-) 0.37%(+) 0.00%

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

1"=40'

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

DITCH

DITCH

T/B

B/B

B/B

T/B

T/B

T/B

B/B

B/B

T/B

T/B

W/L

W/L

S/B

EOP

EOP

EOP

EOP

T/B

S/B

W/L

T/B

W/L

T/B

EOP

EOP

T/B

S/B

T/B

T/B

B/B

B/B

W/L S/B

T/B

T/B

T/B

T/B

E O P

E O P

T B

W L

W L

S B

T B

S B

S B

99 100 101 102

PI STA. 11+85.00

13 KV OE OH CATV

K

V

O

E

K V

O E

OH TEL

U.S. SUGAR CORPORATION

PARCEL B (ORB 27063 PG.1015)

00-38-44-03-00-000-3000

(ORB 10362 PG.1201)

EDGE OF PAVEMENT

5' NORTHERLY FROM

NO. CF-100-015

SFWMD TRACT

PUBLIC R/W PER RPB 7 PG. 186

36" CMP

8.5 8.5

8.5 8.5

10.5

10.5

10.5

10.5

10.5

10.5

N

M A

T C

H

L I N

E

S

T A

.0

R/W LINE

CR 880

¡ CONSTRUCTION CR 880

M A

T C

H

L I N

E

S

T A

.0

ROADWAY PLAN

ROADWAY\PLANRD05.DGN

SAM SENTER ROAD

¡ CONSTRUCTION

STA. 10+00.00 =

SAM SENTER ROAD

¡ CONSTRUCTION

STA. 99+19.00

CR 880

¡ CONSTRUCTION

S A

M

S

E N

T E

R

R

O A

D

R/W LINE

SFWMD

DENOTES ROADWAY WIDENING

DENOTES SHOULDER CONSTRUCTION

4.5' WIDE

PAVEMENT

2" MISC.

2.5' WIDE

PAVEMENT

2" MISC.

GUARDRAIL TL-3

TL-3

GUARDRAIL

GUARDRAIL

EXISTING

REMOVE

GUARDRAIL

EXISTING

REMOVE

4' WIDE

PAVEMENT

2" MISC.

4' WIDE

PAVEMENT

2" MISC.

R=85' R=85'

15.58' LT

+33.18

12.00' LT

+16.00

24.00' RT

+83.51

0 10 40

Feet

N CANAL

DISTRICT

WATER CONTROL

HIGHLAND GLADES

.5

.0

.0

.2

LEGEND:

OVERBUILD EXISTING ROADWAY

DENOTES MILL/RESURFACE/

e = 7.70%

PI STA. = 92+59.01

T = 750.63

L = 1,430.43

R = 1,910.00

PC STA. = 85+08.38

PT STA. = 99+38.81

SFWMD L-13 CANAL

FOR TURNOUT NUMBER 2

CONSTRUCTION INFORMATION

SEE TURNOUT DETAILS FOR

FOR TURNOUT NUMBER 3

CONSTRUCTION INFORMATION

SEE TURNOUT DETAILS FOR

22.00' LT

+31.00

GRAVITY WALL

BARRIER ON

36" CONCRETE

GRAVITY WALL

BARRIER ON

36" CONCRETE

24.62' LT

+17.74

TO CONCRETE BARRIER

CONNECT GUARDRAIL

GRAVITY WALL

BARRIER ON

BEGIN 36" CONCRETE

FOR SAM SENTER ROAD BRIDGE

FOR CONSTRUCTION INFORMATION

SEE BRIDGE LAYOUT DETAIL SHEET

TO CONCRETE BARRIER

CONNECT GUARDRAIL

GRAVITY WALL

BARRIER ON

BEGIN 36" CONCRETE

CR 880 / SAM SENTER RD INTERSECTION

FOR CONSTRUCTION DETAILS AT

2. SEE INTERSECTION DETAIL SHEET

SAM SENTER ROAD INFORMATION

NUMBER 31 FOR BRIDGE AND

1. SEE ROADWAY PLAN SHEET

NOTES:

OF 18" RCP

CONST. 12'

S-12

S-13

TL-3

GUARDRAIL

OF 18" RCP

CONST. 12'

S-14

S-15

GUARDRAIL TL-3

PT STA. 99+38.81

CR 880

¡ CONST.

SWALE BOTTOM

SWALE BOTTOM

+60.00

END SWALE +00.00

BEGIN SWALE

USING RIGID INCLUSIONS

DENOTES SHOULDER RECONSTRUCTION

USING RIGID INCLUSIONS

DENOTES ROADWAY RECONSTRUCTION

CR 880 CURVE 1 DATA:

¡ CONSTRUCTION

¡ CONSTRUCTION CURVE 1

.0

.0

.0

.0

.0

.6

.0

.6

12.00' LT

+58.21

BY OTHERS

TO BE REPLACED

GUY ANCHOR

UTILITY POLE

REPLACED BY OTHERS

TO BE REMOVED/

GUY ANCHORS

UTILITY POLE

32.21' LT

+20.00

QUARTER SPACING

BEGIN GUARDRAIL POST

30.90' LT

+20.00

QUARTER SPACING

END GUARDRAIL POST

FC-9.5 (1.75") APPLICATION ON APPROACH SLAB ONLY

DENOTES BRIDGE/APPROACH SLAB CONSTRUCTION

ROADWAY PROFILE

SCALE

1" = 4' Vertical

1" = 40' Horizontal

ROADWAY\PROFRD05.DGN

M A

T C

H

L I N

E

S

T A

.0

101+00100+0099+0098+00

M A

T C

H

L I N

E

S

T A

.0

CR 880

102+00

AT ¡ CONSTRUCTION

EXISTING GRADE

LINE

GRADE

PROFILE

.8

.0

.5

.4

E 806817.30 N 852638.40

STA 199+10.47, 147.57' LT

CR 880 B/L SURVEY

ELV. 17.42 (NAVD88)

BROWN & PHILLIPS MND (LB6473)

BENCHMARK:

E 806822.38 N 853430.26

STA 199+25.33, 939.22' LT

CR 880 B/L SURVEY

ELV. 14.84 (NAVD88)

BROWN & PHILLIPS 1/2" IRC

BENCHMARK:

STA 98+96.15, 167.68' LT

CR 880 C/L CONSTRUCTION

STA 99+12.17, 959.29' LT

CR 880 C/L CONSTRUCTION

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

1"=40'

A.A.

D.H.

A.A.

08/22/24

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

2019803

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

V P I

.0

E L

.5

(-) 0.37% (+) 0.00%

300' V.C.

.0

.9

.8

.8

.6

.7

.6

.6

.6

.5

.5

.5

.5

.5

E L

.0

V P

T

.0

E L

.0

V P

C

K = 807

P

T

.0

E

L

.5

.5

FULL SUPERELEVATION (+.077)

.0

S U

P E

R E

L E

V A

T I O

N E

N D

F

U L L

.6

TO REVERSE CROWN (+.02)

FULL SUPERELEVATION (+.077)

SUPERELEVATION

TRANSITION

.4

.0

C R

O W

N R

E V

E R

S E

TO (-.02)

REVERSE CROWN (+.02)

SUPERELEVATION FROM

TRANSITION

(+) 0.00%(+) 0.00%

400' V.C.

