South Main Street Sewer Project - Phase 2 - Design Plans and Specifications
This document is a comprehensive design plan and specification set for the South Main Street Sewer Project - Phase 2, a sanitary sewer infrastructure project being undertaken by Hanover Township in Luzerne County, Pennsylvania. The project involves the construction of approximately 790 linear feet of 6-inch gravity sewer main and associated infrastructure, including multiple cleanouts and one manhole with specific rim and invert elevations documented throughout the plan sheets. The sewer main is designed to service the Wyoming Valley Country Club exclusively, while future connections from Schiel Development LLC properties will tie into the existing Hanover Township gravity sewer system on Bunker Drive. The design includes detailed plan and profile sheets (C201-C202) showing the sewer alignment across three segments (184 LF, 326 LF, and 160 LF), with a fourth segment of 124 LF connecting to an existing 8-inch cleanout stub. Sealed bids are to be submitted electronically via the PennBid Program until 12:00 pm local time on April 7, 2026, with bids made publicly available immediately upon opening. The project includes three bid alternates: Alternate No. 1 and No. 2 each propose extending the sewer an additional 100 feet with engineer-provided rim and invert information, while Alternate No. 3 replaces a proposed manhole with a cleanout. Site conditions require contractors to conduct Pennsylvania One-Call utility locating (1-800-242-1776) between 3 and 10 working days before work commences, perform test pitting to verify existing utility depths, maintain resident access to the extent possible, and restore areas to pre-construction conditions unless otherwise noted.
The project is financed in part by a grant from the Commonwealth of Pennsylvania's Commonwealth Financing Authority. Each bid must be accompanied by bid security equal to 10 percent of the bidder's maximum bid price, along with all required forms, statements, affidavits, and certifications as outlined in the bidding documents. All construction work is included in one prime contract on a lump sum and unit price basis. Contractors must comply with Pennsylvania Prevailing Wage Act 442 requirements throughout the project duration. The design plans indicate significant environmental and utility protection requirements, including avoidance of existing electrical boxes, protection of existing wetlands and infiltration basin slopes, and coordination with multiple utility providers including Hanover Township Sewer, Pennsylvania American Water, UGI Utilities Inc., eTech Global Services, and USIC LLC. Erosion and sedimentation controls must comply with Pennsylvania Department of Environmental Protection Chapter 102 and Luzerne County Conservation District requirements, with specific provisions for sediment removal, maintenance inspections, and permanent stabilization of disturbed areas. The project disturbance area is less than one acre, involving approximately 20 feet wide by the length of pipe work. Hanover Township has established non-discrimination policies based on race, color, national origin, sex, religion, age, disability, or familial status. No pre-bid conference will be held; all bidding documents are available at no cost through the PennBid Program website.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCATION MAP
DESIGN PA ONE CALL
SERIAL NUMBERS:
20260552934
THE CONTRACTOR WILL BE RESPONSIBLE TO CONTACT THE
PENNSYLVANIA ONE-CALL NUMBER AT 1-800-242-1776 NOT
LESS THAN THREE (3), NOR MORE THAN TEN (10) WORKING
DAYS PRIOR TO THE START OF WORK TO HAVE ALL
UTILITIES MARKED IN THE AREAS OF WORK.
Know what's below.
Call before you dig.
