2-U46 Kimball Middle School 2026 Capital Improvement Project Design Drawings 021926.pdf

PDF 2 MB Posted

Attached to
KIMBALL MS CAPITAL IMPROVEMENT PROJECT AND LOWER LEVEL ABATEMENT
Solicitation number
425- 25/26
Issued by
Kane County, Illinois

About this file

This document comprises design drawings for the Kimball Middle School 2026 Capital Improvement Project, prepared by Weaver Consultants Group for School District U-46 located in Elgin, Illinois. The project centers on asbestos abatement work at Kimball Middle School, situated at 451 North McLean Boulevard, Elgin, Illinois 60123. The scope of work includes removal and disposal of asbestos-containing thermal system insulation, hard fittings associated with roof drain systems, floor tile and associated mastic, and window caulk, glaze, and transite spandrel panels throughout multiple building levels. Work areas are designated across the lower level, first floor, second floor, and building exterior, with approximate locations indicated on the accompanying floor plan drawings. The contractor bears responsibility for field verification of material quantities and locations, demolition of casework and ceilings as necessary to access abatement materials, removal and proper disposal of mercury-containing fluorescent bulbs and PCB-containing light ballasts, and compliance with IDPH Section 855.430 requirements for barrier construction. The design includes specifications for five-chamber worker decontamination units, two-chamber waste-out facilities, and airlock installations to control contamination during abatement operations.

The drawings were prepared under the professional service of David J. Kedrowski (IDPH #100-04543) and dated February 19, 2026. Barrier construction requirements specify rigid framing with maximum 24-inch on-center spacing, 12-inch plywood sheathing, and two layers of 6-mil polyethylene sheeting for high-containment work areas, with alternative barrier specifications detailed in IDPH Section 855.430(b) for standard containment areas. All work must comply with applicable IDPH, EPA, and OSHA rules and regulations. The contractor shall verify that all systems are de-energized prior to work commencement and reference architect drawings for specific work area locations. Removal of univents and freezers will be performed by others outside the scope of the abatement contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRJ#:

DATE:

DRAWN BY:

REVIEWED BY:

4366-344-59-09 02/19/2026

CRM

SC

HO

O L

DI

ST

RI

CT

U -4

S

HE

LD

O N

D

RI

VE

EL

GI

N

, I

LL

IN

O

IS

W ea ve r

Co ns ul ta nt s

Gr ou p

FIGURE:

DCG

LAYOUTFIGURESFILE:

KI

M

BA

LL

M

ID

DL

E

SC

HO

O L

N O

RT

H

M

CL

EA

N

B O

U

LE

VA

RD

EL

GI

N , I

LL

IN

O

IS

PR

EP

AR

ED

F O

R:

DESIGNER NAME:

DAVID J. KEDROWSKI

IDPH #100-04543

N

NOT TO SCALE

REUSE OF THIS DOCUMENT

AND THE DESIGNS

INCORPORATED HEREIN, AS AN

INSTRUMENT OF PROFESSIONAL

SERVICE, IS THE PROPERTY OF

WEAVER CONSULTANTS GROUP,

AND IS NOT TO BE USED IN

WHOLE OR IN PART, WITHOUT

THE WRITTEN AUTHORIZATION

OF WEAVER CONSULTANTS

GROUP. COPYRIGHT © 2026

WEAVER CONSULTANTS GROUP.

ALL RIGHTS RESERVED.

www.wcgrp.com

WEAVER CONSULTANTS GROUP

1316 BOND STREET, SUITE 108

NAPERVILLE, ILLINOIS 60563

(630) 717-4848

OFFICE LOCATION:

KEYNOTES:

GENERAL NOTES:

SCOPE OF WORK:

Indicates approximate location of asbestos containing thermal system insulation removal. (See scope of work for details.)

Indicates approximate location of asbestos containing hard fittings associated with roof drain removal. (See scope of work for details.)

Indicates approximate location of asbestos containing floor tile and associated mastic removal. (See scope of work for details.)

Indicates approximate location of asbestos containing window caulk, glaze, and transite spandrel panel removal. (See scope of work for details.)

Indicates approximate location of non-removal work area.

Indicates approximate location of five (5) chamber worker decontamination unit.

Indicates approximate location of two (2) chamber waste-out.

Indicates approximate location airlock.

Install airtight barrier constructed of rigid framing with a maximum on-center spacing of 24 inches, 12" plywood sheathing, and two layers of 6-mil polyethylene sheeting applied to abatement work area side. Barrier shall be constructed as detailed in IDPH section 855.430(a).