K = 1076

18" RCP

18" RCP

S-12

S-13

S-14

S-15

FL=6.80

FL=6.80

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

1"=40'

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

DITCH

T/B

B/B

T/B

B/B

W/L

T/B

EOP

EOP

T/B

S/B

DITCH

T/B

B/B

T/B

B/B

W/L

T/B

EOP

EOP

T/B

S/B

W/L

S/B

T/B

T/B

S/B

103 104 105 106 107 108

13 KV OE OH CATV OH TEL

U.S. SUGAR CORPORATION

PARCEL B (ORB 27063 PG.1015)

00-38-44-03-00-000-3000

EDGE OF PAVEMENT (ORB 10362 PG.1201)

SFWMD TRACT NO. CF-100-015 - 5' NORTHERLY FROM

PUBLIC R/W PER RPB 7 PG. 186

8.5

8.5

10.5

10.5

10.5

8.5

8.5

10.5

10.5

10.5

N

R/W LINE

CR 880

¡ CONSTRUCTION CR 880

M A

T C

H

L I N

E

S

T A

.0

ROADWAY PLAN

ROADWAY\PLANRD06.DGN

M A

T C

H

L I N

E

S

T A

.0

SFWMD R/W LINE

GUARDRAIL

EXISTING

REMOVE

4' WIDE

PAVEMENT

2" MISC.

GUARDRAIL TL-3

GUARDRAIL TL-3

0 10 40

Feet

.0

.2

.0

.7

LEGEND:

SFWMD L-13 CANAL

2.5' WIDE

2" MISC. PAVEMENT

SWALE BOTTOM

USING RIGID INCLUSIONS

DENOTES ROADWAY RECONSTRUCTION

USING RIGID INCLUSIONS

DENOTES SHOULDER RECONSTRUCTION

.0

.6

.0

.6

.0

.3

.3

ROADWAY PROFILE

SCALE

1" = 4' Vertical

1" = 40' Horizontal

ROADWAY\PROFRD06.DGN

M A

T C

H

L I N

E

S

T A

.0

106+00105+00104+00103+00

M A

T C

H

L I N

E

S

T A

.0

CR 880107+00

108+00

AT ¡ CONSTRUCTION

EXISTING GRADE

LINE

GRADE

PROFILE

.4

.5

.0

.4

E 807251.84 N 852472.57

STA 203+41.80, 19.38' RT

CR 880 B/L SURVEY

ELV. 17.56 (NAVD88)

MN AND TIN-TAB

BENCHMARK:

E 807650.91 N 852467.13

STA 207+40.86, 25.47' RT

CR 880 B/L SURVEY

ELV. 16.33 (NAVD88)

BROWN & PHILLIPS 1/2" IRC

BENCHMARK:

STA 103+26.68, 0.62' LT

CR 880 C/L CONSTRUCTION

STA 107+25.74, 5.47' RT

CR 880 C/L CONSTRUCTION

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

1"=40'

A.A.

D.H.

A.A.

08/22/24

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

2019803

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

.4

T R

A N

S I T I O

N

.0

S U

P E

R E

L E

V A

T I O

N E

N D

TO (-.02)

FROM REVERSE CROWN (+.02)

TRANSITION SUPERELEVATION

(+) 0.00%

V P I

.0

E L

.5

(+) 0.34% (+) 0.00%

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

1"=40'

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

DITCH DITCH

T/B

B/B

T/B

B/B

B/B

T/B

B/B

T/B

W/L

T/B

EOP

T/B

S/B

EOP

W/L

T/B

EOP

T/B

S/B

EOP

108 109 110 111 112 113

13 KV OE OH CATV OH TEL

U.S. SUGAR CORPORATION

PARCEL B (ORB 27063 PG.1015)

00-38-44-03-00-000-3000

EDGE OF PAVEMENT (ORB 10362 PG.1201)

SFWMD TRACT NO. CF-100-015 - 5' NORTHERLY FROM

PUBLIC R/W PER RPB 7 PG. 186

8.5

8.5

8.5

8.5

10.5

10.5

10.5

10.5 10.5

10.5

N

R/W LINE

CR 880

¡ CONSTRUCTION CR 880

ROADWAY PLAN

ROADWAY\PLANRD07.DGN

M A

T C

H

L I N

E

S

T A

.0

SFWMD R/W LINE

M A

T C

H

L I N

E

S

T A

.0

DENOTES ROADWAY WIDENING

DENOTES SHOULDER CONSTRUCTION

GUARDRAIL

EXISTING

REMOVE

4' WIDE

PAVEMENT

2" MISC.GUARDRAIL TL-3

2.5' WIDE

PAVEMENT

2" MISC.

GUARDRAIL TL-3

12.00' LT

+00.19

12.00' RT

+00.11

SHOULDER

BEGIN VARIABLE WIDTH

END 10' WIDE SHOULDER

SHOULDER

BEGIN VARIABLE WIDTH

END 10' WIDE SHOULDER

0 10 40

Feet

.0

.7

.0

.6

LEGEND:

OVERBUILD EXISTING ROADWAY

DENOTES MILL/RESURFACE/

22.00' RT

+97.52

PI STA. 109+00.11

CR 880

¡ CONSTRUCTION

SFWMD L-13 CANAL

SWALE BOTTOM

TRAVELWAY

EDGE OF EXISTING

USING RIGID INCLUSIONS

DENOTES ROADWAY RECONSTRUCTION

USING RIGID INCLUSIONS

DENOTES SHOULDER RECONSTRUCTION

.0

.3

.3

.0

.0

.0

.2

.2

22.00' RT

+00.11

22.00' LT

+00.32

FDOT INDEX 536-001

PARALLEL APPROACH TERMINAL

END GUARDRAIL TL-3

ROADWAY PROFILE

SCALE

1" = 4' Vertical

1" = 40' Horizontal

ROADWAY\PROFRD07.DGN

M A

T C

H

L I N

E

S

T A

.0

112+00111+00110+00109+00108+00

M A

T C

H

L I N

E

S

T A

.0

CR 880

113+00

AT ¡ CONSTRUCTION

EXISTING GRADE

LINE

GRADE

PROFILE

.4

.0

.0

.5

E 808052.45 N 852473.52

STA 211+42.41, 19.73' RT

CR 880 B/L SURVEY

ELV. 17.40 (NAVD88)

NAIL AND TIN-TAB

BENCHMARK:

STA 111+27.28, 2.70' RT

CR 880 C/L CONSTRUCTION

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

1"=40'

A.A.

D.H.

A.A.

08/22/24

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

2019803

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

(+) 0.34% (-) 0.10%

V P I

.0

E L

.3

V P I

.0

E L

.2

(-) 0.04%

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

1"=40'

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

DITCH

T/B

B/B

B/B

T/B

W/L

T/B

EOP

T/B

S/B

EOP

W/L

T/B

EOP

T/B

S/B

EOP

W/L S/B

114 115 116 117 118

13 KV OE OH CATV

OH TEL

U.S. SUGAR CORPORATION

PARCEL B (ORB 27063 PG.1015)

00-38-44-03-00-000-3000

O R

B

P

G

W .5

E .2

N .1

S

O F

S

R

U.S. SUGAR CORPORATION

PARCEL B (ORB 27063 PG.1015)

00-38-44-03-00-000-3000

KING RANCH, INC.

