2. FS Supplemental Specifications.pdf

PDF 353 KB Posted

Attached to
127EAW21R0039 - South Gate Bridge Project
Solicitation number
127EAW21R0039
Issued by

About this file

This solicitation is for a bridge construction project located on the Shasta-Trinity National Forest. The Forest Service is seeking bids for the South Gate Bridge Project, with an estimated value between $100,000 and $250,000. The solicitation is a total small business set aside. All requests for information must be submitted to the contracting officer by June 30, 2021. Bidders are required to visit the site as no organized pre-proposal site visit will be held. The selected contractor will be responsible for bridge construction services on National Forest System lands under the jurisdiction of the USDA Forest Service Pacific Southwest Region.

View the file

Other files

File Type Posted
SOUTH _GATE_Squaw Creek field investigation 9_17_2019.pdf PDF
RFI Official Responses - 1.pdf PDF
127EAW21R0039 - A00003.pdf PDF
127EAW21R0039 - A00002.pdf PDF
127EAW21R0039 - A00001.pdf PDF
127EAW21R0039.pdf PDF
1. South Gate Bridge Drawings & Plans.pdf PDF
5. RFI Form.docx DOCX document
4. Davis-Bacon Act WD # CA20210007.pdf PDF
3. Fire Plan.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table of Contents Preface

101 - Terms ̧Format ̧and Definitions

101.01 Meaning of Terms

101.03 Abbreviations

101.04 Definitions

102 - Bid ̧Award¸ and Execution of Contract Delete Section 102

103 - Scope of Work

Delete Subsections 103.02, 103.03, 103.04, 103.05

104 - Control of Work Delete Subsections 104.01, 104.02, 104.04

104.06 Use of Roads by Contractor

105 - Control of Material

105.05 Use of Material Found in the Work

106 - Acceptance of Work

106.01 Conformity with Contract Requirements

106.02 Visual Inspection

107 - Legal Relations and Responsibility to the Public Delete Subsection 107.05

108 - Prosecution and Progress

Delete Section 108

109 - Measurement and Payment……………………………………………………………..15/166

Delete Subsections 109.06, 109.07, 109.08, 109.09

109.01 Measurement of Work

109.02 Measurement Terms and Definitions

151 - Mobilization………………………………………………………………………………………………………………………………….17

155 - Schedules for Construction Contracts

Delete Section 155

156 - Public Traffic……………………………………………………………………………………………………………………….19/20

301 - Untreated Aggregate Courses

301.03 General

553 - Prestressed Concrete…………………………………………………………………………………………………………………..23

553.04 - Method Approval………………………………………………………………………………………………………………23/24

553.08 - Pretensioned Members……………………………………………………………………………………………………..24/25

553.09 - Storing, Transporting and Erecting……………………………………………………………………………………25/26

702 - Asphalt Materials………………………………………………………………………………………………………………..………27

702.01 - Asphalt Binder………………………………………………………………………………………………………………………..27

Preface Preface_wo_03_10_2021

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-14 for construction of National Forest System Roads.

101 - Terms¸ Format¸ and Definitions 101.01_National_11_9_2016

Add the following paragraph to Subsection 101.01:

101.01 Meaning of Terms.

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_National_11_9_2016

Add the following to Subsection 101.03:

101.03 Abbreviations.

(a) Acronyms.

AGAR — Agriculture Acquisition Regulations

AFPA — American Forest and Paper Association

FSAR — Forest Service Acquisition Regulations

MSHA — Mine Safety and Health Administration

NESC — National Electrical Safety Code

WCLIB — West Coast Lumber Inspection Bureau

(f) Miscellaneous unit abbreviations.

MP — milepost location ppm — parts per million volume

STA station location

101.04_National_1_22_2020

Make the following changes to Subsection 101.04:

101.04 Definitions.

Delete these definitions and replace the following:

Bid Schedule — The Schedule of Items.

Bridge — A structure, including supports, erected over a depression or an obstruction such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads.

Contractor — The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “Purchaser”.

Culvert — Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure.

Drawings — (Public Works Contracts) Design sheets or fabrication, erection, or construction details submitted to the CO by the Contractor according to FAR Clause 52.236-21 Specifications and Drawings for Construction. Also refers to submissions and submittals.

