2-Project Drawings 4662.020.pdf
PDF 2 MB Posted
- Solicitation number
- Not on record
- Issued by
- Berks County, Pennsylvania
About this file
The document is a comprehensive set of engineering design drawings for the Laurel Avenue Water Main Replacement project, prepared for the Mount Penn Borough Municipal Authority located in Reading, Pennsylvania. The project involves replacing the existing water main along Laurel Avenue, spanning approximately 729 linear feet (from Station 0+00 to Station 7+29), and includes detailed civil engineering plans, construction details, restoration specifications, and erosion and sedimentation control measures. The project is issued for bidding on October 08, 2025, with drawings developed by Entech Engineering and includes multiple detailed plan sheets covering location maps, utility responses, general project notes, and technical specifications.
The project documents indicate a total limit of disturbance of 0.11 acres and involve replacing water infrastructure with new ductile iron piping, gate valves, fire hydrants, and service connections. The design includes specific technical requirements for pipe installation, thrust blocking, utility crossings, and restoration of disturbed areas. Soil types in the project area include Gladstone Gravelly Loam and Urban Land Duffield Complex. The project requires comprehensive erosion and sedimentation control measures, including temporary and permanent seeding, mulching, and ongoing maintenance inspections. Utility coordination involves multiple local entities, including Antietam Valley Municipal Authority, Pennsylvania Electric Company, Borough of Mount Penn, Reading Area Water Authority, and others.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-Project Drawings IFB 4662.018.pdf | ||
| 1-Project Manual IFB 4662.018.pdf | ||
| 1-Project Manual 4662.020.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROPOSED WATERLINE SERVICE
CIVIL LEGEND
LIMIT OF DISTURBANCE
Bh SwD
MATCH LINE REFER TO DWG C-101
PROPOSED TEXT
DRAWING MATCHLINE
TEXT
PROPOSED HYDRANT W/ LOCKING TEE
PROPOSED CURB STOPCS
PROPOSED GATE VALVE
PROPOSED 45° BEND
PROPOSED 22.5° BEND
PROPOSED TEE
PROPOSED REDUCER
PROPOSED CAP
FH PROPOSED FIRE HYDRANT
PROPOSED WATERLINEW
PROPOSED WATERLINE BLOWOFFBO
PROPOSED COUPLING
D R
AW
IN
G
IN
D
EX
, G
EN
ER
AL
P R
O
JE
C T
N O
TE
S
AN
D
D R
AW
IN
G C
O N
VE
N
TI
O
N S
G
EN
ER
AL
GENERAL PROJECT NOTES
DRAWING CONVENTIONS
SECTION INDICATOR
DETAIL INDICATOR
A X-301
A X-301
X-501
SCALE:1 1" = 1'-0"
DRAWING TITLE
DRAWING NUMBER
SECTION LETTER
IDENTIFICATION NUMBER/LETTER
DRAWING TITLE
SHEET KEYNOTE SYMBOL
DRAWING NUMBER
DETAIL NUMBER
TEXT
INDICATES EXIST
CONDITIONS/FEATURES
INDICATES NEW
WORK/FEATURES
DENOTES REFERENCE TO ENLARGED
PLANS WITH DRAWING NUMBER
INDICATED
X
XXX
SCALE:2 NONE
VICINITY MAP
DRAWING INDEX
DWG. NO. DRAWING DESCRIPTION/TITLE
GENERAL
G-001 DRAWING INDEX, GENERAL PROJECT NOTES AND DRAWING
CONVENTIONS
CIVIL
C-101 LAUREL AVENUE PLAN (STA 0+00 TO STA 7+29)
C-501 CONSTRUCTION DETAILS
C-502 CONSTRUCTION DETAILS
C-701 RESTORATION DETAILS
EROSION AND SEDIMENTATION
ES-501 CONTROL NOTES
ES-502 CONTROL DETAILS
1-800-242-1776
(TOLL FREE)
"Pa. Law requires advance notification"
PA ONE CALL FOR FINAL DESIGN
SERIAL NUMBER ISSUED:
20252803478
1-800-242-1776
PE
NN
SY
LV
AN
IA ONE CALL SYSTEM
, INC
STOP-CALL BEFORE YOU D
IG
REFERENCE: USGS 7.5 MINUTE SERIES (TOPOGRAPHIC MAP) - READING, PA.
SCALE:1 1" = 2000'
LOCATION / TOPOGRAPHICAL MAP
00 2000' 4000'
4662.020
A
B
2 3
C
D
1 2 3
4 5 6
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
DRAWING NO.
Entech Engineering - Printed: Oct. 8, 2025 H:\0004662.020\04-CAD\SheetFiles\G-001.dwgLa st
E di te d by : A
A tti ck
G-001
SER
REF
ARA
AS NOTED
M O
UN
T
PE
NN
B O
RO
UG
H M
UN
IC
IP
AL
A
UT
HO
RI
TY
N
5T
H S
TR
EE
T, R
EA
D
IN
G
, P A.
LA
U
R
EL
A
VE
N U
E W
AT
ER
M
AI
N R
EP
LA
C
EM
EN
T
/0
8/
BI
D
D
IN
G
SE
R
1. FIELD SURVEY BY McCARTHY ENGINEERING ASSOCIATES, DATED JULY, 2025.
2. PROPERTY LINES SHOWN ARE APPROXIMATE AND HAVE NOT BEEN
SURVEYED OR FIELD VERIFIED.
3. THE LOCATION AND DIMENSIONS OF ALL SITE FEATURES SHOWN ARE
APPROXIMATE AND MUST BE VERIFIED IN THE FIELD BY THE
CONTRACTOR PRIOR TO BIDDING.
4. ALL UNDERGROUND UTILITIES SHALL BE LOCATED BY THE CONTRACTOR
PRIOR TO ANY EARTH MOVING ACTIVITIES, PURSUANT TO ACT 287.
UNDERGROUND UTILITY LOCATIONS MUST BE VERIFIED BY CALLING
1-800-242-1776.
5. ALL UNDERGROUND UTILITY LOCATIONS AND ELEVATIONS ON THE
CONSTRUCTION PLANS APPROXIMATE LOCATIONS DELINEATED FROM
LIMITED FIELD MARKINGS AND AVAILABLE RECORDS. THEREFORE, ANY
UTILITIES NOT SHOWN OR NOT LOCATED AS SHOWN, SHALL NOT BE THE
CAUSE OF THE CONTRACTOR TO DENY RESPONSIBILITY FOR
PROTECTION AND/OR REPAIR DURING CONSTRUCTION. CONTRACTOR
SHALL FIELD VERIFY ALL EXISTING FACILITIES AND PROVIDE ALL
PROTECTIVE MEASUREMENTS, RESTRAINTS AND APPURTENANCES AS
NECESSARY.
6. THESE DESIGN DRAWINGS MUST BE WORKED IN CONJUNCTION WITH THE
PROJECT MANUAL/SPECIFICATIONS.
7. CONTRACTOR SHALL PROVIDE ALL FITTINGS NECESSARY TO MAINTAIN
HORIZONTAL AND VERTICAL ALIGNMENT OF PIPELINES.
8. CONTRACTOR SHALL PROVIDE A MECHANICAL JOINT RESTRAINT SYSTEM
AT EACH CONNECTION TO A BEND, FITTING, VALVE, CAP, AND
CONNECTION TO EXISTING MAIN. PROVIDE RESTRAINED PUSH-ON JOINT
GASKETS AT EACH JOINT UP AND DOWN STREAM TO SECURE A
MECHANICAL JOINT ELBOW, BEND, FITTING,CAP OR VALVE ACCORDING
TO THE PROJECT MANUAL. CONCRETE THRUST BLOCKING SHALL BE
UTILIZED IN CASES WHERE MECHANICAL JOINTS RESTRAINTS ARE NOT
APPLICABLE.
9. CONTRACTOR SHALL HAVE EPOXY-FUSION COATED DUCTILE IRON OR
CAST IRON TRANSITION COUPLINGS, INCLUDING BARRELS AND GLANDS
FOR PLAIN END DUCTILE IRON PIPE BY WROUGHT, CAST IRON, AC OR PVC
AVAILABLE AT ALL TIMES DURING CONSTRUCTION.
10. CONTRACTOR SHALL USE, MAINTAIN AND PROVIDE ADEQUATE, PROPER
SHORING DEVICES ON SITE AT ALL TIMES. CONTRACTOR SHALL
CONFORM TO ALL LOCAL, STATE AND FEDERAL REGULATIONS.
11. LOCATIONS FOR WATER SERVICE LINES AND CURB STOPS ARE SUBJECT
TO CHANGE UPON VERIFICATION WITH THE OWNER.
12. CONTRACTORS SHALL BE REQUIRED TO HAVE A POWER BROOM WITH
WATER SUPPLY AT ALL TIMES. CONTRACTOR SHALL USE WATER OR
OTHER MEANS NECESSARY FOR DUST CONTROL.
13. CONTRACTOR IS RESPONSIBLE TO MAINTAIN ACCESS TO ALL
RESIDENCES THROUGHOUT CONSTRUCTION.