THE EAST 1/2 OF SECTION 3/44/38

TRACT TWO ORB 11524 PG.441

00-38-44-03-00-000-1010

EDGE OF PAVEMENT (ORB 10362 PG.1201)

SFWMD TRACT NO. CF-100-015 - 5' NORTHERLY FROM

PUBLIC R/W PER RPB 7 PG. 186

8.5

8.5

10.5

10.5

10.5

8.5

8.5

10.5

10.5

10.5

N

R/W LINE

CR 880

¡ CONSTRUCTION CR 880

ROADWAY PLAN

ROADWAY\PLANRD08.DGN

M A

T C

H

L I N

E

S

T A

.0

SFWMD R/W LINE

STA. 118+85.53

DENOTES ROADWAY WIDENING

DENOTES SHOULDER CONSTRUCTION

GUARDRAIL

EXISTING

REMOVE

4' WIDE

PAVEMENT

2" MISC.

GUARDRAIL TL-3

12.00' RT

+85.53

WIDTH SHOULDER

END VARIABLE

18.22' LT

+49.45

GUARDRAIL

CONNECT TO EXISTING

END GUARDRAIL TL-3

12.00' LT

+85.53

WIDTH SHOULDER

END VARIABLE

MATCH EXISTING

END CONSTRUCTION

END PROJECT

0 10 40

Feet

.0

.6

.9

.7

LEGEND:

SFWMD L-13 CANAL

SWALE BOTTOM

+50.00

END SWALE

TRAVELWAY

EDGE OF EXISTING

OVERBUILD EXISTING ROADWAY

DENOTES MILL/RESURFACE/

.0

.0

.2

.2

.0

.0

.0

.0

16.00' RT

+85.53

16.00' LT

+85.53

ROADWAY PROFILE

SCALE

1" = 4' Vertical

1" = 40' Horizontal

ROADWAY\PROFRD08.DGN

117+00116+00115+00114+00

M A

T C

H

L I N

E

S

T A

.0

CR 880118+00

STA. 118+85.53

MATCH EXISTING

END CONSTRUCTION

END PROJECT

EL. 18.04

AT ¡ CONSTRUCTION

EXISTING GRADE

LINE

GRADE

PROFILE

.5

.0

.0

.0

E 808422.90 N 852467.72

STA 215+12.85, 26.13' RT

CR 880 B/L SURVEY

ELV. 16.01 (NAVD88)

BROWN & PHILLIPS 1/2" IRC

BENCHMARK:

E 808689.60 N 852466.79

STA 217+79.55, 27.50' RT

CR 880 B/L SURVEY

ELV. 16.67 (NAVD88)

BROWN & PHILLIPS 1/2" IRC

BENCHMARK:

STA 114+97.60, 13.96' RT

CR 880 C/L CONSTRUCTION

STA 117+64.26, 18.81' RT

CR 880 C/L CONSTRUCTION

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

1"=40'

A.A.

D.H.

A.A.

08/22/24

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

2019803

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

(+) 0.14%

V P I

.0

E L

.3

(-) 0.13%(-) 0.10%

V P I

.0

E L

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

1"=40'

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

D

IT

C H

D

IT

C H

D

IT

C H

DITCH

T B

B B

T B

T B

W L

W L

S B E

O P

E O P

E O P

E O P

T B

S B

W L

T B

T B

T B B B

B B

W L

W L

S B

U N P

A V E

D

R

O A

D

UNPAVED ROAD

S/B

W/L

EOP

EOP

S/B

S/B

T/B

W/L

W/L S/B

T/B

T B

T B

EOP

EOP

T/B

W/L

W/L

S/B

T/B

S/B

S/B

10 11 P I

S

T A

.0

12 13 14

O H

C

A T

V

13 KV OE

13 KV OE

138 KV OE 138 KV OE

O H

T

E L

P U

B L I C

R

W

P

E R

R

P B

P

G

C M

P

N

R/W LINE

C R

ROADWAY PLAN

ROADWAY\PLANRD10.DGN

SAM SENTER ROAD

¡ CONSTRUCTION

STA. 10+00.00 =

SAM SENTER ROAD

¡ CONSTRUCTION

STA. 99+19.00

CR 880

¡ CONSTRUCTION

CR 880

¡ CONSTRUCTION

SAM SENTER ROAD

R/W LINE

SFWMD

R/W LINE

SFWMD

STA. 14+00.00

MATCH EXISTING

SAM SENTER ROAD

END CONSTRUCTION

DENOTES ROADWAY WIDENING

DENOTES SHOULDER CONSTRUCTION

SLAB

APPROACH

BEGIN

STA 10+20.77

STA 10+30.77

SLAB

BEGIN APPROACH

END BRIDGE

BEGIN BRIDGE

SLAB

END APPROACH

STA 11+63.35

SLAB

APPROACH

END

STA 11+73.35

BARRIER

SHOULDER

CONCRETE

20.67' RT

+50.00

BARRIER

SHOULDER

END CONCRETE

WIDENING

ROADWAY

2' WIDE

12.00' RT

+00.00

12.00' LT

+00.00

SHOULDER

END 4'

INFORMATION

NUMBER 23 FOR CR 880

SEE ROADWAY PLAN SHEET

NOTE:

22.00' LT

+10.00

WIDTH SHOULDER

BEGIN VARIABLE

16.00' LT

+90.00

BEGIN 4' SHOULDER

WIDTH SHOULDER

END VARIABLE

16.00' RT

+90.00

BEGIN 4' SHOULDER

WIDTH SHOULDER

END VARIABLE

22.00' RT

+10.00

WIDTH SHOULDER

BEGIN VARIABLE

0 10 40

Feet

SEC. 34/43/38

WEST LINE OF

SEC. 33/43/38 &

EAST LINE OF

R I G

H

F

W

Y

N

C

A N

A L

N CANAL

DISTRICT

WATER CONTROL

HIGHLAND GLADES

NEW HOPE SUGAR COMPANY

ORB 1775 PG.188

00-38-43-40-00-003-0010

U.S. SUGAR CORPORATION

PART OF PARCEL 4

(ORB 27063 PG.992)

00-38-43-41-00-003-0017

(ORB 10362 PG.1201)

EDGE OF PAVEMENT

5' NORTHERLY FROM

NO. CF-100-015

SFWMD TRACT

LEGEND:

