This is a Project Specifications and Bidding Document issued by the State University of New York (SUNY) College of Environmental Science and Forestry for construction contract 201071, titled "Renovate Lower Level Entries & Restrooms for ADA - Moon Library." The project encompasses a comprehensive renovation of the lower level of Moon Library to enhance accessibility and functionality, including complete renovation of existing restrooms to meet current accessibility standards, creation of a new dedicated student space with flexible furnishings and updated technology infrastructure, construction of a new fully accessible entrance on the north side with a vestibule, and addition of a vestibule to the existing south entrance for improved thermal performance. Sealed bids are due by 2:00 PM local time on July 22, 2026, at the Physical Plant Conference Room 209, 307 Stadium Place, Syracuse, NY 13210, with a non-mandatory pre-bid conference and walkthrough scheduled for July 8, 2026, at 10:00 AM at Moon Library Room 110. All work must be completed within 455 calendar days after the date of the Notice to Proceed. The bidding documents are available for download from the New York State Contract Reporter and at multiple builder exchange locations throughout New York State. Prospective bidders must register on the Plan Holder List by providing company information to Elizabeth Parsons or Katherine Hobbs to receive addenda notifications.
Bid security of five percent of the total bid amount is required, submitted as either a bank draft, certified check, or bid bond. The University has established contracting goals of 30 percent overall MWBE participation (15 percent MBE and 15 percent WBE) and 6 percent SDVOB participation. Apparent low bidders must submit post-bid information within 48 hours, including evidence of New York State Vendor Responsibility Questionnaire (CCA-2) certification, a working plan and schedule, names and qualifications of proposed subcontractors for specified trades, and a bid breakdown. Within seven days of bid opening, the three lowest bidders must submit MWBE Utilization Plans and Equal Employment Opportunity statements and staffing plans. Bidders must demonstrate they have successfully completed three similar construction projects within the past five years, with working capital available equal to 15 percent of the first $100,000 of the base bid plus 10 percent of the next $900,000 plus 5 percent of the remainder. The successful bidder must procure Performance and Labor and Material Bonds within ten working days of receiving the Letter of Intent, each in an amount not less than 100 percent of the contract total. Additional requirements include compliance with New York State Finance Law sections 139-j, 139-k, 139-l, and 139-m regarding procurement lobbying restrictions, sexual harassment prevention policies, and gender-based violence workplace policies. The project is subject to prevailing wage requirements under Article 8 of the New York Labor Law and mandatory contractor registration with the New York State Department of Labor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 201071 Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Manual For construction contracts greater than $20,000 RENOVATE LOWER LEVEL ENTRIES & RESTROOMS FOR ADA – MOON LIBRARY Project 201071 July 22, 2026
SUNY College of Environmental Science and Forestry 1 Forestry Dr., Syracuse, NY 13210 Attn: Elizabeth Parsons abbieboglione Image abbieboglione Image abbieboglione Image abbieboglione Image abbieboglione Image
Form 7554-05
Page 2 of 10 SUNY Procedure 7554 Revised: 11/17/2020
Project Number: 201071 Date: July 22, 2026 Project Name: Renovate Lower Level Entries & Restrooms for ADA – Moon Library Agency/Div Code: 28550 Contract No.: D202646
Bidding Documents Section Title Page #
Notice to Bidders ................................................................................................................................................... NB-1
Information for Bidders
1 Definitions ............................................................................................................................................... IB-1
2 Issuance of Bidding and Contract Documents ........................................................................................... IB-1 3 Proposals .......................................................................................................................................... IB-1, IB-2
4 Examination of Bidding and Contract Documents .................................................................................... IB-2 5 Computation of Bid ......................................................................................................................... IB-2, IB-3 6 Payment of Security ................................................................................................................................... IB-3 7 Qualification of Bidders .................................................................................................................. IB-3, IB-4 8 Submission of Post-Bid Information .............................................................................. IB-4,IB-5, IB-6, IB-7 9 Award of Contract ........................................................................................................................... 1B-7, IB-8 10 Required Bonds and Insurance .............................................................................................. IB-8 IB-9, IB-10 11 Minority and Women-Owned Business Enterprises ..................................................................... IB-10,IB-11 12 Equal Employment Opportunity Requirements ...................................................................................... IB-11 13 Executive Order 162 (EO162) ..................................................................................................... IB-11, IB-12 14 Executive Order 177 (EO177) ................................................................................................................. IB-12 15 Service Disabled Veteran Owned Business Enterprises .......................................................................... IB-12 16 Encouraging Use of New York State Business Businesses in Contract Performance ................. IB-12, IB-13 17 Single Contract Responsibility ................................................................................................................ IB-13 18 Examination of Site and Conditions of Work .......................................................................................... IB-13 19 General Terms and Conditions ..................................................................................................... IB-13,IB-14 20 Additional Terms and Conditions ..................................................................................... IB-15, IB-16, IB-17 21 Requirements for Construction Activities To Address Public Health or Safety ...................................... IB-17