Notice to Proceed — (Public Works Contracts) Written notice to the Contractor to begin the contract work.

Right-of-Way — A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Solicitation—(Public Works Contracts) The complete assembly of documents (whether attached or incorporated by reference) furnished to prospective bidders.

Add the following definitions:

Adjustment in Contract Price — “Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change — “Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Forest Service — The United States of America, acting through the Forest Service, U.S.

Department of Agriculture.

Neat Line — A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road — Temporary construction access built along the route of the project.

Purchaser — The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse — A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order — An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Shop Drawings — (Timber and Stewardship Contracts) Referred to as “Drawings” in FP-14, include drawings, diagrams, layouts, schematics, descriptive literature, illustrations, lists or tables, performance and test data, and similar materials furnished by Purchaser to explain in detail specific portions of the work required by the contract.

Utilization Standards —

The minimum size and percent soundness of trees described in Public Works contract specifications or Timber Sale and IRTC contract provisions to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

102 - Bid¸ Award¸ and Execution of Contract 102.00_National_11_9_2016

Delete Section 102 in its entirety.

Delete Section 102.

103 - Scope of Work 103.00_National_11_9_2016

Delete all of Section 103 except Subsection 103.01 Intent of Contract.

Delete Subsections 103.02, 103.03, 103.04, 103.05.

104 - Control of Work 104.00_National_11_9_2016

Delete Subsections 104.01, 104.02, and 104.04.

Delete Subsections 104.01, 104.02, 104.04.

104.06_National_11_9_2016

Add the following to Subsection 104.06:

104.06 Use of Roads by Contractor.

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

105 - Control of Material 105.05_National_6_29_2020

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. Place excess material safely at government-approved location, at no additional cost to government.

106 - Acceptance of Work 106.01_National_7_18_2017

Delete Subsection 106.01 and replace with the following:

106.01 Conformity with Contract Requirements.

Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.

References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.

Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.

Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is morestrict.

Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.

When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.

The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.

Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to

106.05 inclusive. The primary method of acceptance is specified in each Section of work.

However, work may be rejected at any time it is found by any of the methods not to comply with the contract.

Remove, repair, or replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted. Removing, repairing, or replacing work; providing temporary traffic control; and any other related work to accomplish conformity will be at no cost to the Government.

(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:

1. Sampling method;

2. Number of samples;

3. Sample transport;

4. Test procedures;

5. Testing laboratories;

6. Reporting;

7. Estimated time and costs; and

8. Validation process.

If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a thirdparty laboratory.

Use a thirdparty laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.

The CO will review the proposed resolution protocol and may modify it before final approval and execution.

The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.

(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:

1. Have the work accepted at a reduced price; or

2. Be given permission to perform corrective measures to bring the work into conformity.

The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.

106.02_National_11_9_2016

Delete Subsection 106.02 and replace with the following:

106.02 Visual Inspection.

Acceptance is based on visual inspection of the work for compliance with the specific contract requirements. Use prevailing industry standards in the absence of specific contract requirements or tolerances.

107 - Legal Relations and Responsibility to the Public

107.05_National_7_18_2017

Delete Subsection 107.05.

Delete Subsection 107.05.

108 - Prosecution and Progress 108.00_National_11_9_2016

Delete Section 108 in its entirety.

Delete Section 108.

109 - Measurement and Payment 109.00_National_11_9_2016

Delete Subsections 109.06, 109.07, 109.08, and 109.09:

Delete Subsections 109.06, 109.07, 109.08, 109.09.

109.01_National_2_22_2019

Delete the third paragraph and Table 109-1 of Subsection 109.01 and replace with the following:

109.01 Measurement of Work.

Take measurements as described in Subsection 109.02 unless otherwise modified by the Measurement Subsection of the section controlling the work being performed. Table 109-1 indicates the accuracy required for quantities of the various pay units used in the Schedule of Items. Use this guide to determine the decimal placement in the final payment.