OVERBUILD EXISTING ROADWAY

DENOTES MILL/RESURFACE/

TL-3

GUARDRAIL

GUARDRAIL

TO EXISTING

GUARDRAIL

CONNECT

END 4' SHOULDER

WIDENING

END 2' ROADWAY

L

C

A N

A L

S F

W M

D

BRIDGE

SAM SENTER ROAD

INFORMATION FOR

FOR CONSTRUCTION

DETAIL SHEET

SEE BRIDGE LAYOUT

FOR TURNOUT NUMBER 3

CONSTRUCTION INFORMATION

SEE TURNOUT DETAILS FOR

USING RIGID INCLUSIONS

DENOTES ROADWAY RECONSTRUCTION

USING RIGID INCLUSIONS

DENOTES SHOULDER RECONSTRUCTION

16.00' RT

+00.00

16.00' LT

+00.00

FDOT INDEX 536-001

TO RIGID BARRIER

APPROACH TRANSITION

SHOULDER BARRIER

TO CONCRETE

CONNECT GUARDRAIL

AND GUARDRAIL

VEHICLE BARRIER GATE

SFWMD 20' WIDTH

ACCESS ROAD, WITH

CONSTRUCT 15' WIDE

GUARDRAILS AND GATE

REMOVE EXISTING

.0 .0

.0

.0

TL-3

GUARDRAIL

18.00' LT

+90.00

FDOT INDEX 536-001

PARALLEL APPROACH TERMINAL

END GUARDRAIL TL-3

FC-9.5 (1.75") APPLICATION ON APPROACH SLAB ONLY

SLAB CONSTRUCTION

DENOTES BRIDGE/APPROACH

ROADWAY PROFILE

SCALE

1" = 4' Vertical

1" = 40' Horizontal

ROADWAY\PROFRD09.DGN

13+0012+0011+0010+00

14+00

SAM SENTER ROAD

STA. 14+00.00

MATCH EXISTING

SAM SENTER ROAD

END CONSTRUCTION

EL. 15.92

E

D

P R

O A

C H

S

L A

B

S

T A

.3

B E

G

P R

O A

C H

S

L A

B

S

T A

.3

E N

D

B

R I D

G E

B E

G

P R

O A

C H

S

L A

B

S

T A

.7

B E

G I N

B

R I D

G E

S

T A

.7

E

P R

O A

C H

S

L A

B

EL. 18.35

STA. 10+12.00

SAM SENTER ROAD

BEGIN CONSTRUCTION

AT ¡ CONSTRUCTION

EXISTING GRADE

LINE

GRADE

PROFILE

E 806817.30 N 852638.40

STA 199+10.47, 147.57' LT

CR 880 B/L SURVEY

ELV. 17.42 (NAVD88)

BROWN & PHILLIPS MND (LB6473)

BENCHMARK:

E 806822.38 N 853430.26

STA 199+25.33, 939.22' LT

CR 880 B/L SURVEY

ELV. 14.84 (NAVD88)

BROWN & PHILLIPS 1/2" IRC

BENCHMARK:

¡ CONSTRUCTION CR 880

SAM SENTER ROAD

END C/L CONSTRUCTION

BENCHMARK IS BEYOND

NOTE:

STA 11+67.26, 26.59' LT

C/L CONSTRUCTION

SAM SENTER ROAD

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

1"=40'

A.A.

D.H.

A.A.

08/22/24

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

2019803

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

V P I

.0

E L

.3

(+) 6.53%

V P I

.7

E L

.5

(+) 2.05%

V P I

.7

E L

.6

(+) 0.29% (-) 0.29%

V P I

.0

E L

.3

(-) 0.29% (-) 1.50%

135' V.C.

V P I

.0

E L

.2

(-) 1.50% (-) 0.36%

135' V.C.

.4

.4

.2

.1

.9

.6

.4

.1

.8

.6

.4

.2

.1

.0

V

P T

.5

E L

.0

K = 111

K = 117

V P

C .5

E L

.3

V P

C

.5

E L

.5

V P

T

.5

E L

.3

(-) 0.36%

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

1"=40'

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

V P I

.7

E L

.1

E L

.2

.0

.8

E L

.8

(-) 7.55%

(-) 7.02%

(+) 0.22%

V P I

.0

E L

.4

.0

E L

.5

(-) 6.31%

.8

E L

.5

(-) 1 .1

(-) 0.31%

.0

E L

.9

V P I

.0

E L

.5

.0

E L

.2

(-) 2 .00%

.75

(-) 0.06%

TURNOUT PROFILES

1"=20'

1+00 0+80 0+60 0+40 0+20 0+00

SCALE

1" = 20' Horizontal

1" = 2' Vertical

TURNOUT NO. 3

0+00 0+20 0+40 0+60 0+80 1+00

SCALE

1" = 20' Horizontal

1" = 2' Vertical TURNOUT NO. 1

EXISTING GRADE

EXISTING GRADE

CR 880

¡ CONSTR.

CR 880 STA. 91+86.71

TURNOUT GRADE

GRADE

EXISTING

MATCH

0+00 0+20 0+40 0+60 0+80 1+00

SCALE

1" = 20' Horizontal

1" = 2' Vertical TURNOUT NO. 2

EXISTING GRADE

CR 880

¡ CONSTR.

CR 880 STA. 99+30.78

TURNOUT GRADE

GRADE

EXISTING

MATCH

9 9

SAM SENTER RD.

¡ CONSTRUCTION

TURNOUT GRADE

SAM SENTER RD. STA. 11+75.52

GRADE

EXISTING

MATCH

R

W

L I N

E

R

W

L I N

E

ROADWAY\TURNOUTPROFILES01.DGN

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

T/B

S/B

E O P

UNPAVED ROAD

N

0 2.5 10

Feet

TURNOUT DETAIL

ROADWAY\TURNOUT 1 DETAIL.DGN

R C

P

C R

TURNOUT NO. 1

CR 880

¡ CONST.

R=26'

.1

R=24'

R=26'

R=24'

.2 2 1

.7

.8

.1 8 1

.9

.8

CONSTRUCTION

EDGE OF SHOULDER

CONSTRUCTION

EDGE OF SHOULDER

.1

.2

.2

FROM ¡ CONSTRUCTION CR 880

STATIONS AND OFFSETS ARE

NOTE:

4.5' WIDE

PAVEMENT

2" MISC.

4.5' WIDE

PAVEMENT

2" MISC.

GUARDRAIL TL-3

GUARDRAIL TL-3

LEGEND:

STA 91+83.22

70.56' RT

STA 91+79.58

77.08' RT

STA 91+61.27

73.27' RT

STA 91+58.81

73.83' RT

STA 91+63.06

65.50' RT

CURVE

SHOULDER

PC EDGE OF

STA 91+84.43

54.85' RT

CURVE

SHOULDER

PC EDGE OF

STA 92+10.71

34.00' RT

CURVE

SHOULDER

PT EDGE OF

STA 91+36.78

34.00' RT

CURVE

SHOULDER

PT EDGE OF

2'

£ TURNOUT 1

STA. 10+00.00 =

BEGIN £ TURNOUT 1

STA. 91+86.71

¡ CONST. CR 880

75.20' RT

STA. 91+70.42

¡ CONST. CR 880

STA. 10+76.87 =

END £ TURNOUT 1

CR 880

TRAVELWAY

EDGE OF

X X .X

X

DENOTES PAVEMENT ELEVATION

1"=10'

R/W LINE

FDOT INDEX 536-001

TRAILING ANCHORAGE

BEGIN GUARDRAIL

FDOT INDEX 536-001

TRAILING ANCHORAGE

BEGIN GUARDRAIL

NGVD 1929 DATUM, ADD 1.42 FEET

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

PT STA. 99+38.81

N

0 2.5 10

Feet

TURNOUT DETAIL

ROADWAY\TURNOUT 2 DETAIL.DGN

C R

TURNOUT NO. 2

CR 880

¡ CONST.

