About this file
This document consists of construction plans for the Firehouse Skate Park renovation project undertaken by the City of St. George, Utah. The project involves the development of a comprehensive skatepark facility at the existing Firehouse Park location, with construction plans prepared by Mainline Engineering (Project #25-043, Inquiry #26-261). The scope of work includes site excavation, grading, compaction, concrete flatwork ranging from 5 to 8 inches in thickness, retaining walls, ramp support structures, and installation of skatepark features including quarterpipes, rails, banks, boxes, and stairs. The site contractor is responsible for all excavation, backfill, grading, compaction, and concrete work outlined in the Summary Sheet (SM-01), while the skatepark contractor will fabricate, furnish, and install all skatepark features referenced on the Feature Plan (A103). The project requires coordination between multiple contractors, with specific work sequencing outlined in the Site Plan (A102), including foundation pouring, ramp installation, feature placement, and concrete slab pouring. All construction shall comply with the City of St. George Standard Specifications for Design and Construction, the International Building Code, and the Uniform Building Code, with concrete specifications calling for 4000 PSI compressive strength, Grade 60 reinforcing steel, and a minimum floor flatness value of 35 (FF35) per ASTM E1155.
The project requires comprehensive utility coordination involving multiple service providers including the City of St. George Water Department, Dominion Energy for natural gas, St. George Energy Services for electrical power, the City Wastewater Department, Lumen Telephone, TDS Communications, Infowest fiber optic services, and other infrastructure providers. All primary underground power work and street light installation must be completed by contractors pre-qualified by St. George Energy Services, with inspection fees payable prior to permit issuance. Contractors are responsible for obtaining all necessary permits including encroachment permits, air quality permits, Notice of Intent, Notice of Termination, and Stormwater Pollution Prevention Plans (SW3P) prepared in accordance with State of Utah Division of Environmental Quality requirements. The project mandates 95% compaction in roadways and sidewalks and 90% compaction behind sidewalks, with field density reports required upon completion. General construction provisions require traffic control conforming to MUTCD standards, protection of existing utilities and landscaping, and contractor responsibility for costs associated with utility relocation or field condition changes. All construction materials and workmanship shall conform to applicable standards including ACI 318, ASCE 7, ASTM specifications for reinforcing steel and concrete testing, and requires concrete compressive strength testing and verification of 1500 PSI minimum at three days and full specified strength at 28 days.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-26-261 Bid Schedule.xls | XLS spreadsheet | |
| 3-BID BOND TEMPLATE.pdf | ||
| 5-MAJOR SUBCONTRACTOR LISTING.docx | DOCX document | |
| 4-sample - CERTIFICATE OF INSURANCE.pdf | ||
| 6-26-261 Contract Documents FIREHOUSE SKATE PARK.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SNO
W
CANYO
N PKW
Y
2000 NORTH
D
IX
IE
D
O W
N S
R D
1800 NORTH
INQUIRY NO: 26-261
FEBRUARY 2026
1/27/2026
ST. GEORGE, UT
FIREHOUSE SKATE PARK
CONSTRUCTION PLANS FOR
PROJECT LOCATION
INDEX TO SHEETS
SHEET NO. DESCRIPTION
1 COVER SHEET/INDEX TO SHEETS
UT-01 UTILITY CONTACTS/UTILITY NOTES
SA-01 SITE ACCESS SHEET
DM-01 DEMOLITION SHEET
SC-01 SURVEY CONTROL SHEET
DT-01 TO DT-02 DETAIL SHEETS
SM-01 SUMMARY SHEET
SP-01 SITE IMPROVEMENTS
RD-01 TO RD-02 CONCRETE LAYOUT SHEET
RW-01 RETAINING WALL LAYOUT
A101 TITLE PAGE
A102 SITE PLAN
A103 FEATURE PLAN
A104 FLATWORK PLAN
A105 SAWCUT PLAN
A106 FOOTINGS AND WALL
A107 SECTIONS 1
A108 SECTIONS 2
SPD101 DETAILS 1
SPD102 DETAILS 2
SPD103 DETAILS 3
C O
VE
R
S H
EE
T
PB
G
TA
R
P:
\2
5\
-0
St G eo rg e
- F ire ho us e
Sk at e Pa rk \P la ns
\1 .d w g
J an
7,
- 3 :0
1p m
BY
SHEET
M
AI
N
LI
N E
EN
G
IN
EE
R
IN
G
N
O R
TH
M
AL
L
D R
IV
E
SU
IT
E T1
ST
. G
EO
R G
E, U
T
R
EV
IS
IO
N S
N O
PR
O
JE
C
T
C
LI
EN
T
PR
O
J.
C H
EC
KE
D B
Y D
R
AW
N B
Y D
AT
E
D
AT
E
PR
O
FE
SS
IO
N
AL
E N
G
IN
EE
R
-2
M A
IN
LI
N E
EN
G
IN
EE
RI
N G
M
AI
N
LI
N E
PR
O
J.
-0
C
IT
Y
O F
ST
. G
EO
R
G E
PA
R
K
PL
AN
N
IN
G
N O
R
TH
EA
ST
ST
. G
EO
R G
E, U
T
SH
EE
T N
AM
E
FI
R
EH
O
U
SE
SK
AT
E
PA
R K
PR
O
JE
C
T 1/
/2
NOTES:
SITE/CONCRETE CONTRACTOR TO PERFORM THE FOLLOWING:
1. ALL EXCAVATION, BACKFILL, GRADING AND COMPACTION.
2. ALL BID ITEMS ON SM-01.
SKATEPARK CONTRACTOR TO PERFORM THE FOLLOWING:
1. FABRICATE, FURNISH, INSTALL, AND/OR POUR ON-SITE, ALL
SKATEPARK FEATURES REFERENCED ON SHEET A103.
2. SKATEPARK CONTRACTOR WILL COORDINATE ALL
SKATEPARK FEATURES WITH THE SITE/CONCRETE CONTRACTOR.
AutoCAD SHX Text A
AutoCAD SHX Text H
AutoCAD SHX Text U
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text G
AutoCAD SHX Text No. 353590
AutoCAD SHX Text
GILES
AutoCAD SHX Text
PHIL B.
W 8''
G G G
SD 15''
M
CO
SS 8'' SDR 35 SANITARY SEWER - DIAMETER SHOWN
C-900 CULINARY WATER - DIAMETER SHOWN
C-900 PVC "PURPLE" - IRRIGATION - DIAMETER SHOWN
NATURAL GAS (DOMINION ENERGY)
STORM DRAIN PIPE - DIAMETER SHOWN
POWER PHASE A
POWER PHASE B
POWER PHASE C
POWER PHASE ABC
FUTURE USE CONDUIT - SIZE SHOWN
SANITARY SEWER MANHOLE (SEE PLAN SHEETS FOR DIAMETER)
SANITARY SEWER CLEANOUT (4" SERVICE LATERAL)
WATER/IRRIG. VALVE (SEE PLAN SHEETS FOR TYPE AND SIZE)
FIRE HYDRANT
3/4" CULINARY WATER SERVICE, METER BOX AND METER SETTER
1" IRRIGATION SERVICE AND BOX
DIVERSION BOX OR CURB INLET CATCH BASIN (SEE PLAN
SHEETS FOR TYPE AND SIZE)
POWER - SWITCH PAD
POWER - SECONDARY FEEDER
POWER - POWER TRANSFORMER
POWER - STREET LIGHT (HISTORIC)
POWER - STREET LIGHT (COBRA HEAD)
PMH
I
IRR IRR
LEGEND
UT-01
U
TI
LI
TY
C O
N
TA
C
TS
U
TI
LI
TY
N O
TE
S
PB
G
TA
R
CITY OF ST. GEORGE WATER JUC NOTES:
1. All waterlines works must be installed by a contractor that has been pre-qualified by the City of St. George Water Department.
2. All construction shall conform to the 'City of St. George Standard Specifications for Design and Construction', 'The International Plumbing Code', and the 'Uniform
Building Code' Latest edition as administered by the City of St. George.
3. Contractor shall pothole all pipelines and verify location and depth prior to proceeding with any building or pipeline construction. If the in field conditions varies from design the contractor is responsible for costs due to changes in condition. City maps are "Best Knowledge" and approximate.
4. The potable water supply to lawn irrigation systems shall be protected against backflow per the International Plumbing Code (IPC) Section 608.16.5 and for fire sprinkler systems per (IPC) 608.16.4.
5. All Backflow Assembly Installation shall comply with backflow City Ordinance 9-1-1997. Test requirements shall be in accordance with the City of St. George
Backflow Ordinance 9-1-1997-5-6-5.
6. 12 Gauge wire shall be taped to all water lines for locating purposes. The wire shall also be brought up at each valve box and hydrant.
7. Thrust restraint on the new pipeline will be as shown on the details. Use Mega-Lug on the fittings and field lock gaskets on the required length of retrained pipe.
8. Asphalt replaced over the pipe trenching is to match existing pavement depths with a 6 inch over cut from edge of the trench line on each side of the trench
(T-patch). Asphalt patch shall be contiguous along the entire length of the restrained section of the water main.
9. Contractor shall cut off and cap (back at the water main), all existing service lines or unused stub lines that will be abandoned.
10. Any changes made in the field must be first approved and documented by the City of St. George Water Services Representative.
11. All new fire hydrants shall be installed at the correct height. Risers will not be allowed.
12. Irrigation water works may require additional approvals from respective irrigation companies.
DOMINION ENERGY:
1. Developer needs to contact Dominion Energy preconstruction department prior to breaking ground for gas sign up. Eric Ward 435-669-2269.
2. Developer will be responsible to get all compaction tests done at developer's expense.
3. If casings/conduits are needed, they are to be installed by developer at their costs. A map will be available at dominion energy for casing locations (1155 E 350 N -
St George).