Proposal ................................................................................................................................................................. 1 to 6
Technical Specifications
Division 1 - General Requirements
Section A - Description of Work .............................................................................................................. 0100-1 Section B - Alternates ............................................................................................................................... 0100-1 Section C - Special Conditions .................................................................................................. 0100-1 - 0100-9
1. Time Progress Schedule
2. Cutting and Patching
3. Clean Up
4. Temporary Access and Parking
5. Field Meetings
6. Operating Instructions and Manuals
7. Utility Shutdowns and Cut Overs
8. Temporary Power for Construction Activities
9. Sanitary Facilities
Page 3 of 10 SUNY Procedure 7554 Revised: 11/17/2020
10. Temporary Heat
11. Temporary Light
12. Temporary Water for Construction Purposes
13. Conducting Work
14. Safety and Protective Facilities
15. Protection of Existing Structures, Vegetation and Utilities
16. Abbreviations and References
17. Use of Elevators
18. Salvage of Materials
19. Storage of Materials
20. Shop Drawings and Samples
21. U.S. Steel
22. Non-Asbestos Products
23. Material Safety and Data Sheet
24. Architect’s/Engineer’s Seal
25. Construction Permit
26. Other Contracts
27. Asbestos
Technical Specifications
Division 02 – Existing Conditions 024119 Selective Demolition 028200 Asbestos Abatement 028310 LCP/LBP Disturbances using OSHA Lead Safe Work Practices 028400 PCB Caulk Removal
Division 03 – Concrete 031000 Concrete Forming and Accessories 032000 Concrete Reinforcing 033000 Cast-In-Place Concrete 035416 Hydraulic Cement Underlayment
Division 04 – Masonry 040100 Brick 042200 Concrete Unit Masonry
Division 05 – Metals 051200 Structural Steel Framing 051300 Structural Stainless-Steel Framing 053100 Steel Decking 055213 Pipe and Tube Railings 057320 Glass Ballustrade Railing System
Division 06 – Wood, Plastics, Composites 061000 Rough Carpentry 062023 Interior Finish Carpentry
Division 07 – Thermal and Moisture Protection 071326 Self-Adhering Sheet Waterproofing 072100 Thermal Insulation 079200 Joint Sealants
Division 08 – Openings 081113 Hollow Metal Doors and Frames
Page 4 of 10 SUNY Procedure 7554 Revised: 11/17/2020
081416 Flush Wood Doors 083113 Access Doors and Frames 084113 Aluminum-Framed Entrances and Storefronts 084413 Aluminum Framed Curtainwalls 087100 Door Hardware 088000 Glazing
Division 09 – Finishes 092216 Non-Structural Metal Framing 092900 Gypsum Board 093013 Ceramic Tile 095113 Acoustical Panel Ceilings 096513 Resilient Base and Accessories 096519 Resilient Tile Flooring 096813 Tile Carpeting 097200 Wall Coverings 097513 Solid Stone Veneer Aluminum Panel 099124 Interior Painting (MPI Standards)
Division 10 – Specialties 101100 Visual Display Boards
101423.16 Room Identification Panel Signage
102113.17 Phenolic Core Toilet Compartments
105129 Phenolic Lockers 102800 Toilet, Bath and Laundry Accessories
Division 12 – Furnishings 122413 Roller Window Shades 123216 Manufactured Plastic Laminate Clad Casework
123661.19 Quartz Agglomerate Countertops
129200 Interior Planters and Artificial Plants
Division 22 – Plumbing 220513 Common Motor Requirements for Plumbing Equipment 220517 Sleeves and Sleeve Seals for Plumbing Piping 220518 Escutcheons for Plumbing Piping
220523.12 Ball Valves for Plumbing Piping
220523.14 Check Valves for Plumbing Piping
220529 Hangers and Supports for Plumbing Piping and Equipment 220553 Identification for Plumbing Piping and Equipment 220719 Plumbing Piping Insulation 221116 Domestic Water Piping 221119 Domestic Water Piping Specialties 221316 Sanitary Waste and Vent Piping 221319 Sanitary Waste Piping Specialties 221413 Facility Storm Drainage Piping 221423 Storm Drainage Piping Specialties
224213.13 Commercial Water Closets
224213.16 Commercial Urinals
224216.13 Commercial Lavatories
224216.16 Commercial Sinks
224716 Pressure Water Coolers
Division 23 – HVAC 230519 Meters and Gauges for HVAC Piping
230523.12 Ball Valves for HVAC Piping
230529 Hangers and Supports for HVAC Piping and Equipment 230553 Identification for HVAC Piping and Equipment
Page 5 of 10 SUNY Procedure 7554 Revised: 11/17/2020
230593 Testing, Adjusting, And Balancing for HVAC 230713 Duct Insulation 230719 HVAC Piping Insulation
230923.11 Control Valves
232113 Hydronic Piping 232116 Hydronic Piping Specialties 233113 Metal Ducts 233300 Air Duct Accessories 233346 Flexible Ducts
233713.13 Air Diffusers
238213 Valance Heating and Cooling Units 238236 Finned-Tube Radiation Heaters
238239.19 Wall and Ceiling Unit Heaters
Division 26 – Electrical 260519 Low-Voltage Electrical Power Conductors and Cables 260526 Grounding and Bonding for Electrical Systems 260529 Hangers and Supports for Electrical Systems 260533 Raceways and Boxes for Electrical Systems 260544 Sleeves and Sleeve Seals for Electrical Raceways and Cabling 260553 Identification for Electrical Systems 262726 Wiring Devices
265100.01 Interior Lighting
Division 31 – Earthwork 311201 Site Preparation 312201 Site Earthwork
Division 32 – Exterior Improvements 321301 Site Concrete Work 321302 Textured Concrete 323001 Site Furnishings 329001 Planting
Division 33 – Utilities Sections 334001 Storm Drainage
Appendix Asbestos Abatement & Lead Survey Report
List of Drawings