R=26'

.5

R=24'

R=26'

R=24'

.5

.5

.5

CONSTRUCTION

EDGE OF SHOULDER

CONSTRUCTION

EDGE OF SHOULDER

.2

.5

4.5' WIDE

PAVEMENT

2" MISC.

4.5' WIDE

PAVEMENT

2" MISC.

GUARDRAIL TL-3

GUARDRAIL TL-3

STA 99+24.53

77.83' RT

STA 99+22.49

73.05' RT

STA 99+37.06

60.00' RT

CURVE

SHOULDER

PC EDGE OF

STA 99+63.11

34.00' RT

CURVE

SHOULDER

PT EDGE OF

STA 98+97.82

34.00' RT

CURVE

SHOULDER

PT EDGE OF

2'

£ TURNOUT 2

STA. 10+00.00 =

BEGIN £ TURNOUT 2

STA. 91+86.71

¡ CONST. CR 880

77.86' RT

STA. 99+30.78

¡ CONST. CR 880

STA. 10+77.86 =

END £ TURNOUT 2

CR 880

TRAVELWAY

EDGE OF

C M

P

LEGEND:

FROM ¡ CONSTRUCTION CR 880

STATIONS AND OFFSETS ARE

NOTE:

.5

STA 99+37.04

77.88' RT

STA 99+39.12

69.64' RT

.4

STA 99+24.66

60.37' RT

CURVE

SHOULDER

PC EDGE OF

.0

.4

DENOTES PAVEMENT ELEVATION

X

X .X

X

1"=10'

R/W LINE

FDOT INDEX 536-001

TRAILING ANCHORAGE

BEGIN GUARDRAIL

FDOT INDEX 536-001

TRAILING ANCHORAGE

BEGIN GUARDRAIL

NGVD 1929 DATUM, ADD 1.42 FEET

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

EOP

S/B

S/B

A

.0

N

0 2.5 10

Feet

TURNOUT DETAIL

ROADWAY\TURNOUT 3 DETAIL.DGN

TURNOUT NO. 3

£ TURNOUT 3

STA. 10+00.00 =

BEGIN £ TURNOUT 3

LEGEND:

DENOTES PAVEMENT ELEVATION

X

X .X

X

SAM SENTER RD.

¡ CONST.STA. 11+75.52

SAM SENTER RD.

¡ CONST.

SAM SENTER ROAD

FROM ¡ CONSTRUCTION

STATIONS AND OFFSETS ARE

NOTE:

SAM SENTER ROAD

SAM SENTER RD.

TRAVELWAY

EDGE OF

.9

.5

.8

APPROACH SLAB

RAILING

TRAFFIC

CONCRETE 1

.8

R=27.5'

.1

.0

GUARDRAIL

EXISTING

REMOVE

.2

.4

GRAVITY WALL

BARRIER ON

36" CONCRETE

GUARDRAIL TL-3

CONST. 37.5' OF

R=25'

CONSTRUCTION

EDGE OF SHOULDER

STA 11+68.02

50.00' LT

STA 11+83.02

50.00' LT

STA. 10+50.00=

END £ TURNOUT 3

50.00' LT

STA. 11+75.52

SAM SENTER RD.

¡ CONST.

STA 11+83.02

47.29' LT

CURVE

SHOULDER

PC EDGE OF

STA 12+08.61

22.00' LT

CURVE

SHOULDER

PT EDGE OF

.7

S/B

STA 11+40.52

22.00' LT

RAILING

TRAFFIC

PC CONCRETE

1"=10'

SFWMD R/W LINE

SFWMD ACCESS

40.3'7.7' 15.0'

EDGE OF WATER

TOP OF BANK

EXISTING CANAL

TOP OF BANK

PROPOSED CANALNGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

SEE SFWMD GATE DETAILS

SPAN GATE

VEHICLE BARRIER TWO

CONST. SFWMD 20' WIDTH

AND ASPHALT PAVEMENT. SEE TYPICAL SECTIONS.

BRIDGE APPROACH SLAB WITH ASPHALT OVERLAY

SFWMD ACCESS ROAD TURNOUT CONSISTS OF BRIDGE,

NOTE:

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

DITCH

DITCH

T/B

B/B

B/B

T/B

T/B

T/B

W/L

S/B

EOP

EOP

EOP

EOP

T/B

S/B

W/L

T/B

T/B

T/B

B/B

B/B

P T

S

T A

.8

N

CR 880

¡ CONST.

R=85'

36" CMP

LEGEND:

FROM ¡ CONSTRUCTION CR 880

STATIONS AND OFFSETS ARE

NOTE:

DENOTES PAVEMENT ELEVATION

X

X .X

X

0 5 20

Feet

INTERSECTION DETAIL

ROADWAY\INTERSECTION DETAIL.DGN

1"=20'

.7

.3

EDGE OF TRAVELWAY

APPROACH SLAB

EDGE OF TRAVELWAY

R=85'

12.00' LT

+16.00

12.00' LT

+58.21

15.58' LT

+33.18

.5

.4

GRAVITY WALL

BARRIER ON

36" CONCRETE

GRAVITY WALL

BARRIER ON

36" CONCRETE

.9

.0

.0

0 + .0

.0

SHOULDER SLOPE

TRANSITION

SHOULDER SLOPE

TRANSITION

.0

24.62' LT

+17.74

TL-3

GUARDRAIL

22.00' LT

+31.00

CR 880

S A

M

S

E N

T E

R

R

O A

D

TL-3

GUARDRAIL

25.56' LT

+32.52

31.05' LT

+55.40

GRAVITY WALL

BARRIER ON

END 36" CONCRETE

R=75'

29.20' LT

+83.93

GRAVITY WALL

BARRIER ON

BEGIN 36" CONCRETE

R=75'

22.00' LT

+16.00

FDOT INDEX 536-001

TO RIGID BARRIER

APPROACH TRANSITION

TO CONCRETE BARRIER

CONNECT GUARDRAIL

GRAVITY WALL

BARRIER ON

BEGIN 36" CONCRETE

FDOT INDEX 536-001

TO RIGID BARRIER

APPROACH TRANSITION

TO CONCRETE BARRIER

CONNECT GUARDRAIL

GRAVITY WALL

BARRIER ON

END 36" CONCRETE

NGVD 1929 DATUM, ADD 1.42 FEET

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

ENGINEERING AND PUBLIC WORKS

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAME

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA DATE:

A.A.

D.H.

2019803

A.A.

