1-26-261 Bid Schedule.xls

XLS spreadsheet 44 KB Posted

Attached to
IFB - FIREHOUSE SKATE PARK State and local contract opportunity
Solicitation number
26-261
Issued by
Washington County, Utah

About this file

This is a Bid Schedule document for the City of St. George, Utah, related to the Firehouse Skate Park renovation and construction project. The City of St. George is undertaking a renovation of the existing Firehouse Park while adding a skateparkfacility as a public amenity. The document outlines the bidding requirements and submission procedures for interested contractors. All bids must be accompanied by a bid bond equal to 5% of the total bid amount, with the bond issued by a surety company licensed to operate in Utah and submitted on a bond form approved by the City. A 100% performance bond covering both labor and materials will be required upon contract award. The City reserves the right to reject any or all submissions, waive any formalities or technicalities, and make award decisions at its discretion in the interest of the municipality.

The bid schedule document establishes the framework for competitive bidding on this public improvement project. Prospective bidders must comply with all bonding requirements prior to bid submission, with the performance bond serving as security for satisfactory completion of all work. The document does not specify individual line items, pricing structures, or contract duration details within the summarized materials, but establishes that this is a formal Invitation for Bid (IFB) process subject to City procurement standards and Utah state requirements for surety bonding and contract administration.

View the file

Other files for this state and local contract opportunity

Other files attached to IFB - FIREHOUSE SKATE PARK, newest first.
File Type Posted
3-BID BOND TEMPLATE.pdf PDF
5-MAJOR SUBCONTRACTOR LISTING.docx DOCX document
4-sample - CERTIFICATE OF INSURANCE.pdf PDF
2-26-261 FIREHOUSE PARK 2026 PLANS.pdf PDF
6-26-261 Contract Documents FIREHOUSE SKATE PARK.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

ITEMQUANTITYUNIT OF MEASURE
MOBILIZATION1LUMP
CONSTRUCTION SURVEY1LUMP
ENVIRONMENTAL PROTECTION1LUMP
TRAFFIC CONTROL1LUMP
GRASS REMOVAL9800SQ FT
5" BODY SLAB2860SQ FT
8" FOOTING SLAB220SQ FT
THICKENED INTEGRATION SLAB EDGE42FEET
PERIMETER SLAB EDGE138FEET
EXPANSION JOINT AT FLATWORK96FEET
(2') CONCRETE RETAINING WALL33FEET
HUBBA FEATURE - FOOTING33FEET
2'-9" TO 3'-9" HIGH RAMP SUPPORT WALL21FEET
3'-9" TO 4'-9" HIGH RAMP SUPPORT WALL21FEET
PLANTING SOIL75CU YD

BID-SCHEDULE

BASE BID
ITEM NO.ITEM DESCRIPTION/ BID ITEMBID QTYUNITUNIT COSTTOTAL
0MOBILIZATION0LUMP
0CONSTRUCTION SURVEY0LUMP
0ENVIRONMENTAL PROTECTION0LUMP
0TRAFFIC CONTROL0LUMP
0GRASS REMOVAL0SQ FT
05" BODY SLAB0SQ FT
0THICKENED INTEGRATION SLAB EDGE0FEET
0PERIMETER SLAB EDGE0FEET
0EXPANSION JOINT AT FLATWORK0FEET
0(2') CONCRETE RETAINING WALL0FEET
0HUBBA FEATURE - FOOTING0FEET
02'-9" TO 3'-9" HIGH RAMP SUPPORT WALL0FEET
03'-9" TO 4'-9" HIGH RAMP SUPPORT WALL0FEET
0PLANTING SOIL0CU YD
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
BASE BID TOTAL

ENGINEERS EST.

NO.ITEMUNITBID QTYUNIT PRICETOTAL PRICE
0MOBILIZATIONLUMP0$35,000.00$0.00
0CONSTRUCTION SURVEYLUMP0$8,000.00$0.00
0ENVIRONMENTAL PROTECTIONLUMP0$3,000.00$0.00
0TRAFFIC CONTROLLUMP0$2,500.00$0.00
0GRASS REMOVALSQ FT0$6,000.00$0.00
05" BODY SLABSQ FT0$2,500.00$0.00
0THICKENED INTEGRATION SLAB EDGEFEET0$5.00$0.00
0PERIMETER SLAB EDGEFEET0$5.00$0.00
0EXPANSION JOINT AT FLATWORKFEET0$400.00$0.00
0(2') CONCRETE RETAINING WALLFEET0$250.00$0.00
0HUBBA FEATURE - FOOTINGFEET0$250.00$0.00
02'-9" TO 3'-9" HIGH RAMP SUPPORT WALLFEET0$30.00$0.00
03'-9" TO 4'-9" HIGH RAMP SUPPORT WALLFEET0$400.00$0.00
0PLANTING SOILCU YD0$1,500.00$0.00
0000$3,500.00$0.00
0000$5,000.00$0.00
0000$8.00$0.00
0000$10.00$0.00
0000$15.00$0.00
0000$50.00$0.00
0000$25.00$0.00
0000$15.00$0.00
0000$150.00$0.00
0000$175.00$0.00
0000$200.00$0.00
0000$250.00$0.00
0000$300.00$0.00
0000$10.00$0.00
0000$100.00$0.00
0000$2.50$0.00
0000$1.50$0.00
0000$0.75$0.00
0000$0.50$0.00
0000$350.00$0.00
0000$15.00$0.00
0000$250.00$0.00
0000$400.00$0.00
0000$400.00$0.00
0000$400.00$0.00
0000$350.00$0.00
0000$40.00$0.00
0000$40.00$0.00
0000$40.00$0.00
0000$40.00$0.00
0000$40.00$0.00
0000$40.00$0.00
0000$40.00$0.00
0000$30.00$0.00
0000$150.00$0.00
0000$200.00$0.00
0000$10.00$0.00
0000$125.00$0.00
0000$35.00$0.00
CONSTRUCTION TOTAL$0.00
CONTINGENCEY 10%$0.00
CONSTRUCTION TOTAL$0.00

&CLITTLE VALLEY SKATE PARK PROJECT

ENGINEER'S ESTIMATE