Table 109-1

Decimal Accuracy of Quantities for Final Payment

Pay Item Level of Precision Linear Foot 1

Exception--Timber, Steel, and concrete Piles 0.1 Station 0.1 Mile 0.01 Square Foot 0.1 Square Yard 0.1 Each 1 Acre 0.01 Gallon 1 M-Gals. 0.1 Cubic Yard 1

Exception--Structure Excavation; Sheathing Materials; Bedding, Bed Course, and Backfill Materials; Gabions;

0.1

Exception--Concrete; Masonry 0.01 Pound 1 Ton 0.1

Exception--Calcium Chloride;

Sodium Chloride; Hydrated Lime;

Bituminous Materials; Pavements;

Bed Course Materials

0.01

Hour 0.1

MFBM 0.01

Station Yard 1 Cubic Yard Mile 1 Ton Mile 1

109.02_National_11_9_2016

Add the following sentence to Subsection 109.02(b):

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

151 - Mobilization 151.01_0114_us_08_04_2005

151.01 Description

Add the following:

This work consists of washing and treating construction equipment and vehicles necessary for equipment transport to remove seeds, plants, and plant fragments before the equipment is used on Forest Service lands.

Wash the sides, tops, and undercarriages of all construction equipment. Remove all seeds, plants, plant fragments, dirt, and debris from the construction equipment. Only equipment inspected by the Forest Service will be allowed to operate within the project area. All subsequent move-ins of equipment to the project area will be treated in the same manner as the initial move-in. This requirement does not apply to cars, pickup trucks, and other vehicles that regularly travel between the construction site and areas off the National Forest.

Equipment will be considered free of soil, seed, and other such debris when a visual inspection does not disclose such material. Disassembly of equipment, components or the need for specialized inspection tools is not required.

Notify the CO in writing at least 24 hours before moving any construction equipment onto the national forest. Notification will include an agreed upon location where the equipment will be available for inspection by the Forest Service. Inspection will be required after every cleaning.

Use methods of cleaning and locations for cleaning approved by the C.O.

For work at a commercial washing facility, use an approved facility.

New infestations of noxious weeds of concern to Forest Service and identified by either Contractor or Forest Service, on the Project Area or on the haul route, will be promptly reported to the other party. Contractor and Forest Service will agree on treatment methods to reduce or stop the spread of noxious weeds when new infestations are found. A current list of noxious weeds of concern to Forest Service is available at each Forest Service office.

151.02 Measurement

Add the following:

Clean equipment prior to moving onto and at completion of this project. The initial cleaning and exit cleaning will be included in the measurement for payment.

155 - Schedules for Construction Contracts 155.00_National_11_9_2016

Delete Section 155 in its entirety.

Delete Section 155.

156 - Public Traffic 156.00_National_11_4_2016

Delete Section 156 in its entirety and replace with the following:

Section 156. – PUBLIC TRAFIC Description

156.01 This work consists of controlling and protecting public traffic adjacent to and within the project.

Material

156.02 Conform to the MUTCD and the following Sections and Subsections:

Permanent Traffic Control 633

Traffic Signing and Marking Material 718

Concrete Barriers and Precast Guardwalls 618

Temporary plastic fence 710.11

Construction Requirements

156.03 General. Accommodate traffic according to MUTCD, approved traffic control plan and this section. Perform work in a manner that ensures safety and convenience of the public. Unless otherwise provided for in Table 156-1, keep existing roads open to all traffic during road improvement work, and maintain them in a condition that will adequately accommodate traffic.

Delays may not exceed __ Hour at any one time followed by an open period of no less than __minutes. Accommodate public traffic on roads adjacent to and within the project until the project is accepted according to Subsection 106.07(b).

Submit traffic control plan at least 10 days prior to intended use. Give Government 10 days advanced notice prior to starting work so that public notification can be made. Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a traffic control plan has been approved.

Post construction signs and traffic control devices in conformance with MUTCD and Forest Service EM 7100-15. All required signs will be in place and approved prior to beginning work on project.

If the Contractor agrees in writing to allow public traffic to use a new road being constructed prior to completion, it will be considered an existing road for traffic control purposes.

156.04 Temporary Traffic Control. Install and maintain temporary traffic control devices adjacent to and within the project as required by the approved traffic control plan and the MUTCD. Install and maintain traffic control devices as follows:

(a) Furnish and install traffic control devices before the start of construction operations.