Install barrier constructed of rigid framing with a maximum on-center spacing of 24 inches and 12" plywood sheathing. Barrier shall be constructed as detailed in IDPH section 855.430 (b).

Contractor to secure doorway and control access.

Indicates approximate location of negative air exhaust.

Asbestos Abatement: Removal and disposal of asbestos containing thermal system insulation, hard fittings associated with roof drain, floor tile and associated mastic, and window caulk, glaze, and transite spandrel panels per specification and applicable IDPH, EPA, and OSHA rules and regulations.

1. Locations are approximate. Abatement contractor shall field verify quantity and locations.

2. Abatement contractor responsible for demolition of casework to access floor tile and associated mastic located beneath.

3. Abatement contractor responsible for demolition of ceilings to access thermal system insulation located above.

4. Removal of univents and freezers to be performed by others.

5. Abatement contractor shall remove and properly dispose of mercury containing fluorescent bulbs and PCB containing light ballasts.

Abatement contractor shall refer to architects drawings for locations of work areas. Abatement contractor shall field verify the system is de-energized.

ASB-01

AS

BE

ST

O

S

AB

AT

EM

EN

T

- L O

W

ER

L

EV

EL

AutoCAD SHX Text

AutoCAD SHX Text

NAE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AL

102A

104A

102D

VEST 9

PRJ#:

DATE:

DRAWN BY:

REVIEWED BY:

4366-344-59-09 02/19/2026

CRM

SC

HO

O L

DI

ST

RI

CT

U -4

S

HE

LD

O N

D

RI

VE

EL

GI

N

, I

LL

IN

O

IS

W ea ve r

Co ns ul ta nt s

Gr ou p

FIGURE:

DCG

LAYOUTFIGURESFILE:

KI

M

BA

LL

M

ID

DL

E

SC

HO

O L

N O

RT

H

M

CL

EA

N

B O

U

LE

VA

RD

EL

GI

N , I

LL

IN

O

IS

PR

EP

AR

ED

F O

R:

DESIGNER NAME:

DAVID J. KEDROWSKI

IDPH #100-04543

N

NOT TO SCALE

REUSE OF THIS DOCUMENT

AND THE DESIGNS

INCORPORATED HEREIN, AS AN

INSTRUMENT OF PROFESSIONAL

SERVICE, IS THE PROPERTY OF

WEAVER CONSULTANTS GROUP,

AND IS NOT TO BE USED IN

WHOLE OR IN PART, WITHOUT

THE WRITTEN AUTHORIZATION

OF WEAVER CONSULTANTS

GROUP. COPYRIGHT © 2026

WEAVER CONSULTANTS GROUP.

ALL RIGHTS RESERVED.

www.wcgrp.com

WEAVER CONSULTANTS GROUP

1316 BOND STREET, SUITE 108

NAPERVILLE, ILLINOIS 60563

(630) 717-4848

OFFICE LOCATION:

KEYNOTES:

GENERAL NOTES:

SCOPE OF WORK:

Indicates approximate location of asbestos containing thermal system insulation removal. (See scope of work for details.)

Indicates approximate location of asbestos containing hard fittings associated with roof drain removal. (See scope of work for details.)

Indicates approximate location of asbestos containing floor tile and associated mastic removal. (See scope of work for details.)

Indicates approximate location of asbestos containing window caulk, glaze, and transite spandrel panel removal. (See scope of work for details.)

Indicates approximate location of non-removal work area.

Indicates approximate location of five (5) chamber worker decontamination unit.

Indicates approximate location of two (2) chamber waste-out.

Indicates approximate location airlock.

Install airtight barrier constructed of rigid framing with a maximum on-center spacing of 24 inches, 12" plywood sheathing, and two layers of 6-mil polyethylene sheeting applied to abatement work area side. Barrier shall be constructed as detailed in IDPH section 855.430(a).

Install barrier constructed of rigid framing with a maximum on-center spacing of 24 inches and 12" plywood sheathing. Barrier shall be constructed as detailed in IDPH section 855.430 (b).

Contractor to secure doorway and control access.

Indicates approximate location of negative air exhaust.

Asbestos Abatement: Removal and disposal of asbestos containing thermal system insulation, hard fittings associated with roof drain, floor tile and associated mastic, and window caulk, glaze, and transite spandrel panels per specification and applicable IDPH, EPA, and OSHA rules and regulations.