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

08/22/24

PT STA. 99+38.81

10 11 P

A

.0

N

SAM SENTER ROAD

¡ CONSTRUCTION

0 5 20

Feet

BRIDGE LAYOUT DETAIL

GRAVITY WALL

BARRIER ON

36" CONCRETE

STA 10+30.77

BEGIN BRIDGE

SLAB

END APPROACH

SLAB

APPROACH

BEGIN

STA 10+20.77

¡ CONSTRUCTION

FROM SAM SENTER ROAD

STATIONS AND OFFSETS ARE

NOTE:

LEGEND:

DENOTES BRIDGE CONSTRUCTION

DENOTES APPROACH SLAB CONSTRUCTION

SLAB

BEGIN APPROACH

END BRIDGE

STA 11+63.35

SLAB

APPROACH

END

STA 11+73.35

R=73.67'

R=73.67'

STA 10+20.77

64.93' RT

STA 10+29.31

64.93' RT

CR 880

¡ CONST.

STA 10+20.77

64.93' LT

GRAVITY WALL

BARRIER ON

36" CONCRETE

STA 10+29.31

64.93' LT

STA 10+31.95

62.62' RT

STA 10+31.95

62.62' LT

STA 10+97.10

23.33' LT

STA 10+97.10

23.33' RT

STA 11+63.35

23.33' RT

STA 11+73.35

22.00' RT

RAILING

TRAFFIC

36" CONCRETE

RAILING

TRAFFIC

36" CONCRETE

R=26.17'

STA 11+40.52

23.33' LT

GRAVITY WALL

BARRIER ON

36" CONCRETE

STA 11+64.87

36.71' LT

SHOULDER BARRIER

BEGIN CONCRETE

TRAFFIC RAILING

END 36" CONCRETE

TRAFFIC RAILING

BEGIN 36" CONCRETE

ON GRAVITY WALL

END 36" CONCRETE BARRIER

TRAFFIC RAILING

BEGIN 36" CONCRETE

ON GRAVITY WALL

END 36" CONCRETE BARRIER

GRAVITY WALL

BARRIER ON

BEGIN CONCRETE

TRAFFIC RAILING

END 36" CONCRETE

STA 11+68.02

49.50' LT

GRAVITY WALL

BARRIER ON

END CONCRETE

STA 11+73.35

23.33' RT

STA 11+73.35

36.71' LT

FOR TURNOUT NUMBER 3

CONSTRUCTION INFORMATION

SEE TURNOUT DETAILS FOR

SAM SENTER ROAD

BARRIER

SHOULDER

CONCRETE

C R

S F

W M

D

L

C

A N

A L

HGWCD N CANAL

ROADWAY\BRIDGE LAYOUT DETAIL.DGN

1"=20'

R/W LINE

S-10

S-11

FL 6.70 (BK)

INDEX 430-021

CONST. CROSSDRAIN MES (1:2)

STA. 85+00.00 (68.00 RT)

FL 6.80 (RT)

GRATE EL. 9.50

INDEX 425-001, 425-052

3" BLEEDER AT FL 7.50

CONTROL STRUCTURE WITH

CONST. DBI TYPE D

STA. 85+00.00 (51.00 RT)

17.26

R/W LINE

.3

CR 880

C/L CONST.

10.50

14.01

18" RCP SEE NOTE

THE EXISTING AGRICULTURAL DITCH

BOTTOM ELEV. 6.70 BETWEEN THE MES AND

A 5' BOTTOM WIDTH, 1:4 SIDE SLOPES AND

CONSTRUCT A TRAPEZOIDAL DITCH WITH

NOTE:

S-12

S-13

FL 6.80 (RT)

GRATE EL. 9.50

INDEX 425-001, 425-052

3" BLEEDER AT FL 7.50

CONTROL STRUCTURE WITH

CONST. DBI TYPE D

STA. 98+50.00 (58.50 RT)

FL 6.70 (BK)

INDEX 430-021

CONST. CROSSDRAIN MES (1:2)

STA. 98+50.00 (75.43 RT)

17.23

R/W LINE

R/W LINE

.6

CR 880

C/L CONST.

SEE NOTE 18" RCP

10.50

13.11

THE EXISTING AGRICULTURAL DITCH

BOTTOM ELEV. 6.70 BETWEEN THE MES AND

A 5' BOTTOM WIDTH, 1:4 SIDE SLOPES AND

CONSTRUCT A TRAPEZOIDAL DITCH WITH

NOTE:

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAMEDATE:

A.A.

ENGINEERING AND PUBLIC WORKS

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

1"=20'

D.H.

A.A.

08/22/24

SCALE:

1" = 20' HORIZONTAL

1" = 10' VERTICAL

20406080100120 20 40 60 80 100 120

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

2019803

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

85+00.00

-2 -2

0 0

2 2

4 4

6 6

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

98+50.00

DRAINAGE STRUCTURES

DRAINAGE\DRXSRD01A.DGN

-2

-2

S-12

S-13

S-10

S-11

NGVD 1929 DATUM, ADD 1.42 FEET

S-15

S-14

FL 6.70 (BK)

INDEX 430-021

CONST. CROSSDRAIN MES (1:2)

STA. 102+00.00 (74.43 RT)

FL 6.80 (RT)

GRATE EL. 9.50

INDEX 425-001, 425-052

3" BLEEDER AT FL 7.50

CONTROL STRUCTURE WITH

CONST. DBI TYPE H

STA. 102+00.00 (57.50 RT)

17.47

R/W LINE

R/W LINE

.5

CR 880

C/L CONST.

18" RCP SEE NOTE

14.84

10.50

REDUCER COUPLING

A

A

FILTER FABRIC

FILTER FABRIC

INVERT

OUTFALL PIPE

SLOPE VARIES

PLAN

(N.T.S.)

(N.T.S.)

SECTION A-A

1:

:3

CONTROL STRUCTURE

ALIGN WITH ¡ OF

COARSE AGGREGATE

PERFORATED PIPE

45° BEND (6")

CORRUGATED INTERIOR PIPE)

(6" SMOOTH INTERIOR PIPE OR 8"

6' OF PERFORATED UNDERDRAIN PIPE FILTER FABRIC

FDOT STANDARD PLAN 440-001, TYPE II UNDERDRAIN.

NOTE: CONSTRUCT COARSE AGGREGATE AND FILTER FABRIC PER

440-001, NON-PERFORATED PIPE

NOTE: CONSTRUCT BENDS PER FDOT STANDARD PLAN

6"

1' MIN.

6"

12"

6"

1' MIN.

MIN.

1.0'

GRADE 57 STONE

WITH FDOT SPEC. 901,

THE GRADATION IS IN ACCORDANCE

FDOT SPEC 901-2 OR 901-3.

MEETING THE REQUIREMENTS OF

COARSE AGGREGATE (GRAVEL OR STONE)

BLEEDER (3" PVC)

FOR S-10, S-12 AND S-14

CONTROL STRUCTURE BLEED DOWN DETAILS

3" PVC

INVERT EL.

BLEEDER EL.

SWALE BOTTOM

A G

G R

E G

A T

E

C O

A R

S E

BLEEDER INVERT

OUTLET PIPE INVERT

S U

M P

STRUCTURES SHEETS)

(REFER TO DRAINAGE

CONTROL STRUCTURE

THE EXISTING AGRICULTURAL DITCH

BOTTOM ELEV. 6.70 BETWEEN THE MES AND

A 5' BOTTOM WIDTH, 1:4 SIDE SLOPES AND

CONSTRUCT A TRAPEZOIDAL DITCH WITH

NOTE:

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAMEDATE:

A.A.