GENERAL
G-001 GENERAL NOTES, ABBREVIATIONS & SYMBOLS
G-002 PARTITION TYPES, TYPICAL MOUNTING HEIGHTS
G-003 CODE COMPLIANCE NOTES
G-101 OVERALL LOWER LEVEL CODE COMPLIANCE PLAN & SYMBOLS
G-102 OVERALL LOWER AND UPPER FLOOR PHASING PLAN
CIVIL/LANDSCAPE
L100 SURVEY
L101 SITE PREPARATION PLAN
L102 SITE GRADING, DRAINAE AND UTILITY PLAN
L103 SITE LAYOUT PLAN
L104 DETAILS
Page 6 of 10 SUNY Procedure 7554 Revised: 11/17/2020
HAZARDOUS MATERIALS
HM-100 HAZARDOUS MATERIALS ABATEMENT PLAN – GENERAL NOTES
HM-101 HAZARDOUS MATERIALS ABATEMENT PLAN – LOWER LEVEL PLAN
HM-102 HAZARDOUS MATERIALS ABATEMENT PLAN – UPPER LEVEL PLAN
STRUCTURAL
S-001 STRUCTURAL NOTES AND LEGENDS
S-101 STRUCTURAL PLAN – FIRST FLOOR
S-301 STRUCTURAL SECTIONS
S-401 STRUCTURAL ENLARGED PLAN – SHADE ADDITION
S-501 STRUCTURAL DETAILS
ARCHITECTURAL
AD101 OVERALL LOWER LEVEL DEMOLITION PLAN
AD102 OVERALL UPPER LEVEL DEMOLITION PLAN
A-101 OVERALL LOWER LEVEL CONSTRUCTION PLAN
A-111 ENLARGED LOWER LEVEL NEW CONSTRUCTION PLANS
A-112 ENLARGED UPPER LEVEL NEW CONSTRUCITON AND FLOORING FINISH PLANS
A-102 OVERALL UPPER LEVEL CONSTRUCTION PLAN
AC101 OVERALL LOWER AND PARTIAL UPPER LEVEL REFLECTED CEILING PLAN
AC102 ENLARGED REFLECTED CEILING PLANS
A-201 EXTERIOR ELEVATIONS
A-211 INTERIOR ELEVATIONS
A-311 WALL SECTIONS
A-501 PLAN DETAILS
A-521 EXTERIOR DETAILS
A-531 INTERIOR DETAILS
A-532 INTERIOR DETAILS
A-533 FIREPLACE DETAILS
A-541 CEILING DETAILS
A-601 DOOR AND FRAME TYPES AND SCHEDULE
A-611 FINISH. SCHEDULE AND LEGEND
AI101 OVERALL LOWER LEVEL FLOOR FINISH PLAN
AI102 ENLARGED FLOOR FINISH PLAN
AQ101 OVERALL LOWER AND UPPER LEVEL FURN; FIXTURES & EQUIP PLAN
AQ102 ENLARGED LOWER LEVEL FURNITURE, FIXTURES & EQUP PLAN
AQ103 ENLARGED UPPER LEVEL FURNITURE, FIXTURES & EQUIP PLAN
PLUMBING
P-001 GENERAL INFORMATION
PD 100 LOWER LEVEL DEMOLITION PLAN - UNDERFLOOR
PD 101 LOWER LEVEL DEMOLITION PLAN
PD 102 UPPER LEVEL DEMOLITION PLAN
P-501 DETAILS
P-601 SCHEDULES
P-701 SCHEMATICS
MECHANICAL
M-001 GENRAL INFORMATION
MD-101 LOWER LEVEL DEMOLTION PLAN
MD-102 UPPER LEVEL DEMOLTION PLAN
M-101 LOWER LEVEL DUCTWORK CONSTRUCTION PLAN
M-102 UPPER LEVEL CONSTRUCTION PLAN
M-201 LOWER LEVEL PIPING CONSTRUCTION PLAN
M-501 MECHANICAL DETAILS
http://www.suny.edu/sunypp/lookup.cfm?lookup_id=513
Page 7 of 10 SUNY Procedure 7554 Revised: 11/17/2020
M-601 MECHANICAL SCHEDULES AND CONTROLS
ELECTRICAL
E-001 GENERAL INFORMATION
ES001 ELECTRICAL SITE PLAN
ED 101 LOWER LEVEL DEMOLITION PLAN
ED 102 UPPER LEVEL DEMOLITION PLAN
E-101 LOWER LEVEWL POWER & SYSTEMS PLAN
E-102 UPPER LEVEL NEW WORK ELECTRICAL PLAN
E-201 LOWER LEVEL LIGHTING PLAN
E-501 DETAILS
E-502 DETAILS
E-601 SCHEDULES
State University of New York Construction Agreement
Summary
Article I General Provisions
Section 1.01 Definitions ............................................................................................................................ 1, 2 Section 1.02 Captions Section 1.03 Nomenclature Section 1.04 Entire Agreement Section 1.05 Successors, Assigns and Agents Section 1.06 Accuracy and Completeness of Contract Documents Section 1.07 Organization of Contract Documents Section 1.08 Furnishing of Contract Documents Section 1.09 Examination of Contract Documents and Site Section 1.10 Invalid Provisions Section 1.11 No Collusion or Fraud .......................................................................................................... 3, 4 Section 1.12 Notices Section 1.13 Singular-Plural; Male-Female
Article II Contract Administration and Conduct
Section 2.01 Consultant’s Status ............................................................................................................... 4, 5 Section 2.02 Finality of Decisions Section 2.03 Claims and Disputes ............................................................................................................. 5, 6 Section 2.04 Omitted Work Section 2.05 Extra Work ............................................................................................................................ 6, 7 Section 2.06 Contractor to Give Personal Attention Section 2.07 Employment of Workers Section 2.08 Detailed Drawings and Instructions Section 2.09 Contract Documents to Be Kept at Site Section 2.10 Permits and Building Codes .................................................................................................. 7, 8 Section 2.11 Surveys Section 2.12 Site Conditions Section 2.13 Right to Change Location Section 2.14 Unforeseen Difficulties ......................................................................................................... 8, 9 Section 2.15 Moving Materials and Equipment Section 2.16 Other Contracts
Page 8 of 10 SUNY Procedure 7554 Revised: 11/17/2020
Section 2.17 Inspection and Testing ....................................................................................................... 9, 10 Section 2.18 Subcontractors .................................................................................................................. 10, 11 Section 2.19 Shop Drawings and Samples ...................................................................................... 11, 12, 13 Section 2.20 Equivalents - Approved Equal ........................................................................................ 13, 14 Section 2.21 Patents, Trademarks and Copyrights Section 2.22 Possession Prior to Completion Section 2.23 Completion and Acceptance ............................................................................................. 14, 15 Section 2.24 Record Drawings .............................................................................................................. 15, 16 Section 2.25 Guarantees Section 2.26 Default of Contractor .................................................................................................. 16, 17, 18 Section 2.27 Termination ....................................................................................................................... 18, 19
Article III Time of Performance