DESIGN PA ONE CALL
UTILITY RESPONSE ADDRESS CONTACT INFORMATION CONTACT PERSON
ANTIETAM VALLEY
MUNICIPAL AUTHORITY
502 BUTTER LN
READING, PA. 19606
EMAIL: avma@comcast.net
PHONE: 484-333-1436 MICHAEL SCHEUING
PENNSYLVANIA ELECTRIC CO 341 WHITE POND DR
AKRON, OH. 44320
EMAIL: madams@firstenergycorp.com
PHONE: 330-436-4013 MELLYSSA ADAMS
BOROUGH OF MOUNT PENN 200 NORTH 25TH STREET
READING, PA. 19606
EMAIL: dokonski@mtpennborough.com
PHONE: 610-779-5151 DAVID OKONSKI
MOUNT PENN BOROUGH
MUNICIPAL AUTHORITY
200 N 25TH ST
READING, PA. 19606
EMAIL: mhauck@mtpennwater.com
PHONE: 610-779-4900 MATT HAUCK
CITY OF READING 503 N 6TH ST
READING, PA. 19601
EMAIL: caron.washington@readingpa.gov
PHONE: 610-655-6073 CARON WASHINGTON
READING AREA WATER
AUTHORITY
1801 KUTZTOWN RD
READING, PA. 19604
EMAIL: edward.reichelt@readingareawater.com
PHONE: 484-459-6113 EDWARD REICHELT
UGI UTILITIES INC 225 MORGANTOWN RD
READING, PA. 19611
EMAIL: kzielaskowski@ugi.com
PHONE: 610-736-5571 KURT ZIELASKOWSKI
VERIZON BUISNESS
FORMERLY MCI
7000 WESTON PKWY
CARY, NC. 27513
EMAIL: victor.s.wood@verizon.com
PHONE: 919-414-2782 VICTOR WOOD
PROJECT AREA
PROJECT SITE
MOUNT PENN BOROUGH MUNICIPAL AUTHORITY
200 N. 25TH STREET
READING, PA 19606
LAUREL AVENUE
WATER MAIN REPLACEMENT
OCTOBER 08, 2025
ISSUED FOR BIDDING
UmD
GfD
GfD
GfD
UmD
UmD
W
W
FH
CS
CS
CS
CS
CS
CS
CS
CS
CS CS
7+29
0+00 0+60
1+20
1+80
2+40
3+00
3+60
4+20
4+80 5+40 6+00
6+60
7+20
W W W
W
W
W
W
W
W
W
W
W
W
W
W W W W W W W W
FH
CS
BO
CS
CS
2" CS
W
W
W
WS
CS
W S
BO
2" CS
W
W S
4+80 W W W W W
FH
W S
W S
7+29
7+20
W W W
W
W 0+00
W
W W W
FH
Bh SwD
LIMIT OF DISTURBANCE
4662.020
A
B
2 3
C
D
1 2 3
4 5 6
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
DRAWING NO.
Entech Engineering - Printed: Oct. 8, 2025 H:\0004662.020\04-CAD\SheetFiles\C-101.dwgLa st
E di te d by : A
A tti ck
C-101
SER
REF
ARA
AS NOTED
M O
UN
T
PE
NN
B O
RO
UG
H M
UN
IC
IP
AL
A
UT
HO
RI
TY
N
5T
H S
TR
EE
T, R
EA
D
IN
G
, P A.
LA
U
R
EL
A
VE
N U
E W
AT
ER
M
AI
N R
EP
LA
C
EM
EN
T
/0
8/
BI
D
D
IN
G
SE
R
LA
U R
EL
A
VE
N
U E
PL
AN
(S
TA
+0
TO
S
TA
+2
9) C
IV
IL
GENERAL SHEET NOTES
1. REFER TO DRAWING G-001 FOR DRAWING INDEX, GENERAL PROJECT
NOTES & DRAWING CONVENTIONS.
SHEET KEYNOTES
SOIL TYPES
SCALE:1 1" = 30'
LAUREL AVENUE PLAN (STA 0+00 TO STA 7+29)
00 30' 60'
1. EXISTING VALVE TO BE ABANDONED SHALL BE CLOSED. THE VALVE BOX
SHALL BE REMOVED TO A MINIMUM OF 1 FT BELOW GRADE. SURFACE
SHALL BE RESTORED IN-KIND.
2. EXACT LOCATION OF RECONNECTION OF WATER SERVICE TO BE
DETERMINED BY OWNER.
3. REMOVE EXISTING FIRE HYDRANT TO BELOW GRADE, CLOSE VALVE,
REMOVE VALVE BOX TO A MINIMUM OF 1 FT. BELOW GRADE, ABANDON IN
PLACE AND RESTORE SURFACE IN-KIND. THE FIRE HYDRANT SHALL BE
RETURNED TO MPBMA STAFF. CONTRACTOR TO COORDINATE PICKUP
AND REMOVAL FROM SITE WITH MPBMA STAFF.
4. CONTRACTOR TO VERIFY OUTSIDE DIAMETER AND MATERIAL OF EXISTING
PIPE TO CONFIRM APPROPRIATE COUPLING TO BE USED.
5. CONTRACTOR TO VERIFY SIZE OF SERVICE LINE TO BE REPLACED.
GfD GLADSTONE GRAVELLY LOAM, 8 TO 25 PERCENT SLOPES, VERY
BOULDERY.
UmD URBAN LAND DUFFIELD COMPLEX, 8 TO 25 PERCENT SLOPES.
8"x4"
MJ TEE
8" MJ
22.5° BEND
8" MJ
45° BEND
8" MJ
45° BEND
8"x4" MJ
REDUCER
4" D
I
8" DI
8" DI
8" DI
8"x6" MJ
REDUCER
8" MJ
22.5° BEND
8"x6" LOCKED
HYDRANT TEE
8" DI
8"x4" MJ REDUCER
FIRE HYDRANT
ASSEMBLY
ENLARGED PLAN
C-101
SERVICE
CONNECTION (TYP.)
C-501
ENLARGED PLAN
C-101
ENLARGED PLAN
C-101
ENLARGED PLAN
C-101
SERVICE
CONNECTION
C-501
2" BLOW OFF
ASSEMBLY
4" MJ GATE VALVE
8" DI
4" D
I
8" DI 8" DI
8" DI
8" MJ TEE
8" MJ GATE VALVE
(TYP. 3 PLCS.)
8" MJ GATE VALVE
(TYP. 2 PLCS.)
8"x6" LOCKED
HYDRANT TEE
SCALE:2 1" = 10'
ENLARGED PLAN
00 10' 20'
SCALE:3 1" = 10'
ENLARGED PLAN
00 10' 20'
SCALE:4 1" = 10'
ENLARGED PLAN
00 10' 20'
SCALE:5 1" = 10'
ENLARGED PLAN
00 10' 20'
C-501
C-501
C-501
C-501
C-501
FIRE HYDRANT
ASSEMBLY
C-501
ABANDON
WATERMAIN
ABANDON
WATERMAIN
ABANDON
WATERMAIN
C-501
C-501
C-501
TOTAL LOD: 0.11 ACRES
TOTAL LOD: 0.11 ACRES
TOTAL LOD: 0.11 ACRES
TOTAL LOD: 0.11 ACRES
TOTAL LOD: 0.11 ACRES
C-501
8" MJ GATE VALVE
(TYP. 2 PLCS.)
ABANDON
WATERMAIN
C-501
8" MJ 45° BEND
(TYP. 2 PLCS.)
6" MJ COUPLING
4" MJ COUPLING
4" MJ COUPLING
4" NPT
TAPPED PLUG
8" MJ 45° BEND
(TYP. 2 PLCS.)
5 5
4" MJ GATE VALVE
C-501
6" D
I
6" D
I
E&S LEGEND
4662.020
A
B
2 3
C
D
1 2 3
4 5 6
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
DRAWING NO.
Entech Engineering - Printed: Oct. 8, 2025 H:\0004662.020\04-CAD\SheetFiles\C-501.dwgLa st
E di te d by : A
A tti ck
C-501
SER
REF
ARA
AS NOTED
M O
UN
T
PE
NN
B O
RO
UG
H M
UN
IC
IP
AL
A
UT
HO
RI
TY
N
5T
H S
TR
EE
T, R
EA
D
IN
G
, P A.
LA
U
R
EL
A
VE
N U
E W
AT
ER
M
AI
N R
EP
LA
C
EM
EN
T
/0
8/
BI
D
D
IN
G
SE
R C
O N
ST
R
U C
TI
O
N D
ET
AI
LS
C
IV
IL
GENERAL SHEET NOTES
1. REFER TO DRAWING G-001 FOR DRAWING INDEX, GENERAL PROJECT
NOTES & DRAWING CONVENTIONS.
SCALE:1 NONE
CROSSING UNDER EXISTING UTILITY
TYPICAL PROPOSED WATER MAIN
SCALE:2 NONE
CROSSING OVER EXISTING UTILITY
TYPICAL PROPOSED WATER MAIN
10'-0"
" M
IN
EQUAL
DISTANCE
EQUAL
DISTANCE
4' -0
" M
IN
NEW WATER MAIN
MECHANICAL JOINTS
REQUIRED (TYP.)
WHEN VERTICAL SEPARATION IS
LESS THAN 18", PROVIDE CONCRETE
ENCASEMENT ON UNDISTURBED
GROUND. THE LENGTH OF THE
ENCASEMENT SHALL EXTEND
A MINIMUM OF 3 FEET BEYOND
THE CENTERLINE OF THE WATER
MAIN IN BOTH DIRECTIONS
4' -0
" M
IN
" M
IN
EQUAL
DISTANCE
EQUAL
DISTANCE
10'-0"
NEW WATER MAIN
WHEN VERTICAL SEPARATION IS
LESS THAN 18", PROVIDE CONCRETE
ENCASEMENT ON UNDISTURBED
GROUND. THE LENGTH OF THE
ENCASEMENT SHALL EXTEND
A MINIMUM OF 3 FEET BEYOND
THE CENTERLINE OF THE WATER
MAIN IN BOTH DIRECTIONS
MECHANICAL JOINTS
REQUIRED (TYP.)
WATER MAIN TO BE
CAPPED OR ABANDONED
DIP OR
PVC C900
MEGA-LUG RESTRAINT
MJ CAP
TRANSITION COUPLING,
WHEN NECESSARY
NOTES:
1. TRANSITION END CAP MAY BE USED IN LIEU OF A TRANSITION COUPLING.
2. FILL MAIN WITH PRESSURIZED GROUT AND CAP FOR ALL WATER MAINS TO
BE ABANDONED THAT ARE 8" OR GREATER LOCATED WITHIN STATE ROAD
RIGHT-OF-WAY.
3. WHEN CUT AND CAP IS NOTED AT A VALVE, MJ PLUG SHALL BE CONNECTED
TO CLOSED GATE VALVE.
4. REFER TO THRUST BLOCKING DETAIL FOR CUT AND CAP.
SCALE:3 NONE
ABANDONMENT / CUT AND CAP DETAIL
TYPICAL WATERMAIN
4' -0
M
IN
EXISTING GRADE
END VIEW
COARSE
EARTH
UNDISTURBED
AGGEGATE
PENNDOT 2A
VALVE BOX
(2) PC.
ROADWAY TYPE
COVER MARKED "WATER"
6" PIPE BED M.J. GATE VALVE
EXISTING GRADE
SIDE VIEW
NOTE: RETAINER GLANDS REQUIRED ON ALL MECHANICAL JOINT FITTINGS.
M.J. RESTRAINT GLAND
W/ MEGALUGS.