1. Locations are approximate. Abatement contractor shall field verify quantity and locations.

2. Abatement contractor responsible for demolition of casework to access floor tile and associated mastic located beneath.

3. Abatement contractor responsible for demolition of ceilings to access thermal system insulation located above.

4. Removal of univents and freezers to be performed by others.

5. Abatement contractor shall remove and properly dispose of mercury containing fluorescent bulbs and PCB containing light ballasts.

Abatement contractor shall refer to architects drawings for locations of work areas. Abatement contractor shall field verify the system is de-energized.

ASB-02

AS

BE

ST

O

S

AB

AT

EM

EN

T

- F

IR

ST

F

LO

O

R

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NAE

AutoCAD SHX Text

NAE

AutoCAD SHX Text

NAE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NAE

AutoCAD SHX Text

AutoCAD SHX Text

NAE

AutoCAD SHX Text

AutoCAD SHX Text

BAND/

ORCHESTRA

CHORAL/

GENERAL MUSIC

RECEPTION

150C

AP2

150A

AP1

151B

TLT

NURSE

150D

FLEX

150J

WORK RM

150E

CONF. RM

150F

FLEX

150G

FLEX

MUSIC OFFICE

150B

PRINCIPAL

151A

ISOLATION

ROOM

150K

TLT

SECTIONAL

SPACE

155A

MUSIC LIBRARY

& STORAGE

FE

PRJ#:

DATE:

DRAWN BY:

REVIEWED BY:

4366-344-59-09 02/19/2026

CRM

SC

HO

O L

DI

ST

RI

CT

U -4

S

HE

LD

O N

D

RI

VE

EL

GI

N

, I

LL

IN

O

IS

W ea ve r

Co ns ul ta nt s

Gr ou p

FIGURE:

DCG

LAYOUTFIGURESFILE:

KI

M

BA

LL

M

ID

DL

E

SC

HO

O L

N O

RT

H

M

CL

EA

N

B O

U

LE

VA

RD

EL

GI

N , I

LL

IN

O

IS

PR

EP

AR

ED

F O

R:

DESIGNER NAME:

DAVID J. KEDROWSKI

IDPH #100-04543

N

NOT TO SCALE

REUSE OF THIS DOCUMENT

AND THE DESIGNS

INCORPORATED HEREIN, AS AN

INSTRUMENT OF PROFESSIONAL

SERVICE, IS THE PROPERTY OF

WEAVER CONSULTANTS GROUP,

AND IS NOT TO BE USED IN

WHOLE OR IN PART, WITHOUT

THE WRITTEN AUTHORIZATION

OF WEAVER CONSULTANTS

GROUP. COPYRIGHT © 2026

WEAVER CONSULTANTS GROUP.

ALL RIGHTS RESERVED.

www.wcgrp.com

WEAVER CONSULTANTS GROUP

1316 BOND STREET, SUITE 108

NAPERVILLE, ILLINOIS 60563

(630) 717-4848

OFFICE LOCATION:

KEYNOTES:

GENERAL NOTES:

SCOPE OF WORK:

Indicates approximate location of asbestos containing thermal system insulation removal. (See scope of work for details.)

Indicates approximate location of asbestos containing hard fittings associated with roof drain removal. (See scope of work for details.)

Indicates approximate location of asbestos containing floor tile and associated mastic removal. (See scope of work for details.)

Indicates approximate location of asbestos containing window caulk, glaze, and transite spandrel panel removal. (See scope of work for details.)

Indicates approximate location of non-removal work area.

Indicates approximate location of five (5) chamber worker decontamination unit.

Indicates approximate location of two (2) chamber waste-out.

Indicates approximate location airlock.

Install airtight barrier constructed of rigid framing with a maximum on-center spacing of 24 inches, 12" plywood sheathing, and two layers of 6-mil polyethylene sheeting applied to abatement work area side. Barrier shall be constructed as detailed in IDPH section 855.430(a).

Install barrier constructed of rigid framing with a maximum on-center spacing of 24 inches and 12" plywood sheathing. Barrier shall be constructed as detailed in IDPH section 855.430 (b).

Contractor to secure doorway and control access.

Indicates approximate location of negative air exhaust.

Asbestos Abatement: Removal and disposal of asbestos containing thermal system insulation, hard fittings associated with roof drain, floor tile and associated mastic, and window caulk, glaze, and transite spandrel panels per specification and applicable IDPH, EPA, and OSHA rules and regulations.

