2.2.1 Attachment 3 QASP 8.5.25.pdf
PDF 170 KB Posted
- Attached to
- Flood Catastrophic Modeling Software Federal contract opportunity
- Solicitation number
- 70FA6025R00000021
- Issued by
- Federal Emergency Management Agency
About this file
This document is a Quality Assurance Surveillance Plan (QASP) for a federal contract to acquire software licenses for storm surge and inland flood catastrophic data modeling. The contract, to be awarded by FEMA, includes supporting services such as installation, training, documentation, and remote technical support. The QASP outlines performance objectives across five key areas: Schedule (Timeliness of Deliverables), Quality of Service (Training), Quality of Service (Technical and Troubleshooting Support), Management, and Cost Control.
The surveillance plan establishes specific performance standards with acceptable quality levels, including 100% of deliverables submitted by due dates, 90% satisfaction with training materials, 95% response to technical support requests within 48 hours, 98% availability of key personnel, and 100% cost control. The government will conduct monthly surveillance using methods like direct observation, progress meetings, and periodic surveys. Performance will be evaluated through the Contractor Performance Assessment Reporting System (CPARS), with incentives and disincentives tied to meeting or failing to meet the defined performance standards.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 2.1.2 0001 70FA6025R00000021 QA 9.2.25.pdf | ||
| 2.1.2 0001 70FA6025R00000021.pdf | ||
| 2.1.1 0001 Attachment 1 Statement of Work 9.2.25.pdf | ||
| 2.1.1 Attachment 2 Price Schedule 7.18.25.xlsx | XLSX spreadsheet | |
| 2.1.1 70FA6025R00000021 Solicitation 8.18.25.pdf | ||
| 2.1.1 Attachment 1 Statement of Work 4.28.25.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN
For FID Multiple Catastrophe Models
Contract Number: TBD upon contract award Contract Description: Acquisition of software licenses for storm surge and inland flood catastrophic data modeling, along with supporting services including installation, training, documentation, and remote technical and troubleshooting support.
Contractor’s name: TBD upon contract award
1. PURPOSE.
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
• What will be monitored.
• How monitoring will take place.
• Who will conduct the monitoring.
• How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
The following FAR clauses may apply depending on contract type:
52.246-4 Inspection of Services – Fixed-Price,
2. GOVERNMENT ROLES AND RESPONSIBILITIES.
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: Bryan Falcone Organization or Agency: FEMA Telephone: 202-316-0527 Email: bryan.falcone@fema.dhs.gov
b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. At the conclusion of the contract or when requested by the CO, the COR shall provide documentation to the CO. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The contractor shall refer any changes they deem may affect contract price, terms, or conditions to the CO for action.
TBD
c. Other Key Government Personnel
TBD
d. Contractor Program/Task Manager - TBD upon Contract Award
4. PERFORMANCE STANDARDS.
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
5. INCENTIVES.
The Government shall use past performance and exercise additional option years as incentives. Incentives shall be based on exceeding, meeting, or not meeting performance standards.
6. METHODS OF QUALITY ASSURANCE SURVEILLANCE.
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
Regardless of the surveillance method, the COR shall always contact the contractor's task manager or on-site representative when a defect is identified and inform the manager of the specifics of the problem. The COR, with assistance from the CO, if needed, shall be responsible for monitoring the contractor’s performance in meeting a specific performance standard/acceptable quality level (AQL).
a. DIRECT OBSERVATION. (Can be performed periodically or through 100% surveillance.)
The system owner, program manager, and other federal personnel assigned will directly oversee the contractor’s performance and report back to the COR. If the COR identifies any needed remediation efforts, the system owner, program manager, and other federal personnel assigned will directly oversee such remediation efforts by the contractor.
b. PROGRESS AND STATUS MEETINGS.
If the COR identifies any needed remediation efforts, status meetings will be held at a minimum weekly on such remediation efforts with the contractor, system owner, program manager, and/or other federal personnel assigned to represent the Actuarial and Catastrophic Modeling Branch. The contractor shall also submit progress reports at minimum on a weekly basis detailing the status of remediation efforts.
Direct Observation and Progress and Status Meetings
c. Surveillance results may be used as the basis for actions (to include payment deductions) against the contractor. In such cases, the Inspection of Services clause in the Contract becomes the basis for the CO’s actions.
7. QUALITY ASSURANCE SURVEILLANCE PLAN TABLE
Performance Objective Required Service Performance
Standard
Acceptable Quality
Level (AQL)
Method of Inspection
Incentive/ Disincentive
Schedule - Timeliness of Deliverables
All task order deliverables will be delivered to the Government by the due dates established in the task order.
All deliverables will be tracked and monitored for timely delivery.
100% of deliverables are submitted by the due date established in the task order.
95%
No more than 5% of deliverables shall be delivered late.
100% Inspection:
-The COR will track delivery dates
Level of Surveillance:
Monthly
Past Performance Incentive:
Positive
CPARS
assessment for Schedule
Past Performance Disincentive:
Negative
CPARS
assessment for Schedule
Quality of Service – Training
Deliver satisfactory Training Plan and associated documentation and training sessions and/or materials
100% satisfaction with Training Plan and associated documentation and training sessions and/or matierals
90%
No more than 10% of training-related deliverables/pr oducts may be rated unsatisfactory
100% Inspection:
- The COR will assess the quality of the Training Plan and documentation
- The COR will ask training recipients to evaluate the quality of training sessions and/or materials
Past Performance Incentive:
Positive
CPARS
assessment for Quality of Service
Past Performance Disincentive:
Negative
CPARS
assessment for Quality of Service
Quality of Service – Technical and Troubleshooting Support
Respond to requests for technical and troubleshooting support within 48 hours (Monday to Friday)
100% of requests responded to within 48 hours
95%
No more than 5% of requests responded to outside of the 48 hours timeframe.
Periodic surveys
- The COR will survey software users on the timeliness of
Past Performance Incentive:
Positive
CPARS
assessment for contractor responses to technical and troubleshootin g requests
Surveillance:
Monthly
Quality of Service
Past Performance Disincentive:
Negative
CPARS
assessment for Quality of Service
Management Key personnel shall be available to the COR via telephone between the hours of 9:00 AM and 5:00 PM Eastern Time (ET), Monday through Friday, and shall respond to a request for discussion or resolution of technical problems within three (3) hours of notification or next business day.
Key personnel are available and respond within the required timeframe 100% of the time.
98%
Key personnel will be unavailable no more than 2% of the time.
Continuous observation
Level of surveillance:
Monthly
Past Performance Incentive:
Positive
CPARS
assessment for Management of Key Personnel
Past Performance Disincentive:
Negative
CPARS
assessment for Management of Key Personnel
Cost Control Project activities stay within budget 100% of the time and invoices are submitted at least on a monthly basis.
Deliverables and support activities stay within budget 100% of the time.
100% 100% inspection:
-Burn rate tracked and reviewed with the progress reports
-Invoice reviews by
COR
Level of surveillance:
Monthly
Past Performance Incentive:
Positive
CPARS
assessment for Cost Control
Past Performance Disincentive:
Negative
CPARS
assessment for Cost Control
| Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP. |
| Regardless of the surveillance method, the COR shall always contact the contractor's task manager or on-site representative when a defect is identified and inform the manager of the specifics of the problem. The COR, with assistance from the CO, if n... |
File details come from the government source that posted it. Updated .