(TYP 2 PLACES)
SCALE:6 GATE VALVE & VALVE BOX INSTALLATION
NONE
CONTINUOUS AWG #10
SOLID CORE INSULATED
COPPER TRACER WIRE
CONTINUOUS AWG #10
SOLID CORE INSULATED
COPPER TRACER WIRE
SCALE:5 NONE
2" BLOW-OFF ASSEMBLY DETAIL
NOTES:
1. SET BLOW-OFF IN A SUFFICIENT SUPPLY OF CRUSHED STONE OR GRAVEL
TO INSURE DRAINAGE FROM THE DRAIN HOLE IN THE BLOW-OFF BOTTOM.
2. SUPPLY LINES MUST BE FLUSHED FREE OF ROCK,GRAVEL AND OTHER
DEBRIS BEFORE CONNECTING THE BLOW-OFF.
3. CLEAR DRAIN HOLE OF ANY DEBRIS.
4' -0
M
IN
6"
TF500 TRUFLOW BLOWOFF
BY KUPFERLE
2" GALV. COUPLER
NO. 8
COARSE
AGGREGATE2" BRASS OR STAINLESS
STEEL PIPE THREADED
AT BOTH ENDS (3FT. MIN.)
DRAIN
1'-3"
1'-6"
CONC. BLOCK
4' -0
" M
IN
WATER MAIN
(TYP 2 PLACES)
M.J. RESTRAINT GLAND
W/THRUST RESTRAINT WEDGE
ELEVATION
6" PIPE BED
COVER MARKED WATER
ROADWAY SURFACE
COARSE AGGREGATE
TYPE VALVE BOX
2 PIECE ROADWAY
PENNDOT 2A
3/4" DIA. THREADED ROD
WITH DUCTILE IRON LUGS
FIRE HYDRANT
1'-6"
MIN.
PLAN
6" M.J. GATE VALVE
WEDGE (TYP)
W/THRUST RESTRAINT
M.J. RESTRAINT GLAND
HYDRANT TEE
LOCKED
COARSE AGGREGATE
AASHTO NO. 1
PIPE
1'
-2
VA
R
IA
BL
E
1'-3"
1' -3
1'
-3
SCALE:4 NEW HYDRANT INSTALLATION DETAIL
NONE
MATCH EXISTING
WATER MAIN BEDDING
SCALE:7 NONE
3/4" TO 2" SERVICE CONNECTION
4' -0
" M
IN
4' -0
" M
IN
VARIABLE
"WATER" CAST ON LID. REFER TO NOTE #3
TOP OF CURB STOP FLUSH WITH GRADE.
TOP OF CURB STOP 2" BELOW GRADE
2 PIECE CURB BOX (TYP)
RIGHT-OF-WAY LINE
TYPE K COPPER
TUBING (ANNEALED) BALL VALVE
CURB STOP
BALL VALVE
CORPORATION
STOP
D.I.
WATER
MAIN
CONCRETE OR
MASONRY BLOCK
MORTAR SAND TYPE C
ENCASEMENT MIN.
4" UNDER / 4" OVER.
REFER TO NOTE #4
EXIST CURB STOP(S) & BOX(S)
TO BE REMOVED AND DISPOSED
REFER TO NOTE #5
NOTES:
1. SERVICE SHALL BE LAID LOOSELY HORIZONTALLY TO PREVENT DAMAGE UPON SETTLING OF TRENCH.
2. ALL PROPOSED SERVICE PIPING FROM CURB STOP TO EXISTING SERVICE PLUMBING CONNECTION SHALL HAVE A
MINIMUM OF 4'-0" OF COVER
3. WHEN TWO OR MORE ADJACENT SERVICE BOXES ARE LOCATED IN CLOSE PROXIMITY TO EACH OTHER, SERVICE BOXES
SHALL BE SEPARATED AND/OR STAGGERED TO MAINTAIN 6" OF MINIMUM SEPARATION FROM OUTSIDE EDGES OF SERVICE
BOX LIDS.
4. SERVICE TO BE BEDDED IN 4" OF TYPE C MORTAR SAND IN ACCORDANCE WITH PADOT PUB. 408-703.1.C 4 TABLE A ALL
AROUND SERVICE.
5. CONTRACTOR SHALL PROVIDE 1/2" X 3/4" REDUCER FITTING AT THE CURB STOP WHEN EXISTING SERVICE LINE DIAMETER
IS 1/2".
6. IN THE EVENT THAT THE EXISTING PLUMBING AT THE CONNECTION POINT HAS LESS THAN 4'-0" OF COVER, DEFLECT NEW SERVICE PER MANUFACTURER'S RECOMMENDATIONS AT CONNECTION POINT TO MAKE TIE IN. NEW SERVICE PIPING SHALL ONLY BE DEFLECTED AT THE CONNECTION POINT TO MAKE TIE IN. NEW SERVICE PIPING SHALL ONLY BE DEFLECTED AT THE CONNECTION POINT IN ORDER TO MAINTAIN MIN. 4'-0" COVER ON NEW SERVICE LINE FROM
CONNECTION POINT TO CURB STOP.
7. ALL VALVE BOXES, ETC. SHALL BE PLACED IN A MANNER AS NOT TO CREATE A TRIP HAZARD.
PENNDOT 2A
BACKFILL
B
2 3
C
D
1 2 3
4 5 6
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
DRAWING NO.
Entech Engineering - Printed: Oct. 8, 2025 H:\0004662.020\04-CAD\SheetFiles\C-502.dwgLa st
E di te d by : A
A tti ck
C-502
SER
REF
ARA
AS NOTED
M O
UN
T
PE
NN
B O
RO
UG
H M
UN
IC
IP
AL
A
UT
HO
RI
TY
N
5T
H S
TR
EE
T, R
EA
D
IN
G
, P A.
LA
U
R
EL
A
VE
N U
E W
AT
ER
M
AI
N R
EP
LA
C
EM
EN
T
/0
8/
BI
D
D
IN
G
SE
R C
O N
ST
R
U C
TI
O
N D
ET
AI
LS
C
IV
IL
GENERAL SHEET NOTES
1. REFER TO DRAWING G-001 FOR DRAWING INDEX, GENERAL PROJECT
NOTES & DRAWING CONVENTIONS.
NOTES:
1. ALL CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF
3000 PSI AT THE END OF 28 DAYS.
2. ALL REINFORCING STEEL SHALL BE GRADE 60 DEFORMED BARS.
3. INSTALL CONCRETE THRUST BLOCKS AT EACH ELBOW, TEE AND CAPPED
OR VALVED END FITTINGS LOCATED IN THE HORIZONTAL PLANE.
4. PAINT ALL EXPOSED STEEL WITH TWO COATS OF ASPHALT PAINT.
5. NO COUPLING OR JOINTS SHALL BE COVERED WITH CONCRETE.
6. ALL-THREADS WITH PIPE STRAPS MAY BE USED IN PLACE OF
REINFORCING BARS.
7. ALL THRUST BLOCKS SHOWN ARE INTENDED AS A GUIDE AND SHALL
WITHSTAND THE REQUIRED PRESSURE.
8. RETAINER GLANDS REQUIRED ON ALL MECHANICAL JOINT FITTINGS.
9. CERTAIN SITUATIONS MAY WARRANT THE USE OF TIE RODS,
AUTHORIZED BY THE OWNER ONLY.
10. PIPING SHALL BE WRAPPED WITH POLYETHYLENE PRIOR TO PLACEMENT
OF CONCRETE.
11. FOR SOIL BEARING VALVES LESS THAN 1 TON / SQ. FT., CONSULT WITH
AUTHORITY ENGINEER FOR RECOMMENDATION.
VERTICAL THRUST BLOCKING DETAILS
SECTION C-CVERTICAL THRUST UPWARD
VERTICAL THRUST BLOCKING UPWARD
THRUSTS SCHEDULE OF DIMENSIONS
150 PSI WORKING PRESSURE
HORIZONTAL THRUST BLOCKING
SCHEDULE OF DIMENSIONS
MINIMUM SQUARE FEET OF BEARING SURFACE REQUIRED FOR HORIZONTAL THRUST
BLOCKING AND VERTICAL THRUSTS DOWNWARD
A C-502
D
EP
TH
WIDTH
VE
R
TI
C
AL
EM
BE
D M
EN
T
DEPTHLENGTH
6" 6"
VERTICAL
EM
BEDM
ENT
EACH U-SHAPED BAR
SHALL BE CONSIDERED
AS ONE BAR FOR
COMPUTING CROSS
SECTIONAL AREAS
RETAINER
GLANDS
U-SHAPED
REINFORCING
BARS AROUND
PIPE
3"
HORIZONTAL THRUST BLOCKING DETAILS
SECTION B-BPLAN VIEW
PIPE BED
#6 REINFORCING
BARS @ 9" O.C. EW
DUCTILE IRON
BEND
DUCTILE IRON BEND
PIPE BED
BE
AR
IN
G
S U
R
FA
C E
BEARING SURFACE
GRADE
GRADE
GRADE
DUCTILE IRON
TEE
DUCTILE IRON PIPE
PIPE BED
EARTH
(2) #6 REINFORCEMENT BARS
BE
AR
IN
G
S U
R
FA
C E
ALTERNATE SECTION A-ASECTION A-APLAN VIEW
BEARING
SURFACE
EARTH (TYP.)
A C-502
B C-502
BEARING
SURFACE
6"
(TYP.)
4"
DUCTILE IRON
TEE
DUCTILE IRON PIPE
(2) #6 REINFORCING
BARS
(2) #6 REINFORCING
BARS
LENGTH OF PIPE REQUIRED (LF) - PVC
TYPE OF FITTING
PIPE
SIZE
HOR
11-1/4°
VERT
11-1/4°
HOR
22-1/2°
VERT
22-1/2°
HOR
45°
VERT
45° 90° TEE CAP REDUCER OPEN
VALVE
8-INCH 20 20 20 20 20 25 20 20 55 25 25
6-INCH 20 20 20 20 20 20 20 20 45 - 25
RESTRAINED PUSH-ON JOINT GASKET REQUIREMENT FOR MECHANICAL JOINT RESTRAINT SYSTEM
NOTE:
1. WHEN UTILIZING MECHANICAL JOINT RESTRAINT SYSTEM, PROVIDE RESTRAINED PUSH-ON JOINT GASKETS AT EACH JOINT UP AND DOWNSTREAM TO SECURE A MECHANICAL JOINT ELBOW, BEND, FITTING, CAP, OR VALVE. THE LENGTH OF PIPE UP AND DOWNSTREAM OF EACH MECHANICAL JOINT
RESTRAINT SYSTEM SHALL BE DETERMINED BY THE TABLE.