(b) All detours outside of clearing limits will be approved in writing by the Contracting Officer as part of the traffic control plan.

(c) Install only those traffic control devices needed for each stage or phase.

(d) Relocate temporary traffic control devices as necessary.

(e) Remove devices that no longer apply to the existing conditions.

(f) Immediately replace any device that is lost, stolen, destroyed, or inoperative.

(g) Keep temporary traffic control devices clean.

(h) Remove all temporary traffic control devices upon contract completion or when approved.

(i) When required, use flaggers certified by the American Traffic Safety Services Association, the National Safety Council, the International Municipal Signal Association, a state agency, or other acceptable organization. Perform the work described under MUTCD Part 6. Use type III, VII, VIII, or IX retroreflective sheeting on flagger paddles. Do not use flags. Flaggers must wear high visibility safety apparel as required by MUTCD 6E.02.

156.05 Temporary Closures. Road segments may be closed as shown in Table 156-1. The maximum consecutive days of closure shall be followed by a minimum number of consecutive days open to traffic as shown. Maintain traffic control devices during closure period(s).

Appropriate barricades and signs will be erected and maintained as shown in the traffic control plan or as otherwise designated.

Prior to closing roads during construction, give written notice to the Contracting Officer at least 10 days in advance.

Table 156-1 Temporary Road Closures

Road Number

From Terminus

To Terminus

Maximum Consecutive Days of Closure

Minimum Consecutive Days Open

40N56 40N29Y MP-0.14 90 days from NTP 0

156.06 Acceptance. Public traffic work will be evaluated under Subsection 106.02.

Measurement and Payment

156.07 Do not measure Public Traffic for payment. Payment for contract work is provided indirectly. See Subsection 109.05.

301 - Untreated Aggregate Courses 301.03_National_7_17_2017

Add the following to Subsection 301.03:

301.03 General.

Written approval of the roadbed is required before placing aggregate.

For pit run or grid-rolled material, furnish material smaller than the maximum size, no gradation will be required otherwise. After processing on the road, remove all oversize material from the road and dispose as directed by the CO.

Provide additives or binder, if required, at the proportions specified.

Develop and use Government furnished sources according to Section 105.

If the aggregate is produced and stockpiled before placement, handle and stockpile according to Section 314.

301.05_National_7_17_2017

Delete Subsection 301.05 and replace with the following:

301.05 Compacting.

Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road.

Along curbs, headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.

Compact the aggregate using one of the following methods as specified:

(a) Compaction A. Operating spreading and hauling equipment over the full width of the travel way.

(b) Compaction B. Operate rollers and compact as specified in Subsection 204.11(a)(1).

(c) Compaction C. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Operate rollers and compact as specified in Subsection 204.11(a)(1).

(d) Compaction D. Compact to a density of at least 95 percent of the maximum density, as determined by AASHTO T 99, method C or D.

(e) Compaction E. Compact to a density of at least 95 per-cent of the maximum density, as determined by AASHTO T 180, method C or D.

For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in-place density and moisture content according to AASHTO T 310 or other approved test procedures.

Section 553 – PRESTRESSED CONCRETE

Materials

553.02 Conform to the following Section and Subsections:

Add the following materials and paragraph:

High strength non-shrink grout

725.13 (b) Structural steel 555

Use Class P concrete in prestressed members unless otherwise SHOWN ON THE DRAWINGS. Design the concrete mix in accordance with Subsection 552.03 with a 28-day design compressive strength as SHOWN ON THE DRAWINGS. Do not permit lightweight concrete unless otherwise SHOWN ON THE DRAWINGS.

Construction Requirements

553.04 Method Approval.

Delete the entire section and replace with the following:

Notify the CO a minimum of 10 days prior to fabrication of any prestressed members.

Inspect all prestressed concrete members by one of the following methods, unless otherwise SHOWN ON THE DRAWINGS or in the SUPPLEMENTAL

SPECIFICATIONS:

• Use the quality control engineer of a plant certified by the Prestressed Concrete Institute (PCI). Submit a copy of the transmittal letter of the latest PCI inspection with the shop drawings. Furnish a copy of all testing and inspection reports to the CO upon delivery of the members to the jobsite.

