2. Specifications.pdf
PDF 616 KB Posted
- Attached to
- Summer 2027 Roofing at Various Sites
- Solicitation number
- 147098
- Issued by
- Los Angeles County, California
About this file
Summary of Specifications for Burbank Unified School District Summer 2027 Roofing Projects
This specification document outlines roofing installation requirements for Burbank Unified School District's summer 2027 projects at three sites: Horace Mann CC, McKinley ES, and Stevenson ES. The district will supply modified bituminous roofing materials through the California Multiple Award Schedules (CMAS) program, with the contractor responsible for providing all additional materials, labor, equipment, and miscellaneous supplies needed for installation. The project includes two primary roofing systems: a cold-applied 2-ply thermoplastic hybrid roof system (KEE-Stone HP) manufactured by The Garland Company for modified bituminous membrane roofing, and asphalt shingles (GAF Timberline or equivalent) for steep-slope applications. Specific material quantities are provided for each site, including Flexbase E 80 base sheets and KEE-Stone HP cap sheets for the hybrid system. The scope encompasses roof replacement (buildings highlighted in blue), roof recovery (buildings highlighted in yellow), and shingle replacement (buildings highlighted in purple), with work including deck repair, flashing installation, mechanical unit modifications, drain replacement and testing, and metal work fabrication. Contractors must be certified Pre-Approved Garland Contractors with a minimum of five years documented experience, and must maintain a full-time supervisor on-site during all roofing work phases. The manufacturer's representative must perform site inspections at startup, at intervals of three days per working week, and upon completion, with final warranty issuance contingent upon manufacturer acceptance.
The contractor assumes full responsibility for district-supplied materials upon delivery and must replace any lost or stolen materials at the contractor's expense. The district includes a baseline 7 percent deck replacement allowance in the base bid, with additional replacements addressed through change orders at specified unit prices or credits if actual replacement is less than projected. All roofing systems must comply with Energy Star and Cool Roof Rating Council requirements, achieve UL Class A fire classification, and be installed in accordance with NRCA standards and applicable building codes. The contractor must provide a 5-year labor and material warranty, and the manufacturer provides a 40-year no-dollar-limit warranty for the KEE-Stone HP system and a standard limited warranty for shingles. Pre-installation meetings must be conducted a minimum of two weeks prior to work commencement, with mandatory attendance by the roofing installer and manufacturer's representative. All submittals, including product data, installation instructions, design pressure calculations, and manufacturer certifications, must be provided, with alternate systems requiring shop drawings and calculations signed and sealed by a professional engineer licensed in California.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
07550 -1
SECTION 07550
MODIFIED BITUMINOUS MEMBRANE ROOFING
BURBANK UNIFIED SCHOOL DISTRICT
SUMMER 2027 ROOFING PROJECTS
HORACE MANN CC, MCKINLEY ES, STEVENSON ES
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Cold Applied 2-Ply Thermoplastic Hybrid Roof System (KEE-Stone HP).
B. Accessories.
C. Edge Treatment and Roof Penetration Flashings.
1.2 SCOPE OF WORK
A. Provide all labor, equipment, and miscellaneous materials to install District purchased and furnished roofing materials over the properly prepared substrate.
B. DISTRICT SUPPLIED MATERIAL
Note that this project includes the installation of owner-supplied material; the District has acquired roofing material through the CMAS (California Multiple Award Schedules) program.
C. All products listed in 2.1, D will be furnished by the District. All products not listed in 2.1, D are to be furnished by the Contractor. All products listed in 2.1, D will be manufactured by The Garland Company and purchased by Glendale Unified School District. Any material or accessories required for the installation of the roof system in excess of the district provided material must be supplied by the Contractor. It is up to the Contractor to determine the precise amount of material required for the completion of this project; and to provide excess material, as required.
D. Contractor to comply with Roof Site Maps to determine scopes of work for each building.
Contractor responsible for determining deck type and substrate slope prior to submitting bid.
Color-coded site map for reference only.
E. Contractor to provide fenced staging area with sand bags and no fabric screens.
F. Contractor to maintain clean jobsite with daily cleaning of nails and screws.
G. Contractor to inspect all conduit and condensate lines at start of job. Contractor to immediately report any damaged, disconnected, or missing lines to The District. Contractor to verify all condensate lines are in working order and must repair any broken or disconnected lines prior to finishing job.
H. Contractor to maintain dedicated seam checker to inspect all newly welded seams. Seam checker to maintain daily log of activity.
I. Contractor to install surface protection to prevent overspray of all sealants and adhesives.
J. Contractor is responsible for protecting and cleaning all interior space throughout duration of project.
07550 -2
K. All drain bowls are to be replaced with new cast iron drain bowls and cast iron drain covers.
Drains must be lead flashed. Drains must be tested after installation to ensure no leaks.
Drains shall be sumped to the deck with a minimum 4' x 4' tapered sump directed to the primary drain. The contractor may extend sump dimensions as necessary to ensure positive drainage and eliminate ponding.
L. Contractor to raise all mechanical units and increase curb height to 8” minimum above installed roof system on all units marked on job walk, as deemed necessary by Garland.
Pricing to be included in base bid.
M. Roof Replacement Scope of Work (Buildings highlighted in blue)
1. Prior to any work, the contractor is to test the drains. Contractor to ensure the drains, downspouts, and leader heads are not clogged and are not leaking. Downspouts and leader heads are to be un-clogged by contractor prior to installing roofing. Leaks due to internal plumbing issues are to be documented with photos and the District and Garland
Representative are to be notified immediately, in writing.
2. Remove the existing roof system to the structural deck. District to mark any non-functioning equipment. All marked equipment to be removed during demolition.
3. Repair any damaged decking as required. Contractor to include 7% deck replacement in the base bid. If the amount of deck replacement exceeds 7%, the contractor is to receive a change order equal to the unit price for deck replacement per sq ft multiplied by the sq ft in excess of the amount included in the base bid amount. If the amount of deck replacement is less than 7%, the contractor is to provide a credit.
4. Contractor is responsible for ensuring positive drain flow including added slope as needed. All added sloping, included crickets and/or tapered insulation is to be included in base bid. Slope inspection by Garland representative is required prior to base sheet installation.
5. Mechanically fasten, or adhere with Insul-Lock HR, ½” DensDeck Prime coverboard per approved wind-uplift pattern. Attachment method to be approved by Garland.