2. PROVIDE RESTRAINED PUSH-ON JOINT GASKETS SUCH THAT THE RESTRAINED LENGTH IN EACH DIAMETER IS GREATER THAN OR EQUAL TO THE LENGTH OF PIPE REQUIREMENTS SHOWN BELOW.
3. TABLE IS BASED UPON 150 PSI TEST PRESSURE. CONTRACTOR SHALL VERIFY REQUIREMENTS WITH
OWNER/ENGINEER IF REQUIRED TEST PRESSURE IS ABOVE 150 PSI.
LENGTH OF PIPE REQUIRED (LF) - DUCTILE IRON
TYPE OF FITTING
PIPE
SIZE
HOR
11-1/4°
VERT
11-1/4°
HOR
22-1/2°
VERT
22-1/2°
HOR
45°
VERT
45° 90° TEE CAP REDUCER OPEN
VALVE
8-INCH 20 20 20 20 20 20 20 20 40 20 25
6-INCH 20 20 20 20 20 20 20 20 30 - 25
B
2 3
C
D
1 2 3
4 5 6
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
DRAWING NO.
Entech Engineering - Printed: Oct. 8, 2025 H:\0004662.020\04-CAD\SheetFiles\C-701.dwgLa st
E di te d by : A
A tti ck
C-701
SER
REF
ARA
AS NOTED
M O
UN
T
PE
NN
B O
RO
UG
H M
UN
IC
IP
AL
A
UT
HO
RI
TY
N
5T
H S
TR
EE
T, R
EA
D
IN
G
, P A.
LA
U
R
EL
A
VE
N U
E W
AT
ER
M
AI
N R
EP
LA
C
EM
EN
T
/0
8/
BI
D
D
IN
G
SE
R R
ES
TO
R
AT
IO
N
D
ET
AI
LS
C
IV
IL
GENERAL SHEET NOTES
1. REFER TO DRAWING G-001 FOR DRAWING INDEX, GENERAL PROJECT
NOTES & DRAWING CONVENTIONS.
REFER TO TRENCH
RESTORATION DETAILS
6" TOPSOIL AND SEED
ALL DISTURBED AREAS
REFER TO TRENCH
RESTORATION DETAILS
SAW-CUT FULL DEPTH
EXIST. PAVEMENT
(INITIAL SAW-CUT) (TYP.)
2" SUPERPAVE ASPHALT DESIGN,
9.5MM, PG 64-22, SRL E, WEARING COURSE
NOTES:
1. EXISTING PAVEMENT MARKINGS SHALL BE REPLACED IF DISTURBED.
SCALE:1 NONE
FOR PAVED ROADWAY
SURFACE RESTORATION DETAIL
SCALE:2 NONE
FOR GRASS AREAS
SURFACE RESTORATION DETAIL
SCALE:3 NONE
TRENCH RESTORATION DETAIL
TYPICAL AGGREGATE BACKFILL
6" B
ED
D
IN
G
IN
E
AR
TH
8"
IN
R O
C K
H
AU
N C
H
IN
G 12" MIN.12" MIN.
REFER TO SURFACE
RESTORATION DETAILS
4' -0
" D
EP
TH
F
R O
M F
IN
IS
H
ED
G R
AD
E
6"
NO. 8 COARSE AGGREGATE
HAND TAMPED IN 4" LAYERS
PIPE
NO. 3 COARSE AGGREGATE
SUB-BEDDING (IF REQUIRED)
UNDISTURBED
SUBGRADE
PAY LINE FOR ADDITIONAL
COARSE AGGREGATE AND
MISCELLANEOUS EXCAVATION
IN UNSTABLE MATERIAL
1' -0
PA NO. 2A BACKFILL HAND
TAMPED IN 4" LAYERS, MACHINE
TAMPED IN 8" LAYERS, TO 100%
PROCTOR DENSITY IN STATE ROAD
AND 95% IN ALL OTHER AREAS
NOTES:
1. ALL STONE GRADATIONS ARE AASHTO CLASSIFICATION.
2. PENNDOT CERTIFIED MATERIALS ARE REQUIRED WITHIN RIGHT-OF-WAY.
3. WARNING TAPE WILL BE USED FOR ALL DUCTILE IRON SECTIONS OF NEW WATER MAIN.
4. TRACER WIRE SHALL BE USED FOR ALL C900 PVC SECTIONS OF NEW WATER MAIN.
VARIES
TRACER WIRE
OR WARNING
TAPE
4,000 PSI CONCRETE
L CROWNC
4"
4'-0"
SCALE:4 NONE
CURB AND SIDEWALK REPLACEMENT DETAIL
6" x 6" x W2.9 x W2.9
WELDED WIRE FABRIC
4" MIN. PENNDOT 2A
COARSE AGGREGATE
MATCH EXIST.
FINISHED GRADE
MATCH EXIST.
FINISHED GRADE
PG 64-22 SEAL
ROADWAY
8" x 18" MIN. CURB.
REFER TO RC-64M
PENNDOT CLASS A
CEMENT CONCRETE
SLOPE 1/4"
PER FOOT
NOTES:
1. SAW-CUT EXISTING CONCRETE SIDEWALK AT EXISTING SCORED JOINTS. PROVIDE 1/2"
PREFORMED EXPANSION JOINTS AT EITHER END.
2. SAW-CUT EXISTING CURB AND PROVIDE 1/2" PREFORMED EXPANSION JOINTS AT EITHER
END.
3. THE DIMENSIONS INDICATED ON THE CURB ARE "TYPICAL". THE ACTUAL CONFIGURATION
SHALL MATCH THE EXISTING CURB.
8"
B
2 3
C
D
1 2 3
4 5 6
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
DRAWING NO.
Entech Engineering - Printed: Oct. 8, 2025 H:\0004662.020\04-CAD\SheetFiles\ES-501.dwgLa st
E di te d by : A
A tti ck
ES-501
SER
REF
ARA
AS NOTED
M O
UN
T
PE
NN
B O
RO
UG
H M
UN
IC
IP
AL
A
UT
HO
RI
TY
N
5T
H S
TR
EE
T, R
EA
D
IN
G
, P A.
LA
U
R
EL
A
VE
N U
E W
AT
ER
M
AI
N R
EP
LA
C
EM
EN
T
/0
8/
BI
D
D
IN
G
SE
R C
O N
TR
O
L N
O
TE
S
ER
O
SI
O N
A N
D S
ED
IM
EN
TA
TI
O
N
GENERAL SHEET NOTES
1. REFER TO DRAWING G-001 FOR DRAWING INDEX, GENERAL PROJECT
NOTES & DRAWING CONVENTIONS.
STANDARD NOTES
1. ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND FILLS
SHALL BE DONE IN ACCORDANCE WITH THE APPROVED E&S PLAN. A COPY OF THE APPROVED
DRAWINGS (STAMPED, SIGNED AND DATED BY THE REVIEWING AGENCY) MUST BE AVAILABLE AT THE PROJECT SITE AT ALL TIMES. THE REVIEWING AGENCY SHALL BE NOTIFIED OF ANY CHANGES
TO THE APPROVED PLAN PRIOR TO IMPLEMENTATION OF THOSE CHANGES. THE REVIEWING
AGENCY MAY REQUIRE A WRITTEN SUBMITTAL OF THOSE CHANGES FOR REVIEW AND APPROVAL AT
ITS DISCRETION.
2. AT LEAST 7 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING CLEARING
AND GRUBBING, THE OWNER AND/OR OPERATOR SHALL INVITE ALL CONTRACTORS, THE
LANDOWNER, APPROPRIATE MUNICIPAL OFFICIALS, THE E&S PLAN PREPARER, THE PCSM PLAN
PREPARER, THE LICENSED PROFESSIONAL RESPONSIBLE FOR OVERSIGHT OF CRITICAL STAGES OF IMPLEMENTATION OF THE PCSM PLAN, AND A REPRESENTATIVE FROM THE LOCAL CONSERVATION
DISTRICT TO AN ON-SITE PRECONSTRUCTION MEETING.
3. AT LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING INTO AN AREA PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM INC. SHALL BE NOTIFIED
AT 1-800-242-1776 FOR THE LOCATION OF EXISTING UNDERGROUND UTILITIES.
4. ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE
PROVIDED ON THE PLAN DRAWINGS. DEVIATION FROM THAT SEQUENCE MUST BE APPROVED IN
WRITING FROM THE LOCAL CONSERVATION DISTRICT OR BY THE DEPARTMENT PRIOR TO
IMPLEMENTATION.
5. AREAS TO BE FILLED ARE TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO REMOVE
TREES, VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL.
6. CLEARING, GRUBBING, AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS DESCRIBED IN
EACH STAGE OF THE CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, GRUBBING AND
TOPSOIL STRIPPING MAY NOT COMMENCE IN ANY STAGE OR PHASE OF THE PROJECT UNTIL THE E&S BMPS SPECIFIED BY THE BMP SEQUENCE FOR THAT STAGE OR PHASE HAVE BEEN INSTALLED
AND ARE FUNCTIONING AS DESCRIBED IN THIS E&S PLAN.
7. AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE LIMIT OF DISTURBANCE BOUNDARIES SHOWN ON THE PLAN MAPS. THESE AREAS MUST BE CLEARLY MARKED
AND FENCED OFF BEFORE CLEARING AND GRUBBING OPERATIONS BEGIN.
8. TOPSOIL REQUIRED FOR THE ESTABLISHMENT OF VEGETATION SHALL BE STOCKPILED AT THE LOCATION(S) SHOWN ON THE PLAN MAPS(S) IN THE AMOUNT NECESSARY TO COMPLETE THE FINISH GRADING OF ALL EXPOSED AREAS THAT ARE TO BE STABILIZED BY VEGETATION. EACH STOCKPILE
SHALL BE PROTECTED IN THE MANNER SHOWN ON THE PLAN DRAWINGS. STOCKPILE HEIGHTS
SHALL NOT EXCEED 35 FEET. STOCKPILE SLOPES SHALL BE 2H: 1V OR FLATTER.
9. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR
ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT
APPROPRIATE BEST MANAGEMENT PRACTICES TO MINIMIZE THE POTENTIAL FOR EROSION AND
SEDIMENT POLLUTION AND NOTIFY THE LOCAL CONSERVATION DISTRICT AND/OR THE REGIONAL
OFFICE OF THE DEPARTMENT.
10. ALL BUILDING MATERIALS AND WASTES SHALL BE REMOVED FROM THE SITE AND RECYCLED OR
DISPOSED OF IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT
REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1, AND 287.1 ET. SEQ. NO BUILDING MATERIALS OR WASTES OR UNUSED BUILDING MATERIALS SHALL BE BURNED, BURIED, DUMPED, OR DISCHARGED
AT THE SITE.