Section 3.01 Commencement, Prosecution and Completion of Work ................................................... 19, 20 Section 3.02 Time Progress Schedule Section 3.03 Time Schedule for Shop Drawings and Samples Section 3.04 Notice of Conditions Causing Delay Section 3.05 Extension of Time ............................................................................................................. 20, 21 Section 3.06 Contractor's Progress Reports ........................................................................................... 21, 22
Article IV Payment
Section 4.01 Compensation to Be Paid Contractor Section 4.02 Value of Omitted and Extra Work ................................................................................... 22, 23 Section 4.03 Adjustment for Bond and Insurance Premiums Section 4.04 Unit Prices ........................................................................................................................ 23, 24 Section 4.05 Allowances Section 4.05A Field Orders Section 4.06 Deductions for Unperformed and/or Uncorrected Work .................................................. 24, 25 Section 4.07 Liquidated Damages Section 4.08 Contract Breakdown Section 4.09 Prompt Payment Requirements Section 4.10 Progress Payments ............................................................................................................ 25, 26 Section 4.11 Applications for Progress Payments Section 4.12 Progress Payments for Materials Delivered to Site Section 4.13 Transfer of Title to Materials Delivered to Site Section 4.14 Progress Payments for Materials Stored Off Site .............................................................. 26, 27 Section 4.15 Withholding of Progress Payments .................................................................................. 27, 28 Section 4.16 Lien Law Section 4.17 Substitution of Securities for Retainage Section 4.18 Final Payment Section 4.19 Acceptance of Final Payment ........................................................................................... 28, 29 Section 4.20 Guarantee Payment Section 4.21 Acceptance of Guarantee Payment Section 4.22 Contractor Limited to Money Damages Section 4.23 No Estoppel or Waiver ...................................................................................................... 29, 30 Section 4.24 Limitation of Actions Section 4.25 Electronic Payments…………………………………………………………………………..30
Article V Protection of Rights and Property
Page 9 of 10 SUNY Procedure 7554 Revised: 11/17/2020
Section 5.01 Accidents and Accident Prevention Section 5.02 Adjoining Property Section 5.03 Emergencies Section 5.04 Fire Safety Section 5.05 Risks Assumed by Contractor .......................................................................................... 31, 32 Section 5.06 Compensation and Liability Insurance........................................................................ 32, 33, 34 Section 5.07 Builder's Risk Insurance .................................................................................................. 34, 35 Section 5.08 Effect of Procurement of Insurance Section 5.09 No Third Party Rights ....................................................................................................... 35, 36
Article VI Minority and Women’s Business Enterprises (MWBEs) / Equal Employment Opportunities (EEO) Provisions
Article VII Provisions Required by Law Section 7.01 Provisions Deemed Inserted Section 7.02 Wage Rates
Article VIII Vendor Responsibility
Article IX Use of Service-Disabled Veteran-Owned Business Enterprises in Contract Performance
Signature of Parties and Governmental Approvals
Acknowledgments
Schedule I
Attachments – Terms, Conditions
1. Schedule I, II, III (Schedule I Unit Prices, Schedule II Allowances, Schedule III Field Order Allowances)
2. Exhibit A Standard Contract Clauses
3. Exhibit A-1 Affirmative Action Clauses
Attachments –Contractor Documentation
4. Form 7554-07 – Contractor Proposal
5. Form 7554-10 - Bid Bond and Acknowledgement (required with bid)
6. Affirmative Action and Minority & Women Owned Business Enterprises from SUNY Procedure Item
#7557 “Participation by Minority Group Members and Women (MWBEs) with Respect to State University of New York Contract” (applies >$100,000)
a. Form 7557-121b – MWBE Prospective Bidders Notice
b. Form 7557-107 - M/WBE Utilization Plan (required within seven days of the bid)
c. The Contractor’s EEO Policy Statement or Form 7557-104 (required within seven days of the bid)
d. 7557-108 - M/WBE-EEO Work Plan or EEO Staffing Plan (required within seven days of the bid)
Note: In accordance Procedure Item #7557 MWBE Utilization Plans, EEO policy statements and EEO Work Plans are due within seven days of submittal of the bid.
7. Service Disabled Owned Business Enterprise from SUNY Procedure Item #7564 “Participation by http://www.suny.edu/sunypp/lookup.cfm?lookup_id=126 http://www.suny.edu/sunypp/lookup.cfm?lookup_id=125 http://www.suny.edu/sunypp/lookup.cfm?lookup_id=511 http://www.suny.edu/sunypp/lookup.cfm?lookup_id=512 https://www.suny.edu/sunypp/lookup.cfm?lookup_id=855 http://www.suny.edu/sunypp/lookup.cfm?lookup_id=618 https://www.suny.edu/sunypp/lookup.cfm?lookup_id=615 https://www.suny.edu/sunypp/lookup.cfm?lookup_id=621 https://www.suny.edu/sunypp/lookup.cfm?lookup_id=857 https://www.suny.edu/sunypp/lookup.cfm?lookup_id=821 https://opdv.ny.gov/system/files/documents/2025/10/state-finance-law-139m-policy-attestation-template.pdf https://opdv.ny.gov/system/files/documents/2025/08/opdv-gbv-workplace-bidder-model-policy_2025.08.28_0.pdf http://www.suny.edu/sunypp/lookup.cfm?lookup_id=281 http://www.suny.edu/sunypp/lookup.cfm?lookup_id=282 http://www.suny.edu/sunypp/lookup.cfm?lookup_id=283 https://www.suny.edu/sunypp/lookup.cfm?lookup_id=889
Page 10 of 10 SUNY Procedure 7554 Revised: 11/17/2020
Service-Disabled Veteran-Owned Business (SDVOBs) with Respect to State University of New York Contracts” (applies >$100,000)
a. Form 7564-121b – SDVOB Prospective Bidders Notice
b. Form 7564-107 - SDVOB Utilization Plan (required within seven days of the bid)
8. NYS Finance Law §139-m
a. Gender-Based Violence and the Workplace Certification
b. Gender-Based Violence and the Workplace Model Policy for NYS Bidders
Attachments –Additional Contractor Documentation (required after bid opening from the low bidder)
9. State Finance Law §§139-j and 139-k from SUNY Procedure Item #7552 “Procurement Lobbying Procedure for State University of New York” (applies >$15,000)