6. Mechanically attach 1/4" or 1/2" DensDeck Prime to all vertical substrates to provide a solid backing for the flashing plies.
N. Roof Recover Scope of Work (Buildings highlighted in yellow)
1. Prior to any work, the contractor is to test the drains. Contractor to ensure the drains, downspouts, and leader heads are not clogged and are not leaking. Downspouts and leader heads are to be un-clogged by contractor prior to installing roofing. Leaks due to internal plumbing issues are to be documented with photos and the District and Garland
Representative are to be notified immediately, in writing.
2. Prep the roof for recover:
a. Remove all non-functioning equipment and any marked curbs no longer in use.
Deck these areas in.
b. Remove and replace all areas of wet insulation in like-kind, as noted on project documents. Tie-in to existing roof. Additional areas of wet insulation replacement to be priced per square foot.
c. Clean roofs of all dust, dirt, and debris. Remove all loose, flaking, or deteriorated coatings. Remove all silicone coatings and sealants.
d. Remove all blisters, wrinkles and mole runs in roof membrane. Patch in like-kind materials to tie-in to existing roof.
e. Install crickets on high side of all equipment as needed to eliminate ponding.
Wood / Metal Decks: Mechanically fasten new ½” DensDeck Prime coverboard per approved wind uplift pattern.
07550 -3
a. Metal or wood deck canopies/walkways with no soffit are to be adhered with
Insul-Lock HR Adhesive with no fasteners exposed on underside.
Concrete Deck: Adhere new ½” DensDeck Prime coverboard with Insul-Lock HR per approved wind uplift adhesive spacing.
3. Portables highlighted in yellow: Leave metal roofing in place and fill with rigid insulation between standing seams. Proceed with mechanically-fastened Dens-Deck Prime and roof system installation.
O. Roof Installation Scope of Work
1. Install one ply Flexbase E 80 set in GreenLock membrane adhesive applied at a minimum 2.5 gal/100sf
a. If the slope exceeds 3:12, contractor to install Greenlock Flashing Adhesive at a rate of 3 gal per sq.
2. Install one ply KEE-Stone HP set in KEE-Lock Spatter Spray foam adhesive applied per product wind uplift criteria and datasheets.
3. Flashings:
a. Base Flashing Ply: Flexbase E 80.
b. Base Flashing Adhesive: Greenlock Plus Flashing Adhesive applied at 3 gal per sq.
c. Cap Sheet Flashing Ply: KEE Stone HP NF Flashing
d. Cap Sheet Flashing Ply Adhesive: KEE Lock Flashing Adhesive applied at a rate of 3 gal per sq.
e. Flashing Plies: All flashing plies to be terminated with termination bar set in butyl tape. Fasten termination bar every 2” o.c. Caulk above the termination bar and flashing plies.
f. Edge Metal: Replace all. Comply with manufacturer detail. All edge metal shall be replaced with KEE Clad Metal fabricated from Garland KEE Clad Metal
Flat Stock. No gravel stop or high-rise at edge, unless approved by Garland. All new drip edge to overlap existing stucco/fascia minimum 2”.
g. Counterflashing: All flashing plies to be terminated as high as possible under the existing counterflashing metal with termination bar set in butyl tape. Caulk above the termination bar and flashing plies. Fasten termination bar every 2” o.c. Install 22 gauge, galvanized skirt metal flashing to existing counterflashing metal.
h. Parapet Walls: Install wood nailer as needed to create 8” minimum height.
Wrap the flashing plies up and over the wood nailer, extending down the exterior wall 2”. Cap sheet flashing ply to be on walls in excess of 2.5 feet, Flexbase E 80 set in Greenlock Flashing adhesive only to extend up the wall
2.5 feet and terminate with a termination bar. KEE Stone HP NF Flashing ply to extend up the entire wall set in KEE Lock Flashing Adhesive.
i. Penetrations: Install new Garland KEE Boots. Clamp and caulk and install an umbrella cover, clamped and caulked. No pitch pockets permitted. All “L” metal to receive a wood block prior to the pipe boot install. Wood block to be sealed, pipe boot installed, clamped, caulked, and umbrella clamped and caulked.
j. Expansion Joint: Install all new expansion joints and replace all metal covers.
k. Scuppers: Install new metal lining per manufacturer details. Seal exterior leader heads and scuppers.
07550 -4
4. Duct Work & Metal Pans: All seams / fasteners / joints and base plates are to be sealed.
If top surface of ducting holds water, install sloped Dens-Deck Prime and wrap with
Garland Duct Wrap. All ducting is to be wrapped with Garland Duct Wrap.
5. Sheet Metal: All sheet metal to be ANSI SPRI ES-1 compliant. All metal to be manufactured by The Garland Company.
a. Coping: Replace all existing coping caps, as well as install coping cap metal at all parapet walls. Install wood nailer as required. Install 22 gauge, kynar coping – fabricated from RMER SS Flat Stock. Coping to be fastened with metal cleats per approved wind-uplift calculations. No exposed fasteners. District to determine color.
All coping to receive self-adhered underlayment.
b. Gutters: Replace all existing gutters, unless otherwise noted. Install 22 gauge, kynar gutters – fabricated from RMER SS Flat Stock. All gutters to match existing shape or to be 5”x5”x5” box gutters (district option).
c. Perimeter Edge: Remove and replace all edge metal. All edge metal shall be replaced with KEE Clad Metal fabricated from Garland KEE Clad Metal Flat Stock.
No gravel stop or rise permitted at low edge of roofs.
d. Wood fascia replacement to be priced per linear foot and replaced after change order approval, unless otherwise noted. All new fascia to be primed and painted to match existing color.
e. Interior Walls: Install new 22 gauge, reglet skirt metal flashing. Flashing plies to be set as high as possible. Terminate materials with termination bar set in butyl tape fastened every 6” o.c.. Seal above the term bar and flashing plies with Tuff-Stuff MS
Sealant. Fasten skirt metal to existing counterflashing metal. Fabricate from RMER
SS Flat Stock. Seal all voids and penetrations with Tuff-Stuff MS Sealant.
f. Install new splash pans for all internal downspouts.
g. Replace metal pans that are rusted. Replace all damaged pans with new seamless sheet metal.
6. Place all conduit on new rubber blocks, Garland WPG C-Port, no wood supports unless approved by Garland. Condensate lines may be placed on pressure-treated wood blocks with slip sheet if rubber blocks alter performance.