11. ALL OFF-SITE WASTE AND BORROW AREAS MUST HAVE AN E&S PLAN APPROVED BY THE LOCAL CONSERVATION DISTRICT OR THE DEPARTMENT FULLY IMPLEMENTED PRIOR TO BEING ACTIVATED.
12. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS
CLEAN FILL.
CLEAN FILL IS DEFINED AS: UNCONTAMINATED, NON-WATER SOLUBLE, NON-DECOMPOSABLE,
INERT, SOLID MATERIAL. THE TERM INCLUDES SOIL, ROCK, STONE, DREDGED MATERIAL, USED ASPHALT, AND BRICK, BLOCK OR CONCRETE FROM CONSTRUCTION AND DEMOLITION ACTIVITIES
THAT IS SEPARATE FROM OTHER WASTE AND IS RECOGNIZABLE AS SUCH. THE TERM DOES NOT
INCLUDE MATERIALS PLACED IN OR ON THE WATERS OF THE COMMONWEALTH UNLESS OTHERWISE AUTHORIZED. (THE TERM "USED ASPHALT" DOES NOT INCLUDE MILLED ASPHALT OR ASPHALT THAT
HAS BEEN PROCESSED FOR RE-USE).
CLEAN FILL AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE: FILL MATERIALS AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE STILL QUALIFIES AS CLEAN FILL
PROVIDED THE TESTING REVEALS THAT THE FILL MATERIAL CONTAINS CONCENTRATIONS OF
REGULATED SUBSTANCES THAT ARE BELOW THE RESIDENTIAL LIMITS IN TABLES FP-1A AND FP-1B
FOUND IN THE DEPARTMENT'S POLICY "MANAGEMENT OF FILL".
ANY PERSON PLACING CLEAN FILL THAT HAS BEEN AFFECTED BY A SPILL OR RELEASE OF A
REGULATED SUBSTANCE MUST USE FORM FP-001 TO CERTIFY THE ORIGIN OF THE FILL MATERIAL AND THE RESULTS OF THE ANALYTICAL TESTING TO QUALIFY THE MATERIAL AS CLEAN FILL. FORM
FP-001 MUST BE RETAINED BY THE OWNER OF THE PROPERTY RECEIVING THE FILL.
ENVIRONMENTAL DUE DILIGENCE: THE APPLICANT MUST PERFORM ENVIRONMENTAL DUE
DILIGENCE TO DETERMINE IF THE FILL MATERIALS ASSOCIATED WITH THE PROJECT QUALIFY AS
CLEAN FILL. ENVIRONMENTAL DUE DILIGENCE IS DEFINED AS: INVESTIGATIVE TECHNIQUES,
INCLUDING, BUT NOT LIMITED TO, VISUAL PROPERTY INSPECTIONS, ELECTRONIC DATA BASE
SEARCHES, REVIEW OF PROPERTY OWNERSHIP, REVIEW OF PROPERTY USE HISTORY, SANBORN
MAPS, ENVIRONMENTAL QUESTIONNAIRES, TRANSACTION SCREENS, ANALYTICAL TESTING,
ENVIRONMENTAL ASSESSMENTS OR AUDITS. ANALYTICAL TESTING IS NOT A REQUIRED PART OF
DUE DILIGENCE UNLESS VISUAL INSPECTION AND/OR REVIEW OF THE PAST LAND USE OF THE
PROPERTY INDICATES THAT THE FILL MAY HAVE BEEN SUBJECTED TO A SPILL OR RELEASE OF REGULATED SUBSTANCE. IF THE FILL MAY HAVE BEEN AFFECTED BY A SPILL OR RELEASE OF A REGULATED SUBSTANCE, IT MUST BE TESTED TO DETERMINE IF IT QUALIFIES AS CLEAN FILL.
TESTING SHOULD BE PERFORMED IN ACCORDANCE WITH APPENDIX A OF THE DEPARTMENT'S
POLICY "MANAGEMENT OF FILL".
FILL MATERIAL THAT DOES NOT QUALIFY AS CLEAN FILL IS REGULATED FILL. REGULATED FILL IS
WASTE AND MUST BE MANAGED IN ACCORDANCE WITH THE DEPARTMENT'S MUNICIPAL OR
RESIDUAL WASTE REGULATIONS BASED ON 25 PA. CODE CHAPTERS 287 RESIDUAL WASTE
MANAGEMENT OR 271 MUNICIPAL WASTE MANAGEMENT, WHICHEVER IS APPLICABLE. THESE
REGULATIONS ARE AVAILABLE ON-LINE AT WWW.PACODE.COM
13. ALL PUMPING OF WATER FROM ANY WORK AREA SHALL BE DIRECTED INTO A PUMPED WATER
FILTER BAG AND DISCHARGED TO AN UNDISTURBED VEGETATED AREA.
14. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS SHALL BE MAINTAINED
PROPERLY. MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT BMPS
AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL
MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, RE-GRADING, RESEEDING, RE-MULCHING AND RE-NETTING MUST BE PERFORMED IMMEDIATELY. IF THE E&S BMPS FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMPS, OR MODIFICATIONS OF THOSE INSTALLED WILL BE
REQUIRED.
15. A LOG SHOWING DATES THAT E&S BMPS WERE INSPECTED AS WELL AS ANY DEFICIENCIES FOUND
AND THE DATE THEY WERE CORRECTED SHALL BE MAINTAINED ON THE SITE AND BE MADE
AVAILABLE TO REGULATORY AGENCY OFFICIALS AT THE TIME OF INSPECTION.
16. SEDIMENT TRACKED ONTO ANY PUBLIC ROADWAY OR SIDEWALK SHALL BE RETURNED TO THE CONSTRUCTION SITE BY THE END OF EACH WORK DAY AND DISPOSED IN THE MANNER DESCRIBED IN THIS PLAN. IN NO CASE SHALL THE SEDIMENT BE WASHED, SHOVELED, OR SWEPT INTO ANY
ROADSIDE DITCH, STORM SEWER, OR SURFACE WATER.
17. ALL SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF IN THE MANNER DESCRIBED ON THE
PLAN DRAWINGS.
18. AREAS WHICH ARE TO BE TOP SOILED SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 3 TO 5 INCHES
- 6 TO 12 INCHES ON COMPACTED SOILS -- PRIOR TO PLACEMENT OF TOPSOIL. AREAS TO BE
VEGETATED SHALL HAVE A MINIMUM 4 INCHES OF TOPSOIL IN PLACE PRIOR TO SEEDING AND
MULCHING. FILL SLOPES SHALL HAVE A MINIMUM OF 2 INCHES OF TOPSOIL.
19. ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE OR OTHER RELATED PROBLEMS. FILL INTENDED TO SUPPORT BUILDINGS, STRUCTURES AND CONDUITS, ETC. SHALL BE COMPACTED IN ACCORDANCE WITH LOCAL
REQUIREMENTS OR CODES.
20. ALL EARTHEN FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 9 INCHES IN
THICKNESS.
21. FILL MATERIALS SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER FOREIGN
OR OBJECTIONABLE MATERIALS THAT WOULD INTERFERE WITH OR PREVENT CONSTRUCTION OF
SATISFACTORY FILLS.
22. FROZEN MATERIALS OR SOFT, MUCKY, OR HIGHLY COMPRESSIBLE MATERIALS SHALL NOT BE
INCORPORATED INTO FILLS.
23. FILL SHALL NOT BE PLACED ON SATURATED OR FROZEN SURFACES.
24. SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE HANDLED IN ACCORDANCE WITH THE STANDARD AND SPECIFICATION FOR SUBSURFACE DRAIN OR OTHER APPROVED METHOD.
25. ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY UPON REACHING FINISHED
GRADE. CUT SLOPES IN COMPETENT BEDROCK AND ROCK FILLS NEED NOT BE VEGETATED.
SEEDED AREAS WITHIN 50 FEET OF A SURFACE WATER, OR AS OTHERWISE SHOWN ON THE PLAN
DRAWINGS, SHALL BE BLANKETED ACCORDING TO THE STANDARDS OF THIS PLAN.
26. IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF THE PROJECT, THE OPERATOR SHALL STABILIZE ALL DISTURBED AREAS. DURING NON-GERMINATING MONTHS, MULCH OR PROTECTIVE BLANKETING SHALL BE APPLIED AS DESCRIBED IN THE PLAN.
AREAS NOT AT FINISHED GRADE, WHICH WILL BE REACTIVATED WITHIN 1 YEAR, MAY BE STABILIZED
IN ACCORDANCE WITH THE TEMPORARY STABILIZATION SPECIFICATIONS. THOSE AREAS WHICH
WILL NOT BE REACTIVATED WITHIN 1 YEAR SHALL BE STABILIZED IN ACCORDANCE WITH THE
PERMANENT STABILIZATION SPECIFICATIONS.
27. PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM, PERENNIAL 70% VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED EROSION. CUT AND FILL SLOPES SHALL BE CAPABLE OF RESISTING FAILURE DUE TO
SLUMPING, SLIDING, OR OTHER MOVEMENTS.
28. E&S BMPS SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL AREAS TRIBUTARY TO THEM ARE
PERMANENTLY STABILIZED OR UNTIL THEY ARE REPLACED BY ANOTHER BMP APPROVED BY THE
LOCAL CONSERVATION DISTRICT OR THE DEPARTMENT.
29. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF
ALL DISTURBED AREAS, THE OWNER AND/OR OPERATOR SHALL CONTACT THE LOCAL
CONSERVATION DISTRICT FOR AN INSPECTION PRIOR TO REMOVAL/CONVERSION OF THE E&S BMPS.
30. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENT BMPS
MUST BE REMOVED OR CONVERTED TO PERMANENT POST CONSTRUCTION STORMWATER
MANAGEMENT BMPS. AREAS DISTURBED DURING REMOVAL OR CONVERSION OF THE BMPS SHALL
BE STABILIZED IMMEDIATELY. IN ORDER TO ENSURE RAPID RE-VEGETATION OF DISTURBED AREAS, SUCH REMOVAL/CONVERSIONS ARE TO BE DONE ONLY DURING THE GERMINATING SEASON.
31. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF
ALL DISTURBED AREAS, THE OWNER AND/OR OPERATOR SHALL CONTACT THE LOCAL
CONSERVATION DISTRICT TO SCHEDULE A FINAL INSPECTION.