R
THREE
DAYS
BEFORE
YOU DIG
CALL
PA ONE CALL
SYSTEM TOLL
FREE
OR
1-800-242-1776
HANOVER TOWNSHIP, LUZERNE COUNTY, PENNSYLVANIA
HANOVER TOWNSHIP
SOUTH MAIN STREET SEWER PROJECT-PHASE 2
z:
\p ro je ct fi le s\ ga -h z\ ha nt w p\
- h an ov er to w ns hi p so ut h m ai n se w er e xt en s\ ca d\ sh ee ts a nd p la ns
\p ha se
\0
_c s_ re co ve r.d w g 3/
/2
8:
A M
C O
VE
R
S H
EE
T
AS NOTED
CS
LIST OF UTILITIES
HANOVER TOWNSHIP (SEWER)
1267 SAN SOUCI PARKWAY
HANOVER TOWNSHIP, PA 18706
CONTACT: SAMUEL GUESTO
EMAIL: SGUESTO@HANOVERTOWNSHIP.ORG
PENNSYLVANIA AMERICAN WATER
2699 STAFFORD AVENUE
SCRANTON, PA 18507
CONTACT: MAUREEN CARPENTER
EMAIL: MAUREEN.CARPENTER@AMWATER.COM
UGI UTL INC
1 UGI DRIVE
WILKES-BARRE, PA 18711
CONTACT: AMANDA NIXON
EMAIL: ANIXON@UGI.COM
ETECH GLOBAL SERVICES
1903 BERRY DR
NAOGDOCHES, TX 75964
CONTACT: SKYE GOLDON
EMAIL: SKYE.GOLSON@ETECHTEXAS.COM
USIC LLC
17 WEST TRINDLE ROAD
CARLISLE, PA 17017
CONTRACT: MICHAEL SHAFFER
EMAIL: MICHAELSHAFFER@USICLLC.COM
PR
O
JE
C
T N
O
C H
EC
KE
D B
Y
R
EV
IS
IO
N N o.
C
H K'
D B
Y D
AT
E
DATE
SCALE
SHEET
D
ES
IG
N
ED
B
Y
D R
AW
N
B Y z:
\p ro je ct fi le s\ ga -h z\ ha nt w p\
- h an ov er to w ns hi p so ut h m ai n se w er e xt en s\ ca d\ sh ee ts a nd p la ns
\p ha se
\0
_c s_ re co ve r.d w g 3/
/2
8:
A M
HA
NO
VE
R
TO
W
NS
HI
P
SO
UT
H
M
AI
N
ST
RE
ET
S
EW
ER
P
RO
JE
CT
PH
AS
E
H A
N O
VE
R
T O
W N
SH
IP
, L U
ZE
R
N E
C O
U N
TY
, P
EN
N
SY
LV
A N
IA
3/16/2026
ED
T
ED
T
C D
M
ST
AT
E:
P
EN
N
SY
LV
AN
IA
IS
SU
ED
F
O R
B
ID
3/
/2
C D
M
Sheet List Table
Sheet Number Sheet Title
CS COVER SHEET
C01 LEGEND, ABBREVIATIONS
C200 OVERALL SITE
C200 PLAN & PROFILE
C202 PLAN & PROFILE
C400 E&S CONTROL PLAN
C900 E&S NOTES
C901 E&S DETAILS & GENERAL DETAILS
AutoCAD SHX Text
PROJECT LOCATION
PR
O
JE
C
T N
O
C H
EC
KE
D B
Y
R
EV
IS
IO
N N o.
C
H K'
D B
Y D
AT
E
DATE
SCALE
SHEET
D
ES
IG
N
ED
B
Y
D R
AW
N
B Y z:
\p ro je ct fi le s\ ga -h z\ ha nt w p\
- h an ov er to w ns hi p so ut h m ai n se w er e xt en s\ ca d\ sh ee ts a nd p la ns
\p ha se
\0
_c s_ re co ve r.d w g 3/
/2
8:
A M
HA
NO
VE
R
TO
W
NS
HI
P
SO
UT
H
M
AI
N
ST
RE
ET
S
EW
ER
P
RO
JE
CT
PH
AS
E
H A
N O
VE
R
T O
W N
SH
IP
, L U
ZE
R
N E
C O
U N
TY
, P
EN
N
SY
LV
A N
IA
3/16/2026
ED
T
ED
T
C D
M
ST
AT
E:
P
EN
N
SY
LV
AN
IA
IS
SU
ED
F
O R
B
ID
3/
/2
C D
M z:
\p ro je ct fi le s\ ga -h z\ ha nt w p\