7. Vent Covers- Remove and replace all damaged vent covers. All remaining and new vent covers to be painted white.
8. All fasteners to be fastened to the vertical side of the edge metal. No penetrations on horizontal side of edge metal or coping.
9. All drains to be sumped where possible. Copper drains are not permitted. Lead flash all drains as per manufacturer detail.
10. Walk Pads- Install Garland KEE Walkpads at working side of each mechanical unit.
11. Interior walls and parapets- Seal all voids, cracks and penetrations with Tuff-Stuff MS
Sealant.
12. Skylights- Seal all skylights with new sealant.
13. Access Doors- Seal around all doors with Tuff-Stuff MS Sealant
14. White roofs only- all products used are to be white in color unless otherwise specified.
Any significant markings left on roof to be removed and/or coated white.
15. The contractor is responsible for ensuring positive drainage and no ponding conditions.
P. Site Specific Instructions (All to be included in Base Bid unless otherwise stated):
1. McKinley ES: Lounge/Library- Replace expansion joint, to be included in base bid.
07550 -5
2. Stevenson ES: Install three roof access ladders at the following locations complying with
DIR.CA.Gov California Code of Regulations under section 3277: Bldg 1- exterior side of restrooms, Bldg 4- HVAC well, Bldg 5- HVAC well.
3. Horace Mann CC: Install three roof access ladders at the following locations complying with DIR.CA.Gov California Code of Regulations under section 3277 : Kitchen, Speech
Room hatch, HVAC well
1.3 REFERENCES
A. ASTM D 312 - Standard Specification for Asphalt used in Roofing.
B. ASTM D 1970 - Specification for Sheet Materials, Self-Adhering Polymer Modified Bituminous, Used as Steep Roofing Underlayment for Ice Dam Protection.
C. ASTM D 1079 Standard Terminology Relating to Roofing, Waterproofing and Bituminous Materials.
D. ASTM D 2178 Standard Specification for Asphalt Glass Felt Used in Roofing and Waterproofing.
E. ASTM D 4586 Standard Specification for Asphalt Roof Cement, Asbestos-Free.
F. ASTM D 4601 Standard Specification for Asphalt Coated Glass Fiber Base Sheet Used in Roofing.
G. ASTM D 5147 Standard Test Method for Sampling and Testing Modified Bituminous Sheet Materials.
H. ASTM D 6162 Standard Specification for Styrene Butadiene Styrene (SBS) Modified Bituminous Sheet Materials Using a Combination of Polyester and Glass Fiber Reinforcements.
I. ASTM D 6163 Standard Specification for Styrene Butadiene Styrene (SBS) Modified Bituminous Sheet Materials Using Glass Fiber Reinforcements.
J. ASTM D 6164 - Standard Specification for Styrene Butadiene Styrene (SBS) Modified Bituminous Sheet Materials Using Polyester Reinforcements.
K. ASTM D 6754 - Standard Specification for Ketone Ethylene Ester (KEE) Sheet Roofing.
L. ASTM D 6757 - Standard Specification for Underlayment Felt Containing Inorganic Fibers Used in Steep-Slope Roofing.
M. ASTM E 108 - Standard Test Methods for Fire Test of Roof Coverings
N. National Roofing Contractors Association (NRCA): Roofing and Waterproofing Manual.
O. Sheet Metal and Air Conditioning Contractors National Association, Inc. (SMACNA) - Architectural Sheet Metal Manual.
P. Underwriters Laboratories, Inc. (UL): Fire Hazard Classifications.
Q. Warnock Hersey (WH): Fire Hazard Classifications.
R. ANSI-SPRI ES-1 Wind Design Standard for Edge Systems used with Low Slope Roofing Systems.
S. ASCE 7, Minimum Design Loads for Buildings and Other Structures
07550 -6
T. UL - Fire Resistance Directory.
U. FM Approvals - Roof Coverings and/or RoofNav assembly database.
V. California Title 24 Energy Efficient Standards.
1.4 DESIGN / PERFORMANCE REQUIREMENTS
A. Perform work in accordance with all federal, state and local codes.
B. Energy Star: Roof System shall comply with the initial and aged reflectivity required by the U.S. Federal Government's Energy Star program.
C. Roof System membranes containing recycled or bio-based materials shall be third party certified through UL Environment.
D. Roof system shall have been tested in compliance with the following codes and test requirements:
1. Cool Roof Rating Council (CRRC)
1.5 SUBMITTALS
A. Product Data: Manufacturer's data sheets on each product to be used, including:
1. Preparation instructions and recommendations.
2. Storage and handling requirements and recommendations.
3. Installation instructions.
B. Shop Drawings: Submit shop drawings if submitting an alternate roof system other than the basis of design including installation details of roofing, flashing, fastening, insulation and vapor barrier, including notation of roof slopes and fastening patterns of insulation and base modified bitumen membrane, a minimum of 7 days prior to bid opening. Shop drawings must be signed and sealed by a professional engineer licensed in the state of CA.
C. Design Pressure Calculations: Submit design pressure calculations for the roof area in accordance with ASCE 7 and local Building Code requirements. Include a roof system attachment analysis report, certifying the system's compliance with applicable wind load requirements before Work begins. If submitting an alternate to the basis of design, contractor is to submit design pressure calculations a minimum of 7 days prior to bid opening that are signed and sealed by a professional engineer licensed to practice in the state of CA
D. Provide a notarized letter stating that a full-time representative of the roofing manufacturer will perform the site inspections listed in section 3.9
E. Recycled or Bio-Based Materials: Provide third party certification through UL Environment of roof System membranes containing recycled or bio based materials.
F. Verification Samples: For each modified bituminous membrane ply product specified, two samples, minimum size 6 inches (150 mm) square, representing actual product, color, and patterns.
G. Manufacturer's Certificates: Provide to certify products meet or exceed specified requirements.
H. Test Reports: Submit test reports, prepared by an independent testing agency, for all modified bituminous sheet roofing, indicating compliance with ASTM D5147. Testing must be performed at 77 deg. F. Tests at 0 deg. F will not be considered.
I. Closeout Submittals: Provide manufacturer's maintenance instructions that include
07550 -7 recommendations for periodic inspection and maintenance of all completed roofing work.
Provide product warranty executed by the manufacturer. Assist Owner in preparation and submittal of roof installation acceptance certification as may be necessary in connection with fire and extended coverage insurance on roofing and associated work.