1. Locations are approximate. Abatement contractor shall field verify quantity and locations.

2. Abatement contractor responsible for demolition of casework to access floor tile and associated mastic located beneath.

3. Abatement contractor responsible for demolition of ceilings to access thermal system insulation located above.

4. Removal of univents and freezers to be performed by others.

5. Abatement contractor shall remove and properly dispose of mercury containing fluorescent bulbs and PCB containing light ballasts.

Abatement contractor shall refer to architects drawings for locations of work areas. Abatement contractor shall field verify the system is de-energized.

ASB-03

AS

BE

ST

O

S

AB

AT

EM

EN

T

- F

IR

ST

F

LO

O

R

AutoCAD SHX Text

AutoCAD SHX Text

NAE

AutoCAD SHX Text

AutoCAD SHX Text

AL

AutoCAD SHX Text

AL

AutoCAD SHX Text

AL

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NAE

AutoCAD SHX Text

NAE

AutoCAD SHX Text

NAE

AutoCAD SHX Text

AutoCAD SHX Text

NAE

AutoCAD SHX Text

AutoCAD SHX Text

M

AT

CH

LI

N E

A- A

M

AT

CH

LI

N E

A- A

PRJ#:

DATE:

DRAWN BY:

REVIEWED BY:

4366-344-59-09 02/19/2026

CRM

SC

HO

O L

DI

ST

RI

CT

U -4

S

HE

LD

O N

D

RI

VE

EL

GI

N

, I

LL

IN

O

IS

W ea ve r

Co ns ul ta nt s

Gr ou p

FIGURE:

DCG

LAYOUTFIGURESFILE:

KI

M

BA

LL

M

ID

DL

E

SC

HO

O L

N O

RT

H

M

CL

EA

N

B O

U

LE

VA

RD

EL

GI

N , I

LL

IN

O

IS

PR

EP

AR

ED

F O

R:

DESIGNER NAME:

DAVID J. KEDROWSKI

IDPH #100-04543

N

NOT TO SCALE

REUSE OF THIS DOCUMENT

AND THE DESIGNS

INCORPORATED HEREIN, AS AN

INSTRUMENT OF PROFESSIONAL

SERVICE, IS THE PROPERTY OF

WEAVER CONSULTANTS GROUP,

AND IS NOT TO BE USED IN

WHOLE OR IN PART, WITHOUT

THE WRITTEN AUTHORIZATION

OF WEAVER CONSULTANTS

GROUP. COPYRIGHT © 2026

WEAVER CONSULTANTS GROUP.

ALL RIGHTS RESERVED.

www.wcgrp.com

WEAVER CONSULTANTS GROUP

1316 BOND STREET, SUITE 108

NAPERVILLE, ILLINOIS 60563

(630) 717-4848

OFFICE LOCATION:

KEYNOTES:

GENERAL NOTES:

SCOPE OF WORK:

Indicates approximate location of asbestos containing thermal system insulation removal. (See scope of work for details.)

Indicates approximate location of asbestos containing hard fittings associated with roof drain removal. (See scope of work for details.)

Indicates approximate location of asbestos containing floor tile and associated mastic removal. (See scope of work for details.)

Indicates approximate location of asbestos containing window caulk, glaze, and transite spandrel panel removal. (See scope of work for details.)

Indicates approximate location of non-removal work area.

Indicates approximate location of five (5) chamber worker decontamination unit.

Indicates approximate location of two (2) chamber waste-out.

Indicates approximate location airlock.

Install airtight barrier constructed of rigid framing with a maximum on-center spacing of 24 inches, 12" plywood sheathing, and two layers of 6-mil polyethylene sheeting applied to abatement work area side. Barrier shall be constructed as detailed in IDPH section 855.430(a).

Install barrier constructed of rigid framing with a maximum on-center spacing of 24 inches and 12" plywood sheathing. Barrier shall be constructed as detailed in IDPH section 855.430 (b).

Contractor to secure doorway and control access.

Indicates approximate location of negative air exhaust.

Asbestos Abatement: Removal and disposal of asbestos containing thermal system insulation, hard fittings associated with roof drain, floor tile and associated mastic, and window caulk, glaze, and transite spandrel panels per specification and applicable IDPH, EPA, and OSHA rules and regulations.

1. Locations are approximate. Abatement contractor shall field verify quantity and locations.

2. Abatement contractor responsible for demolition of casework to access floor tile and associated mastic located beneath.