• Use an independent licensed professional engineer experienced in prestressed voided concrete slab unit inspection to certify that the prestressed members were built in accordance with the drawings and specifications. Furnish, along with the certification, a copy of all testing and inspection reports to the CO upon delivery of the members to the jobsite.

Ensure that the prestressed members conform to the dimensional tolerances as given in Table 553-1.

Perform prestressing by pretensioning methods. Submit four copies of shop drawings for prestressed members and one copy of reproducible detailed drawings of the method, material, and equipment proposed for approval at least 21 days before starting prestressing.

Show the following:

(a) Method and sequence of stressing.

(b) Complete specifications, details, and test results for the prestressing steel and anchoring devices.

(c) Anchoring stresses.

(d) Arrangement of the prestressing steel in the members to include the strand pattern at midspan and at center span of bearing; and the location of total strand center of gravity at midspan, at hold-down points, at quarter points, and at centerline of bearing.

(e) Tendon elongation calculations for jacking procedures to be used, to include the calibration curve for the gauge and jacking system, the stress-strain curve for the prestressed strands, and the pressure gauge readings.

(f) Number, spacing, and method of draping pretensioned strands.

(g) The prestressing bed layout and overall length between grips at fixed and jacking ends, and the type of equipment to be used.

(h) Other substantiating calculations for the prestressing method.

(i) Certification of wire or strand taken in accordance with Subsection 709.02.

(j) Concrete mix design.

(k) Type of tendon ducts for post-tensioning.

(l) Pressure grouting material and equipment for post-tensioning.

(m) Samples of wire or strand.

(n) Additions or re-arrangement of reinforcing steel and changes in concrete dimensions.

Provide the signature and seal of a licensed professional engineer on all shop drawings and calculations prepared for fabrication of prestressed members.

The CO will review mix designs and approve shop drawings prior to fabrication of prestressed members.

553.08 Pretensioned Members.

Add the following paragraph after the first sentence:

Cast pretensioned members in commercial prestressing plants that are PCI-Certified Plants in Product Group B—Bridges, category B3 (Prestressed Straight Strand Bridge Members) or category B4 (Prestressed Draped Strand Bridge Members), as applicable to the members to be manufactured.

553.09 Storing, Transporting, and Erecting.

Add the following paragraphs to the end of the section:

Advise the CO a minimum of 48 hours before prestressed voided concrete slab beams for multibeam bridges are to be field welded, and before any field grout or mortar is to be placed.

Adjust, if necessary, multibeam voided concrete slab beams by using galvanized steel shims the same length and width as the bearing pad or plate. Allow no more than 1/4 inch vertical difference between top of adjacent beam edges at each end of the span. When an asphalt wearing surface or cast-in-place deck is to be placed on top of the prestressed beams, allow a vertical tolerance of only 1/2 inch. Do not load beams to make them assume the same camber as an adjacent beam.

Perform abrasive blasting on the keyway surfaces of all multibeam prestressed concrete members to provide a new and clean concrete surface that is free of carbonated concrete and other contaminants, and to expose parts of the large aggregate beneath the concrete paste.

Use high-pressure water blasting (3,000 psi or more) to remove all debris and loosened paste in the keyways immediately prior to placing high-strength non-shrink grout (grout).

Remove all freestanding water and allow keyways to completely surface dry. Test for the presence of carbonated concrete when directed by the CO or called for by the SUPPLEMENTAL SPECIFICATIONS. Repeat abrasive blasting and water washing as needed if tests indicate the presence of carbonated concrete.

Use grout in keyways between multibeam members and to patch defects, blockouts, or other areas on the concrete roadway portion of the structure 1 inch or more in depth and over 1 inch in width. Patch smaller areas on the concrete roadway with grout.

Maintain air and concrete keyway temperatures between 45°F and 85 °F before placing grout. Maintain the temperature within these limits until grout placement and application of curing method is completed.

Use grout on all anchor bolts and dowels to make all repairs.