1.6 QUALITY ASSURANCE
A. Perform Work in accordance with NRCA Roofing and Waterproofing Manual.
B. Manufacturer Qualifications: Company specializing in manufacturing products specified with documented ISO 9001 certification and minimum of twelve years of documented experience and must not have been in Chapter 11 bankruptcy during the last five years.
C. Installer Qualifications: Company specializing in performing Work of this section with minimum five years documented experience and a certified Pre-Approved Garland Contractor. Installer must submit a Certified Pre-approval letter from Garland with bid form.
D. Installer's Field Supervision: Maintain a full-time Supervisor/Foreman on job site during all phases of roofing work while roofing work is in progress.
E. Product Certification: Provide manufacturer's certification that materials are manufactured in the United States and conform to requirements specified herein, are chemically and physically compatible with each other, and are suitable for inclusion within the total roof system specified herein.
F. Source Limitations: Obtain all components of roof system from a single manufacturer.
Secondary products that are required shall be recommended and approved in writing by the roofing system Manufacturer. Upon request of the Architect or Owner, submit Manufacturer's written approval of secondary components in list form, signed by an authorized agent of the Manufacturer.
1.7 PRE-INSTALLATION MEETINGS
A. Convene minimum two weeks prior to commencing Work of this section.
B. Review installation procedures and coordination required with related Work.
C. Inspect and make notes of job conditions prior to installation:
1. Record minutes of the conference and provide copies to all parties present.
2. Identify all outstanding issues in writing designating the responsible party for follow-up action and the timetable for completion.
3. Installation of roofing system shall not begin until all outstanding issues are resolved to the satisfaction of the Architect.
1.8 DELIVERY, STORAGE, AND HANDLING
A. Deliver and store products in manufacturer's unopened packaging with labels intact until ready for installation.
B. Store all roofing materials in a dry place, on pallets or raised platforms, out of direct exposure to the elements until time of application. Store materials at least 4 inches above ground level and covered with "breathable" tarpaulins.
C. Stored in accordance with the instructions of the manufacturer prior to their application or installation. Store roll goods on end on a clean flat surface except store KEE-Stone FB 60 rolls flat on a clean flat surface. No wet or damaged materials will be used in the application.
D. Store at room temperature wherever possible, until immediately prior to installing the roll.
07550 -8
During winter, store materials in a heated location with a 50 degree F (10 degree C) minimum temperature, removed only as needed for immediate use. Keep materials away from open flame or welding sparks.
E. Avoid stockpiling of materials on roofs without first obtaining acceptance from the Garland
F. Adhesive storage shall be between the range of above 50 degree F (10 degree C) and below 80 degree F (27 degree C). Area of storage shall be constructed for flammable storage.
1.9 COORDINATION
A. Coordinate Work with installing associated metal flashings as work of this section proceeds.
1.10 PROJECT CONDITIONS
A. Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer's absolute limits.
1.11 WARRANTY
A. Upon completion of the work, provide the Manufacturer's written and signed System Warranty, warranting that, if a leak develops in the roof during the term of this warranty, due either to defective material or defective workmanship by the installer, the manufacturer shall provide the Owner, at the Manufacturer's expense, with the labor and material necessary to return the defective area to a watertight condition including Garland Metal Components.
a. Warranty Period: 40 Year No-Dollar-Limit Warranty
B. Installer is to guarantee all work against defects in materials and workmanship for a period indicated following final acceptance of the Work. Contractor will submit warranty to the membrane manufacturer with a copy directly to Burbank USD.
1. Warranty Period: 5 years from date of acceptance.
PART 2 PRODUCTS
2.1 MANUFACTURERS
A. Garland Company, Inc. (The); 3800 E. 91st St., Cleveland, OH 44105. Web Site:
www.garlandco.com.
Tony DeMartinis
(818) 900-3000 tdemartinis@garlandco.com
B. Roofing Contractor to be responsible for all Garland materials in excess of District purchased and furnished amount. District to provide material quantities matching the specified amount below. Any additional Garland material required to complete the project is the responsibility of the roofing contractor. Roofing Contractor responsible for purchasing additional materials required, including all freight and tax charges.
C. Roofing contractor to be at delivery of District purchased roof materials. The District has no responsibility to provide any equipment for handling and / or loading the materials to the Contractor’s trucks. Upon signature of delivery, the roofing contractor assumes full responsibility for all District purchased roof materials. Any materials lost or stolen are the responsibility of the roofing contractor to replace. Roofing Contractor responsible for freight and tax on the replaced materials.
http://www.garlandco.com/ mailto:tdemartinis@garlandco.com
07550 -9
D. Listed in the tables below are quantities of district provided material. Any material or accessories required for the installation of the roof system in excess of the district provided material must be supplied by the Contractor. It is up to the Contractor to determine the precise amount of material required for the completion of this project; and to provide excess material, as required. Maximum quantity of the OFCI materials to be provided for all roofing which will be provided to the Contractor is as follows:
Horace Mann CC
Material Amount Unit Size
Flexbase E 80 333 100 sf Roll
KEE Stone HP 42 800 sf Roll
Stevenson ES
Flexbase E 80 710 100 sf Roll
KEE Stone HP 89 800 sf Roll
McKinley ES
Flexbase E 80 444 100 sf Roll
KEE Stone HP 56 800 sf Roll
2.2 COLD APPLIED 2-PLY THERMOPLASTIC HYBRID ROOF SYSTEM - KEE-Stone HP
A. Insulation: WPG Polyiso attached per ASCE 7-16 and tapered as necessary to eliminate any ponding conditions
B. Coverboard: ½” DensDeck Prime attached per engineered wind uplift calculations.
C. Base (Ply) Sheet: One ply bonded to the prepared substrate with Interply Adhesive:
1. FlexBase E 80
D. Thermoplastic Cap (Ply) Sheet: One ply bonded to the prepared substrate with Interply Adhesive (2):
1. KEE-Stone HP
E. Interply Adhesive: (1)
1. Green-Lock Plus Membrane Adhesive
F. Interply Adhesive: (2)
1. KEE-Lock Foam Spatter Spray
G. Flashing Base Ply: One ply bonded to the prepared substrate with Flashing Ply Adhesive:
1. FlexBase E 80
H. Flashing Cap (Ply) Sheet: One ply bonded to the prepared substrate with Flashing Ply Adhesive:
07550 -10
1. KEE-Stone HP NF Flashing
I. Flashing Ply Adhesive (1):
1. Green-Lock Plus Flashing Adhesive
J. Flashing Ply Adhesive (2):
1. KEE-Lock Flashing Adhesive
K. Flashing Ply Adhesive (3):
1. KEE-Lock Foam
L. Edge Detail Roll:
1. KEE Reinforced Utility Roll
2.3 EDGE TREATMENT AND ROOF PENETRATION FLASHINGS
A. Coping Cap: R-Mer 22GA flat sheet fabricated and installed per ANSI/SPRI ES-1. Requires wood nailer and continuous cleat
B. Metal Fascia: R-Mer 22GA flat sheet fabricated and installed per ANSI/SPRI ES-1.
C. Edge Metal: All edge metal shall be replaced with KEE Clad Metal fabricated from Wise Product Group KEE Clad Metal Flat Stock.