a. Form A - Summary: Policy and Procedure of the State University of New York Relating to State
Finance Law §§139-j and 139-k
b. Form B - Affirmation with respect to State Finance Law §§139-j and 139-k
c. Form C - Disclosure and Certification with respect to State Finance Law §§139-j and 139-k
Bidder’s Certifications (State Finance Law §139-l, Non-collusive bidding, Executive Order 177)
10. from SUNY Procedure Item #7554 “Construction Contracting Procedures
a. Form 7554-20 Bidder’s Certifications
11. Procurement Forms from SUNY Procedure Item #7553 “Purchasing and Contracting (Procurement)
a. Form I Omnibus Procurement Act of 1992 (applies >$1,000,000)
b. Form II Omnibus Procurement Act of 1992, Out of state firms (applies >$1,000,000)
c. Form XIII Public Officers Law Compliance
12. Bonds and Certificate of Insurance from SUNY Procedure Item #7554 “Construction Contracting
Procedures
a. Form 7554-11 Labor & Materials and Performance Bonds (applies >$50,000)
b. Form 7554-12 Certificate of Insurance (applies to all contracts)
c. NYS Workers Compensation and Disability Insurance (applies all contracts)
13. Vendor Responsibility
a. OSC’s Vendrep - Online System or Link to paper forms (form applies > $100,000)
14. NYS Labor Law, Section 220-a
a. Form 7554-13
i. Form AC 2947, Prime Contractor's Certification
ii. Form AC 2948, Subcontractor's Certification
iii. Form AC 2958, Sub-subcontractor's Certification
15. Prevailing Wage Rate Schedule for Article 8 Public Work Project http://www.suny.edu/sunypp/lookup.cfm?lookup_id=471 http://www.suny.edu/sunypp/lookup.cfm?lookup_id=472 http://www.suny.edu/sunypp/lookup.cfm?lookup_id=483 http://www.suny.edu/sunypp/lookup.cfm?lookup_id=514 http://www.suny.edu/sunypp/docs/493.pdf http://www.osc.state.ny.us/vendrep/login_vendors.htm http://www.osc.state.ny.us/vendrep/forms_agency_vresp.htm http://www.suny.edu/sunypp/lookup.cfm?lookup_id=516
Form 7554-03
Page NB-1 of NB-2 SUNY Procedure 7554 Rev. November 2025
Notice to Bidders and Newspaper Advertisement
The State University of New York College of Environmental Science and Forestry at Syracuse will receive sealed bids for project number 201071 titled Renovate Lower Level Entries & Restrooms for ADA – Moon Library, until 2:00pm local time on 7/22/26 at Physical Plant Conference Room 209, 307 Stadium Place, Syracuse, NY 13210, where such proposals will be publicly opened and read aloud.
All work on this Contract is to be completed within 455 calendar days after the date of the Notice to Proceed.
Bidding and Contract Documents may be examined free of charge at the campus and at the following locations.
● Campus: Facilities Planning, Design and Construction, Division of Sustainable Facilities and Operations, SUNY ESF, 307 Stadium Place, Syracuse, NY 13210
● Printer: (None. If hard copies of the bid documents are needed, prospective bidders are responsible to download the bid documents from the NYS Contact Reporter ad and print their own bid documents.)
● Consultant: Dwyer Architectural, 110 W Fayette Street, Suite 225, Syracuse, NY 13202.
315-473-1800, Contact: Cassie Raymond cassieraymond@dwyerarch.com
● Syracuse Builders Exchange, 6563 Ridings Rd., Syracuse, NY 13206. 315-437-9936.
www.syrabex.com
● Northern New York Builder’s Exchange, 22074 Fabco Rd, Watertown, NY 13601. 315- 788-1330. www.nnybe.com
● Eastern Contractors Association, 6 Airline Dr., Albany, NY 12205. 518-869-0961.
www.ecainc.org
● Mohawk Valley Builders Exchange, 10 Main St, Suite 202, Whitesboro, NY 13492.
315-736-2441. www.mvbe.com
● Builders Exchange of the Southern Tier, 65 East Main St, Falconer, NY 14733. 716- 665-4026. www.bxstier.com
● Construction Exchange of Buffalo, 2660 Williams St, Cheektowaga, NY 14227. 716- 847-3435. www.conexbuff.com
● Builders Exchange of Rochester, 180 Linden Oaks, Suite 100, Rochester NY 14625.
585-586-5460. www.robex.com
● Upstate Minority Economic Alliance, 115 West Fayette St, Syracuse, NY 13202. 315- 314-8074. www.upstatemea.com
A complete set of bid documents - including drawings, project manual and addenda - may be previewed and downloaded free of charge from the New York State Contract Reporter ad mailto:cassieraymond@dwyerarch.com http://www.syrabex.com/ http://www.nnybe.com/ http://www.ecainc.org/ http://www.mvbe.com/ http://www.bxstier.com/ http://www.conexbuff.com/ http://www.robex.com/ http://www.upstatemea.com/
Form 7554-03
Page NB-2 of NB-2 SUNY Procedure 7554 Rev. November 2025
#2135637 (https://www.nyscr.ny.gov/). Prospective bidders shall download and print their own bid documents, as needed.
ESF will maintain a Plan Holder List for the purpose of notifying prospective bidders of any addendum when it is issued. In order to be included on the Plan Holder List, prospective bidders must provide company name and address and a contact’s name, phone number and email address to one of the following individuals:
• Elizabeth Parsons, Associate Facilities Program Coordinator, Phone: 315-470-6694, Email: eaparson@esf.edu
• Katherine Hobbs, Construction Contract Administrator, Phone: 315-470-6529, Email:
khobbs@esf.edu
A bidder is not required to be included on the Plan Holder List in order to submit a bid.
A non-mandatory pre-bid conference and walk through is scheduled for 7/8/26 at 10:00am local time, with prospective bidders gathering at Moon Library Room 110.
Pursuant to State Finance Law §139-j and §139-k, this solicitation includes and imposes certain restrictions on communications between the University and potential bidders during the procurement process. Failure to adhere to this provision may result in the disqualification under the NYS Procurement Lobbying Act. The designated contacts for this procurement are:
• Katherine Hobbs, Contracts and Compliance Business Manager, Phone: 315-470-6529, Email: khobbs@esf.edu
Bids must be submitted in duplicate in accordance with the instructions contained in the Information for Bidders. Security will be required for each bid in an amount not less than five (5) percent of the Total Bid.
It is the policy of the State of New York and the State University of New York to encourage minority business enterprise participation in this project by contractors, subcontractors and suppliers, and all bidders are expected to cooperate in implementing this policy.