3. Abatement contractor responsible for demolition of ceilings to access thermal system insulation located above.

4. Removal of univents and freezers to be performed by others.

5. Abatement contractor shall remove and properly dispose of mercury containing fluorescent bulbs and PCB containing light ballasts.

Abatement contractor shall refer to architects drawings for locations of work areas. Abatement contractor shall field verify the system is de-energized.

ASB-04

AS

BE

ST

O

S

AB

AT

EM

EN

T

- S

EC

O N

D

FL

O O

R

AutoCAD SHX Text

NAE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NAE

AutoCAD SHX Text

AutoCAD SHX Text

200A

203A

205A

M

AT

CH

LI

N E

A- A

M

AT

CH

LI

N E

B- B

M

AT

CH

LI

N E

A- A

M

AT

CH

LI

N E

B- B

PRJ#:

DATE:

DRAWN BY:

REVIEWED BY:

4366-344-59-09 02/19/2026

CRM

SC

HO

O L

DI

ST

RI

CT

U -4

S

HE

LD

O N

D

RI

VE

EL

GI

N

, I

LL

IN

O

IS

W ea ve r

Co ns ul ta nt s

Gr ou p

FIGURE:

DCG

LAYOUTFIGURESFILE:

KI

M

BA

LL

M

ID

DL

E

SC

HO

O L

N O

RT

H

M

CL

EA

N

B O

U

LE

VA

RD

EL

GI

N , I

LL

IN

O

IS

PR

EP

AR

ED

F O

R:

DESIGNER NAME:

DAVID J. KEDROWSKI

IDPH #100-04543

N

NOT TO SCALE

REUSE OF THIS DOCUMENT

AND THE DESIGNS

INCORPORATED HEREIN, AS AN

INSTRUMENT OF PROFESSIONAL

SERVICE, IS THE PROPERTY OF

WEAVER CONSULTANTS GROUP,

AND IS NOT TO BE USED IN

WHOLE OR IN PART, WITHOUT

THE WRITTEN AUTHORIZATION

OF WEAVER CONSULTANTS

GROUP. COPYRIGHT © 2026

WEAVER CONSULTANTS GROUP.

ALL RIGHTS RESERVED.

www.wcgrp.com

WEAVER CONSULTANTS GROUP

1316 BOND STREET, SUITE 108

NAPERVILLE, ILLINOIS 60563

(630) 717-4848

OFFICE LOCATION:

KEYNOTES:

GENERAL NOTES:

SCOPE OF WORK:

Indicates approximate location of asbestos containing thermal system insulation removal. (See scope of work for details.)

Indicates approximate location of asbestos containing hard fittings associated with roof drain removal. (See scope of work for details.)

Indicates approximate location of asbestos containing floor tile and associated mastic removal. (See scope of work for details.)

Indicates approximate location of asbestos containing window caulk, glaze, and transite spandrel panel removal. (See scope of work for details.)

Indicates approximate location of non-removal work area.

Indicates approximate location of five (5) chamber worker decontamination unit.

Indicates approximate location of two (2) chamber waste-out.

Indicates approximate location airlock.

Install airtight barrier constructed of rigid framing with a maximum on-center spacing of 24 inches, 12" plywood sheathing, and two layers of 6-mil polyethylene sheeting applied to abatement work area side. Barrier shall be constructed as detailed in IDPH section 855.430(a).

Install barrier constructed of rigid framing with a maximum on-center spacing of 24 inches and 12" plywood sheathing. Barrier shall be constructed as detailed in IDPH section 855.430 (b).

Contractor to secure doorway and control access.

Indicates approximate location of negative air exhaust.

Asbestos Abatement: Removal and disposal of asbestos containing thermal system insulation, hard fittings associated with roof drain, floor tile and associated mastic, and window caulk, glaze, and transite spandrel panels per specification and applicable IDPH, EPA, and OSHA rules and regulations.

1. Locations are approximate. Abatement contractor shall field verify quantity and locations.

2. Abatement contractor responsible for demolition of casework to access floor tile and associated mastic located beneath.

3. Abatement contractor responsible for demolition of ceilings to access thermal system insulation located above.

4. Removal of univents and freezers to be performed by others.

5. Abatement contractor shall remove and properly dispose of mercury containing fluorescent bulbs and PCB containing light ballasts.

Abatement contractor shall refer to architects drawings for locations of work areas. Abatement contractor shall field verify the system is de-energized.