D. Flashing Boot - KEE Flashing Boot: Solarbrite KEE pipe boot for sealing single or multiple pipe penetrations adhered in approved adhesives as recommended and furnished by the membrane manufacturer.
E. Conduit Supports – WPG C-port foam block supports to be installed to replace all wood blocks to support all conduit throughout the roof.
F. Vents and Breathers: Heavy gauge aluminum and fully insulated vent that allows moisture and air to escape but not enter the roof system as recommended and furnished by the membrane manufacturer.
G. Pitch pans, Rain Collar 24 gauge stainless or 20oz (567gram) copper. All joints should be welded/soldered watertight. See details for design.
H. Liquid Flashing - Tuff-Flash: An asphaltic-polyurethane, low odor, liquid flashing material designed for specialized details unable to be waterproofed with typical modified membrane flashings.
1. Tensile Strength, ASTM D 412: 400 psi
2. Elongation, ASTM D 412: 300%
3. Density @77 deg. F 8.5 lb/gal typical
I. Fabricated Flashings: Fabricated flashings and trim are specified in Section 07620.
1. Fabricated flashings and trim shall conform to the detail requirements of SMACNA
"Architectural Sheet Metal Manual" and/or the CDA Copper Development Association "Copper in Architecture - Handbook" as applicable.
J. Manufactured Roof Specialties: Shop fabricated copings, fascia, gravel stops, control joints, expansion joints, joint covers and related flashings and trim are specified in Section 07710.
1. Manufactured roof specialties shall conform to the detail requirements of SMACNA
"Architectural Sheet Metal Manual" and/or the NRCA "Roofing and Waterproofing Manual" as applicable.
K. Walk pads: WPG KEE Walkway Roll heat welded directly to the KEE roof membrane installed in all high foot traffic areas
07550 -11
1. Thickness 5/32 in
2. Roll Size 30 in x 50 ft
3. Breaking Stength 56 lbs
4. Elongation 205
PART 3 EXECUTION
3.1 EXAMINATION
A. Do not begin installation until substrates have been properly prepared.
B. Inspect and approve the deck condition, slopes and fastener backing if applicable, parapet walls, expansion joints, roof drains, stack vents, vent outlets, nailers and surfaces and elements.
C. Verify that work penetrating the roof deck, or which may otherwise affect the roofing, has been properly completed.
D. If substrate preparation and other conditions are the responsibility of another installer, notify Architect of unsatisfactory preparation before proceeding.
3.2 PREPARATION
A. General: Clean surfaces thoroughly prior to installation.
1. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.
2. Fill substrate surface voids that are greater than 1/4 inch wide with an acceptable fill material.
3. Roof surface to receive roofing system shall be smooth, clean, free from loose gravel, dirt and debris, dry and structurally sound.
4. Wherever necessary, all surfaces to receive roofing materials shall be power broom and vacuumed to remove debris and loose matter prior to starting work.
5. Do not apply roofing during inclement weather. Do not apply roofing membrane to damp, frozen, dirty, or dusty surfaces.
6. Fasteners and plates for fastening components mechanically to the substrate shall provide a minimum pull-out capacity of 400 lbs. (136 k) per fastener.
B. Re-Roofing Applications:
1. Remove existing roof flashings from curbs and parapet walls down to the surface of the roof. Remove existing flashings at roof drains and roof penetrations.
2. Remove all roofing membrane and insulation and fill in any low spots occurring as a result of removal work to create a smooth, even surface for application of new roof membranes.
3. Install new wood nailers as necessary to accommodate insulation/recovery board or new nailing patterns.
4. When mechanically attached, the fastening pattern for the insulation/recovery board shall be as recommended by the specific product manufacturer.
5. When adhered, the adhesive pattern for the insulation/recovery board shall be as recommended by the specific product manufacturer.
C. Overlay Applications:
1. Remove all existing roof blisters and wrinkles down to stable bonded surface.
2. Patch areas in like-kind materials to tie-in to existing roof system.
3. Remove all vertical flashings and cant strips down to substrate.
4. Mechanically remove all loose/flaking/peeling coatings down to stable surface.
5. Clean and remove all dirt, dust, and debris from roof surface.
07550 -12
3.3 INSTALLATION - GENERAL
A. Install modified bitumen membranes and flashings in accordance with manufacturer's instructions and with the recommendations provided by the National Roofing Contractors Association's Roofing & Waterproofing Manual, the Asphalt Roofing Manufacturers Association, and applicable codes.
B. General: Avoid installation of modified bitumen membranes at temperatures lower than 40- 45 degrees F. When work at such temperatures unavoidable use the following precautions:
1. Take extra care during cold weather installation and when ambient temperatures are affected by wind or humidity, to ensure adequate bonding is achieved between the surfaces to be joined. Use extra care at material seam welds and where adhesion of the applied product to the appropriately prepared substrate as the substrate can be affected by such temperature constraints as well.
2. Unrolling of cold materials, under low ambient conditions must be avoided to prevent the likelihood of unnecessary stress cracking. Rolls must be at least 40 degrees F at the time of application. If the membrane roll becomes stiff or difficult to install, it must be replaced with roll from a heated storage area.
C. Commence installation of the roofing system at the lowest point of the roof (or roof area), working up the slope toward the highest point. Lap sheets shingle fashion so as to constantly shed water
D. All slopes greater than 2:12 require back-nailing to prevent slippage of the ply sheets. Use ring or spiral-shank 1 inch cap nails, or screws and plates at a rate of 1 fastener per ply (including the membrane) at each insulation stop. Place insulation stops at 16 ft o.c. for slopes less than 3:12 and 4 feet o.c. for slopes greater than 3:12. On non-insulated systems, nail each ply directly into the deck at the rate specified above. When slope exceeds 2:12, install all plies parallel to the slope (strapping) to facilitate backnailing. Install 4 additional fasteners at the upper edge of the membrane when strapping the plies.