- h an ov er to w ns hi p so ut h m ai n se w er e xt en s\ ca d\ sh ee ts a nd p la ns
\p ha se
\0
_c s_ re co ve r.d w g 3/
/2
8:
A M
LE
G
EN
D
AS NOTED
C01
STREAM CENTERLINE
EOP
OVERHEAD ELEC
GAS LINE WITH VALVE
ROADWAY CENTERLINE
STORM MANHOLE
STORM PIPE
MINOR CONTOUR
MAJOR CONTOUR
WATER LINE WITH VALVE
BUILDING
DELINEATED WETLAND
MUNICIPAL BOUNDARY LINE
DECIDUOUS TREE
CONIFEROUS TREE
SHRUB
BOLLARD
UTILITY POLE
SIGN
MAILBOX
LEGEND AND SYMBOLS
PROPERTY LINE
DRAINAGE SWALE
STORM INLET
EXISTING PROPOSEDITEM
CONCRETE AREA
TREELINE
RIGHT-OF-WAY
XXX
SANITARY LINE WITH CLEANOUT
CHAIN LINK FENCE
GUIDERAIL
EASEMENT LINE
WOOD FENCE
UNDERGROUND ELEC
ZONING BOUNDARY LINE
BUILDING SETBACK LINE
FLOODPLAIN
CURB
UTILITY MANHOLE
FIRE HYDRANT
LIGHT POLE
STONE ROW
DIRT ROAD
GENERAL NOTES:
1. PROJECT SITE IS LOCATED ALONG BUNKER DRIVE,
HANOVER TOWNSHIP, LUZERNE COUNTY,
PENNSYLVANIA.
2. THE PARCEL LINES SHOWN ARE A COMPOSITE OF
DEEDS OF RECORD, COUNTY TAX ASSESSMENT
MAPS, GIS MAPPING, AND AERIAL PHOTOGRAPHY.
3. THE TOPOGRAPHY SHOWN IS BASED UPON DCNR PA
MAP LIDAR DATA SUPPLEMENTAL TO FIELD SURVEY
COMPLETED BY VERDANTAS.
4. PROJECT SURVEY DATUMS:
HORIZONTAL: PENNSYLVANIA STATE PLANE; NORTH
ZONE; NAD83
VERTICAL: NAVD88
5. THERE ARE NO PROPOSED STREAM OR WATERWAY
ALTERATIONS OR RELOCATIONS ASSOCIATED WITH
THIS PROJECT.
6. THE LOCATIONS OF UNDERGROUND UTILITIES AS
SHOWN HEREON ARE BASED ON VISIBLE ABOVE
GROUND STRUCTURES. LOCATIONS OF
UNDERGROUND UTILITIES/STRUCTURES MAY VARY
FROM LOCATIONS SHOWN HEREON AND ADDITIONAL
BURIED UTILITIES/STRUCTURES MAY BE
ENCOUNTERED. PRIOR TO ANY EXCAVATIONS, A "PA
ONE CALL" MUST BE MADE FOR VERIFICATION OF
UTILITY TYPE AND FOR FIELD LOCATIONS.
7. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
SITE CONDITIONS. EXISTING CONDITIONS ARE BASED
UPON FIELD SURVEY AND PA ONE-CALL MARKINGS.
DEPTHS OF EXISTING UTILITIES ARE APPROXIMATE
AND SHALL BE VERIFIED BY THE CONTRACTOR. ALL
UTILITY CROSSINGS SHALL BE TEST PITTED.
8. EXISTING UTILITIES SHALL BE PROTECTED. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR ANY
DAMAGE TO THE EXISTING UTILITIES. DAMAGED
UTILITIES SHALL BE REPAIRED IN ACCORDANCE WITH
UTILITY OWNER REQUIREMENTS AT NO COST TO THE
OWNER. CONTRACTOR SHALL BE RESPONSIBLE TO
LOCATE DEPTH OF UTILITIES PRIOR TO HORIZONTAL
DIRECTIONAL DRILLING OR EXCAVATION FOR 6"
GRAVITY SEWER MAIN.
9. RESIDENT ACCESS SHALL BE MAINTAINED TO THE
EXTENT POSSIBLE.