The State University of New York reserves the right to reject any or all bids.
https://www.nyscr.ny.gov/ mailto:eaparson@esf.edu mailto:khobbs@esf.edu
JMA Wireless
Dome
(SU)
Sadler Dining Center
(SU)
Lawrinson
(SU)
Oak Leaf Drive
Forestry Drive
Campus Drive
Campus Drive East
Campus Drive West
Oakland Street
Stadium Place (tw o way)
Standart Street (One Way)
E. Raynor Avenue
ESF
Campus
Entrance
Physical Plant
P3
P4
P22
◀ Sims Drive SU Entrance
V
Irving Avenue
Dineen Hall
(SU)
SU Visitor Parking
Irving Garage
Stadium Place (one way)
ESF Visitor Parking
SU Parking
Standart Street Lot SU Visitor Parking
Enter Here Enter
Here
V
Public Entry
V
V
V
Entrance Henry Street
Entrance
Stairway
E. Raynor Avenue
Van Buren Street
Fineview Place
Standart Street (One Way)
Irving Avenue
E. Raynor Avenue
Henry Street
Moon Patio
Quad
172-2223 TourSUNY ESF 1 Forestry Drive | Syracuse, NY 13210 | www.esf.edu
MAPC A M P U S
This map and the building descriptions on the reverse side will guide you through a walking tour of our Syracuse campus. The campus is on a hill, with Walters Hall at the top and Centennial Hall at the bottom. Accessible parking approval can be obtained by calling ESF University Police at (315) 470-6667.
172-2223 TourSUNY ESF 1 Forestry Drive | Syracuse, NY 13210 | www.esf.edu
Walters Hall
Illick Hall
Moon Library
Jahn Laboratory
Gateway Center
Baker Laboratory
Centennial Hall
Sadler Hall Dining Center (SU)
Old Greenhouse
Bray Hall
Marshall Hall
SUNY ESF Undergraduate Admissions 1 Forestry Drive | 218 Gateway Center | Syracuse, NY 13210 | www.esf.edu/admissions | (315) 470-6600
VISITOR PARKIN G
P2 P4 P22
SU Irving Garage SU Standart Street Lot ESF Parking
CROSSWALKS
ACCESSIBLE ENTRANCE
UNIVERSITY POLICE
(315) 470-6667
Pre-Bid & Bid Opening Parking Location
Bid Delivery Room 209 -
Physical Plant
Pre-Bid Location Moon Library 110
Elizabeth Parsons Polygon
Elizabeth Parsons Line
Elizabeth Parsons Polygon
Elizabeth Parsons Polygon
Elizabeth Parsons Line
SUNY
College of Environmental
Science & Forestry
ONE DAY
PARKING PASS
Authorized by:
ESF Facilities Office
PARKING LOT P-22 ONLY
7/8/2026 Pre-Bid Conference
201071 Renovate Lower Level Entries & Restrooms for ADA –
Moon Library
This permit is valid to park on SUNY ESF Campus lots. Obey all traffic & parking regulations.
Any alteration voids this permit.
Rev. 8/18 CMS
SUNY
College of Environmental
Science & Forestry
ONE DAY
PARKING PASS
Authorized by:
ESF Facilities Office
PARKING LOT P-22 ONLY
7/22/206 Bid Opening
201071 Renovate Lower Level Entries & Restrooms for ADA –
Moon Library
This permit is valid to park on SUNY ESF Campus lots. Obey all traffic & parking regulations.
Any alteration voids this permit.
Rev. 8/18 CMS
Form 7554-06
Page IB-1 of IB-17 SUNY Procedure 7554 November 2025
INFORMATION FOR BIDDERS
Section 1 Definitions
All definitions set forth in the Agreement are applicable to the Notice to Bidders, Information for Bidders and the Proposal, all of which documents are hereinafter referred to as the Bidding Documents.
Section 2 Issuance of Bidding and Contract Documents
Drawings and Specifications will be issued by the Consultant upon request after payment of the deposit specified in the Notice to Bidders.
Section 3 Proposals
(1) Proposals must be submitted in duplicate on the forms provided by the University. They shall be addressed to the University in a sealed envelope, marked with the name and address of the bidder, the title of the Project and the Project number. The University accepts no responsibility for Proposals that may be delivered by any courier or other messenger service that does not contain all of the above-noted information on the outside of a sealed envelope. Facsimile or email copies of the Proposal will not be accepted.
(2) All blank spaces in the Proposal must be filled in and, except as otherwise expressly provided in the Bidding Documents; no change is to be made in the phraseology of the Proposal or in the items mentioned therein.
(3) Proposals that are illegible or that contains omissions, alterations, additions or items not called for in the Bidding Documents may be rejected as informal. In the event any bidder modifies, limits or restricts all or any part of its Proposal in a manner other than that expressly provided for in the Bidding Documents, its Proposal may be rejected as informal.
(4) Any Proposal may be considered informal which does not contain prices in words and figures in all of the spaces provided or which is not accompanied by a bid security in proper form. In case any price shown in words and its equivalent shown in figures do not agree, the written words shall be binding upon the bidder. In case of a discrepancy in the prices contained in the Proposal forms submitted in duplicate by the bidder, the Proposal form which contains the lower bid shall be deemed the bid of the bidder; provided, however, the University at its election may consider the Proposal of such bidder informal.
(5) If the Proposal is made by a corporation, the names and places of residence of the president, secretary and treasurer shall be given. If by a partnership, the names and places of residence of the partners shall be given. If by a joint venture, the names and addresses of the members of the joint venture shall be given. If by an individual, the name and place of residence shall be given.
(6) No Proposal will be considered which has not been deposited with the University at the location designated in and prior to the time of opening of bids designated in the Bidding and Contract Documents or prior to the time of opening as extended by Addendum.
(7) Bids may be modified, withdrawn or canceled only in writing or by email notice received by the
University prior to the time of opening of bids designated in the Bidding and Contract Documents.