3.4 INSTALLATION COLD APPLIED ROOF SYSTEM
A. Base Ply: Cut base ply sheets into 18 foot lengths and allow plies to relax before installing.
Install base sheet in Interply Adhesive: applied at the rate required by the manufacturer.
Shingle base sheets uniformly to achieve one ply throughout over the prepared substrate.
Shingle in proper direction to shed water on each large area of roofing.
1. Lap ply sheet ends 8 inches. Stagger end laps 12 inches minimum.
2. Solidly bond to the substrate and adjacent ply with specified cold adhesive at the rate of 2 to 2-1/2 gallons per 100 square feet.
3. Roll must push a puddle of adhesive in front of it with adhesive slightly visible at all side laps. Use care to eliminate air entrapment under the membrane.
4. Install subsequent rolls of modified across the roof as above with a minimum of 4 inch side laps and 8 inch staggered end laps. Lay modified membrane in the same direction as the underlayers but the laps shall not coincide with the laps of the base layers.
5. Extend plies 2 inches beyond top edges of cants at wall and projection bases.
6. Install base flashing ply to all perimeter and projection details.
7. Allow the one ply of base sheet to cure at least 30 minutes before installing the modified membrane. However, the modified membrane must be installed the same day as the base plies.
B. Thermoplastic Cap Ply: Allow plies to relax before installing. Install in interply adhesive applied at the rate required by the manufacturer. Shingle sheets uniformly over the prepared substrate to achieve the number of plies specified. Shingle in proper direction to shed water on each large area of roofing.
1. All field seams exceeding 10 feet in length shall be welded with an approved
07550 -13 automatic welder.
2. All field seams must be clean and dry prior to initiating any field welding. Remove foreign materials from the seams (dirt, oils, etc.) with acetone or authorized alternative. Use CLEAN WHITE COTTON cloths and allow approximately five minutes for solvents to dissipate before initiating the automatic welder. Do not use denim or synthetic rags for cleaning.
3. Contaminated areas within a membrane seam will inhibit proper welding and will require a membrane patch or strip.
4. All welding shall be performed only by qualified personnel to ensure the quality and continuity of the weld. The lap or seam area of the membrane may be intermittently tack welded to hold the membrane in place.
5. The back interior edge of the membrane shall be welded first, with a thin, continuous weld to concentrate heat along the exterior edge of the lap during the final welding pass.
6. Follow local code requirements for electric supply, grounding and surge protection.
The use of a dedicated, portable generator is highly recommended to ensure a consistent electrical supply, without fluctuations that can interfere with weld consistency.
7. Properly welded seams shall utilize a 1.5 inch wide nozzle, to create a homogeneous weld, a minimum of 1.5 inches in width.
C. Fibrous Cant Strips: Provide non-combustible perlite or glass fiber cant strips at all wall/curb detail treatments where angle changes are greater than 45 degrees. Cant may be set in approved cold adhesives, hot asphalt or mechanically attached with approved plates and fasteners.
D. Wood Blocking, Nailers and Cant Strips: Provide wood blocking, nailers and cant strips as specified in Section 06114.
1. Provide nailers at all roof perimeters and penetrations for fastening membrane flashings and sheet metal components.
2. Wood nailers should match the height of any insulation, providing a smooth and even transition between flashing and insulation areas.
3. Nailer lengths should be spaced with a minimum 1/8 inch gap for expansion and contraction between each length or change of direction.
4. Nailers and flashings should be fastened in accordance with Factory Mutual "Loss
Prevention Data Sheet 1- 49, Perimeter Flashing" and be designed to be capable of resisting a minimum force of 200 lbs/lineal foot in any direction.
E. Metal Work: Provide metal flashings, counter flashings, parapet coping caps and thru-wall flashings as specified in Section 07710. Install in accordance with the SMACNA "Architectural Sheet Metal Manual" or the NRCA Roofing Waterproofing manual.
F. Termination Bar: Provide a metal termination bar or approved top edge securement, set in butyl tape, at the terminus of all flashing sheets at walls and curbs. Fasten the bar a minimum of 8 inches (203 mm) o/c to achieve constant compression. Provide suitable, sealant at the top edge if required.
G. Flashing Base Ply: Install flashing sheets by the same application method used for the base ply.
1. Seal curb, wall and parapet flashings with an application of mastic and mesh on a daily basis. Do not permit conditions to exist that will allow moisture to enter behind, around or under the roof or flashing membrane.
2. Prepare all walls, penetrations, expansion joints and where shown on the Drawings to be flashed with required primer at the rate of 100 square feet per gallon. Allow primer to dry tack free.
3. Adhere to the underlying base ply with specified flashing ply adhesive unless otherwise specified. Nail off at a minimum of 8 inches (203 mm) o.c. from the finished
07550 -14 roof at all vertical surfaces.
4. Solidly adhere the entire flashing ply to the substrate. Secure the tops of all flashings that are not run up and over curb through termination bar fastened at 6 inches (152
mm) O.C. and sealed at top.
5. Seal all vertical laps of flashing ply with a three-course application of trowel-grade mastic and fiberglass mesh.
6. Coordinate counter flashing, cap flashings, expansion joints and similar work with modified bitumen roofing work as specified.
7. Coordinate roof accessories, miscellaneous sheet metal accessory items, including piping vents and other devices with the roofing system work.
8. Secure the top edge of the flashing sheet using a termination bar only when the wall surface above is waterproofed, or nailed 4 inches on center and covered with an acceptable counter flashing.
H. Flashing Cap Ply:
1. Seal curb, wall and parapet flashings with an application of mastic and mesh on a daily basis. Do not permit conditions to exist that will allow moisture to enter behind, around or under the roof or flashing membrane.
2. Prepare all walls, penetrations, expansion joints and where shown on the Drawings to be flashed with required primer at the rate of 100 square feet per gallon. Allow primer to dry tack free.
3. Adhere to the underlying base flashing ply with specified flashing ply adhesive unless otherwise specified. Nail off at a minimum of 8 inches (203 mm) o.c. from the finished roof at all vertical surfaces.
4. Coordinate counter flashing, cap flashings, expansion joints and similar work with modified bitumen roofing work as specified.