10. CONTRACTOR SHALL RESTORE AREA TO
PRE-CONSTRUCTION CONDITIONS, UNLESS
OTHERWISE NOTED.
11. CONTRACTOR SHALL PROVIDE EROSION AND
SEDIMENTATION CONTROLS TO PROTECT STORM
WATER INLETS, EXCESSIVE RUN-OFF, AND SEDIMENT
DEPOSITION. EROSION AND SEDIMENTATION
CONTROLS SHALL BE IN ACCORDANCE WITH PADEP
CHAPTER 102 AND LUZERNE COUNTY CONSERVATION
DISTRICT REQUIREMENTS.
12. THERE ARE NO WETLANDS, FLOODPLAINS, OR PRIME
AGRICULTURE LANDS IN THE PROJECT AREA LIMITS.
13. THE PROPOSED 6" SANITARY SEWER IS ONLY TO
SERVICE THE WYOMING COUNTRY CLUB. THE LOTS
LABELED 'SCHIEL DEVELOPMENT LLC' ARE TO
CONNECT TO EXISTING HANOVER TOWNSHIP
GRAVITY SEWER SYSTEM ON BUNKER DRIVE IN THE
FUTURE.
DELTA
ABDN ABANDON
ABUT ABUTMENT
AC ACRES
AD AREA DRAIN
APPROX APPROXIMATE
B/24" BLUE 24"
B/4" BLUE 4"
BC BOTTOM CURB
BCBC BITUMINOUS CONCRETE BASE COURSE
BLDG BUILDING
BM BENCH MARK
BOB BOTTOM OF BANK
BRG BEARING
BVCE BEGIN VERTICAL CURVE ELEVATION
BVCS BEGIN VERTICAL CURVE STATION
BW BOTTOM WALL
CBL CABLE
CHD CHORD
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SOURCE
CJ CONTROL JOINT
CL CENTER LINE
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CO CLEANOUT
COMM COMMUNICATION
CONC CONCRETE
COND CONDENSATE
CPP CORRUGATED PLASTIC PIPE
CY CUBIC YARDS
DB DEED BOOK
DEMO DEMOLITION
DI DUCTILE IRON
DIA DIAMETER
DIR DIRECTION
DN DOWN
DWG DRAWING
DWGS DRAWINGS
DY/4" DOUBLE YELLOW 4"
E= EASTING
E & S EROSION AND SEDIMENTATION CONTROL
EA EACH
EJ EXPANSION JOINT
EL ELEVATION
EOP EDGE OF PAVE
EOS EDGE OF SHOULDER
EVCE END VERTICAL CURVE ELEVATION
EVCS END VERTICAL CURVE STATION
EXIST EXISTING
FES FLARED END SECTION
FF FINISH FLOOR
FG FINISH GRADE
FH FIRE HYDRANT
FM FORCE MAIN
FND FOUND
FT FEET
CALV GALVANIZED
GND GROUND
GPM GALLONS PER MINUTE
GV GAS VALVE
HC HYDRAULIC CONDUCTIVITY
HDD HORIZONTAL DIRECT DRILLING
HOP HIGHWAY OCCUPANCY PERMIT
HT HEIGHT
ID INSIDE DIAMETER
IN INCHES
INV INVERT
JB JUNCTION BOX
LAT LATITUDE
LF LINEAR FEET
LOD LIMIT OF DISTURBANCE
LONG LONGITUDE
LP LIGHT POLE
LT LEFT
LVC LENGTH VERTICAL CURVE
MAX MAXIMUM
MB MAILBOX
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MON MONUMENT
MPT MAINTENANCE AND PROTECTION OF TRAFFIC
N/F NOW OR FORMERLY
N= NORTHING
NPDES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
OC ON CENTER
OD OUTSIDE DIAMETER
OFF OFFSET