32. FAILURE TO CORRECTLY INSTALL E&S BMPS, FAILURE TO PREVENT SEDIMENT-LADEN RUNOFF FROM LEAVING THE CONSTRUCTION SITE, OR FAILURE TO TAKE IMMEDIATE CORRECTIVE ACTION TO RESOLVE FAILURE OF E&S BMPS MAY RESULT IN ADMINISTRATIVE, CIVIL, AND/OR CRIMINAL
PENALTIES BEING INSTITUTED BY THE DEPARTMENT AS DEFINED IN SECTION 602 OF THE
PENNSYLVANIA CLEAN STREAMS LAW. THE CLEAN STREAMS LAW PROVIDES FOR UP TO $10,000
PER DAY IN CIVIL PENALTIES, UP TO $10,000 IN SUMMARY CRIMINAL PENALTIES, AND UP TO $25,000
IN MISDEMEANOR CRIMINAL PENALTIES FOR EACH VIOLATION.
33. UPON TEMPORARY CESSATION OF AN EARTH DISTURBANCE OR ANY STAGE OR PHASE OF AN
ACTIVITY WHERE A CESSATION OF EARTH DISTURBANCE ACTIVITIES EXCEED 4 DAYS, THE SITE
SHALL BE IMMEDIATELY SEEDED, MULCHED OR OTHERWISE PROTECTED FROM ACCELERATED
EROSION AND SEDIMENTATION PENDING FUTURE EARTH DISTURBANCE ACTIVITIES.
34. EROSION CONTROL BLANKETING SHALL BE INSTALLED ON ALL SLOPES 3H:1V OR STEEPER WITHIN 50 FEET OF A SURFACE WATER AND ON ALL OTHER DISTURBED AREAS SPECIFIED ON THE PLAN
MAPS AND/OR DETAIL SHEETS.
CONSTRUCTION SEQUENCE
1. PRIOR TO CONSTRUCTION THE PROPOSED LIMIT OF DISTURBANCE (LOD) SHALL BE DELINEATED
AND STAKED IN THE FIELD. LOCATE ALL ACCESS POINTS, ACCESS ROADS AND LAYDOWN AREAS THAT WILL BE NECESSARY FOR PROPER EXECUTION OF THE WORK, PRIOR TO THE START OF ANY
WORK. MARK OFF THE LIMITS OF ANY WORK AREA WITHIN ANY PUBLIC STREETS.
RESPONSIBILITY FOR STAGING/LAYDOWN FOR THE PROJECT FALLS ON THE CONTRACTOR.
CONTRACTOR SHALL FINALIZE A LOCATION THAT HAS AN APPROVED E&S PLAN AND/OR IS
LOCATED ON AN AREA THAT IS ENTIRELY EXISTING IMPERVIOUS.
2. THERE ARE NO PROPOSED ROCK CONSTRUCTION ENTRANCES. ACCESS TO THE WORK AREAS WILL BE OBTAINED FROM THE EXISTING PAVED SURFACE OF LAUREL AVE. SUMMIT AVE, AND CAMERON STREET. EITHER DAILY VACUUM SWEEPING OF ROADWAY OR DIRECT LOADING OF EQUIPMENT WILL
BE EMPLOYED TO PREVENT TRACKING OF MUD AND SEDIMENT ONTO THE ROADWAY.
3. THE CONTRACTOR WILL INSPECT WEEKLY AND AFTER EACH RAIN EVENT, THE PROJECT'S EROSION
AND SEDIMENTATION CONTROLS DURING THE ENTIRE ACTIVE CONSTRUCTION STAGES. THE
CONTRACTOR WILL BE RESPONSIBLE FOR THE INSTALLATION, OPERATION, MAINTENANCE, AND
REMOVAL OF ALL EROSION AND SEDIMENTATION CONTROLS THROUGHOUT THE ENTIRE
CONSTRUCTION PROJECT.
THE CONTRACTOR MUST IMMEDIATELY REPAIR ANY DAMAGED EROSION CONTROLS (BMPS).
SEDIMENT REMOVED FROM THE BMPS SHALL BE DISPOSED OF IN LANDSCAPED AREAS OUTSIDE OF STEEP SLOPES, WETLANDS, FLOODPLAINS, OR DRAINAGE SWALES AND IMMEDIATELY STABILIZED
OR PLACED IN TOPSOIL STOCKPILES.
4. CLEAR AND GRUB PROJECT AREA AS NECESSARY.
5. THE CONTRACTOR SHALL THEN PERFORM THE NECESSARY EXCAVATION, BACKFILL, AND
COMPACTION FOR THE WATER MAIN INSTALLATION. REMOVE EXISTING SECTIONS AND
STRUCTURES ALONG THE PROPOSED ALIGNMENT AS CONSTRUCTION OF THE NEW WATER MAIN
PROGRESSES. TRENCHING WORK WILL BE LIMITED TO THE AMOUNT THAT CAN BE EXCAVATED,
BACKFILL INSTALLED AND STABILIZED WITHIN ONE WORKING DAY. TRENCHING SHALL CONFORM TO
THE FOLLOWING BMP PROCEDURE:
· WHEN CALLED FOR, BACKFILL WITH “SELECT BACKFILL”, IN WHICH CASE SOIL WILL BE STORED
UNTIL PIPE INSTALLATION IS COMPLETE. THIS EXCAVATED MATERIAL WILL BE LAID UP
GRADIENT OF THE OPEN TRENCH DIRECTING DRAINAGE BACK INTO THE TRENCH, THUS
PREVENTING SEDIMENT FROM MIGRATING TO NEARBY DRAINAGE CHANNELS.
· IF EXCAVATIONS NEED TO BE DEWATERED, THE WATER IN THE EXCAVATIONS SHALL BE
PUMPED AND DISCHARGED INTO A PUMPED WATER FILTER BAG. DISCHARGE POINTS SHOULD
BE ESTABLISHED TO PROVIDE FOR MAXIMUM DISTANCE TO ACTIVE WATERWAYS.
· CONSTRUCTION WASTE WILL BE HAULED OFF-SITE IMMEDIATELY AND PROPERLY DISPOSED
OF FOLLOWING RECYCLING AND DISPOSAL METHOD GUIDANCE.
· BACKFILL THE OPEN TRENCH WITH SPECIFIED MATERIAL AND AS PER PLAN. DITCH LINES MAY
BE CROWNED TO PREVENT FUTURE SETTLEMENT AND RE-DISTURBANCE TO REPAIR SETTLED
AREAS.
· UTILITY LINES WITH JOINTS THAT ALLOW THE MANUFACTURED LENGTH OF PIPE TO BE
PLACED IN THE TRENCH WITH THE PIPE ASSEMBLED/MADE IN THE TRENCH REQUIRE AN OPEN
TRENCH THAT IS ONLY SLIGHTLY LONGER THAN THE LENGTH OF THE PIPE BEING INSTALLED.
FOR THESE TYPES OF UTILITY LINES, THE TOTAL LENGTH OF EXCAVATED TRENCH OPEN AT
ANY ONE TIME SHOULD NOT BE GREATER THAN THE TOTAL LENGTH OF UTILITY LINE THAT
CAN BE PLACED IN THE TRENCH AND BACKFILLED IN ONE WORKING DAY. NO MORE THAN 50
LINEAR FEET OF OPEN TRENCH SHOULD EXIST WHEN UTILITY LINE INSTALLATION CEASES AT
THE END OF THE WORKDAY.
7. ONCE THE WATER MAIN IS INSTALLED, THE LIMITS OF DISTURBANCE CAN BE RETURNED TO
FINISHED GRADE.
8. IF CONSTRUCTION IS TERMINATED OR SUSPENDED PRIOR TO CONSTRUCTION COMPLETION, ALL EXPOSED SOIL AREAS SHALL BE SEEDED WITH TEMPORARY SEEDING AND MULCHED IMMEDIATELY.
SEED FOLLOWING TEMPORARY SEEDING GUIDELINES ON ES-501.
9. STABILIZATION FOR THIS PROJECT SHALL CONSIST OF REVEGETATION OF DISTURBED AREAS.
FINAL STABILIZATION OF VEGETATED AREAS WILL OCCUR WHEN A MINIMUM UNIFORM 70%
PERENNIAL VEGETATIVE COVER, WITH A DENSITY CAPABLE OF RESISTING ACCELERATED EROSION AND SEDIMENTATION. PAVED AREAS SHALL BE CONSIDERED PERMANENTLY STABILIZED WITH THE APPLICATION OF THE BASE COURSE LAYER. RESTORE IMPERVIOUS AREAS TO PRE-CONSTRUCTION
CONDITIONS PER THE RESTORATION DETAILS ON C-701.
10. AFTER FINAL STABILIZATION HAS BEEN ACHIEVED, TEMPORARY E&S BMPS SHALL BE REMOVED.
AREAS DISTURBED DURING REMOVAL OF TEMPORARY E&S BMPS ARE TO BE IMMEDIATELY
STABILIZED.
NOTE:A COPY OF THE EROSION AND SEDIMENT CONTROL PLAN MUST BE AVAILABLE AT THE PROJECT
SITE DURING CONSTRUCTION UNTIL THE SITE IS STABILIZED.
GROUND COVER
AFTER THE EARTH DISTURBANCE ACTIVITY IS COMPLETED, THE DISTURBED AREA MUST BE
REVEGETATED. THE VEGETATIVE COVER MUST BE A UNIFORM 70% PERENNIAL VEGETATIVE COVER, WITH A DENSITY CAPABLE OF RESISTING ACCELERATED EROSION AND SEDIMENTATION. ANOTHER OPTION IS TO USE AN ACCEPTABLE BMP, WHICH PERMANENTLY MINIMIZES ACCELERATED EROSION AND
SEDIMENTATION.
TEMPORARY SEEDING
TEMPORARY SEEDING WILL BE PERFORMED DURING THE GERMINATION SEASON (APRIL TO
OCTOBER) FOR THE ESTABLISHMENT OF GRASS SEED ON DISTURBED AREAS BEFORE THE START OF
THE DORMANT SEASON. DURING THE NON-GERMINATION SEASON, MULCH SHALL BE APPLIED TO
THE DISTURBED SURFACES AND THE SEED MIXTURE WILL BE ADDED AT THE START OF THE
GERMINATION PERIOD.