5. Coordinate roof accessories, miscellaneous sheet metal accessory items with the roofing system work.
6. All stripping shall be installed prior to flashing cap sheet installation.
7. Heat and scrape granules when welding or adhering at cut areas and seams to granular surfaces at all flashings.
8. Secure the top edge of the flashing sheet using a termination bar only when the wall surface above is waterproofed, or nailed 4 inches on center and covered with an acceptable counter flashing.
I. Roof Walkways: Provide WPG KEE Walkway Roll and install around all mechanical units.
3.5 INSTALLATION EDGE TREATMENT AND ROOF PENETRATION FLASHING
A. Coping Cap: Designed per approved architectural details
1. Install continuous cleat first nailed 3” O.C. staggered
2. Position base flashing ply over the wall edge covering nailers completely, fastening 8 inches on center. Install base ply and thermoplastic cap ply with proper material and procedure according to manufacturer's recommendations.
3.6 CLEANING
A. Clean-up and remove daily from the site all wrappings, empty containers, paper, loose particles and other debris resulting from these operations.
B. Remove asphalt markings from finished surfaces.
C. Repair or replace defaced or disfigured finishes caused by Work of this section.
3.7 PROTECTION
A. Provide traffic ways, erect barriers, fences, guards, rails, enclosures, chutes and the like to
07550 -15 protect personnel, roofs and structures, vehicles and utilities.
B. Protect exposed surfaces of finished walls with tarps to prevent damage.
C. Plywood for traffic ways required for material movement over existing roofs shall be not less than 5/8 inch (16 mm) thick.
D. In addition to the plywood listed above, an underlayment of minimum 1/2 inch (13 mm) recover board is required on new roofing.
E. Special permission shall be obtained from the Manufacturer before any traffic shall be permitted over new roofing.
3.8 FIELD QUALITY CONTROL
A. Inspection: Provide manufacturer's field observations at start-up and at intervals of 3 days per working week. Provide a final inspection upon completion of the Work.
1. Warranty shall be issued upon manufacturer's acceptance of the installation.
2. Field observations shall be performed by a Sales Representative employed full-time by the manufacturer and whose primary job description is to assist, inspect and approve membrane installations for the manufacturer.
3. Provide observation reports from the Sales Representative indicating procedures followed, weather conditions and any discrepancies found during inspection.
4. Provide a final report from the Sales Representative, certifying that the roofing system has been satisfactorily installed according to the project specifications, approved details and good general roofing practice.
B. Correct defects or irregularities discovered during field inspection.
3.9 SCHEDULES
A. Base (Ply) Sheet:
1. FlexBase E 80: 80 mil SBS (Styrene-Butadiene-Styrene) rubber modified roofing base sheet reinforced with a fiberglass and polyester composite scrim, performance requirements according to ASTM D 5147.
a. Tensile Strength, ASTM D 5147
1) 2 in/min. @ 73.4 +/- 3.6 deg. F MD 550 lbf/in XD 550 lbf/in
2) 50 mm/min. @ 23 +/- 2 deg. C MD 96.2 kN/m XD96.2 kN/m
b. Tear Strength, ASTM D 5147
1) 2 in/min. @ 73.4 +/- 3.6 deg. F MD 1,000 lbf XD 1,000 lbf
2) 50 mm/min. @ 23 +/- 2 deg. C MD 4,448 N XD 4,448 N
c. Elongation at Maximum Tensile, ASTM D 5147
1) 2 in/min. @ 73.4 +/- 3.6 deg. F MD 9% XD 9%
2) 50 mm/min. @ 23 +/- 2 deg. C MD 9% XD 9%
d. Low Temperature Flexibility, ASTM D 5147, Passes -40 deg. F (-40 deg. C)
B. Thermoplastic Cap (Ply) Sheet:
1. KEE-Stone HP: 60 mil thermoplastic, ketone ethylene ester (KEE) roofing membrane with polyester scrim. ASTM D6754
a. Breaking Strength, ASTM D 751, Proc. B, strip
1) 375 lbf. (1,668 N)
b. Tear Strength ASTM D 751
1) 150 lbf. min. (667 N)
c. Elongation at Break (%), ASTM D 751, Proc. B, Strip
1) 40.0%
C. Interply Adhesive:
07550 -16
1. Green-Lock Plus Membrane Adhesive: Cold applied solvent free membrane adhesive:
zero V.O.C. compliant performance requirements:
a. Non-Volatile Content ASTM D 4586 100%
b. Density ASTM D 1475 11.4 lbs./gal. (1.36 g/m3)
c. Viscosity Brookfield 20,000-50,000 cPs.
d. Flash Point ASTM D 93 400 deg. F min. (232 deg. C)
e. Slope: up to 3:12
2. KEE-Lock Foam Spatter Spray: Dual component, single bead (spatter applied) urethane insulation/membrane adhesive.
a. Tensile Strength (ASTM D 412) 250 psi
b. Density (ASTM D 1875) 8.5 lbs./gal.
c. Viscosity (ASTM D 2556) 22,000 - 60,000 cP
d. Peel Strength (ASTM D 903) 17 lb./in.
e. Flexibility (ASTM D 816) Pass @ -70 deg. F (-56.7 deg. C)
D. Flashing Base Ply:
1. FlexBase E 80: 80 mil SBS (Styrene-Butadiene-Styrene) rubber modified roofing base sheet reinforced with a fiberglass and polyester composite scrim, performance requirements according to ASTM D 5147.
a. Tensile Strength, ASTM D 5147
1) 2 in/min. @ 73.4 +/- 3.6 deg. F MD 550 lbf/in XD 550 lbf/in
2) 50 mm/min. @ 23 +/- 2 deg. C MD 96.2 kN/m XD96.2 kN/m
b. Tear Strength, ASTM D 5147
1) 2 in/min. @ 73.4 +/- 3.6 deg. F MD 1,000 lbf XD 1,000 lbf
2) 50 mm/min. @ 23 +/- 2 deg. C MD 4,448 N XD 4,448 N
c. Elongation at Maximum Tensile, ASTM D 5147
1) 2 in/min. @ 73.4 +/- 3.6 deg. F MD 9% XD 9%
2) 50 mm/min. @ 23 +/- 2 deg. C MD 9% XD 9%
d. Low Temperature Flexibility, ASTM D 5147
1) Passes -40 deg. F (-40 deg. C)
E. Flashing Cap (Ply) Sheet:
1. KEE-Stone HP NF 60 Flashing: 60 mil thermoplastic, ketone ethylene ester (KEE) roofing membrane with polyester scrim. ASTM D 6754.