OH OVERHEAD
OHE OVERHEAD ELECTRIC
OHW OVERHEAD WIRE
PCSM POST CONSTRUCTION STORM WATER MANAGEMENT
PG PAGE
PI POINT OF INTERSECTION
PIN PROPERTY IDENTIFICATION NUMBER
PL PROPERTY LINE
PNT POINT
POB POINT OF BEGINNING
POE POINT OF ENDING
PPC PREPAREDNESS PREVENTION AND CONTINGENCY
PRC POINT REVERSE CURVE
PRV PRESSURE REDUCING VALVE
PT POINT TANGENCY
PVC POINT OF VERTICAL CURVE
PVI POINT OF VERTICAL INTERSECTION
R/W RIGHT-OF-WAY
R RADIUS
RA ROCK APRON
RB RECORD BOOK
RCE ROCK CONSTRUCTION ENTRANCE
RCP REINFORCED CONCRETE PIPE
RD ROAD
RR RAILROAD
RTE ROUTE
S= SLOPE
SAN SANITARY
SEG SEGMENT
SF SQUARE FEET
SCH SCHEDULE
SLCPP SMOOTH LINE CORRUGATED POLYETHYLENE PIPE
SR STATE ROUTE
STL STEEL
STM STEAM
SY SQUARE YARDS
T= TANGENT
TB TEST BORING
TBA TO BE ABANDONED
TBR TO BE REMOVED
TC TOP CURB
TD TRENCH DRAIN
TEL TELEPHONE
TEMP TEMPORARY
TP TEST PIT
TWP TOWNSHIP
TW TOP WALL
TYP TYPICAL
UG UNDERGROUND
UGE UNDERGROUND ELECTRIC
UTIL UTILITIES
W WATER
W/24" WHITE 24"
W/4" WHITE 4"
WSE WATER SURFACE ELEVATION
WV WATER VALVE
WWTP WASTE WATER TREATMENT PLANT
YR YEAR
AutoCAD SHX Text
LEGENDS, ABBREVIATIONS, AND SYMBOLS
XXX
APPROXIMATE LOCATION OF EXISTING ON
LOT SEWER. WVCC RESPONSIBLE TO
DEMO EXISTING SYSTEM AND CONNECT TO
6" GRAVITY SEWER (NOT IN THIS
CONTRACT)
184 LF ± OF
6" GRAVITY
SEWER
MANHOLE
RIM: 701.00
INV: 696.10 (IN)
INV: 696.00 (OUT)
326 LF ± OF 6" GRAVITY SEWER
PROPOSED CLEANOUT
STA 6+31
RIM: 707.25
INV: 703.25
160 LF ± OF 6" GRAVITY SEWER
CONNECT TO
EXISTING 8"
CLEANOUT/STUB
RIM: 699.12
INV: 686.90 ±
124 LF ± OF
6" GRAVITY
SEWER
PROTECT EXISTING
WETLANDS - SEE
EROSION CONTROL
PLAN
PROVIDE 6" CLEANOUT WITH
CAPPED STUB FOR FUTURE
CONNECTION TO WVCC
SEE NOTE 8 REGARDING BID
ALTERNATES NO. 1 AND NO. 2
RIM: 710.90
INV: 706.00
(CONTRACTOR TO
PROTECT EXISTING
ELECTRIC BOXES)
CLEANOUT
RIM: 702.75
INV: 698.75
TEST PIT REQUIRED TO VERIFY
DEPTH OF STORM PIPE
(EXISTING SPOT ELEVATION - TYP)
TEST PIT REQUIRED TO VERIFY
DEPTH OF STORM PIPE
(EXISTING SPOT ELEVATION - TYP)
40' EASEM
EN
T
0' 60' 120' 180' z:
\p ro je ct fi le s\ ga -h z\ ha nt w p\
- h an ov er to w ns hi p so ut h m ai n se w er e xt en s\ ca d\ sh ee ts a nd p la ns
\p ha se
\0
_c
0_ re co ve r_ re co ve r.d w g
3/
/2
8:
A
M
O
VE
R A
LL
S
IT
E
1:60
C200
PR
O
JE
C
T N
O
C H
EC
KE
D B
Y
R
EV
IS
IO
N N o.