ENGINEERING AND PUBLIC WORKS

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

1"=20'

D.H.

A.A.

08/22/24

SCALE:

1" = 20' HORIZONTAL

1" = 10' VERTICAL

20406080100120 20 40 60 80 100 120

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

2019803

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

DRAINAGE STRUCTURES

DRAINAGE\DRXSRD01A.DGN

-2

-2

102+00.00

S-14

S-15

NGVD 1929 DATUM, ADD 1.42 FEET

17.92

C/L CONST.

R/W LINE

R/W LINE

.9

R-101

1A

17.82

C/L CONST.

R/W LINE

R/W LINE

.9

PC-1

P

5A

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAMEDATE:

A.A.

A

Regular Exc. Embankment

AV V

ENGINEERING AND PUBLIC WORKS

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

1"=20'

D.H.

A.A.

08/22/24

ROADWAY\RDXSRD001.DGN

SCALE:

1" = 20' HORIZONTAL

1" = 10' VERTICAL

20406080100120 20 40 60 80 100 120

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

2019803

CR 880

CROSS SECTIONS

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

76+00.00

-2 -2

0 0

2 2

4 4

6 6

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

76+50.00

BEGIN EARTHWORK

BEGIN CONSTRUCTION

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

49.2

94.5

12.5

20.7

9.9

20.0

133.0

182.6

17.73

R/W LINE

R/W LINE

.8

17.64

C/L CONST.

R/W LINE

R/W LINE

.8

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAMEDATE:

A.A.

A

Regular Exc. Embankment

AV V

ENGINEERING AND PUBLIC WORKS

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

1"=20'

D.H.

A.A.

08/22/24

ROADWAY\RDXSRD001.DGN

SCALE:

1" = 20' HORIZONTAL

1" = 10' VERTICAL

20406080100120 20 40 60 80 100 120

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

2019803

CR 880

CROSS SECTIONS

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

77+00.00

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

77+50.00

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

11.8

20.1

10.0

18.0

102.8

116.3

202.8

227.4

17.56

R/W LINE

R/W LINE

.8

R-102

1A

5A

17.48

C/L CONST.

R/W LINE

R/W LINE

.8

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAMEDATE:

A.A.

A

Regular Exc. Embankment

AV V

ENGINEERING AND PUBLIC WORKS

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

1"=20'

D.H.

A.A.

08/22/24

ROADWAY\RDXSRD001.DGN

SCALE:

1" = 20' HORIZONTAL

1" = 10' VERTICAL

20406080100120 20 40 60 80 100 120

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

2019803

CR 880

CROSS SECTIONS

0 0

2 2

4 4

6 6

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

78+00.00

6 6

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

78+50.00

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

8.4

14.4

7.2

13.4

129.3

152.8

261.2

276.1

17.43

R/W LINE

R/W LINE

.7

17.42

C/L CONST.

R/W LINE

R/W LINE

.8

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAMEDATE:

A.A.

A

Regular Exc. Embankment

AV V

ENGINEERING AND PUBLIC WORKS

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

1"=20'

D.H.

A.A.

08/22/24

ROADWAY\RDXSRD001.DGN

SCALE:

1" = 20' HORIZONTAL

1" = 10' VERTICAL

20406080100120 20 40 60 80 100 120

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

2019803

CR 880

CROSS SECTIONS

6 6

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

79+00.00

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

79+50.00

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

7.3

12.5

6.2

66.3

145.3

163.9

286.3

341.8

17.40

R/W LINE

R/W LINE

.8

R-103

1A

15.39

17.42

C/L CONST.

R/W LINE

R/W LINE

.9

15.43

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAMEDATE:

A.A.

A

Regular Exc. Embankment

AV V

ENGINEERING AND PUBLIC WORKS

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

1"=20'

D.H.

A.A.

08/22/24

ROADWAY\RDXSRD001.DGN

SCALE:

1" = 20' HORIZONTAL

1" = 10' VERTICAL

20406080100120 20 40 60 80 100 120

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

2019803

CR 880

CROSS SECTIONS

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

80+00.00

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

80+50.00

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

65.4

64.7

205.3

190.4

120.4 366.8

120.0 337.4

R/W LINE

R/W LINE

.9

15.4717.44

17.41

C/L CONST.

R/W LINE

R/W LINE

.9

15.51

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAMEDATE:

A.A.

A

Regular Exc. Embankment

AV V

ENGINEERING AND PUBLIC WORKS

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

1"=20'

D.H.

A.A.

08/22/24

ROADWAY\RDXSRD001.DGN

SCALE:

1" = 20' HORIZONTAL

1" = 10' VERTICAL

20406080100120 20 40 60 80 100 120

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

2019803

CR 880

CROSS SECTIONS

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

81+00.00

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

81+50.00

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

64.9

61.8

173.9

200.7

117.3 346.9

112.9 380.3

17.38

R/W LINE

R/W LINE

.0

R-104

1A

15.55

17.44

C/L CONST.

R/W LINE

R/W LINE

.9

15.43

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAMEDATE:

A.A.

A

Regular Exc. Embankment

AV V

ENGINEERING AND PUBLIC WORKS

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

1"=20'

D.H.

A.A.

08/22/24

ROADWAY\RDXSRD001.DGN

SCALE:

1" = 20' HORIZONTAL

1" = 10' VERTICAL

20406080100120 20 40 60 80 100 120

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

2019803

CR 880

CROSS SECTIONS

0 0

2 2

4 4

6 6

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

82+00.00

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

82+50.00

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

60.2

66.9

210.0

206.9

117.7 386.1

129.9 385.2

17.51

R/W LINE

R/W LINE

.7

15.27

17.43

C/L CONST.

R/W LINE

R/W LINE

.6

15.02

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAMEDATE:

A.A.

A

Regular Exc. Embankment

AV V

ENGINEERING AND PUBLIC WORKS

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

1"=20'

D.H.

A.A.

08/22/24

ROADWAY\RDXSRD001.DGN

SCALE:

1" = 20' HORIZONTAL

1" = 10' VERTICAL

20406080100120 20 40 60 80 100 120

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

2019803

CR 880

CROSS SECTIONS

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

83+00.00

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

83+50.00

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

73.4

77.1

209.2

216.2

139.3 393.8

150.5 403.7

17.35

R/W LINE

R/W LINE

.5

PC-2

P

R-105

1A

14.69

17.28

C/L CONST.

R/W LINE

R/W LINE

.4

14.36

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAMEDATE:

A.A.

A

Regular Exc. Embankment

AV V

ENGINEERING AND PUBLIC WORKS

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

1"=20'

D.H.

A.A.

08/22/24

ROADWAY\RDXSRD001.DGN

SCALE:

1" = 20' HORIZONTAL

1" = 10' VERTICAL

20406080100120 20 40 60 80 100 120

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

2019803

CR 880

CROSS SECTIONS

-8 -8

-6 -6

-4 -4

-2 -2

0 0

2 2

4 4

6 6

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

-4 -4

-2 -2

0 0

2 2

4 4

6 6

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

84+00.00

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

84+50.00

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

85.5 219.8

96.2 246.8

168.2 432.0

188.9 442.7

17.26

R/W LINE

R/W LINE

.3

R-301

1A

5A

14.01

17.37

C/L CONST.