· ALL GRASS AREAS DISTURBED BY THE WORK OF THIS PROJECT SHALL BE SEEDED AS
FOLLOWS:
O APPLY AGRICULTURAL LIME AND FERTILIZER AS FOLLOWS FOR TEMPORARY SEEDING:
¨ AGRICULTURAL LIME - 40 POUNDS PER 1,000 SQUARE FEET
¨ FERTILIZER - 12.5 POUNDS PER 1,000 SQUARE FEET
O FERTILIZER SHALL BE A COMMERCIAL TYPE 10-10-10.
O TEMPORARY SEED MIXTURE ANNUAL RYEGRASS -- 1 POUND PER 1,000 SQUARE FEET.
· ALL TEMPORARY SEEDING SHALL BE MULCHED. TEMPORARY SEEDING SHALL BE WATERED
AS REQUIRED TO DEVELOP COVER. NON-POTABLE UTILITY WATER SHALL BE PROVIDED BY
THE CONTRACTOR.
· MULCH SHALL BE STRAW, SHALL BE CLEAN AND FREE FROM NOXIOUS WEEDS, AND SHALL BE
APPLIED AT THE RATE OF 140 POUNDS PER 1,000 SQUARE FEET (3.0 TONS PER ACRE).
O APPLICATION OF MULCH SHALL BE USED IN CONJUNCTION WITH CRIMPING, A TACKIFIER
OR A SIMILAR METHOD IN ORDER TO PREVENT MULCH FROM BEING WINDBLOWN.
PERMANENT SEEDING
PERMANENT SEEDING SHALL TAKE PLACE IN ALL DISTURBED AREAS AS FOLLOWS:
· UPON COMPLETION OF EARTH DISTURBANCE ACTIVITIES, THE SITE SHALL BE IMMEDIATELY
STABILIZED.
· THE FOLLOWING SHALL BE SPREAD AND WORKED INTO THE TOPSOIL TO A DEPTH OF 2 TO 4
INCHES.
O AGRICULTURAL LIME - 240 POUNDS PER 1,000 SQUARE FEET
O FERTILIZER - 25 POUNDS PER 1,000 SQUARE FEET
·· THE FERTILIZER SHALL BE A COMMERCIAL TYPE 10-20-20.
·· NOTE - IF AGRICULTURAL LIME AND FERTILIZER HAVE BEEN APPLIED PREVIOUSLY
TO THE GROUND WHERE THE PERMANENT SEED IS TO BE APPLIED, THE LIME AND
FERTILIZER RATES SHALL BE REDUCED BY THE AMOUNT BY WHAT HAS BEEN
APPLIED PREVIOUSLY.
· PERMANENT SEED MIXTURE: THE FOLLOWING SEED MIXTURES SHALL BE APPLIED AS
FOLLOWS:
O APPLY MULCH TO ALL PERMANENTLY SEEDED AREAS.
O MATERIALS: STRAW, AIR-DRIED AND FREE FROM UNDESIRABLE SEEDS AND COURSE
MATERIALS. APPLICATION: 140 POUNDS PER 1,000 SQUARE FEET.
·· APPLICATION OF MULCH SHALL BE USED IN CONJUNCTION WITH CRIMPING, A
TACKIFIER OR A SIMILAR METHOD IN ORDER TO PREVENT MULCH FROM BEING
WINDBLOWN.
·· EROSION CONTROL BLANKETS SHALL BE USED ON SLOPES 3:1 (H:V) OR GREATER.
MAINTENANCE PROGRAM
EMERGENCY EROSION PROTECTION
IF EROSION DOES OCCUR, THE CONTRACTOR SHALL REPAIR AND RESEED THOSE AREAS OR USE OTHER STABILIZATION METHODS AS REQUIRED. THE CONTRACTOR SHALL USE JUTE, WOOD FIBER, OR OTHER TIE DOWN FILTER NETTING ON TOP OF THE NEW SEED AS REQUIRED, REGARDLESS OF THE SLOPE OF
THE LAND.
MULCHED AREAS SHALL BE CHECKED WEEKLY AND AFTER EACH RAIN EVENT FOR DAMAGE, UNTIL THE MULCHING IS NO LONGER NECESSARY FOR PROTECTION AGAINST EROSION. DAMAGED PORTIONS OF
THE MULCH OR TIE DOWN MATERIALS SHALL BE REPAIRED AS SOON AS DISCOVERED.
PERIODIC INSPECTION PROGRAM
THE CONTRACTOR WILL INSPECT THE PROJECT'S EROSION AND SEDIMENTATION CONTROLS WEEKLY AND AFTER EACH RAIN EVENT UNTIL THE SITE HAS ACHIEVED FINAL STABILIZATION. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE INSTALLATION, OPERATION, MAINTENANCE, AND REMOVAL OF ALL EROSION AND SEDIMENTATION CONTROLS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT REPAIR, REPLACEMENT, REGRADING, RESEEDING, REMULCHING, AND
RENETTING MUST BE PERFORMED IMMEDIATELY. SEDIMENT THAT HAS BEEN TRAPPED BY THE
COMPOST SOCK WILL BE REMOVED AS REQUIRED, AND IN ALL CASES, BEFORE THE ACCUMULATION HAS REACHED HALF THE HEIGHT OF THE SOCK. COMPOST SOCK WILL BE RE-ANCHORED, REPAIRED, OR REPLACED AS NECESSARY. SEDIMENT MUST BE REMOVED FROM SILT SACKS AFTER EACH RUNOFF EVENT, OR WHEN THE DISTANCE BETWEEN THE GRATE AND THE SEDIMENT LEVEL IN THE SILT SACK IS
REDUCED TO 18". SILT SACKS WILL BE REPAIRED, OR REPLACED AS NECESSARY. ALL OTHER
CONTROLS WILL BE INSPECTED ON THE SAME SCHEDULE. IF EROSION AND SEDIMENT CONTROL BMPS FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMPS, OR MODIFICATION OF THOSE INSTALLED WILL BE
REQUIRED.
MAINTENANCE OPERATIONS
AS PART OF THE LONG TERM OPERATION AND MAINTENANCE, ROUTINE MAINTENANCE INSPECTIONS WILL BE REQUIRED TO INSURE THE EFFICIENCY OF ALL THE SEDIMENT CONTROL DEVICES. AT A MINIMUM, ALL BMP'S SHALL BE INSPECTED ON A WEEKLY BASIS AND AFTER EACH MEASURABLE RUNOFF EVENT, INCLUDING THE REPAIR OF THE BMP'S TO ENSURE EFFECTIVE AND EFFICIENT OPERATION. THIS INSPECTION SHALL BE FOLLOWED UP WITH A REPAIR SCHEDULE OF ALL NOTED DEFICIENCIES.
VEGETATION PROGRESS SHALL ALSO BE INCLUDED IN THIS INSPECTION. VOID AREAS SHALL PROMPTLY
BE RESEEDED AND MULCHED TO ESTABLISH PROTECTION.
BMP'S THAT FAIL AFTER INSTALLATION MUST BE REPAIRED TO FUNCTION PROPERLY OR BE REPLACED BY ALTERNATIVE BMP'S THAT WILL SERVE THE INTENDED PURPOSE. IF UNFORESEEN CONDITIONS OCCUR ON A SITE, AND THE INSTALLED BMP'S ARE OBVIOUSLY NOT EFFECTIVE, THEN ALTERNATE BMP'S
MUST BE DESIGNED AND INSTALLED. THE NEED FOR REDESIGN WILL BE DETERMINED ON A
CASE-BY-CASE BASIS.
ANY CHANGES OR ADDITIONS MADE TO THIS PLAN WILL BE DONE SO IN WRITING WITH A SIGNATURE FROM A PERMITTEE OR CO-PERMITTEE REPRESENTATIVE. THESE CHANGES OR ADDITIONS MUST BE APPROVED AND INITIALED BY A PA DEP OR CONSERVATION DISTRICT REPRESENTATIVE AND KEPT
ON-SITE WITH THIS NPDES PERMIT.
REMOVAL OF CONTROLS AND CONTINUING MAINTENANCE
ALL REQUIRED TEMPORARY EROSION AND SEDIMENTATION CONTROLS SHALL REMAIN IN PLACE AND BE MAINTAINED UNTIL THE AREA THEY PROTECT HAS BEEN STABILIZED. AREAS DISTURBED DURING
REMOVAL OF THE CONTROLS MUST BE STABILIZED IMMEDIATELY.
STABILIZATION FOR THIS PROJECT SHALL CONSIST OF REVEGETATION OF DISTURBED AREAS. FINAL
STABILIZATION OF VEGETATED AREAS WILL OCCUR WHEN A MINIMUM UNIFORM 70% PERENNIAL
VEGETATIVE COVER, WITH A DENSITY CAPABLE OF RESISTING ACCELERATED EROSION AND
SEDIMENTATION. PAVED AREAS SHALL BE CONSIDERED PERMANENTLY STABILIZED WITH THE
APPLICATION OF THE BASE COURSE LAYER.
REVEGETATION SHALL OCCUR AS SOON AS PRACTICAL AFTER COMPLETION OF THE FINAL GRADING.
SHOULD CONDITIONS PROHIBIT PERMANENT REVEGETATION EFFORTS, THE AREA WILL BE
TEMPORARILY STABILIZED THROUGH THE USE OF QUICK-GROWING GRASSES, NYLON EROSION
CONTROL MATS OR SIMILAR MEASURES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE
PERMANENT STABILIZATION OF ALL AREAS EXPOSED OR DISTURBED DURING THE PROJECT.
THE CONTRACTOR SHALL MAINTAIN ALL TEMPORARY EROSION AND SEDIMENTATION CONTROL
FACILITIES IN GOOD CONDITION UNTIL ESTABLISHMENT OF GROUND COVER OVER TRIBUTARY AREAS.
THIS WILL INCLUDE CLEANING AND, IF REQUIRED, REPAIR OF ANY SEDIMENT CONTROL BMPS, AND
SEEDING OF ERODED AREAS, AS NECESSARY.
PERMANENT EROSION AND SEDIMENTATION CONTROL MEASURES WILL BECOME THE RESPONSIBILITY
OF THE FACILITY OWNER UPON COMPLETION OF ALL ASPECTS OF THE PROJECT.
UNTIL THE SITE ACHIEVES FINAL STABILIZATION, THE PERMITTEE AND CO-PERMITTEE SHALL ASSURE THAT THE BEST MANAGEMENT PRACTICES ARE IMPLEMENTED, OPERATED, AND MAINTAINED PROPERLY AND COMPLETELY. MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL BEST MANAGEMENT PRACTICE FACILITIES ON A WEEKLY BASIS AND AFTER EACH MEASURABLE RAINFALL EVENT, AND MAINTAIN AND MAKE AVAILABLE TO THE REVIEWING AGENCY COMPLETE, WRITTEN INSPECTION LOGS OF ALL THOSE INSPECTIONS. ALL MAINTENANCE WORK, INCLUDING CLEANING, REPAIR, REPLACEMENT, REGARDING, RESEEDING, AND RE-STABILIZATION SHALL BE PERFORMED IMMEDIATELY.