C
H K'
D B
Y D
AT
E
DATE
SCALE
SHEET
D
ES
IG
N
ED
B
Y
D R
AW
N
B Y z:
\p ro je ct fi le s\ ga -h z\ ha nt w p\
- h an ov er to w ns hi p so ut h m ai n se w er e xt en s\ ca d\ sh ee ts a nd p la ns
\p ha se
\0
_c
0_ re co ve r_ re co ve r.d w g
3/
/2
8:
A
M
HA
NO
VE
R
TO
W
NS
HI
P
SO
UT
H
M
AI
N
ST
RE
ET
S
EW
ER
P
RO
JE
CT
PH
AS
E
H A
N O
VE
R
T O
W N
SH
IP
, L U
ZE
R
N E
C O
U N
TY
, P
EN
N
SY
LV
A N
IA
3/16/2026
ED
T
ED
T
C D
M
ST
AT
E:
P
EN
N
SY
LV
AN
IA
IS
SU
ED
F
O R
B
ID
3/
/2
C D
M
PR
O
JE
C T
N O
C H
EC
KE
D B
Y
R
EV
IS
IO
N N o.
C
H K'
D B
Y D
AT
E
DATE
SCALE
SHEET
D
ES
IG
N
ED
B
Y
D R
AW
N
B Y z:
\p ro je ct fi le s\ ga -h z\ ha nt w p\
- h an ov er to w ns hi p so ut h m ai n se w er e xt en s\ ca d\ sh ee ts a nd p la ns
\p ha se
\0
_c
0_ re co ve r_ re co ve r.d w g
3/
/2
8:
A
M
HA
NO
VE
R
TO
W
NS
HI
P
SO
UT
H
M
AI
N
ST
RE
ET
S
EW
ER
P
RO
JE
CT
PH
AS
E
H A
N O
VE
R
T O
W N
SH
IP
, L U
ZE
R
N E
C O
U N
TY
, P
EN
N
SY
LV
A N
IA
3/16/2026
ED
T
ED
T
C D
M
ST
AT
E:
P
EN
N
SY
LV
AN
IA
IS
SU
ED
F
O R
B
ID
3/
/2
C D
M
AutoCAD SHX Text
LANDS N/F KENNETH MITCHELL RB 3003, PG 317999
AutoCAD SHX Text
LANDS N/F CONNIE GUESTO & SAMUEL T. GUESTO JR. DB 2218, PG 738
AutoCAD SHX Text
LANDS N/F DAVID W. BERRYMAN & BONNIE S. BERRYMAN RB 3005, PG 213197
AutoCAD SHX Text
LANDS N/F DONNA PODRAZIK DB 2570, PG 1181
AutoCAD SHX Text
LANDS N/F PAUL P. ZAVADA DB 2706, PG 431
AutoCAD SHX Text
WYOMING VALLEY COUNTRY CLUB 2518 00A84C000
AutoCAD SHX Text
WYOMING VALLEY COUNTRY CLUB 2519 00A21A000
AutoCAD SHX Text
WYOMING VALLEY COUNTRY CLUB 2519 00A21B000
AutoCAD SHX Text
WYOMING VALLEY COUNTRY CLUB 2518 00A006000
AutoCAD SHX Text
EXISTING MANHOLE RIM: 699.69' INV SW: 686.67'
AutoCAD SHX Text
ELECTRIC BOX
AutoCAD SHX Text
18" SLCPP INV: 695.11'
AutoCAD SHX Text
18" SLCPP INV: 686.43'
AutoCAD SHX Text
15" SLCPP INV: 696.89.'