ASB-05

AS

BE

ST

O

S

AB

AT

EM

EN

T

- S

EC

O N

D

FL

O O

R

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NAE

AutoCAD SHX Text

AutoCAD SHX Text

NAE

AutoCAD SHX Text

NAE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

NAE

AutoCAD SHX Text

AutoCAD SHX Text

PRJ#:

DATE:

DRAWN BY:

REVIEWED BY:

4366-344-59-09 02/19/2026

CRM

SC

HO

O L

DI

ST

RI

CT

U -4

S

HE

LD

O N

D

RI

VE

EL

GI

N

, I

LL

IN

O

IS

W ea ve r

Co ns ul ta nt s

Gr ou p

FIGURE:

DCG

LAYOUTFIGURESFILE:

KI

M

BA

LL

M

ID

DL

E

SC

HO

O L

N O

RT

H

M

CL

EA

N

B O

U

LE

VA

RD

EL

GI

N , I

LL

IN

O

IS

PR

EP

AR

ED

F O

R:

DESIGNER NAME:

DAVID J. KEDROWSKI

IDPH #100-04543

N

NOT TO SCALE

REUSE OF THIS DOCUMENT

AND THE DESIGNS

INCORPORATED HEREIN, AS AN

INSTRUMENT OF PROFESSIONAL

SERVICE, IS THE PROPERTY OF

WEAVER CONSULTANTS GROUP,

AND IS NOT TO BE USED IN

WHOLE OR IN PART, WITHOUT

THE WRITTEN AUTHORIZATION

OF WEAVER CONSULTANTS

GROUP. COPYRIGHT © 2026

WEAVER CONSULTANTS GROUP.

ALL RIGHTS RESERVED.

www.wcgrp.com

WEAVER CONSULTANTS GROUP

1316 BOND STREET, SUITE 108

NAPERVILLE, ILLINOIS 60563

(630) 717-4848

OFFICE LOCATION:

KEYNOTES:

GENERAL NOTES:

SCOPE OF WORK:

Indicates approximate location of asbestos containing thermal system insulation removal. (See scope of work for details.)

Indicates approximate location of asbestos containing hard fittings associated with roof drain removal. (See scope of work for details.)

Indicates approximate location of asbestos containing floor tile and associated mastic removal. (See scope of work for details.)

Indicates approximate location of asbestos containing window caulk, glaze, and transite spandrel panel removal. (See scope of work for details.)

Indicates approximate location of non-removal work area.

Indicates approximate location of five (5) chamber worker decontamination unit.

Indicates approximate location of two (2) chamber waste-out.

Indicates approximate location airlock.

Install airtight barrier constructed of rigid framing with a maximum on-center spacing of 24 inches, 12" plywood sheathing, and two layers of 6-mil polyethylene sheeting applied to abatement work area side. Barrier shall be constructed as detailed in IDPH section 855.430(a).

Install barrier constructed of rigid framing with a maximum on-center spacing of 24 inches and 12" plywood sheathing. Barrier shall be constructed as detailed in IDPH section 855.430 (b).

Contractor to secure doorway and control access.

Indicates approximate location of negative air exhaust.

Asbestos Abatement: Removal and disposal of asbestos containing thermal system insulation, hard fittings associated with roof drain, floor tile and associated mastic, and window caulk, glaze, and transite spandrel panels per specification and applicable IDPH, EPA, and OSHA rules and regulations.

1. Locations are approximate. Abatement contractor shall field verify quantity and locations.

2. Abatement contractor responsible for demolition of casework to access floor tile and associated mastic located beneath.

3. Abatement contractor responsible for demolition of ceilings to access thermal system insulation located above.

4. Removal of univents and freezers to be performed by others.

5. Abatement contractor shall remove and properly dispose of mercury containing fluorescent bulbs and PCB containing light ballasts.

Abatement contractor shall refer to architects drawings for locations of work areas. Abatement contractor shall field verify the system is de-energized.

ASB-06

AS

BE

ST

O

S

AB

AT

EM

EN

T

- B U

IL

DI

N G

EX

TE

RI

O

R

AutoCAD SHX Text

AutoCAD SHX Text

NAE

AutoCAD SHX Text

AutoCAD SHX Text

Sheets and Views
4366-344-59-09_Layout Figures-ASB-01
4366-344-59-09_Layout Figures-ASB-02
4366-344-59-09_Layout Figures-ASB-03
4366-344-59-09_Layout Figures-ASB-04
4366-344-59-09_Layout Figures-ASB-05
4366-344-59-09_Layout Figures-ASB-06

File details come from the government source that posted it. Updated .