4. All of the utility easements back of sidewalk will be graded, at full width, to within 6 inches of top back of curb before gas lines will be installed. **No retaining, rock, or block walls may be constructed on/in a pue **Developer will be responsible for the costs of any gas lines to be lowered and/or relocated after installation.**
5. All trenches shall be backfilled and all debris, construction materials and excess dirt piles shall be cleared away.
6. Property lot lines, back of curb and grade must be staked by developer before gas will be installed.
7. Power, water, sewer lines, culverts or other hazards not clearly noticeable shall be staked by developer.
8. Failure to comply with the above notes will result in delay of service to this project.
9. Contact JC Hall, 435-210-0729, at least two (2) weeks prior to being ready, for scheduling of installation.
10. **important notice** gas will be put on the schedule for installation when power trench is buried, streets are within 6 inches of sub-grade and the utility easement is graded to top back of curb.
11. High Pressure Gas Note:
Contractor is required to call high pressure dispatch at 801-324-3370 or Bryan Ward 435-559-6547, at least 48 hours in advance, before working within 10 feet of a high pressure gas line. This will schedule a Dominion Energy high pressure inspector to the project site.
CITY OF ST. GEORGE WASTEWATER JUC NOTES:
1. No sewers under 9' deep unless approved by the City of St. George.
2. Any sewers not in public streets shall show recorded easements.
3. Buildings may require interceptors at a later date.
4. All sewer manholes shall have "City of St. George" logo lids for final inspection.
5. 100' Maximum space between sewer lateral cleanouts.
6. All construction shall conform to the "City of St. George Standard Specifications for Design and Construction", "The International Plumbing Code", and the
"Uniform Building Code" latest edition as administered by the City of St. George.
LUMEN TELEPHONE NOTES:
1. Developer to place conduit in all JUC trench and stub up at all power locations. Contact Lumen engineer for print if needed.
2. Lumen will provide all conduit and deliver to job site. Call 435-632-6553 seven (7) days prior to requiring conduit to schedule delivery.
3. Contractor to install conduit and place pull string in all conduit to verify conduit integrity.
4. All conduit is 2" unless otherwise noted.
5. Any questions to JUC approved plans, please contact Lumen engineer Zach Mathews at 435-673-9639.
6. Any Lumen facility relocations associated with project will be billable to owner/developer. Lumen engineer must be contacted a minimum of four (4) weeks before relocation is required.
7. Developer is responsible to provide all street names and addresses within three (3) weeks of utility plan approval. Failure to provide addressed will result in a delay of service to project.
8. For most rerouting of Lumen infrastructure such as closures, pedestals, fiber or copper cables please contact Chuck Taylor at Fugal Engineering 801-403-9565 chuck.taylor@lumen.com.
9. For any road moves or road widening projects to move multiple Lumen closures, pedestals, fiber or copper cables please contact Koby Dutson 801-822-1483 or
Darren Keller 801-762-8004 darren.keller@lumen.com.
NOTES:
1. TRENCHING, BEDDING, AND COMPACTION SHALL CONFORM TO
CURRENT SGES AND CITY STANDARDS. SEE SGES DETAILS D13-D15
IN UNDERGROUND STANDARDS. PROVIDE COMPACTION TEST
RESULTS TO CITY; COPY SGES ON POWER RELATED TESTING.
2. ALL STUBBED CONDUIT SHALL TERMINATE IN A BOX PER CURRENT
UNDERGROUND STANDARDS. EACH UTILITY, POWER, FIBER, AND
TELECOMMUNICATIONS SHALL PROVIDE AND INSTALL THEIR OWN
BOXES RESPECTIVELY.
MIN. 12" DEEP
MIN. 24" DEEP
MIN. 32" DEEP
MIN. 42" DEEP
JOINT UTILITY TRENCH
WARNING TAPE
6" WIDE MIN.
24"
12"
12"
8"
10"
PLACE SAND 12"
ABOVE, 6" BELOW AND
BOTH SIDES OF UTILITY
CENTURYLINK (1) 2" CONDUIT
GO FIBER (1) 2" CONDUIT
TDS COMMUNICATION (2) 2" CONDUITS
SECONDARY POWER CONDUITS
AS NEEDED
PRIMARY POWER CONDUITS
AS NEEDED
DOMINION ENERGY HP GAS NOTES:
1. Call Dominion Energy (formerly Questar Gas) at 801-324-3370, 48 hours prior to working within 10 feet of any high pressure gas line. This will schedule a Company
High Pressure Inspector to be present during construction activities near the HP gas pipelines
2. All high pressure gas pipelines shall be protected in place.
3. Maintain at least 3 feet horizontal and 1 foot vertical clearance, (outside to outside) between high pressure gas pipelines and other utility pipes, boxes, manholes, etc.
4. No vibratory on compaction equipment allowed within 5 feet of the outside of the high pressure gas line. If static rolling of the road base doesn't achieve minimum compaction specifications, flow fill will need to be used over the HP gas pipelines. Vibratory paving equipment is ok to use over the HP gas pipelines
5. Flow fill will also need to be used to backfill proposed utility crossings with the high pressure gas line, when the vertical clearance is less than 2 feet from outside of pipe to outside of pipe. At least 12" minimum flow sand needs to be installed directly over the high pressure gas line, under the flow fill. Visqueen plastic needs to be laid over the sand to prevent migration of the flow fill into the sand.
6. Contractor to provide Dominion Energy HP Engineer with a list of construction equipment that will be crossing and working over the high pressure gas pipelines.
Loading analysis needs to be performed prior to the start of construction to determine if the equipment is safe to cross the HP gas pipelines.
7. Potholes of the high pressure gas pipelines shall be done at points where cover depths are unknown, especially at proposed utility crossings, so that the above requirements can be followed..
8. Bladed excavation vehicles shall not drop their blade to cut directly over the high pressure gas lines, where the cover depth is less than 3 feet. Carefully dig with a tracked excavator above the high pressure gas, with a Company High Pressure Inspector observing.
GENERAL CONSTRUCTION NOTES:
1. All construction and materials shall be in accordance with the project specifications; St. George City standard specifications for design and construction; any other applicable standards issued by the controlling agency. The uniform building code and all local government codes and ordinances applicable.
2. The contractor shall take all precautionary measures necessary to protect the existing improvements which are to remain in place, from damage, and all such improvements or structures damaged by the contractor's operations shall be repaired or reconstructed satisfactory to the owner at the expense of the contractor.
3. The contractor shall be responsible for the location of and protection of all existing underground utilities and overhead power lines during construction.
4. All grading to be within +/- 0.1' of proposed elevations.
5. An encroachment permit is required for any work within the public Right-Of-Way. An air quality permit is also required in order to perform construction. The contractor shall secure all permits and inspections required for this construction. Contact Clint Hafen (435-632-7933, clint.hafen@sgcity.org)
6. The contractor shall install an information sign on site before construction begins. The sign shall have a minimum size, placement location and content information with the company name, phone number and permit number.
7. Contractor is responsible to obtain all necessary permits pertaining to storm water. This includes, but is not limited to, Notice of Intent, Notice of Termination, and storm water pollution prevention plan (SW3P). a SW3P tracking document will need to be signed and returned before a grading permit will be issued. the SW3P shall be prepared as required by State of Utah Division of Environmental Quality requirements. Contractor shall maintain all such permits and is required to have SW3P on-site at all times as required by St. George City and the State of Utah Department of Environmental Quality.
Contact Kristi Schultz (435-627-4142, kristi.schul tz@sgcity.org).
8. Projects shall submit a dust control plan with details on equipment scheduling and reporting of dust control activities.
9. Existing utilities are shown on the plans for the convenience of the contractor only. The engineer bears no responsibility for utilities not shown, or shown incorrectly.
10. The contractor shall provide traffic control and maintain traffic flow within all public Rights-of-Way unless arrangements are made and written approval granted from the
City of St. George. Traffic control shall conform to MUTCD standards.
13. Contractor shall pothole all critical utilities as needed to verify location and potential conflicts.
14. The contractor shall be responsible for ensuring that the interior of all pipe be clear of debris including soil, rocks, trash, etc.
TDS, CATV BROADBAND NOTES:
1. The developer will provide all required trench within the project. Any modifications along the periphery to feed this project will be billed to the developer.
2. TDS will place conduits in an open/joint trench. Please contact TDS Engineering at 435-288-1415 at least 3 weeks prior to opening trench to create design and schedule work.
3. Contact TDS prior to constructing buildings for prewire options for fiber optic service. Any other questions regarding construction of service should be directed to TDS
Engineering at 435-288-1415.
4. Relocation of new or existing TDS facilities will be billable to the developer/contractor.
5. Any modifications after conduit/cable placement will be billable to the developer/contractor as will damages caused by other contractors working for the developer on this project.
INFOWEST, CATV/FIBER OPTIC NOTES:
1. Developer to provide all required trenching within the project.
2. Any modifications required to feed project will be billed to the developer.
3. Infowest will provide all conduits. Call 435-272-3559 or email juc@infowest.com for conduit delivery at least one (1) week prior to opening the trench.
4. For commercial projects with an MDF/Comm Room. Developer will install a 2" PVC run to the exterior of building.
5. Any questions regarding service should be directed towards Gab Tremblay at 435-272-3559 or juc@infowest.com
6. Relocation of existing new or existing GO Fiber facilities are billable to the developer. the developer will be provided with an estimate of costs for work done.
P:
\2
5\
-0
St G eo rg e
- F ire ho us e
Sk at e Pa rk \P la ns
\U T.
dw
6,
- 1 :3
4p m
BY
SHEET
M
AI
N
LI
N E
EN
G
IN
EE
R
IN
G
N
O R
TH
M
AL
L
D R
IV
E
SU
IT
E T1
ST
. G
EO
R G
E, U
T
R
EV
IS
IO
N S
N O
PR
O
JE
C
T
C
LI
EN
T
PR
O
J.
C H
EC
KE
D B
Y D
R
AW
N B
Y D
AT
E
D
AT
E
PR
O
FE
SS
IO
N
AL
E N
G
IN
EE
R
-2
M A
IN
LI
N E
EN
G
IN
EE
RI
N G
M
AI
N
LI
N E
PR
O
J.
-0
C
IT
Y
O F
ST
. G
EO
R
G E
PA
R
K
PL
AN
N
IN
G
N O
R
TH
EA
ST
ST
. G
EO
R G
E, U
T
SH
EE
T N
AM
E
FI
R
EH
O
U
SE
SK
AT
E
PA
R K
PR
O
JE
C
T 1/
/2
ST. GEORGE ENERGY SERVICES POWER NOTES
1. Primary power from switch to switch shall be 750 wire in 3" conduit (90°c temp. rating).
2. Primary power from vault to transformer shall be 1/0 wire in 3" conduit unless otherwise noted. All wire shall have a temperature rating of 90°c
3. Secondary power from transformer to meter: All wire shall have a temperature rating of 90°c and conform to current NEC requirements for allowable capacities and voltage drop. Where secondary power is maintained by St. George Energy Services (SGES), wire and conduit sizes will be specified on the approved JUC plan.
Secondary wire maintained by SGES shall be aluminum. Otherwise, secondary wire and conduit shall be sized by the building electrical engineer.
4. Contractor to follow all Blue Stakes protocols.
5. The power design on this utility plan is considered by SGES as preliminary and non-bidable until accompanied by a JUC approval stamp.
6. All primary underground power work and street light installation must be provided and installed by a contractor that has been prequalified by SGES and meet all SGES standards. All overhead work/installation must be completed by SGES. Inspection fees and other applicable costs assessed by SGES upon JUC approval shall be paid prior to a permit being issued. Overhead power or other work completed by SGES will be billed to the prequalified contractor/owner and paid prior to the final inspection.
7. It is the responsibility of the owner to provide locations, elevations, and applicable easements for each of the power facilities that are to be installed with the project. The final grade of the area/easement shall be established before construction can begin for any buried power, pad mount equipment, or overhead power. If the grade changes after the construction has been completed, the cost to change the elevation shall be billable to the owner. Pad mount equipment is typically placed 6-ft behind TBC but shall not be less than pad mount clearances identified in the current SGES underground standards. Contractor shall provide applicable control such as TBC location and elevation, or other, prior to placement of electrical equipment.
8. All JUC trenches will be backfilled and compacted in 6" to 8" lifts to a compaction of 95% in roadways/sidewalks and 90% behind sidewalk. Testing is to be done at middle and top of trench. Trench construction shall conform to SGES details D13, D14, D15, & D18. alternate trench construction shall be approved by SGES prior to installation. Transformer pads and other heavy electrical equipment shall be backfilled and compacted in 6" to 8" lifts to a compaction of 95%. Field density reports from an accredited geotechnical engineering company shall be submitted to the SGES engineering department upon completion of the project.
9. All changes to existing grades near existing power utilities must be approved by SGES prior to construction.
10. Any in-field changes to the JUC approved power design will be at the developer's expense and must be pre-approved and documented by SGES prior to installation.
11. Landscaping around all primary power equipment shall conform to SGES standards and applicable SGES details. Trees planted under overhead power shall not grow more than 15-ft when fully matured. Mature vegetation shall not obstruct SGES access to or into pad mount equipment. No above-ground irrigation systems are permitted within 10-ft around the equipment pads. Landscape rock shall not exceed 1" diameter.
12. Please reference the current SGES underground standards for information on installation guidelines and metering standards. Coordinate equipment marking and tagging requirements with the SGES inspector.
AutoCAD SHX Text
SS
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text F
F
SITE ACCESS
(PROTECT EXISTING FACILITES,
MINIMIZE TRIPS ACROSS
CONCRETE PATH)
DI
XI
E
DO
W
NS
R D
SA-01
SI
TE
A C
C
ES
S
SH
EE
T
PB
G
TA
R
P:
\2
5\
-0
St G eo rg e
- F ire ho us e
Sk at e Pa rk \P la ns
\S A.
2,
- 1 2:
pm
BY
SHEET
M
AI
N
LI
N E
EN
G
IN
EE
R
IN
G
N
O R
TH
M
AL
L
D R
IV
E
SU
IT
E T1
ST
. G
EO
R G
E, U
T
R
EV
IS
IO
N S
N O
PR
O
JE
C
T
C
LI
EN
T
PR
O
J.
C H
EC
KE
D B
Y D
R
AW
N B
Y D
AT
E
D
AT
E
PR
O
FE
SS
IO
N
AL
E N
G
IN
EE
R
-2
M A
IN
LI
N E
EN
G
IN
EE
RI
N G
M
AI
N
LI
N E
PR
O
J.
-0
C
IT
Y
O F
ST
. G
EO
R
G E
PA
R
K
PL
AN
N
IN
G
N O
R
TH
EA
ST
ST
. G
EO
R G
E, U
T
SH
EE
T N
AM
E
FI
R
EH
O
U
SE
SK
AT
E
PA
R K
PR
O
JE
C
T 1/
/2
1800 NORTH
SITE ACCESS NOTES:
1. NO CONCRETE TRUCKS ALLOWED ACROSS THE
CONCRETE PATH
2. SITE ACCESS IS FOR REMOVING GRASS AND PLACING
UNTREATED BASE COURSE AND TOP SOIL.
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CUT
FILL
FILL
FILL
FILL
FILL
FIL
L
FI
LL
0+50
~ LIMITS OF GRASS REMOVAL
(COORDINATE LIMITS WITH CITY)
GRASS REMOVAL (~1,000 SQ FT)
(COORDINATE LIMITS WITH CITY,
~ 6" DEEP)
STA:0+79.16, 98.24' LT
STA:0+73.31, 22.07' LT
STA:0+24.07, 25.43' LT
0+00
1+00
1+40
BP: 0+00.00
EP: 1+40.00
NOTES:
1. PROTECT EXISTING UTILITIES IN PLACE.
2. PROTECT EXISTING LANDSCAPING IN PLACE
3. PROTECT EXISTING IRRIGATION IN PLACE
4. CITY WILL REPAIR IRRIGATION AND LANDSCAPING
IMPACTED BY NEW IMPROVEMENTS. ALL OTHER
DAMAGED AREAS AND FACILITIES WILL BE REPAIRED
BY THE CONTRACTOR AT CONTRACTOR'S EXPENSE.
DM-01
D
EM
O
LI
TI
O
N S
H
EE
T
PB
G
TA
R
P:
\2
5\
-0
St G eo rg e
- F ire ho us e
Sk at e Pa rk \P la ns
\D M
.d
7,
- 3
:2 0p m
BY
SHEET
M
AI
N
LI
N E
EN
G
IN
EE
R
IN
G
N
O R
TH
M
AL
L
D R
IV
E
SU
IT
E T1
ST
. G
EO
R G
E, U
T
R
EV
IS
IO
N S
N O
PR
O
JE
C
T
C
LI
EN
T
PR
O
J.
C H
EC
KE
D B
Y D
R
AW
N B
Y D
AT
E
D
AT
E
PR
O
FE
SS
IO
N
AL
E N
G
IN
EE
R
-2
M A
IN
LI
N E
EN
G
IN
EE
RI
N G
M
AI
N
LI
N E
PR
O
J.
-0
C
IT
Y
O F
ST
. G
EO
R
G E
PA
R
K
PL
AN
N
IN
G
N O
R
TH
EA
ST
ST
. G
EO
R G
E, U
T
SH
EE
T N
AM
E
FI
R
EH
O
U
SE
SK
AT
E
PA
R K
PR
O
JE
C
T 1/
/2
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DI
XI
E
DO
W
NS
R D
P1P3
P2
0+00
1+00
1+40
BP: 0+00.00
EP: 1+40.00
FIREHOUSE SKATE PARK
1+40.00
N: 10021655.567 E: 1021261.549
FIREHOUSE SKATE PARK
0+00.00
N: 10021515.893 E: 1021271.090
N0 3°
' 2
8" W
0.0
1800 NORTH
CONTROL POINTS
POINT
P1
P2
P3
NORTHING
10,021,670.16
10,021,420.84
10,021,676.64
EASTING
1,021,313.29
1,021,329.39
1,021,005.63
ELEVATION
2883.12
2880.42
2870.54
DESCRIPTION
PK NAIL
PK NAIL
PK NAIL
DATUM INFORMATION:
HORIZONTAL DATUM = NORTH AMERICAN DATUM OF 1983 (N.A.D.83)
VERTICAL DATUM = NORTH AMERICAN VERTICAL DATUM OF 1988 (N.A.V.D.88)
COORDINATE SYSTEM = US STATE PLANE 1983, UTAH SOUTH ZONE (4303)
GEOID MODEL - GEOID 18
UNITS - US SURVEY FEET SC-01
SU
R
VE
Y
C O
N
TR
O L
PB
G
TA
R
P:
\2
5\
-0
St G eo rg e
- F ire ho us e
Sk at e Pa rk \P la ns
\S C
.d
6,
- 1
:3 6p m
BY
SHEET
M
AI
N
LI
N E
EN
G
IN
EE
R
IN
G
N
O R
TH
M
AL
L
D R
IV
E
SU
IT
E T1
ST
. G
EO
R G
E, U
T
R
EV
IS
IO
N S
N O
PR
O
JE
C
T
C
LI
EN
T
PR
O
J.
C H
EC
KE
D B
Y D
R
AW
N B
Y D
AT
E
D
AT
E
PR
O
FE
SS
IO
N
AL
E N
G
IN
EE
R
-2
M A
IN
LI
N E
EN
G
IN
EE
RI
N G
M
AI
N
LI
N E
PR
O
J.
-0
C
IT
Y
O F
ST
. G
EO
R
G E
PA
R
K
PL
AN
N
IN
G
N O
R
TH
EA
ST
ST
. G
EO
R G
E, U
T
SH
EE
T N
AM
E
FI
R
EH
O
U
SE
SK
AT
E
PA
R K
PR
O
JE
C
T 1/
/2
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
REINFORCED CONCRETE LAP SPLICE SCHEDULE
F'c= 4000 PSI AT 28 DAYS
HORIZ. BARS ONLY
18 24 30 36 53 60
#3
BARS
#4
BARS
#5
BARS
#6
BARS
#7
BARS
#8
BARS
REINFORCEMENT LENGTH (INCHES)
NOTES:
1. DESIGN COMPLIES WITH 2012 INTERNATIONAL BUILDING CODE, ACI 318 AND ASCE 7. RETAINING
WALL DESIGN FOR COMBINED LIVE LOAD, DEAD LOAD AND SEISMIC LOAD.
2. MINIMUM CONCRETE MIX REQUIREMENTS (IN ACCORDANCE TO ACI 318, SECTION 4.3):
CONCRETE COMPRESSIVE STRENGTH. fc: 4000 PSI
MAXIMUM WATER TO CEMENT RATIO: 0.45
CEMENTITIOUS MATERIAL : TYPE V + POZZOLAN OR SLAG
3. STRUCTURAL CONCRETE SHALL REACH A MINIMUM 3-DAY COMPRESSIVE STRENTH OF 1500 PSI
AND SHALL REACH THE SPECIFIED COMPRESSIVE STRENGTH IN 28 DAYS. CONCRETE
COMPRESSIVE TESTS SHALL CONFORM TO ASTM C 150 "TEST METHOD SAMPLING AND TESTING
CONCRETE MASONRY UNITS AND RELATED UNITS". CEMENTITIOUS MATERIAL SHALL CONFORM
TO ASTM C 150 "SPECIFICATION FOR PORTLAND CEMENT"
4. DEFORMED CONCRETE REINFORCING SHALL BE GRADE 60 REINFORCING STEEL CONFORMING TO
ASTM A 615 "STANDARD SPECIFICATION FOR DEFORMED AND PLAIN CARBON-STEEL BARS FOR
CONCRETE REINFORCEMENT".
5. BAR MATS FOR CONCRETE REINFORCING SHALL CONFORM TO ASTM A 184 "STANDARD
SPECIFICATION FOR WELDED DEFORMED STEEL BAR MATS FOR CONCRETE REINFORCEMENT".
REINFORCING BARS USED IN BAR MATS SHALL CONFORM TO ASTM A 515 OR ASTM A 706.
6. NO ADMIXTURES, OTHER THAN AIR-ENTRAINING ADMIXTURE CONFORMING TO "STANDARD
SPECIFICATIONS FOR AIR ENTRAINING ADMIXTURES FOR CONCRETE" (ASTM C 260) MAY BE USED
WITHOUT THE WRITTEN APPROVAL FROM THE ENGINEER, CALCIUM CHLORIDE AND CONCRETE
ADMIXTURES CONTAINING CHLORIDE SALTS ARE NOT PERMITTED.
7. LAP ALL REINFORCING BARS ACCORDING TO THE FOLLOWING LAP SPLICE SCHEDULE, WHERE WALL/FOOTING REINFORCING IS REQUIRED TO BE SPLICED, SPLICING SHALL ONLY TAKE PLACE IN
HORIZONTAL REBAR ONLY, NO VERTICAL REBAR TO BE SPLICED:
8. ALL FOOTINGS NEED TO BE LEVELED AND TROWELED THE SAME AS THE FINISHED CONCRETE SLAB.
2' -0
16"
8"
(2') CONCRETE
RETAINING WALL
8"
30"
HUBBA FEATURE - FOOTING
5" R
EI
N
FO
R
C
ED
C O
N C
R
ET
E
SL
AB
5" R
EI
N
FO
R
C
ED
C O
N C
R
ET
E
SL
AB
24"#4 @ 12" O.C.
#4 @ 18" O.C.
#4 @ 18" O.C.
#4 @ 12" O.C.
1/2" TOOLED RADIUS
(ALL EXPOSED EDGES)
#4 @ 24" O.C.
#4 @ 12" O.C.
6" UTBC
HUBBA FEATURE BY
SKATEPARK CONTRACTOR
1/2" EXPANSION JOINT
W/ SEALANT
6" UTBC
GENERAL HUBBA FEATURE - FOOTING NOTES:
1. SLOPE FOOTING WITH THE GRADE.
2. ALL FOOTINGS NEED TO BE LEVELED AND TROWELED
THE SAME AS THE FINISHED CONCRETE SLAB. DT-01
D
ET
AI
L
SH
EE
T C
O N
C R
ET
E
R
ET
AI
N
IN
G
W
AL
L
PB
G
TA
R
P:
\2
5\
-0
St G eo rg e
- F ire ho us e
Sk at e Pa rk \P la ns
\D T_
W
AL
LS
.d
7,
- 2 :5
6p m
BY
SHEET
M
AI
N
LI
N E
EN
G
IN
EE
R
IN
G
N
O R
TH
M
AL
L
D R
IV
E
SU
IT
E T1
ST
. G
EO
R G
E, U
T
R
EV
IS
IO
N S
N O
PR
O
JE
C
T
C
LI
EN
T
PR
O
J.
C H
EC
KE
D B
Y D
R
AW
N B
Y D
AT
E
D
AT
E
PR
O
FE
SS
IO
N
AL
E N
G
IN
EE
R
-2
M A
IN
LI
N E
EN
G
IN
EE
RI
N G
M
AI
N
LI
N E
PR
O
J.
-0
C
IT
Y
O F
ST
. G
EO
R
G E
PA
R
K
PL
AN
N
IN
G
N O
R
TH
EA
ST
ST
. G
EO
R G
E, U
T
SH
EE
T N
AM
E
FI
R
EH
O
U
SE
SK
AT
E
PA
R K
PR
O
JE
C
T 1/
/2
REINFORCED CONCRETE LAP SPLICE SCHEDULE
F'c= 4000 PSI AT 28 DAYS
HORIZ. BARS ONLY
18 24 30 36 53 60
#3
BARS
#4
BARS
#5
BARS
#6
BARS
#7
BARS
#8
BARS
REINFORCEMENT LENGTH (INCHES)
NOTES:
1. DESIGN COMPLIES WITH 2012 INTERNATIONAL BUILDING CODE, ACI 318 AND ASCE 7. RETAINING
WALL DESIGN FOR COMBINED LIVE LOAD, DEAD LOAD AND SEISMIC LOAD.
2. MINIMUM CONCRETE MIX REQUIREMENTS (IN ACCORDANCE TO ACI 318, SECTION 4.3):
CONCRETE COMPRESSIVE STRENGTH. fc: 4000 PSI
MAXIMUM WATER TO CEMENT RATIO: 0.45
CEMENTITIOUS MATERIAL : TYPE V + POZZOLAN OR SLAG
3. STRUCTURAL CONCRETE SHALL REACH A MINIMUM 3-DAY COMPRESSIVE STRENTH OF 1500 PSI
AND SHALL REACH THE SPECIFIED COMPRESSIVE STRENGTH IN 28 DAYS. CONCRETE
COMPRESSIVE TESTS SHALL CONFORM TO ASTM C 150 "TEST METHOD SAMPLING AND TESTING
CONCRETE MASONRY UNITS AND RELATED UNITS". CEMENTITIOUS MATERIAL SHALL CONFORM
TO ASTM C 150 "SPECIFICATION FOR PORTLAND CEMENT"
4. DEFORMED CONCRETE REINFORCING SHALL BE GRADE 60 REINFORCING STEEL CONFORMING TO
ASTM A 615 "STANDARD SPECIFICATION FOR DEFORMED AND PLAIN CARBON-STEEL BARS FOR
CONCRETE REINFORCEMENT".
5. BAR MATS FOR CONCRETE REINFORCING SHALL CONFORM TO ASTM A 184 "STANDARD
SPECIFICATION FOR WELDED DEFORMED STEEL BAR MATS FOR CONCRETE REINFORCEMENT".
REINFORCING BARS USED IN BAR MATS SHALL CONFORM TO ASTM A 515 OR ASTM A 706.
6. NO ADMIXTURES, OTHER THAN AIR-ENTRAINING ADMIXTURE CONFORMING TO "STANDARD
SPECIFICATIONS FOR AIR ENTRAINING ADMIXTURES FOR CONCRETE" (ASTM C 260) MAY BE USED
WITHOUT THE WRITTEN APPROVAL FROM THE ENGINEER, CALCIUM CHLORIDE AND CONCRETE
ADMIXTURES CONTAINING CHLORIDE SALTS ARE NOT PERMITTED.
7. LAP ALL REINFORCING BARS ACCORDING TO THE FOLLOWING LAP SPLICE SCHEDULE, WHERE WALL/FOOTING REINFORCING IS REQUIRED TO BE SPLICED, SPLICING SHALL ONLY TAKE PLACE IN
HORIZONTAL REBAR ONLY, NO VERTICAL REBAR TO BE SPLICED:
8. ALL FOOTINGS NEED TO BE LEVELED AND TROWELED THE SAME AS THE FINISHED CONCRETE SLAB.
3' -9
'-9
8"
3'-9" TO 4'-9" HIGH
RAMP SUPPORT WALL
8"8" 7'-4"
8"2' -9
'-9
8"
2'-9" TO 3'-9" HIGH RAMP
SUPPORT WALL
8"8" 6'-10"
8" #4 @ 12" O.C.
#4 @ 12" O.C.
1/2" TOOLED RADIUS
(ALL EXPOSED EDGES)
#4 @ 12" O.C.
#4 @ 12" O.C.
#4 @ 12" O.C.
#4 @ 12" O.C.
1/2" TOOLED RADIUS
(ALL EXPOSED EDGES)
#4 @ 12" O.C.
#4 @ 12" O.C.6" UTBC
6" UTBC
DT-02
D
ET
AI
L
SH
EE
T R
AM
P
SU
PP
O R
T W
AL
L
PB
G
TA
R
P:
\2
5\
-0
St G eo rg e
- F ire ho us e
Sk at e Pa rk \P la ns
\D T_
W
AL
LS
.d
7,
- 2 :5
6p m
BY
SHEET
M
AI
N
LI
N E
EN
G
IN
EE
R
IN
G
N
O R
TH
M
AL
L
D R
IV
E
SU
IT
E T1
ST
. G
EO
R G
E, U
T
R
EV
IS
IO
N S
N O
PR
O
JE
C
T
C
LI
EN
T
PR
O
J.
C H
EC
KE
D B
Y D
R
AW
N B
Y D
AT
E
D
AT
E
PR
O
FE
SS
IO
N
AL
E N
G
IN
EE
R
-2
M A
IN
LI
N E
EN
G
IN
EE
RI
N G
M
AI
N
LI
N E
PR
O
J.
-0
C
IT
Y
O F
ST
. G
EO
R
G E
PA
R
K
PL
AN
N
IN
G
N O
R
TH
EA
ST
ST
. G
EO
R G
E, U
T
SH
EE
T N
AM
E
FI
R
EH
O
U
SE
SK
AT
E
PA
R K
PR
O
JE
C
T 1/
SM-01
SU
M
M
AR
Y
SH
EE
T
PB
G
TA
R
P:
\2
5\
-0
St G eo rg e
- F ire ho us e
Sk at e Pa rk \P la ns
\S M
.d
7,
- 3
:1 8p m
BY
SHEET
M
AI
N
LI
N E
EN
G
IN
EE
R
IN
G
N
O R
TH
M
AL
L
D R
IV
E
SU
IT
E T1
ST
. G
EO
R G
E, U
T
R
EV
IS
IO
N S
N O
PR
O
JE
C
T
C
LI
EN
T
PR
O
J.
C H
EC
KE
D B
Y D
R
AW
N B
Y D
AT
E
D
AT
E
PR
O
FE
SS
IO
N
AL
E N
G
IN
EE
R
-2
M A
IN
LI
N E
EN
G
IN
EE
RI
N G
M
AI
N
LI
N E
PR
O
J.
-0
C
IT
Y
O F
ST
. G
EO
R
G E
PA
R
K
PL
AN
N
IN
G
N O
R
TH
EA
ST
ST
. G
EO
R G
E, U
T
SH
EE
T N
AM
E
FI
R
EH
O
U
SE
SK
AT
E
PA
R K
PR
O
JE
C
T 1/
FILL
FILL
FILL
FILL
FIL
L
FI
LL
RECESSED 4.5"
NOTES:
1. CITY WILL PROVIDE CAD FILE AND SURFACE MODEL.
2. PROTECT EXISTING UTILITIES IN PLACE.
3. PROTECT EXISTING LANDSCAPING IN PLACE
4. PROTECT EXISTING IRRIGATION IN PLACE
5. ALL FILL SLOPES AND CUT SLOPES ARE 3H:1V
6. CITY WILL REPAIR IRRIGATION AND LANDSCAPING
IMPACTED BY NEW IMPROVEMENTS. ALL OTHER
DAMAGED AREAS AND FACILITIES WILL BE REPAIRED
BY THE CONTRACTOR AT CONTRACTOR'S EXPENSE.
SP-01
SK
AT
E
PA
R K
SI
TE
IM
PR
O
VE
M
EN
TS
PB
G
TA
R
P:
\2
5\
-0
St G eo rg e
- F ire ho us e
Sk at e Pa rk \P la ns
\S P.
7,
- 3 :1
2p m
BY
SHEET
M
AI
N
LI
N E
EN
G
IN
EE
R
IN
G
N
O R
TH
M
AL
L
D R
IV
E
SU
IT
E T1
ST
. G
EO
R G
E, U
T
R
EV
IS
IO
N S
N O
PR
O
JE
C
T
C
LI
EN
T
PR
O
J.
C H
EC
KE
D B
Y D
R
AW
N B
Y D
AT
E
D
AT
E
PR
O
FE
SS
IO
N
AL
E N
G
IN
EE
R
-2
M A
IN
LI
N E
EN
G
IN
EE
RI
N G
M
AI
N
LI
N E
PR
O
J.
-0
C
IT
Y
O F
ST
. G
EO
R
G E
PA
R
K
PL
AN
N
IN
G
N O
R
TH
EA
ST
ST
. G
EO
R G
E, U
T
SH
EE
T N
AM
E
FI
R
EH
O
U
SE
SK
AT
E
PA
R K
PR
O
JE
C
T 1/
/2
LEGEND:
CONCRETE FLATWORK
(5 INCH THICK WITH REBAR)
CONCRETE FLATWORK
(8 INCH THICK WITH REBAR)
THICKENED INTEGRATION
SLAB EDGE
PERIMETER SLAB EDGE
EXPANSION JOINT AT
FLATWORK
(2') CONCRETE
RETAINING WALL
HUBBA FEATURE - FOOTING
2'-9" TO 3'-9" HIGH
RAMP SUPPORT WALL
3'-9" TO 4'-9" HIGH
RAMP SUPPORT WALL
LANDSCAPE AREA
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FILL
FILL
FILL
FILL
FIL
L
FI
LL
0+00
1+00
1+40
BP: 0+00.00
EP: 1+40.00
8128802879
82 STA:1+16.31, 3.51' RT
EL: 2881.70
STA:1+16.31, 4.49' LT
EL: 2879.20
STA:1+16.31, 29.82' LT
EL: 2879.20
STA:1+16.31, 37.82' LT
EL: 2877.20
STA:1+16.31, 62.42' LT
EL: 2877.20
STA:1+14.81, 62.45' LT
EL: 2877.20
STA:1+14.81, 71.92' LT
EL: 2881.93
STA:1+14.81, 75.42' LT
EL: 2882.00
STA:1+08.81, 75.42' LT
EL: 2881.94
EL: 2880.94
STA:0+93.81, 75.42' LT
EL: 2880.80
STA:0+93.81, 71.25' LT
EL: 2880.73
STA:0+93.81, 62.42' LT
EL: 2876.98
STA:0+92.31, 62.42' LT
EL: 2876.96
STA:0+92.31, 37.82' LT
EL: 2876.96
STA:0+92.31, 29.82' LT
EL: 2878.96
STA:0+92.31, 21.82' LT
EL: 2879.04
STA:0+82.50, 12.00' LT
EL: 2879.08
STA:0+74.50, 12.00' LT
EL: 2879.04
STA:0+66.50, 12.00' LT
EL: 2878.04
STA:0+42.36, 12.00' LT
EL: 2877.92
STA:0+42.36, 10.50' LT
EL: 2877.93
STA:0+34.20, 10.50' LT
EL: 2880.68
STA:0+30.03, 10.50' LT
EL: 2880.76
STA:0+30.03, 4.50' RT
EL: 2880.91
EL: 2881.91
STA:0+30.03, 10.50' RT
EL: 2881.97
STA:0+33.53, 10.50' RT
EL: 2881.89
STA:0+42.36, 10.50' RT
EL: 2878.14
STA:0+42.36, 12.00' RT
EL: 2878.16
STA:0+66.50, 12.00' RT
EL: 2878.40
STA:0+74.50, 12.00' RT
EL: 2879.40
STA:0+99.83, 12.00' RT
EL: 2879.65
STA:1+07.83, 12.00' RT
EL: 2882.15
STA:1+07.83, 3.51' RT
EL: 2881.93
STA:1+07.83, 22.84' RT
EL: 2882.15
STA:1+25.78, 3.51' RT
EL: 2881.70
STA:0+82.86, 3.47' LT
EL: 2877.90
STA:0+82.86, 0.83' RT
EL: 2877.90
STA:0+66.50, 3.47' LT
EL: 2877.90
STA:0+66.16, 0.83' RT
EL: 2877.90
NOTES:
1. ELEVATION SHOWN IS TO SLAB FINISH GRADE.
2. CITY WILL PROVIDE CAD FILE AND SURFACE MODEL.
3. PROTECT EXISTING UTILITIES IN PLACE.
4. PROTECT EXISTING LANDSCAPING IN PLACE
5. PROTECT EXISTING IRRIGATION IN PLACE
6. ALL FILL SLOPES AND CUT SLOPES ARE 3H:1V
7. CITY WILL REPAIR IRRIGATION AND LANDSCAPING IMPACTED
BY NEW IMPROVEMENTS. ALL OTHER DAMAGED AREAS AND
FACILITIES WILL BE REPAIRED BY THE CONTRACTOR AT
CONTRACTOR'S EXPENSE.
RD-01
SK
AT
E
PA
R K
C O
N C
R
ET
E
LA
YO
U
T
PB
G
TA
R
P:
\2
5\
-0
St G eo rg e
- F ire ho us e
Sk at e Pa rk \P la ns
\R D
.d
6,
- 1
:3 8p m
BY
SHEET
M
AI
N
LI
N E
EN
G
IN
EE
R
IN
G
N
O R
TH
M
AL
L
D R
IV
E
SU
IT
E T1
ST
. G
EO
R G
E, U
T
R
EV
IS
IO
N S
N O
PR
O
JE
C
T
C
LI
EN
T
PR
O
J.
C H
EC
KE
D B
Y D
R
AW
N B
Y D
AT
E
D
AT
E
PR
O
FE
SS
IO
N
AL
E N
G
IN
EE
R
-2
M A
IN
LI
N E
EN
G
IN
EE
RI
N G
M
AI
N
LI
N E
PR
O
J.
-0
C
IT
Y
O F
ST
. G
EO
R
G E
PA
R
K
PL
AN
N
IN
G
N O
R
TH
EA
ST
ST
. G
EO
R G
E, U
T
SH
EE
T N
AM
E
FI
R
EH
O
U
SE
SK
AT
E
PA
R K
PR
O
JE
C
T 1/
/2
GENERAL NOTES FOR CONCRETE FLATNESS REQUIREMENTS:
1. GENERAL REQUIREMENTS:
THE CONCRETE FLOOR SLAB SHALL BE PLACED, FINISHED, AND CURED
TO ACHIEVE A MINIMUM FLOOR FLATNESS (FF) VALUE OF 35 OR
GREATER AS MEASURED IN ACCORDANCE WITH ASTM E1155,
“STANDARD TEST METHOD FOR DETERMINING FLOOR FLATNESS AND
LEVELNESS USING EITHER THE 10FT STRAIGHT EDGE METHOD OR A
FLOOR PROFILE GAUGE”
2. TESTING AND MEASUREMENT:
TESTING OF THE CONCRETE SLAB’S FLATNESS AND LEVELNESS SHALL
BE PERFORMED AFTER THE SLAB HAS ADEQUATELY CURED AND IS
FREE OF ANY EXCESSIVE MOISTURE. THE TESTING SHALL BE
CONDUCTED BY A QUALIFIED INDEPENDENT TESTING AGENCY USING
APPROPRIATE EQUIPMENT AS OUTLINED IN ASTM E1155 OR AN
APPROVED EQUIVALENT METHOD.
3. CORRECTION OF DEFICIENCIES:
IF AREAS OF THE FLOOR SLAB DO NOT MEET THE SPECIFIED FF, THE
CONTRACTOR SHALL TAKE CORRECTIVE MEASURES TO MEET THE
REQUIRED TOLERANCES. THESE MEASURES PRESCRIBED BY THE
ENGINEER MAY INCLUDE BUT ARE NOT LIMITED TO GRINDING,
RE-FINISHING, OR RE-POURING SECTIONS OF THE SLAB TO ENSURE
CONFORMANCE WITH THE SPECIFIED VALUES.
4. APPLICABLE STANDARDS:
· ASTM E1155 – “STANDARD TEST METHOD FOR DETERMINING FLOOR
FLATNESS AND LEVELNESS USING EITHER THE 10FT STRAIGHT EDGE
METHOD OR A FLOOR PROFILE GAUGE”
· ACI 117 – “SPECIFICATION FOR TOLERANCES FOR CONCRETE
CONSTRUCTION AND MATERIALS”
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
8.00' 25.33'
8.00' 24.60'
9.50'3.50'
6.
.0 0'
.0
0'
.0
0'
16.00'
13.89'
8.
8.
.1
3'
8.49'
8.
.3 3'
8.
.1 3'
8.
4.
6.87' 11.51'
3.63'
8.
8.
24.00' 21.00'
9.
10.84'
9.
8.
RD-02
SK
AT
E
PA
R K
C O
N C
R
ET
E
LA
YO
U
T
PB
G
TA
R
P:
\2
5\
-0
St G eo rg e
- F ire ho us e
Sk at e Pa rk \P la ns
\R D
_0 2.
6,
- 1 :3
7p m
BY
SHEET
M
AI
N
LI
N E
EN
G
IN
EE
R
IN
G
N
O R
TH
M
AL
L
D R
IV
E
SU
IT
E T1
ST
. G
EO
R G
E, U
T
R
EV
IS
IO
N S
N O
PR
O
JE
C
T
C
LI
EN
T
PR
O
J.
C H
EC
KE
D B
Y D
R
AW
N B
Y D
AT
E
D
AT
E
PR
O
FE
SS
IO
N
AL
E N
G
IN
EE
R
-2
M A
IN
LI
N E
EN
G
IN
EE
RI
N G
M
AI
N
LI
N E
PR
O
J.
-0
C
IT
Y
O F
ST
. G
EO
R
G E
PA
R
K
PL
AN
N
IN
G
N O
R
TH
EA
ST
ST
. G
EO
R G
E, U
T
SH
EE
T N
AM
E
FI
R
EH
O
U
SE
SK
AT
E
PA
R K
PR
O
JE
C
T 1/
/2
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FILL
FILL
FILL
FILL
FIL
L
FI
LL
0+00
1+00
1+40
BP: 0+00.00
EP: 1+40.00
0+50
STA:0+92.31, 37.82' LT
TOP OF HUBBA FEATURE
FOOTING EL: 2876.58
STA:0+92.31, 29.82' LT
TOP OF HUBBA FEATURE
FOOTING EL: 2878.58
STA:0+92.31, 21.82' LT
TOP OF HUBBA FEATURE
FOOTING EL: 2878.68
STA:0+82.50, 12.00' LT
TOP OF HUBBA FEATURE
FOOTING EL: 2878.68
STA:0+74.50, 12.00' LT
TOP OF HUBBA FEATURE
FOOTING EL: 2878.64
STA:0+66.50, 12.00' LT
TOP OF HUBBA FEATURE
FOOTING EL: 2877.64
STA:1+16.31, 62.42' LT
TOP OF WALL EL: 2878.80
FOOTING EL: 2876.80
STA:1+16.31, 30.42' LT
TOP OF WALL EL: 2878.80
FOOTING EL: 2876.80
(2') CONCRETE
RETAINING WALL
NOTES:
1. CITY WILL PROVIDE CAD FILE AND SURFACE MODEL.
2. PROTECT EXISTING UTILITIES IN PLACE.
3. PROTECT EXISTING LANDSCAPING IN PLACE
4. PROTECT EXISTING IRRIGATION IN PLACE
5. CITY WILL REPAIR IRRIGATION AND LANDSCAPING
IMPACTED BY NEW IMPROVEMENTS. ALL OTHER
DAMAGED AREAS AND FACILITIES WILL BE REPAIRED
BY THE CONTRACTOR AT CONTRACTOR'S EXPENSE.
6. SEE SP-01 FOR WALL TYPE.
RW-01
SK
AT
E
PA
R K
R
ET
AI
N
IN
G
W
AL
L/
FO
O
TI
N G
L
AY
O U
T
PB
G
TA
R
P:
\2
5\
-0
St G eo rg e
- F ire ho us e
Sk at e Pa rk \P la ns
\R W
.d
6,
- 1
:3 8p m
BY
SHEET
M
AI
N
LI
N E
EN
G
IN
EE
R
IN
G
N
O R
TH
M
AL
L
D R
IV
E
SU
IT
E T1
ST
. G
EO
R G
E, U
T
R
EV
IS
IO
N S
N O
PR
O
JE
C
T
C
LI
EN
T
PR
O
J.
C H
EC
KE
D B
Y D
R
AW
N B
Y D
AT
E
D
AT
E
PR
O
FE
SS
IO
N
AL
E N
G
IN
EE
R
-2
M A
IN
LI
N E
EN
G
IN
EE
RI
N G
M
AI
N
LI
N E
PR
O
J.
-0
C
IT
Y
O F
ST
. G
EO
R
G E
PA
R
K
PL
AN
N
IN
G
N O
R
TH
EA
ST
ST
. G
EO
R G
E, U
T
SH
EE
T N
AM
E
FI
R
EH
O
U
SE
SK
AT
E
PA
R K
PR
O
JE
C
T 1/
/2
AutoCAD SHX Text
( IN FEET )
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
IS
S
U E
/2
6/
D R
A W
N B
Y D
D
C
IT
Y O
F S
T.
G
E O
R G
E
PA
R K
P
LA
N N
IN
G
0N
0E S
T.
G
E O
R G
E , U
T
P R
O
JE
C T
FI
R
E H
O U
S E
S K
AT
E
PA
R
K
P R
O
JE
C T
N O
-2
O M
E G
A R
A M
P S
S . R
IV
E
R W
IL
LO
W L
N
W A
S H
IN
G
TO
N
, U T
A101
SHEET
NUMBER SHEET NAME
A101 Title Page
A102 Site Plan
A103 Feature Plan
A104 Flatwork Plan
A105 Sawcut Plan
A106 Footings and walls
A107 Sections 1
A108 Sections 2
SPD101 Details 1
SPD102 Details 2
SPD103 Details 3
FIREHOUSE SKATEPARK
Ti tle
P ag e
U E
/2
6/
D R
A W
N B
Y D
D
C
IT
Y O
F S
T.
G
E O
R G
E
PA
R K
P
LA
N N
IN
G
0N
0E S
T.
G
E O
R G
E , U
T
P R
O
JE
C T
FI
R
E H
O U
S E
S K
AT
E
PA
R
K
P R
O
JE
C T
N O
-2
O M
E G
A R
A M
P S
S . R
IV
E
R W
IL
LO
W L
N
W A
S H
IN
G
TO
N
, U T
A102 ite
P la n
PROJECT WORK SEQUENCE
1.
2.
3.
4.
5.
SITE CONTRACTOR PERFORMS EXCAVATION
AND GRADING. POURS ALL FOOTINGS AND WALLS
SKATEPARK CONTRACTOR INSTALLS RAMPS,
BOXES, AND RAILS
SKATEPARK CONTRACTOR PREPS AND
POURS BANKS, HIPS, AND SLAPPY CURB
CONCRETE CONTRACTOR POURS
SKATEPARK BODY SLABS
CONCRETE CONTRACTOR POURS DECK SLABS
6. SITE CONTRACTOR OR CITY BACKFILLS
EARTH BEHIND RETAINING WALLS AND
SLOPED AWAYFROM SKATEPARK
FEATURES TO SOUTH AND SOUTHEAST
U E
/2
6/
D R
A W
N B
Y D
D
C
IT
Y O
F S
T.
G
E O
R G
E
PA
R K
P
LA
N N
IN
G
0N
0E S
T.
G
E O
R G
E , U
T
P R
O
JE
C T
FI
R
E H
O U
S E
S K
AT
E
PA
R
K
P R
O
JE
C T
N O
-2
O M
E G
A R
A M
P S
S . R
IV
E
R W
IL
LO
W L
N
W A
S H
IN
G
TO
N
, U T
A103
Fe at ur e
P la n
SYMBOL DESCRIPTION
A 3 FT QUARTERPIPE
B 4 FT QUARTERPIPE
C 5’ PIP QUARTERPIPE
D FLAT TO DOWN RAIL ROUND
E KICKER RAMP
F SHOTCRETE HIP
G PRECAST STAIRS
H BANK - PIP
I DOWN RAIL - SQUARE
J FLYOUT BOX 16’X2’
K FLYOUT MANNY PAD/LEDGE 15’X44”
L SKINNY DOWN LEDGE
M SLAPPY CURB PIP
SKATEPARK FEATURES
C
B
A
H
L K
J
J
M
H I
F
EH
DG
B
U E
/2
6/
D R
A W
N B
Y D
D
C
IT
Y O
F S
T.
G
E O
R G
E
PA
R K
P
LA
N N
IN
G
0N
0E S
T.
G
E O
R G
E , U
T
P R
O
JE
C T
FI
R
E H
O U
S E
S K
AT
E
PA
R
K
P R
O
JE
C T
N O
-2
O M
E G
A R
A M
P S
S . R
IV
E
R W
IL
LO
W L
N
W A
S H
IN
G
TO
N
, U T
A104
Fl at w or k P la n
SLOPED BANK
COORDINATE W/
SKATEPARK CONTRACTOR
ON DETAILS FOR SLOPED
GEOMETRY
5” SLAB. THICKEN EDGES AND
PREPARE JOINTS PER ENG
DRAWINGS AND SPECS
5” SLAB. THICKEN EDGES AND
PREPARE JOINTS PER ENG
DRAWINGS AND SPECS
5” SLAB. THICKEN EDGES AND
PREPARE JOINTS PER ENG
DRAWINGS AND SPECS
5” SLAB. THICKEN EDGES AND
PREPARE JOINTS PER ENG
DRAWINGS AND SPECS
AFLATWORK PLAN
3/32” = 1’ - 0”
5” RAMP DECK SLAB
THICKEN TO 8” ALONG
EDGE OF PRECAST
FEATURES
5” RAMP DECK SLAB
THICKEN TO 8” ALONG
EDGE OF PRECAST
FEATURES
STEEL NOSING. SKATEPARK
CONTRACTOR PROVIDED SITE
CONTRACTOR INSTALLED
U E
/2
6/
D R
A W
N B
Y D
D
C
IT
Y O
F S
T.
G
E O
R G
E
PA
R K
P
LA
N N
IN
G
0N
0E S
T.
G
E O
R G
E , U
T
P R
O
JE
C T
FI
R
E H
O U
S E
S K
AT
E
PA
R
K
P R
O
JE
C T
N O
-2
O M
E G
A R
A M
P S
S . R
IV
E
R W
IL
LO
W L
N
W A
S H
IN
G
TO
N
, U T
A105 aw cu t P la n
NOTES:
• 1. SAWCUTS PER ACI 302.1R.
• 2. SITE CONTRACTOR RESPONSIBLE
FOR ALL SAWCUTS IN SLABS WITHIN THEIR
S.O.W.
LEGEND:
SAWCUT PATH
ASAWCUT PLAN
3/32” = 1’ - 0”
ALIGN WITH FEATURE
ALIGN WITH FEATURE
ALIGN WITH FEATURE
ALIGN WITH FEATURE
SAWCUT UNDER RAIL
POST TO POST
U E
/2
6/
D R
A W
N B
Y D
D
C
IT
Y O
F S
T.
G
E O
R G
E
PA
R K
P
LA
N N
IN
G
0N
0E S
T.
G
E O
R G
E , U
T
P R
O
JE
C T
FI
R
E H
O U
S E
S K
AT
E
PA
R
K
P R
O
JE
C T
N O
-2
O M
E G
A R
A M
P S
S . R
IV
E
R W
IL
LO
W L
N
W A
S H
IN
G
TO
N
, U T
A106
Fo ot in gs a nd w al ls
BSLAB FTGS AND WALLS
3/32” = 1’ - 0”
AFTGS AND WALLS ISO
NTS
SYMBOL DESC.
A 8” SLAB FOOTING REF.
7/SPD102
B 8” SUPPORT WALL TYP.
A A
A
A
A A
A
U E
/2
6/
D R
A W
N B
Y D
D
C
IT
Y O
F S
T.
G
E O
R G
E
PA
R K
P
LA
N N
IN
G
0N
0E S
T.
G
E O
R G
E , U
T
P R
O
JE
C T
FI
R
E H
O U
S E
S K
AT
E
PA
R
K
P R
O
JE
C T
N O
-2
O M
E G
A R
A M
P S
S . R
IV
E
R W
IL
LO
W L
N
W A
S H
IN
G
TO
N
, U T
A107 ec tio ns
KEY MAP SCALE: N/A
3 3
5 4
1 SECTION SCALE: 3/16” = 1’ - 0”
2 SECTION SCALE: 3/16” = 1’ - 0”
3 SECTION SCALE 1/8” = 1’ - 0”
4 SECTION SCALE 1/8=0.125 1’ - 0”
3' -9
15'-0"
4' -9
5"
5'-10"
21'-8"
6” UTBC
6” UTBC 3'
-9
5'-10" 15'-0"
2' -9
8”
5”
21’ - 8”
6” UTBC
SPD102
4SPD103
SPD101
1SPD101
SPD102
SPD101
SPD101
SPD102
SPD102
SPD102
6” UTBC
6” UTBC
SLOPED
FILL
DECK SLAB
PRECAST RAMPS
SPD103
4POUR MONOLITIC RAMP
WITH FLATS. THICKEN AT
GRADE BREAKS
SPD102
SPD102
PRECAST BOX
FEATURE
SPD102
SPD101
SPD103
SLOPED
U E
/2
6/
D R
A W
N B
Y D
D
C
IT
Y O
F S
T.
G
E O
R G
E
PA
R K
P
LA
N N
IN
G
0N
0E S
T.
G
E O
R G
E , U
T
P R
O
JE
C T
FI
R
E H
O U
S E
S K
AT
E
PA
R
K
P R
O
JE
C T
N O
-2
O M
E G
A R
A M
P S
S . R
IV
E
R W
IL
LO
W L
N
W A
S H
IN
G
TO
N
, U T
A108 ec tio ns
KEY MAP SCALE: N/A
3 3
5 4
6 SECTION SCALE: 3/16” = 1’ - 0”
SECTION
SECTION
SECTION
6” UTBC SPD102
PRECAST BOX
FEATURE
POUR MONOLITHIC RAMP
WITH FLATS. THICKEN AT
GRADE BREAKS
SPD102
SPD102
6” UTBC
1 2 3 4 5
R
EV
IS
IO
N S R
EM
AR
K
S M
M /D
D /Y
Y
C
IT
Y O
F S
T.
G
E O
R G
E
Fi re ho us e S ka te pa rk
JA
N
SHEET TITLE
DETAILS 1
DATE
SHEET SIZE
1/23/26
11x17
SHEET NUMBER
COMPANY LOGO
COMPANY LOGO
COMPANY LOGO
A101
RAMP INTEGRATION
Scale: 1 1/2" = 1' - 0"
1/8"
RAMP CONNECTION TO WALL TYP.
Scale: 3" = 1' - 0"
FLAT RAIL
Scale: 1" = 1' - 0"
PIP BOX OVER THICKENED SLAB
Scale: 1" = 1' - 0"
PIP BOX WITH FOOTING
Scale: 1" = 1' - 0"
CAST IN PLACE BANK TYP.
Scale: 1/2" = 1' - 0"
TYP. BOND BEAM
Scale: 1 1/2" = 1' - 0"
SPD101
#3 REBAR @ 12" O.C. EACH WAY
5” REINFORCED CONCRETE SLAB
#4 BARS AT 8" EACH WAY AT RAIL AND
24" MIN. LENGTH
COMPACTED SUBGRADE:
REFER TO GEOTECHNICAL
REPORT FOR RECOMMENDATIONS
6” UTBC
8" REINFORCED CONCRETE WALL TYP.
PRECAST RAMP FURNISHED AND
INSTALLED BY RAMP MANUFACTURER
SIMPSON TITEN THD37212H CONCRETE
ANCHOR BOLT OR 3/8" WEDGE ANCHOR.
4" HEAVY ANGLE
#3 REBAR @ 12" O.C. EACH WAY
5” REINFORCED CONCRETE SLAB
SMOOTH STEEL TROWEL FINISH
COMPACTED SUBGRADE:
REFER TO GEOTECHNICAL
REPORT FOR RECOMMENDATIONS
6” UTBC
#4 HOOK DOWELS STUBBED UP
@ 12" O.C AND MIN 2" CLEAR OF
FORM WALLS AND EXTEND 24" MIN
ABOVE CONCRETE SLAB
FABRICATED STEEL FRAME WITH
WELDED REBAR MESH AND ABOVE
SLAB FORMWORK PROVIDED BY
SKATEPARK MANUFACTURER.
INSTALLATION
AND POUR/FINISH BY CONCRETE
CONTRACTOR
SMOOTH STEEL TROWEL FINISH. SEE
6/SPD102 FOR FINISHING INSTRUCTIONS
COMPACTED SUBGRADE:
REFER TO GEOTECHNICAL
REPORT FOR RECOMMENDATIONS
6” UTBC
5” REINFORCED CONCRETE SLAB
COMPACTED SUBGRADE:
REFER TO GEOTECHNICAL
REPORT FOR RECOMMENDATIONS
6” UTBC
6" CAST IN PLACE BANK WITH
#3 REBAR @ 12" O.C. EACH WAY
BOND BEAM
SMOOTH STEEL TROWEL FINISH
COMPACTED SUBGRADE:
REFER TO GEOTECHNICAL
REPORT FOR RECOMMENDATIONS
6” UTBC
#4 X 18" SMOOTH DOWEL
WITH PLASTIC SLEEVE ON
ONE END @2'-0"O.C. TYP.
12" MIN. 24" MIN.
LIGHT BROOM FINISH
ENSURE GOOD CONSOLIDATION
AGAINST JOINT. TAKE CARE TO PROTECT
PRECAST RAMPS FROM DAMAGE. ENSURE
LEVEL WITH RAMP COMPONENTS
8"
SHIM AND FILL GAP WITH NON-SHRINK GROUT5
VARIES1/
2"
3" M
IN
9" M
IN
M
IN
12" MIN
ALL SIDES
6 2 3/8" O.D. RAIL FURNISHED BY RAMP
MANUFACTURER
12" MIN. 12" MIN.VARIES
V
AR
IE
S
SE
E
SE
CT
IO
NS
2" MIN
1' -0
#4 BARS @12 O.C. (TYP.) MIN 2 BARS
PER SIDE CONTINUOUS WITH 24" LAP
SPLICE
#4 BARS @12" CONTINUOUS WITH
24" LAP SPLICE
#4 BARS @12" O.C.(TYP.) SUPPORT BARS8
SPD102
#4 HOOK DOWELS STUBBED UP
@ 12" O.C AND MIN 2" CLEAR OF
FORM WALLS AND EXTEND 24" MIN
FROM CONCRETE SLAB. FORM AND
POUR BOX AFTER PROPER CURING OF
FOOTING
#4 BARS @12 O.C. (TYP.) MIN 2 BARS
PER SIDE CONTINUOUS WITH 24" LAP
SPLICE
#4 BARS @12" CONTINUOUS WITH
24" LAP SPLICE
#4 BARS @12" O.C.(TYP.) SUPPORT BARS8
SPD102
SPD102
#4 X 18" SMOOTH DOWEL
WITH PLASTIC SLEEVE ON
ONE END @2'-0"O.C. TYP.
VARIES SEE SECTIONS
VA
RI
ES
VARIES
DIMENSIONS AND SLOPE VARY. SEE SECTIONS.
SCREED BOARDS PROVIDED TO CONTRACTOR
BY SKATEPARK MANUFACTURER FOR EXACT
GEOMETRY
6"
REINFORCED TOP DECK8
3" CLR. TYP
1' -0
" M
IN
BOND BEAM WITH 4(EA) #3 CONT.
REBAR WITH TIES @ 18" O.C.
4" MIN.
1'-0" MIN.
SPD103
FABRICATED STEEL FRAME WITH
WELDED REBAR MESH AND ABOVE
SLAB FORMWORK PROVIDED BY
SKATEPARK MANUFACTURER.
INSTALLATION AND POUR/FINISH BY
CONCRETE CONTRACTOR
SMOOTH STEEL TROWEL FINISH. SEE
6/SPD102 FOR FINISHING INSTRUCTIONS
8"
1' -0
VARIES SEE SECTIONS VARIES SEE SECTIONS
VA
RI
ES
SE
E
SE
CT
IO
NS
1' - 0" 1' - 0"
1'
0"
VARIES SEE SECTIONS
#4 X 18" SMOOTH DOWEL
WITH PLASTIC SLEEVE ON
ONE END @2'-0"O.C. TYP.
N O
T
AP
PL
IC
AB
LE
N O
T
AP
PL
IC
AB
LE
EV
IS
IO
N S R
EM
AR
K
S M
M /D
D /Y
Y
C
IT
Y O
F S
T.
G
E O
R ho us e S ka te pa rk
JA
N
SHEET TITLE
DETAILS 2
DATE
SHEET SIZE
1/23/26
11x17
SHEET NUMBER
COMPANY LOGO
COMPANY LOGO
COMPANY LOGO
A102
SAW CUT TYP.
Scale: 3" = 1' - 0"
CONSTRUCTION JOINT
Scale: 2" = 1' - 0"
EXPANSION JOINT AT FLATWORK
Scale: 2" = 1' - 0"
5” BODY SLAB
Scale: 1" = 1' - 0"
EXPANSION JOINT BET. ELEMENTS
Scale: 3" = 1' - 0"
SPD102
BOX FINISHING DETAILS
Scale: 3" = 1' - 0"
TH
IC
KN
ES
S
VA
RI
ES
1/3 SLAB THICKNESS MIN.
REINFORCED SLAB
12" MIN.
#4 X 18" SMOOTH DOWEL
WITH PLASTIC SLEEVE ON
ONE END @2'-0"O.C. TYP.
2 BOND BREAKER MEMBRANE
1/8” THICK
1/8" TOOLED RADIUS EACH WAY AT JOINT
COMPACTED SUBGRADE:
REFER TO GEOTECHNICAL
REPORT FOR RECOMMENDATIONS
POLYURETHANE ELASTOMERIC SEALANT
SEE STRUCTURAL NOTES.
#3 REBAR @ 12" O.C. EACH WAY
6” REINFORCED CONCRETE SLAB
SMOOTH STEEL TROWEL FINISH
COMPACTED SUBGRADE:
REFER TO GEOTECHNICAL
REPORT FOR RECOMMENDATIONS
1/ 2"
M
IN
. D
EP
TH
REINFORCED SLAB
#4 X 18" SMOOTH DOWEL
WITH PLASTIC SLEEVE ON
ONE END @2'-0"O.C. TYP.
6" UTBC
1/8" TOOLED RADIUS EACH WAY AT JOINT
COMPACTED SUBGRADE:
REFER TO GEOTECHNICAL
REPORT FOR RECOMMENDATIONS
TERMINATE SLAB REINFORCEMENT
AT JOINT
1/4"
6" UTBC
6" UTBC
4"
ADJACENT ITEM
CONCRETE SKATEPARK SLAB. TYP
SEE 4/SPD102
1/2" FELT
2 SMOOTH STEEL TROWEL FINISH
STEEL FABRICATION AND PIP FORMWORK
FURNISHED BY SKATERAMP MANUFACTURER
3/4" CHAMFERED CORNERS
3/4" MIN. DEPTH POLYURETHANE
ELASTOMERIC SEALANT.
SEE STRUCTURAL NOTES
3 4
1/2"
1/8" TOOLED RADIUS AT JOINT
REINFORCED CONRETE SKATEPARK FEATURE
DIMENSIONS VARY
DI
M
ES
IO
NS
V
AR
Y
1 1
1/8" SAW CUT WITH DIAMOND RIMMED BLADE.
CUT JOINTS INTO CONCRETE WHEN CUTTING ACTION
WILL NOT DAMAGE OR TEAR SURFACE, BUT BEFORE
SHRINKAGE CRACKING OCCURS. FILL WITH
POLYURETHANE ELASTOMERIC SEALANT
SEE STRUCTURAL NOTES
SLAB EDGE TYP.
Scale: 1 1/2" = 1' - 0"
8"
4"
12' MIN.
#3 REBAR @ 12" O.C. EACH WAY
5” REINFORCED CONCRETE SLAB
SEE DET. 4/SPD102
SMOOTH STEEL TROWEL FINISH
COMPACTED SUBGRADE:
REFER TO GEOTECHNICAL
REPORT FOR RECOMMENDATIONS
6” UTBC
2" MIN.
8" FOOTING SLAB TYP.
Scale: 1" = 1' - 0"
#4 REBAR @ 12" O.C. EACH WAY
8" REINFORCED CONCRETE SLAB
BROOM FINISH
COMPACTED SUBGRADE:
REFER TO GEOTECHNICAL
REPORT FOR RECOMMENDATIONS
6” UTBC
N O
T
AP
PL
IC
AB
LE
N O
T
AP
PL
IC
EV
IS
IO
N S R
EM
AR
K
S M
M /D
D /Y
Y
C
IT
Y O
F S
T.
G
E O
R ho us e S ka te pa rk
JA
N
SHEET TITLE
DETIALS 3
DATE
SHEET SIZE
1/23/26
11x17
SHEET NUMBER
COMPANY LOGO
COMPANY LOGO
COMPANY LOGO
A103
RETAINING WALL TYP.
Scale: 1 1/2" = 1' - 0"
ANGLE INBED TYP.
Scale: 3" = 1' - 0"
SPD103
BENT PLATE INBED TYP.
Scale: 3" = 1' - 0"
1'-0"
VA
R
IE
S.
S
EE
S
EC
TI
O
N S
1' -0
8"
#4 VERTICAL BARS AT 12” O.C.
#4 HORIZONTAL REBAR CONTINUOUS AT
12" SPACING WITH 24" LAP MIN.
CENTER IN WALL U.N.O
#4 BARS CONTINUOUS WITH 24"
LAP MIN AND #3 TIES @ 18" O.C.
1/2" TOOLED RADIUS. AT EXPOSED CORNERS
6” UTBC
COMPACTED SUBGRADE:
REFER TO GEOTECHNICAL
REPORT FOR RECOMMENDATIONS
1/8" ROUNDED RADIUS
6" X 1/4" BENT PLATE. ANGLE VARIES
REFER TO SECTIONS
#3 HOOKED REBAR ADNCHOR @ 4" MIN. INBED
DEPTH OR NELSON STUD. 12" SPACING O.C.
1/8" TOOLED JOINT CONT. ALONG TOP AND
BOTTOM OF ANGLE. FILL WITH POLYURETHANE
ELASTOMERIC SEALANT PER SPECS.
1/8" ROUNDED RADIUS
3" X 3" X 1/4" ANGLE
#3 HOOKED REBAR ADNCHOR @ 4" MIN. INBED
DEPTH OR NELSON STUD. 12" SPACING O.C.
1/8" TOOLED JOINT CONT. ALONG TOP AND
BOTTOM OF ANGLE. FILL WITH POLYURETHANE
ELASTOMERIC SEALANT PER SPECS.
3"
4" MIN.
3"
4" M
IN.
RAMP SUPPORT WALL TYP.
Scale: 1 1/2" = 1' - 0"
#4 @ 12” O.C.
#4 HORIZONTAL REBAR CONTINUOUS AT
12" SPACING WITH 24" LAP MIN.
CENTER IN WALL U.N.O
#4 BARS CONTINUOUS WITH 24"
LAP MIN AND #3 TIES @ 18" O.C.
1/2" TOOLED RADIUS ON EXPOSED
CORNERS
6” UTBC
COMPACTED SUBGRADE:
REFER TO GEOTECHNICAL
REPORT FOR RECOMMENDATIONS
8"
8"
1' -0
2' - 0"
SPD102
H
EI
G H
T
VA
R
IE
S.
S
EE
S
EC
TI
O N
S
2' - 8"
1'-0"
SLAB OVER SLAB REINFORCEMENT
Scale: 1" = 1' - 0"
#3 REBAR EPOXY ANCHORED VERTICALLY INTO FOOTING
PER MANUFACTUREERS RECOMMENDATIONS. BEND TO
GRID PATTERN @12" SPACING AROUND PERIMETER AND 4" AWAY FROM
OUTSIDE EDGE
APPROX. 4.5" REINFORCED CONCRETE SLAB
SMOOTH TROWEL FINISH.BRING CONCRETE
UP TO LEVEL OF PRECAST RAMPS. ENSURE
GOOD CONSOLIDATION AT JOINT BETWEEN
SLAB AND PRECAST RAMPS
COMPACTED SUBGRADE:
REFER TO GEOTECHNICAL
REPORT FOR RECOMMENDATIONS
56” UTBC
AP
PR
O X.
.5
8"N O
T
AP
PL
IC
AB
LE
N O
T
AP
PL
IC
AB
LE
N O
T
AP
PL
IC
| 1-1 |
| UT-01 |
| SA-1 |
| DM-1 |
| SC-01 |
| DT-01 |
| DT-02 |
| SM-1 |
| SP-1 |
| RD-01 |
| RD-02 |
| RW-1 |
File details come from the government source that posted it. Updated .