AutoCAD SHX Text
SEPTIC TANK LID 722.78'
AutoCAD SHX Text
CLEAN OUT RIM: 722.89'
AutoCAD SHX Text
EXISTING CURB
AutoCAD SHX Text
EXISTING WOOD FENCE
AutoCAD SHX Text
EXISTING WETLANDS
AutoCAD SHX Text
SCHIEL DEVELOPMENT LLC
AutoCAD SHX Text
SCHIEL DEVELOPMENT LLC
AutoCAD SHX Text
SCHIEL DEVELOPMENT LLC
AutoCAD SHX Text
SCHIEL DEVELOPMENT LLC
AutoCAD SHX Text
SCHIEL DEVELOPMENT LLC
AutoCAD SHX Text
SCHIEL DEVELOPMENT LLC
AutoCAD SHX Text
SCHIEL DEVELOPMENT LLC
AutoCAD SHX Text
SCHIEL DEVELOPMENT LLC
AutoCAD SHX Text
SCHIEL DEVELOPMENT LLC
AutoCAD SHX Text
SCHIEL DEVELOPMENT LLC
AutoCAD SHX Text
SCHIEL DEVELOPMENT LLC
AutoCAD SHX Text
BUNKER DRIVE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 701.38'
AutoCAD SHX Text 701.24'
AutoCAD SHX Text 700.56'
AutoCAD SHX Text 700.73'
AutoCAD SHX Text 704.18'
AutoCAD SHX Text 704.53'
AutoCAD SHX Text 705.19'
AutoCAD SHX Text 703.40'
AutoCAD SHX Text 707.16'
AutoCAD SHX Text 708.56'
AutoCAD SHX Text 709.96'
AutoCAD SHX Text 710.81'
AutoCAD SHX Text 704.94'
AutoCAD SHX Text 702.66'
AutoCAD SHX Text
EXISTING RETENTION AREA
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING CURB
AutoCAD SHX Text
SETBACK LINE
AutoCAD SHX Text 702.07'
EXISTING STORM INLET RIM: 699.24' INV SW: 689.84'
184 LF ± OF 6" GRAVITY SEWER
MANHOLE
RIM: 701.00
INV: 696.10 (IN)
INV: 696.00 (OUT)
CONNECT TO EXISTING 8" CLEANOUT/STUB
RIM: 699.12
INV: 686.90 ±
124 LF ± OF 6" GRAVITY SEWER
PROTECT EXISTING
WETLANDS - SEE
EROSION CONTROL
PLAN
27' ± OF WORKING
SPACE
(CONTRACTOR TO
PROTECT EXISTING
ELECTRIC BOXES)
-0 +2
0+
1+00
2+00
3+00
CLEANOUT
RIM: 702.75
INV: 698.75
TEST PIT
REQUIRED TO
VERIFY DEPTH
OF STORM PIPE
(EXISTING SPOT ELEVATION - TYP)
TEST PIT
REQUIRED TO
VERIFY DEPTH
OF STORM PIPE
40' EASEM
EN
T 0' 20' 40' 80' z:
\p ro je ct fi le s\ ga -h z\ ha nt w p\
- h an ov er to w ns hi p so ut h m ai n se w er e xt en s\ ca d\ sh ee ts a nd p la ns
\p ha se
\0
_c
0_ re co ve r_ re co ve r.d w g
3/
/2
8:
A
M
PL
A
N
P R
O
FI
LE
(1
O F
2)
1:20
C201
PR
O
JE
C
T N
O
C H
EC
KE
D B
Y
R
EV
IS
IO
N N o.
C
H K'
D B
Y D
AT
E
DATE
SCALE
SHEET
D
ES
IG
N
ED
B
Y
D R
AW
N
B Y z:
\p ro je ct fi le s\ ga -h z\ ha nt w p\
- h an ov er to w ns hi p so ut h m ai n se w er e xt en s\ ca d\ sh ee ts a nd p la ns
\p ha se
\0
_c
0_ re co ve r_ re co ve r.d w g
3/
/2
8:
A
M
HA
NO
VE
R
TO
W
NS
HI
P
SO
UT
H
M
AI
N
ST
RE
ET
S
EW
ER
P
RO
JE
CT
PH
AS
E
H A
N O
VE
R
T O
W N
SH
IP
, L U
ZE
R
N E
C O
U N
TY
, P
EN
N
SY
LV
A N
IA
3/16/2026
ED
T
ED
T
C D
M
ST
AT
E:
P
EN
N
SY
LV
AN
IA
IS
SU
ED
F
O R
B
ID
3/
/2
C D
M
MATCHLINE
NOTES:
1. CONTRACTOR TO AVOID ALL UTILITIES AND PROTECT
EXISTING ELECTRICAL BOXES AND EXISTING WETLAND
AREA.