a. Breaking Strength, ASTM D 751, Proc. B, strip
1) 375 lbf
b. Tear Strength ASTM D 751
1) 145 lbf. minimum.
c. Elongation at Break (%), ASTM D 751, Proc. B, Strip
1) 35.0%
F. Flashing Ply Adhesive:
1. KEE-Lock Flashing Adhesive: Acrylic, pressure-sensitive adhesive.
a. Density (ASTM D 1475) 10.8 lbs./gal.
b. Viscosity (ASTM D 2556) 900,000 cP
2. Green-Lock Plus Flashing Adhesive: Cold applied solvent free flashing adhesive: zero V.O.C.
a. Non-Volatile Content ASTM D 4586 100%
b. Density ASTM D 1475 11.8 lbs./gal. (1.17 g/m3)
c. Viscosity Brookfield 400,000 cPs.
d. Flash Point ASTM D 93 400 deg. F min. (232 deg. C)
END OF SECTION
07 31 00-1
SECTION 07 31 00
ASPHALT SHINGLES
BURBANK UNIFIED SCHOOL DISTRICT
SUMMER 2027 ROOFING PROJECTS
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Removal of existing roofing.
B. Asphalt roofing shingles.
C. Leak barrier and moisture shedding roof deck protection.
D. Underlayments.
1.2 SCOPE OF WORK
A. Provide all labor, equipment, and miscellaneous materials to install District purchased and furnished roofing materials over the properly prepared substrate.
B. DISTRICT SUPPLIED MATERIAL
Note that this project includes the installation of owner-supplied material; the District has acquired roofing material through the CMAS (California Multiple Award Schedules) program.
C. All products listed in 2.1, D will be furnished by the District. All products not listed in 2.1, D are to be furnished by the Contractor. All products listed in 2.1, D will be manufactured by The Garland Company and purchased by Burbank Unified School District. Any material or accessories required for the installation of the roof system in excess of the district provided material must be supplied by the Contractor. It is up to the Contractor to determine the precise amount of material required for the completion of this project; and to provide excess material, as required.
D. Contractor to comply with Roof Site Maps to determine scopes of work for each building.
Contractor responsible to determine deck type. Color-coded site map for reference only.
E. Shingle Replacement Scope of Work (Buildings highlighted in purple)
1. Remove the existing roof system to the structural deck.
2. Repair any damaged decking as required. Contractor to include 7% deck replacement in the base bid. If the amount of deck replacement exceeds 7%, the contractor is to receive a change order equal to the unit price for deck replacement per sq ft multiplied by the sq ft in excess of the amount included in the base bid amount. If the amount of deck replacement is less than 7%, the contractor is to provide a credit.
3. Apply HPR SA FR Base Sheet to entire field and flashings.
4. Apply SBS modified, self-adhering – RMer Seal to entire field and flashings.
5. Flashings:
a. Vents: Re-use the existing vent crickets.
07 31 00-2
b. Metal Edge: Install all new 22 gauge, kynar edge metal over the HPR SA FR Base
Sheet. Set in mastic. Fasten every 2” o.c. Edge metal to have a 4” face. District to determine color.
c. Gutter: Replace all existing gutters. Install 22 gauge, kynar gutters – fabricated from
RMER SS Flat Stock. All gutters to match existing shape or be 5”x5”x5” box gutters
(District option).
d. Ridge Vent: Tape all vent seams with Unibond ST 4” tape. Caulk any fastener. Paint the vents to District determined color.
e. Wood fascia replacement to be priced per linear foot. All new fascia to be primed and painted to match existing color.
6. Install 30 year, asphalt,. Class A, ANSI/UL790 shingle – GAF Timberline or equal. Install per manufacturer guidelines.
1.3 REFERENCES
A. AC438-1011-R1 - New Acceptance Criteria for Alternative Asphalt Roofing Shingles
B. American Society of Civil Engineers (ASCE): ASCE 7 - Minimum Design Loads for Buildings and Other Structures.
C. Asphalt Roofing Manufacturers Association (ARMA).
D. ASTM International (ASTM):
1. ASTM D 3018 - Standard Specification for Class A Asphalt Shingles Surfaced with
Mineral Granules.
2. ASTM D 3161 - Standard Test Method for Wind-Resistance of Asphalt Shingles (Fan-
Induced Method).
3. ASTM D 3462 - Standard Specification for Asphalt Shingles Made from Glass Felt and
Surfaced with Mineral Granules.
4. ASTM A 653/A 653M - Standard Specification for Steel Sheet, Zinc Coated
(Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process.
5. ASTM B 209 - Standard Specification for Aluminum and Aluminum-Alloy Sheet and
Plate.
6. ASTM B 370 - Standard Specification for Copper Sheet and Strip for Building
Construction.
7. ASTM C 1549 - Standard Test Method for Determination of Solar Reflectance Near
Ambient Temperature Using a Portable Solar Reflectometer.
8. ASTM D 4586 - Standard Specification for Asphalt Roof Cement, Asbestos-Free.
9. ASTM E 903 - Standard Test Method for Solar Absorption, Reflectance and
Transmission of Materials Using Integrating Spheres.
E. California Title 24 Energy Efficient Standards.
F. Cool Roof Rating Council (CRRC).
G. National Roofing Contractors Association (NRCA).
H. Sheet Metal and Air Conditioning Contractors National Association, 1nc. (SMACNA) - Architectural Sheet Metal Manual.
I. Underwriters Laboratory (UL)
1. UL 790 - Tests for Fire Resistance of Roof Covering Materials.
2. UL 997 - Wind Resistance of Prepared Roof Covering Materials.
1.4 DEFINITIONS
07 31 00-3
A. Roofing Terminology: Refer to ASTM D1079 and the glossary of the National Roofing Contractors Association (NRCA) Roofing and Waterproofing Manual for definitions of roofing terms related to this section.
1.5 SUBMITTALS
A. Product Data: Manufacturer's data sheets on each product to be used, showing compliance with requirements.
B. Installation Instructions: Manufacturer's installation instructions, showing required preparation and installation procedures.
1.6 QUALITY ASSURANCE
A. Perform Work in accordance with NRCA Roofing and…
This is the start of the file's text. The full file is on GovTribe.