Strike off exposed grout surfaces flush with the same surface texture finish as the surrounding concrete as soon as the grout has set sufficiently. Cure the exposed surface as specified in Subsection 552.15. When artificial means are used to control the curing temperature of the grout, as during hot or cold weather, the CO will approve the method in advance. Use combustion heaters only if fully vented outside their enclosure. Store all dry grout materials and mixing and placing equipment such that their temperature is above freezing. Warm mixing water to provide grout at desired temperature, but ensure that it is at 85 °F or less when mixed with the dry materials. Use ice as part of the mixing water provided it is completely melted prior to the introduction of the water to the dry materials.

Ensure that patching grout are the same color as the parent concrete.

Ensure that all field welding meets the requirements specified in Section 555. When welding or burning on precast members, attach the ground lead directly to the base metal; reject any precast prestressed member used as a conductor for the ground, and replace the member without compensation.

702 – Asphalt Material

702.01 Asphalt Binder

Delete the first sentence add the following:

Performance graded (PG) asphalt binder shall conform to the following Standard Specifications, State of California:

Performance Graded Asphalt Binder Specification

Grade

Property AASHTO Test

Method

PG

58-22a

64-10

64-16

64-28

70-10 Original Binder

Flash Point, Min. °C T48 230 230 230 230 230 Solubility, Min. % b T44 99 99 99 99 99 Viscosity at 135°C, c

Max., Pa·s T316

3.0

Dynamic Shear, Test Temp. at 10 rad/s, °C Min. G*/sin(delta), kPa

T315

1.00

RTFO Test e, Mass Loss, Max., % T240

RTFO Test Aged Binder

Dynamic Shear, Test Temp. at 10 rad/s, °C Min. G*/sin(delta), kPa

T315

2.20

Ductility at 25°C

Min., cm T51

PAV f Aging, Temperature, °C R28

RTFO Test and PAV Aged Binder

Dynamic Shear, Test Temp. at 10 rad/s, °C Min. G*sin(delta), kPa

T315 22 d

31 d

28 d

22 d

34 d

Creep Stiffness, Test Temperature, °C Max. S-value, MPa Min. M-value

T313 -12

0.300

-6

-18

0.300

Notes:

a. For use as asphalt rubber base stock for high mountain and high desert area.

b. The Engineer will waive this specification if the supplier is a Quality Supplier as defined by the Department's "Certification Program for Suppliers of Asphalt."

c. The Engineer will waive this specification if the supplier certifies the asphalt binder can be adequately pumped and mixed at temperatures meeting applicable safety standards.

d. Test the sample at 3°C higher if it fails at the specified test temperature.

G*sin(delta) shall remain 5000 kPa maximum.

e. "RTFO Test" means the asphaltic residue obtained using the Rolling Thin Film Oven Test, AASHTO Test Method T240 or ASTM Designation: D 2872.

f. "PAV" means Pressurized Aging Vessel.

Preface
101 - Terms¸ Format¸ and Definitions
101.01 Meaning of Terms.
101.03 Abbreviations.
101.04 Definitions.
102 - Bid¸ Award¸ and Execution of Contract
Delete Section 102.
103 - Scope of Work
Delete Subsections 103.02, 103.03, 103.04, 103.05.
104 - Control of Work
Delete Subsections 104.01, 104.02, 104.04.
104.06 Use of Roads by Contractor.
105 - Control of Material
105.05 Use of Material Found in the Work.
106 - Acceptance of Work
106.01 Conformity with Contract Requirements.
106.02 Visual Inspection.
Delete Subsection 107.05.
108 - Prosecution and Progress
Delete Section 108.
109 - Measurement and Payment
Delete Subsections 109.06, 109.07, 109.08, 109.09.
109.01 Measurement of Work.
109.02 Measurement Terms and Definitions.
Delete Section 155.
156 - Public Traffic
Section 156. – PUBLIC TRAFIC
301 - Untreated Aggregate Courses
301.03 General.
301.05 Compacting.
Section 553 – PRESTRESSED CONCRETE
553.02 Conform to the following Section and Subsections:
Construction Requirements
553.08 Pretensioned Members.
553.09 Storing, Transporting, and Erecting.
Delete the first sentence add the following: