1-26-261 Bid Schedule.xls
XLS spreadsheet 44 KB Posted
- Attached to
- IFB - FIREHOUSE SKATE PARK State and local contract opportunity
- Solicitation number
- 26-261
- Issued by
- Washington County, Utah
About this file
This is a Bid Schedule document for the City of St. George, Utah, related to the Firehouse Skate Park renovation and construction project. The City of St. George is undertaking a renovation of the existing Firehouse Park while adding a skateparkfacility as a public amenity. The document outlines the bidding requirements and submission procedures for interested contractors. All bids must be accompanied by a bid bond equal to 5% of the total bid amount, with the bond issued by a surety company licensed to operate in Utah and submitted on a bond form approved by the City. A 100% performance bond covering both labor and materials will be required upon contract award. The City reserves the right to reject any or all submissions, waive any formalities or technicalities, and make award decisions at its discretion in the interest of the municipality.
The bid schedule document establishes the framework for competitive bidding on this public improvement project. Prospective bidders must comply with all bonding requirements prior to bid submission, with the performance bond serving as security for satisfactory completion of all work. The document does not specify individual line items, pricing structures, or contract duration details within the summarized materials, but establishes that this is a formal Invitation for Bid (IFB) process subject to City procurement standards and Utah state requirements for surety bonding and contract administration.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 3-BID BOND TEMPLATE.pdf | ||
| 5-MAJOR SUBCONTRACTOR LISTING.docx | DOCX document | |
| 4-sample - CERTIFICATE OF INSURANCE.pdf | ||
| 2-26-261 FIREHOUSE PARK 2026 PLANS.pdf | ||
| 6-26-261 Contract Documents FIREHOUSE SKATE PARK.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
| ITEM | QUANTITY | UNIT OF MEASURE |
| MOBILIZATION | 1 | LUMP |
| CONSTRUCTION SURVEY | 1 | LUMP |
| ENVIRONMENTAL PROTECTION | 1 | LUMP |
| TRAFFIC CONTROL | 1 | LUMP |
| GRASS REMOVAL | 9800 | SQ FT |
| 5" BODY SLAB | 2860 | SQ FT |
| 8" FOOTING SLAB | 220 | SQ FT |
| THICKENED INTEGRATION SLAB EDGE | 42 | FEET |
| PERIMETER SLAB EDGE | 138 | FEET |
| EXPANSION JOINT AT FLATWORK | 96 | FEET |
| (2') CONCRETE RETAINING WALL | 33 | FEET |
| HUBBA FEATURE - FOOTING | 33 | FEET |
| 2'-9" TO 3'-9" HIGH RAMP SUPPORT WALL | 21 | FEET |
| 3'-9" TO 4'-9" HIGH RAMP SUPPORT WALL | 21 | FEET |
| PLANTING SOIL | 75 | CU YD |
BID-SCHEDULE
| BASE BID | |||||
| ITEM NO. | ITEM DESCRIPTION/ BID ITEM | BID QTY | UNIT | UNIT COST | TOTAL |
| 0 | MOBILIZATION | 0 | LUMP | ||
| 0 | CONSTRUCTION SURVEY | 0 | LUMP | ||
| 0 | ENVIRONMENTAL PROTECTION | 0 | LUMP | ||
| 0 | TRAFFIC CONTROL | 0 | LUMP | ||
| 0 | GRASS REMOVAL | 0 | SQ FT | ||
| 0 | 5" BODY SLAB | 0 | SQ FT | ||
| 0 | THICKENED INTEGRATION SLAB EDGE | 0 | FEET | ||
| 0 | PERIMETER SLAB EDGE | 0 | FEET | ||
| 0 | EXPANSION JOINT AT FLATWORK | 0 | FEET | ||
| 0 | (2') CONCRETE RETAINING WALL | 0 | FEET | ||
| 0 | HUBBA FEATURE - FOOTING | 0 | FEET | ||
| 0 | 2'-9" TO 3'-9" HIGH RAMP SUPPORT WALL | 0 | FEET | ||
| 0 | 3'-9" TO 4'-9" HIGH RAMP SUPPORT WALL | 0 | FEET | ||
| 0 | PLANTING SOIL | 0 | CU YD | ||
| 0 | 0 | 0 | 0 | ||
| 0 | 0 | 0 | 0 | ||
| 0 | 0 | 0 | 0 | ||
| 0 | 0 | 0 | 0 | ||
| 0 | 0 | 0 | 0 | ||
| 0 | 0 | 0 | 0 | ||
| 0 | 0 | 0 | 0 | ||
| 0 | 0 | 0 | 0 | ||
| 0 | 0 | 0 | 0 | ||
| 0 | 0 | 0 | 0 | ||
| 0 | 0 | 0 | 0 | ||
| 0 | 0 | 0 | 0 | ||
| 0 | 0 | 0 | 0 | ||
| 0 | 0 | 0 | 0 | ||
| 0 | 0 | 0 | 0 | ||
| BASE BID TOTAL |
ENGINEERS EST.
| NO. | ITEM | UNIT | BID QTY | UNIT PRICE | TOTAL PRICE |
| 0 | MOBILIZATION | LUMP | 0 | $35,000.00 | $0.00 |
| 0 | CONSTRUCTION SURVEY | LUMP | 0 | $8,000.00 | $0.00 |
| 0 | ENVIRONMENTAL PROTECTION | LUMP | 0 | $3,000.00 | $0.00 |
| 0 | TRAFFIC CONTROL | LUMP | 0 | $2,500.00 | $0.00 |
| 0 | GRASS REMOVAL | SQ FT | 0 | $6,000.00 | $0.00 |
| 0 | 5" BODY SLAB | SQ FT | 0 | $2,500.00 | $0.00 |
| 0 | THICKENED INTEGRATION SLAB EDGE | FEET | 0 | $5.00 | $0.00 |
| 0 | PERIMETER SLAB EDGE | FEET | 0 | $5.00 | $0.00 |
| 0 | EXPANSION JOINT AT FLATWORK | FEET | 0 | $400.00 | $0.00 |
| 0 | (2') CONCRETE RETAINING WALL | FEET | 0 | $250.00 | $0.00 |
| 0 | HUBBA FEATURE - FOOTING | FEET | 0 | $250.00 | $0.00 |
| 0 | 2'-9" TO 3'-9" HIGH RAMP SUPPORT WALL | FEET | 0 | $30.00 | $0.00 |
| 0 | 3'-9" TO 4'-9" HIGH RAMP SUPPORT WALL | FEET | 0 | $400.00 | $0.00 |
| 0 | PLANTING SOIL | CU YD | 0 | $1,500.00 | $0.00 |
| 0 | 0 | 0 | 0 | $3,500.00 | $0.00 |
| 0 | 0 | 0 | 0 | $5,000.00 | $0.00 |
| 0 | 0 | 0 | 0 | $8.00 | $0.00 |
| 0 | 0 | 0 | 0 | $10.00 | $0.00 |
| 0 | 0 | 0 | 0 | $15.00 | $0.00 |
| 0 | 0 | 0 | 0 | $50.00 | $0.00 |
| 0 | 0 | 0 | 0 | $25.00 | $0.00 |
| 0 | 0 | 0 | 0 | $15.00 | $0.00 |
| 0 | 0 | 0 | 0 | $150.00 | $0.00 |
| 0 | 0 | 0 | 0 | $175.00 | $0.00 |
| 0 | 0 | 0 | 0 | $200.00 | $0.00 |
| 0 | 0 | 0 | 0 | $250.00 | $0.00 |
| 0 | 0 | 0 | 0 | $300.00 | $0.00 |
| 0 | 0 | 0 | 0 | $10.00 | $0.00 |
| 0 | 0 | 0 | 0 | $100.00 | $0.00 |
| 0 | 0 | 0 | 0 | $2.50 | $0.00 |
| 0 | 0 | 0 | 0 | $1.50 | $0.00 |
| 0 | 0 | 0 | 0 | $0.75 | $0.00 |
| 0 | 0 | 0 | 0 | $0.50 | $0.00 |
| 0 | 0 | 0 | 0 | $350.00 | $0.00 |
| 0 | 0 | 0 | 0 | $15.00 | $0.00 |
| 0 | 0 | 0 | 0 | $250.00 | $0.00 |
| 0 | 0 | 0 | 0 | $400.00 | $0.00 |
| 0 | 0 | 0 | 0 | $400.00 | $0.00 |
| 0 | 0 | 0 | 0 | $400.00 | $0.00 |
| 0 | 0 | 0 | 0 | $350.00 | $0.00 |
| 0 | 0 | 0 | 0 | $40.00 | $0.00 |
| 0 | 0 | 0 | 0 | $40.00 | $0.00 |
| 0 | 0 | 0 | 0 | $40.00 | $0.00 |
| 0 | 0 | 0 | 0 | $40.00 | $0.00 |
| 0 | 0 | 0 | 0 | $40.00 | $0.00 |
| 0 | 0 | 0 | 0 | $40.00 | $0.00 |
| 0 | 0 | 0 | 0 | $40.00 | $0.00 |
| 0 | 0 | 0 | 0 | $30.00 | $0.00 |
| 0 | 0 | 0 | 0 | $150.00 | $0.00 |
| 0 | 0 | 0 | 0 | $200.00 | $0.00 |
| 0 | 0 | 0 | 0 | $10.00 | $0.00 |
| 0 | 0 | 0 | 0 | $125.00 | $0.00 |
| 0 | 0 | 0 | 0 | $35.00 | $0.00 |
| CONSTRUCTION TOTAL | $0.00 | ||||
| CONTINGENCEY 10% | $0.00 | ||||
| CONSTRUCTION TOTAL | $0.00 |
&CLITTLE VALLEY SKATE PARK PROJECT
ENGINEER'S ESTIMATE
File details come from the government source that posted it. Updated .