A written or email notice of modification, withdrawal or cancellation shall be marked by the bidder with the name and address of the bidder, the title of the Project and the Project number. Upon
Page IB-2 of IB-17 SUNY Procedure 7554 receipt by the University a duly authorized employee of the University, who shall note thereon the date and time of receipt and shall thereupon attach said written or email notice of modification, withdrawal or cancellation to the envelope submitted by the bidder pursuant to subdivision (1) of this
(8) Permission will not be given to modify, explain, withdraw or cancel any Proposal or part thereof after the time designated in the Bidding and Contract Documents for the opening of bids, unless such modification, explanation, withdrawal or cancellation is permitted by law and the University is of the opinion that it is in the public interest to permit the same.
Section 4 Examination of Bidding and Contract Documents
(1) Prospective bidders shall examine the Bidding and Contract Documents carefully and, before bidding, shall make written request to the Consultant (with a copy thereof to the University) for an interpretation or correction of any ambiguity, inconsistency or error therein which should be discovered by a reasonably prudent bidder. Such interpretation or correction as well as any additional Contract provision the University shall decide to include will be issued in writing by the Consultant as an Addendum, which will be sent to each person recorded as having received a copy of the Bidding and Contract Documents from the Consultant, and which also will be available at the places where the Bidding and Contract Documents are available for inspection by prospective bidders. Upon such emailing or delivery and making available for inspection, such Addendum will become a part of the Bidding and Contract Documents and will be binding on all bidders whether or not the bidder receives or acknowledges the actual notice of it. Prospective bidders are responsible for ensuring that all addenda have been incorporated into the bid. The requirements contained in all Bidding and Contract Documents shall apply to all Addenda.
(2) Only the written interpretation or correction so given by Addendum shall be binding. Prospective bidders are warned that no trustee, officer, agent or employee of the University or the Consultant is authorized to explain or interpret the Bidding and Contract Documents by any other method, and any such explanation or interpretation, if given, must not be relied upon.
Section 5 Computation of Bid
(1) In computing their bids, bidders are not to include the sales and compensating use taxes of the
State of New York or of any city and county in the State of New York for any supplies or materials which are incorporated into the completed Project as the University is exempt from such taxes.
(2) Unit prices may be inserted in the Proposal by the University or the bidder at the discretion of the
University. Any unit prices listed in the Proposal by the University are based upon the Consultant's appraisal of a fair cost for the work involved. Such listed prices will be binding upon both the bidder and the University unless the bidder wishes to change any of such unit prices by crossing out the listed unit price and inserting a revised unit price. Such revised unit price shall not be binding upon the University unless it accepts the same, in writing, before it issues a Notice of Award. In the event the Proposal contains blank spaces for unit prices or the bidder revises any stated unit price, the amount of such unit prices for additions shall not vary by more than 15 percent from the prices inserted by the bidder for deductions, and, if the variance of such prices exceeds 15 percent, the University may adjust the deduction price inserted by the bidder so that it is only 15 percent lower than the addition price inserted by the bidder. In addition, the University may adjust any unit price filled in by a bidder to an amount agreeable to both the bidder and the University or it may reject any unit prices.
Page IB-3 of IB-17 SUNY Procedure 7554
(3) Alternates, if any, listed in the Proposal shall be accepted in the order indicated and will be used in combination with the Base Bid to determine the low bidder. Unit prices will not be used to determine the low bidder.
(4) If a tie bid should occur the University reserves the right to use one of the following methods to determine the successful bidder. For tie bids between two contractors the University representative shall flip a coin, both affected contractors must be present for the coin toss. For tie bids between three or more contractors the University representative shall pull names from a bowl, hat or other container. The affected contractors must be present for the drawing.
Section 6 Payment of Bid Security
(1) Each Proposal must be accompanied by the required amount of the bid security, which is 5% of the Total Bid, in the form of a bank draft or certified check, payable at sight to the University and drawn on a bank authorized to do business in the United States, or by a Bid Bond, on a form approved by the University, duly executed by the bidder as principal and having as surety thereon a surety company or companies, approved by the University, authorized to do business in the State of New York as a surety. Attorneys-in-fact who execute a Bid Bond on behalf of a surety must affix thereto a certified and effectively dated copy of their power of attorney.
(2) The University will return, without interest, bid securities in accordance with the following procedure:
a. To all bidders except the apparent three (3) lowest bidders within two (2) working days after the opening of bids.
b. To any bidder submitting a Bid Bond as a replacement for a previously provided bank draft or certified check, within two (2) working days after the University's approval of such Bid Bond.
c. To the apparent three (3) lowest bidders, unless their bid security was previously returned, within two (2) working days after delivery to the University by the successful bidder of the executed Agreement and required Bonds, or within two (2) working days of the University's rejection of all bids or within two (2) working days after the expiration of forty-five (45) calendar days after the bid opening, whichever event shall occur first.
d. Bid Bonds, due to their nature, will not be returned.
(3) The University reserves the right to deposit bid security drafts or checks pending final disposal of them.
Section 7 Qualifications of Bidders
(1) A bidder must demonstrate, to the satisfaction of the University, that it has successfully completed three (3) contracts similar in size, scope and complexity to this contract within the last five (5) years.
a. For scope and complexity, similar work is defined as Interior Building Signage replacement work, or as further described in the General Requirements, Description of Work.
Page IB-4 of IB-17 SUNY Procedure 7554
b. The determination of relevant contract experience in terms of size, scope and complexity will be at the sole discretion of the University.
c. The above three projects shall be submitted on Attachment A of the Proposal (Form 7554-
07), “List of Completed Similar Construction Projects” (the List). If the List is not provided or is missing information, and/or is found to have erroneous information or information that is no longer current, a Proposal may be rejected as not responsive. If requested by the University, the bidder may be permitted to add missing information, modify and/or explain erroneous information or information that is no longer current on the List.
Modifications and/or explanations of the List must be received within 48 hours of receipt of the University’s request.
(2) All prospective bidders must demonstrate to the satisfaction of the University that they have the skill and experience, as well as the necessary facilities, ample financial resources, ability to manage staff and subcontractors effectively, ability to anticipate and plan construction work for optimal progress, ability to create, strive for and maintain working environments and relationships that are constructive, communicative and cooperative, organization and general reliability to do the work to be performed under the provisions of the Contract in a satisfactory manner and within the time specified.