R/W LINE

R/W LINE

.4

13.86

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAMEDATE:

A.A.

A

Regular Exc. Embankment

AV V

ENGINEERING AND PUBLIC WORKS

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

1"=20'

D.H.

A.A.

08/22/24

ROADWAY\RDXSRD001.DGN

SCALE:

1" = 20' HORIZONTAL

1" = 10' VERTICAL

20406080100120 20 40 60 80 100 120

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

2019803

CR 880

CROSS SECTIONS

-10 -10

-8 -8

-6 -6

-4 -4

-2 -2

0 0

2 2

4 4

6 6

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

85+00.00

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

85+50.00

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

114.0 251.4

123.6 260.8

205.4 447.0

220.0 474.2

17.55

R/W LINE

R/W LINE

.5

13.72

17.91

C/L CONST.

R/W LINE

R/W LINE

.6

R-106

1A

5A

13.77

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAMEDATE:

A.A.

A

Regular Exc. Embankment

AV V

ENGINEERING AND PUBLIC WORKS

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

1"=20'

D.H.

A.A.

08/22/24

ROADWAY\RDXSRD001.DGN

SCALE:

1" = 20' HORIZONTAL

1" = 10' VERTICAL

20406080100120 20 40 60 80 100 120

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

2019803

CR 880

CROSS SECTIONS

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

86+00.00

2 2

4 4

6 6

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

86+50.00

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

123.6 260.8

135.6 261.4

240.0 483.5

261.3 499.0

18.25

R/W LINE

R/W LINE

.8

13.81

18.53

C/L CONST.

R/W LINE

R/W LINE

.9

13.87

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAMEDATE:

A.A.

A

Regular Exc. Embankment

AV V

ENGINEERING AND PUBLIC WORKS

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

1"=20'

D.H.

A.A.

08/22/24

ROADWAY\RDXSRD001.DGN

SCALE:

1" = 20' HORIZONTAL

1" = 10' VERTICAL

20406080100120 20 40 60 80 100 120

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

2019803

CR 880

CROSS SECTIONS

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

87+00.00

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

87+50.00

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

146.6 277.6

169.9 283.3

293.1 519.3

318.8 538.1

18.64

R/W LINE

R/W LINE

.0

R-107

1A

13.92

18.56

C/L CONST.

R/W LINE

R/W LINE

.1

13.97

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAMEDATE:

A.A.

A

Regular Exc. Embankment

AV V

ENGINEERING AND PUBLIC WORKS

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

1"=20'

D.H.

A.A.

08/22/24

ROADWAY\RDXSRD001.DGN

SCALE:

1" = 20' HORIZONTAL

1" = 10' VERTICAL

20406080100120 20 40 60 80 100 120

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

2019803

CR 880

CROSS SECTIONS

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

28 28

88+00.00

6 6

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

28 28

88+50.00

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

174.3 297.8

176.6 312.0

324.9 564.6

327.1 587.8

18.43

R/W LINE

R/W LINE

.3

14.02

18.42

C/L CONST.

R/W LINE

R/W LINE

.4

14.08

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAMEDATE:

A.A.

A

Regular Exc. Embankment

AV V

ENGINEERING AND PUBLIC WORKS

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

1"=20'

D.H.

A.A.

08/22/24

ROADWAY\RDXSRD001.DGN

SCALE:

1" = 20' HORIZONTAL

1" = 10' VERTICAL

20406080100120 20 40 60 80 100 120

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

2019803

CR 880

CROSS SECTIONS

6 6

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

28 28

89+00.00

6 6

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

28 28

89+50.00

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

176.6 322.8

174.3 337.2

324.9 611.2

319.0 632.3

18.46

R/W LINE

R/W LINE

.5

R-108

1A

5B2

5C

14.13

18.66

C/L CONST.

R/W LINE

R/W LINE

.6

14.19

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAMEDATE:

A.A.

A

Regular Exc. Embankment

AV V

ENGINEERING AND PUBLIC WORKS

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

1"=20'

D.H.

A.A.

08/22/24

ROADWAY\RDXSRD001.DGN

SCALE:

1" = 20' HORIZONTAL

1" = 10' VERTICAL

20406080100120 20 40 60 80 100 120

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

2019803

CR 880

CROSS SECTIONS

2 2

4 4

6 6

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

28 28

90+00.00

6 6

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

28 28

90+50.00

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

170.3 345.7

172.1 362.6

317.1 655.8

316.9 660.1

18.78

R/W LINE

R/W LINE

.8

14.25

18.81

C/L CONST.

R/W LINE

R/W LINE

.8

R-302

1A

5B

14.22

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAMEDATE:

A.A.

A

Regular Exc. Embankment

AV V

ENGINEERING AND PUBLIC WORKS

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

1"=20'

D.H.

A.A.

08/22/24

ROADWAY\RDXSRD001.DGN

SCALE:

1" = 20' HORIZONTAL

1" = 10' VERTICAL

20406080100120 20 40 60 80 100 120

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

2019803

CR 880

CROSS SECTIONS

6 6

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

28 28

91+00.00

-6 -6

-4 -4

-2 -2

0 0

2 2

4 4

6 6

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

28 28

91+50.00

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

170.1 350.4

182.0 308.3

326.0 609.9

376.3 468.6

18.78

R/W LINE

R/W LINE18

.8

R-109

1A

14.45

18.76

C/L CONST.

R/W LINE

R/W LINE

.8

14.22

P A

L M

BE

ACH

Y T

N U

OC

F L

ORID

A

PALM BEACH COUNTY SHEET:

OF:

PROJECT NO.

SCALE:

APPROVED:

DRAWN:

CHECKED:

NO. REVISION BY DATE

DRAWING NO.DESIGN FILE NAMEDATE:

A.A.

A

Regular Exc. Embankment

AV V

ENGINEERING AND PUBLIC WORKS

ROADWAY PRODUCTION

P.O. BOX 21229, WEST PALM BEACH, FLORIDA

1"=20'

D.H.

A.A.

08/22/24

ROADWAY\RDXSRD001.DGN

SCALE:

1" = 20' HORIZONTAL

1" = 10' VERTICAL

20406080100120 20 40 60 80 100 120

Q. Amin ahmed, P.E. NO. 52564 www.stanleygroup.com

West Palm Beach, Florida 33409

1641 WORTHINGTON ROAD, SUITE 400

CR 880 AND SAM SENTER RD.

BRIDGE REPLACEMENT)

(INTERSECTION IMPROVEMENTS AND

2019803

CR 880

CROSS SECTIONS

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

28 28

92+00.00

8 8

10 10

12 12

14 14

16 16

18 18

20 20

22 22

24 24

26 26

28 28

92+50.00

NGVD 1929 DATUM, ADD 1.42 FEET

TO CONVERT FROM NAVD 1988 TO

ELEVATIONS HEREON ARE NAVD 1988.

224.4 197.8

175.6…