RECYCLING AND DISPOSAL METHODS
CONSTRUCTION MATERIALS AND OTHER CONSTRUCTION SITE WASTES MUST BE PROPERLY MANAGED AND DISPOSED OF TO REDUCE POTENTIAL FOR POLLUTION TO SURFACE AND GROUND WATERS AS PER 25 PA. CODE § 102.4(B)(5)(XI). PROPER TRASH DISPOSAL, RECYCLING OF MATERIALS, PROPER MATERIALS HANDLING, AND SPILL PREVENTION AND CLEAN-UP REDUCE THE POTENTIAL FOR CONSTRUCTION SITE
WASTES TO BE MOBILIZED BY STORMWATER RUNOFF AND CONVEYED TO SURFACE WATERS.
· COLLECTED SEDIMENT WILL BE PLACED ON FILL SLOPES AND GRADED, SEEDED AND
MULCHED AS NEEDED TO ATTAIN STABILIZATION.
· THE CONTRACTOR SHALL REMOVE FROM THE SITES, RECYCLE OR DISPOSE OF ALL
MATERIALS AND WASTES IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE
MANAGEMENT REGULATIONS AT 25 PA CODE 260.1 ET SEQ., 271.1 E. SEQ. AND 287.1 ET SEQ.
O ANTICIPATED CONSTRUCTION WASTES FOR THIS PROJECT MAY INCLUDE EXISTING
WATER MAIN PIPING AND GENERAL CONSTRUCTION DEBRIS.
B
2 3
C
D
1 2 3
4 5 6
PROJECT NO.
APPROVED BY:
SCALE:
CHECKED BY:
PREPARED BY:
A
B
D
AT
E R
EV
4 5
IS
SU
ED
F
O R
/R
EV
IS
ED
C
AP
PD
D
DRAWING NO.
Entech Engineering - Printed: Oct. 8, 2025 H:\0004662.020\04-CAD\SheetFiles\ES-502.dwgLa st
E di te d by : A
A tti ck
ES-502
SER
REF
ARA
AS NOTED
M O
UN
T
PE
NN
B O
RO
UG
H M
UN
IC
IP
AL
A
UT
HO
RI
TY
N
5T
H S
TR
EE
T, R
EA
D
IN
G
, P A.
LA
U
R
EL
A
VE
N U
E W
AT
ER
M
AI
N R
EP
LA
C
EM
EN
T
/0
8/
BI
D
D
IN
G
SE
R C
O N
TR
O
L D
ET
AI
LS
ER
O
SI
O N
A N
D S
ED
IM
EN
TA
TI
O
N
GENERAL SHEET NOTES
1. REFER TO DRAWING G-001 FOR DRAWING INDEX, GENERAL PROJECT
NOTES & DRAWING CONVENTIONS.
SCALE:1 NONE
PUMPED WATER FILTER BAG
STANDARD CONSTRUCTION DETAIL #3-16
LOW VOLUME FILTER BAGS SHALL BE MADE FROM NON-WOVEN GEOTEXTILE MATERIAL
SEWN WITH HIGH STRENGTH, DOUBLE STICHED "J" TYPE SEAMS. THEY SHALL BE
CAPABLE OF TRAPPING PARTICLES LARGER THAN 151 MICRONS. HIGH VOLUME FILTER
BAGS SHALL BE MADE FROM WOVEN GEOTEXTILES THAT MEET THE FOLLOWING
STANDARDS:
PROPERTY TEST METHOD MINIMUM STANDARD
AVG. WIDE WIDTH STRENGTH ASTM D-4884 60 lb/in
GRAB TENSILE ASTM D-4632 205 lb
PUNCTURE ASTM D-4833 110 lb
MULLEN BURST ASTM D-3786 350 psi
UV RESISTENCE ASTM D-4355 70%
AOS % RETAINED ASTM D-4751 80 SieveNOTES:
1. A SUITABLE MEANS OF ACCESSING THE BAG WITH MACHINERY REQUIRED FOR DISPOSAL PURPOSES SHALL BE PROVIDED. FILTER BAGS SHALL BE REPLACED WHEN THEY BECOME 1/2 FULL OF SEDIMENT. SPARE BAGS SHALL BE KEPT AVAILABLE FOR REPLACEMENT OF THOSE THAT HAVE FAILED OR ARE FILLED. BAGS SHALL BE PLACED ON STRAPS TO
FACILITATE REMOVAL UNLESS BAGS COME WITH LIFTING STRAPS ALREADY ATTACHED.
2. BAGS SHALL BE LOCATED IN WELL-VEGETATED (GRASSY) AREA, AND DISCHARGE ONTO STABLE, EROSION RESISTANT AREAS. WHERE THIS IS NOT POSSIBLE, A GEOTEXTILE UNDERLAYMENT AND FLOW PATH SHALL BE PROVIDED. BAGS MAY BE PLACED ON FILTER STONE TO INCREASE DISCHARGE CAPACITY. BAGS SHALL NOT BE PLACED ON SLOPES GREATER THAN 5%. FOR SLOPES EXCEEDING 5%, CLEAN ROCK OR OTHER NON-ERODIBLE AND NON-POLLUTING MATERIAL MAY BE
PLACED UNDER THE BAG TO REDUCE SLOPE STEEPNESS.
3. NO DOWNSLOPE SEDIMENT BARRIER IS REQUIRED FOR MOST INSTALLATIONS. COMPOST BERM OR COMPOST FILTER SOCK SHALL BE INSTALLED BELOW BAGS LOCATED IN HQ OR EV WATERSHEDS, WITHIN 50 FT. OF ANY RECEIVING
SURFACE WATER OR WHERE GRASSY AREA IS NOT AVAILABLE.
4. THE PUMP DISCHARGE HOSE SHALL BE INSERTED INTO BAGS IN THE MANNER SPECIFIED BY THE MANUFACTURER AND
SECURELY CLAMPED. A PIECE OF PVC PIPE IS RECOMMENDED FOR THIS PURPOSE.
5. THE PUMPING RATE SHALL BE NO GREATER THAN 750 GPM OR 1/2 THE MAXIMUM SPECIFIED BY THE MANUFACTURER, WHICHEVER IS LESS. PUMP INTAKES SHALL BE FLOATING AND SCREENED.
6. FILTER BAGS SHALL BE INSPECTED DAILY. IF ANY PROBLEM IS DETECTED, PUMPING SHALL CEASE IMMEDIATELY AND
NOT RESUME UNTIL THE PROBLEM IS CORRECTED.
WELL VEGETATED, GRASSY AREA
PUMP
INTAKE HOSE
CLAMPS
DISCHARGE HOSE
HEAVY DUTY LIFTING STRAPS
(RECOMMENDED)
INTAKE HOSE
CLAMPS
DISCHARGE HOSE
PUMP
WELL VEGETATED, GRASSY AREA
ELEVATION VIEW
PLAN VIEW
COMPOST FILTER
SOCK RING REQUIRED
FOR THIS INSTALLATION
NOTE:
FOR SPECIAL PROTECTION WATERSHED, COMPOST BERM OR COMPOST FILTER SOCK SHALL
BE INSTALLED BELOW BAGS LOCATED IN HQ OR EV WATERSHEDS, WITHIN 50 FT. OF ANY
RECEIVING SURFACE WATER OR WHERE GRASSY AREA IS NOT AVAILABLE.
FILTER BAG
FILTER BAG
NOTES:
1. COMPOST FILTER SOCK SHALL BE PLACED AT EXISTING LEVEL GRADE. BOTH ENDS OF
THE SOCK SHALL BE EXTENDED AT LEAST 8 FEET UPSLOPE AT 45 DEGREES TO THE
MAIN SOCK ALIGNMENT. MAXIMUM SLOPE LENGTH ABOVE ANY 12" AND 18" DIAMETER
SOCK SHALL NOT EXCEED THE SLOPE LENGTH THAT IS ALLOWED FOR 18" AND 30"
REINFORCED SILT FENCE. MAXIMUM SLOPE LENGTH FOR 24" DIAMETER SOCK SHALL
NOT EXCEED THAT FOR SUPER SILT FENCE.
2. TRAFFIC SHALL NOT BE PERMITTED TO CROSS FILTER SOCKS..
3. ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN IT REACHES HALF THE ABOVE
GROUND HEIGHT OF THE SOCKS AND DISPOSED IN THE MANNER DESCRIBED
ELSEWHERE IN THE PLAN.
4. SOCKS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT. DAMAGED
SOCKS SHALL BE REPAIRED ACCORDING TO MANUFACTURER'S SPECIFICATIONS OR
REPLACED WITHIN 24 HOURS OF INSPECTION.
5. BIODEGRADABLE FILTER SOCK SHALL BE REPLACED AFTER 6 MONTHS;
PHOTODEGRADABLE SOCKS AFTER ONE YEAR. POLYPROPYLENE SOCKS SHALL BE
REPLACED ACCORDING TO MANUFACTURER'S RECOMMENDATIONS.
6. UPON STABILIZATION OF THE AREA TRIBUTARY TO THE SOCK, STAKES SHALL BE
REMOVED. THE SOCK MAY BE LEFT IN PLACE AND VEGETATED OR REMOVED. IN THE
LATTER CASE, THE MESH SHALL BE CUT OPEN AND THE MULCH SPREAD AS A SOIL
SUPPLEMENT.
' M
IN
SCALE:2 NONE
COMPOST FILTER SOCK
STANDARD CONSTRUCTION DETAIL #4-1
FL
O
W FLO
W
DISTURBED
AREA
UNDISTURBED AREA
2" x 2" WOODEN STAKES
PLACED 10' O.C.
2" x 2" WOODEN STAKES PLACED 10' O.C.
COMPOST FILTER SOCK
UNDISTURBED AREA
BLOWN PLACED FILTER MEDIA
DISTURBED AREA
PLAN VIEW
SECTION VIEW
| Sheets and Views |
| G-001-24x36 |
| C-101-24x36 |
| C-501-24x36 |
| C-502-24x36 |
| C-701-24x36 |
| ES-501-24x36 |
| ES-502-24x36 |
File details come from the government source that posted it. Updated .