(3) Each bidder must demonstrate to the satisfaction of the University that it has working capital available for the Project upon which it is bidding in an amount equal to 15 percent of the first $100,000 of the amount of its Base Bid plus 10 percent of the next $900,000 plus 5 percent of the remainder of its Base Bid. Working capital is defined as the excess of current assets over current liabilities. The University defines current assets as assets which can be reasonably expected to be converted into cash within a year, and current liabilities as debts which will have to be paid within a year.
(4). The University may make such investigation as the University deems necessary to determine the ability of any bidder to perform the Work. Bidders shall furnish to the University all information and data required by the University, including complete financial data, within the time and in the form and manner required by the University. The University reserves the right to reject any bid if the evidence submitted by or an investigation of such bidder fails to satisfy the University that such bidder is properly qualified to carry out its obligations of the contract and to complete the work contemplated therein. Conditional bids will not be accepted.
(5) At the time of the bid opening, all bidders and subcontractors, domestic and foreign, must be in compliance with New York State business registration requirements. Contact the NYS Department of State regarding compliance.
Section 8 Submission of Post-Bid Information
(1) Within forty-eight (48) hours after the opening of bids, each of the apparent three lowest bidders, unless otherwise directed by the University or otherwise provided in the Bidding and Contract Documents, shall submit to both the University and the Consultant:
a. Evidence of a completed New York State Uniform Contracting Questionnaire (Vendor
Responsibility Questionnaire For-Profit Construction (CCA-2)). Either email confirmation that the bidder’s CCA-2 is current and certified in the New York State VendRep System (VendRep) within the last six months from the bid date, or deliver a certified paper format CCA-2, including all attachments, to the University.
Page IB-5 of IB-17 SUNY Procedure 7554
The University recommends that vendors file the required CCA-2 online via the VendRep.
To enroll in and use the VendRep, see the VendRep Instructions at https://www.osc.state.ny.us/vendrep/info_vrsystem.htm or go directly to the VendRep online at https://portal.osc.state.ny.us. To request assistance, contact the Office of the State Comptroller’s (“OSC”) Help Desk at 866-370-4672 or 518- 408-4672 or by email at ciohelpdesk@osc.state.ny.us.
The paper format CCA-2 and accompanying definitions are available on the OSC website at the following location:
http://www.osc.state.ny.us/vendrep/forms_vendor.htm
b. A working plan and schedule showing clearly, in sequence and time-scale, all significant activities of the work. The working plan and schedule shall be in the form of suitable charts, diagrams or bar graphs and shall be based on the Contractor's logic and time estimates for the anticipated time of commencement and completion of the work and its significant phases and activities and the interrelationship between such significant activities and other items pertinent to the work. This requirement is in addition to and not a substitute for the schedule requirements of section 3.02 (Time Progress Schedule) of the Agreement.
Although the working plan and schedule submitted shall not be used in determining the lowest responsible bidder, failure to submit the working plan and schedule may result in the rejection of the Proposal as not responsive.
c. The names and addresses of the bidder's proposed subcontractor for the Asbestos Abatement work of any value, and proposed subcontractors for Electrical Work, the Heating, Ventilating and Air-Conditioning Work and the Plumbing Work for each of said work categories valued at $100,000 or more.
i. For each proposed subcontractor named, provide a completed “List of Completed
Similar Construction Projects (the List).” If the List is not provided or is missing information, and/or is found to have erroneous information or information that is no longer current, a proposed subcontractor may be rejected. If requested by the University, the bidder may be permitted to add missing information, modify and/or explain erroneous information or information that is no longer current on the List;
modifications and/or explanations of the List must be received promptly after receipt of the University’s request.
ii. Only one proposed subcontractor should be named for each of such trades. Proposed subcontractors of the bidder may not be changed except with the specific written approval of the University.
iii. The naming of the bidder itself for any of such work is not acceptable and may result in rejection of the bidder unless the bidder can demonstrate to the University that it has successfully completed or substantially completed three (3) contracts similar in size, scope and complexity for the designated work within the last five (5) years. The determination of relevant contract experience in terms of size, scope and complexity will be at the sole discretion of the University.
iv. The bidder will be required to establish, to the satisfaction of the Consultant and the University, the reliability and responsibility of each of their said proposed https://www.osc.state.ny.us/vendrep/info_vrsystem.htm https://www.osc.state.ny.us/vendrep/info_vrsystem.htm https://portal.osc.state.ny.us/ mailto:ciohelpdesk@osc.state.ny.us http://www.osc.state.ny.us/vendrep/forms_vendor.htm
Page IB-6 of IB-17 SUNY Procedure 7554 subcontractors to furnish and perform the work described in the sections of the Specifications pertaining to each of such proposed subcontractors' respective trades.
By submission of the “List of Completed Similar Construction Projects,” a proposed subcontractor must be able to demonstrate that they have successfully completed or substantially completed three (3) contracts similar in size, scope and complexity for the designated work within the last five (5) years. The determination of relevant contract experience in terms of size, scope and complexity will be at the sole discretion of the University.
v. For each of the proposed subcontractors, the bidders must submit to the University, within seven (7) calendar days after the bid opening, evidence of a completed New York State Uniform Contracting Questionnaire (Vendor Responsibility Questionnaire For-Profit Construction (CCA-2)). Either email confirmation that the subcontractor’s CCA-2 is current and certified in the New York State VendRep System (VendRep) within the last six months from the bid date, or deliver a certified paper format CCA-2, including all attachments, to the University.
vi. In the event that the University and the Consultant reject any of said proposed subcontractors, the bidder, within two (2) working days after receipt of notification of such rejection, shall again submit to the University and the Consultant the name of another proposed subcontractor in place of the one rejected and it will be required to establish to the satisfaction of the University and the Consultant the reliability and responsibility of said proposed subcontractor; When naming another proposed subcontractor, the bidder must promptly submit the proposed subcontractor’s completed “List of Completed Similar Construction Projects” and their completed CCA- 2.
vii. The bidder will not be permitted to submit another proposed subcontractor if it designated itself for any of the aforesaid categories of work.
viii. Proposed subcontractors of the bidder, approved by the University and the Consultant, must be used on the work for which they were proposed and approved and they may not be changed except with the specific written approval of the…