2. CONTRACTOR TO AVOID ANY DISTURBANCE TO
INFILTRATION BASIN SLOPE AND KEEP DISTURBED AREA
ALONG BASIN WITHIN EXISTING BERM.
3. REMOVAL OF TREES IN WORK AREA IS INCIDENTAL TO
PROJECT. CONTRACTOR TO MINIMIZE REMOVAL OF TREES
TO EXTENT POSSIBLE.
4. STA 0+00 TO STA 0+50 TO BE RESTORED IN KIND WITH
GRAVEL (2A MODIFIED)
5. CONTRACTOR WILL BE PROVIDED TEMPORARY AND
PERMANENT EASEMENT INFORMATION FOR SCHIEL
DEVELOPMENT AND WVCC PROPERTIES.
6. BID ALTERNATE NO. 3 REPLACES MANHOLE WITH
CLEANOUT. IF CLEANOUT IS INSTALLED BEND MUST BE
ACHIEVED WITH MAXIMUM FITTINGS OF 22.5°.
7. ALL WORK ON WVCC PROPERTY TO BE COORDINATED
WITH OWNER REGARDING WORK HOURS/DAYS.
8. BID ALTERNATES NO. 1 AND NO. 2 INCLUDE EXTENDING
SEWER AN ADDITIONAL 100 FEET (EACH) AND ARE NOT
SHOWN ON PLAN. RIM AND INVERT INFORMATION WILL BE
PROVIDED BY ENGINEER. ASSUME 4.5 FEET OF COVER AND
MINIMUM OF 1% SLOPE.
0' 20' 40' 80'
-0+30 0+00 1+00 2+00 3+00 3+10
PROPOSED 6" GRAVITY MAIN
LENGTH = 123.61 L.F
PROPOSED 6" GRAVITY MAIN
LENGTH = 184.07 L.F
PROPOSED MANHOLE
STA 1+21
RIM: 701.00
INV (IN) = 696.10
INV (OUINV (OUT) = 696.00
PROPOSED CLEANOUT
STA 3+05
RIM: 702.75
INV = 698.75
PROFILE
BEGIN TRANSITION TO CONNECT
TO EXISTING CLEANOUT
TRANSITION TO 8" PIPE
PRIOR TO CLEANOUT
AutoCAD SHX Text
EXISTING CLEANOUT RIM: 699.12'
AutoCAD SHX Text
INV = 686.90 ±
AutoCAD SHX Text
EXISTING 18" STORMWATER PIPE
AutoCAD SHX Text
EXISTING 15" STORMWATER PIPE
AutoCAD SHX Text
EXISTING MANHOLE
AutoCAD SHX Text
EXISTING MANHOLE RIM: 699.69' INV SW: 686.67'
AutoCAD SHX Text
ELECTRIC BOX
AutoCAD SHX Text
18" SLCPP INV: 695.11'
AutoCAD SHX Text
18" SLCPP INV: 686.43'
AutoCAD SHX Text
15" SLCPP INV: 696.89.'
AutoCAD SHX Text
EXISTING CURB
AutoCAD SHX Text
EXISTING WOOD FENCE
AutoCAD SHX Text
EXISTING WETLANDS
AutoCAD SHX Text
SCHIEL DEVELOPMENT LLC
AutoCAD SHX Text
SCHIEL DEVELOPMENT LLC
AutoCAD SHX Text
SCHIEL DEVELOPMENT LLC
AutoCAD SHX Text
SCHIEL DEVELOPMENT LLC
AutoCAD SHX Text
SCHIEL DEVELOPMENT LLC
AutoCAD SHX Text
BUNKER DRIVE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 701.38'
AutoCAD SHX Text 701.24'
AutoCAD SHX Text 700.56'
AutoCAD SHX Text 700.73'
AutoCAD SHX Text 702.66'
AutoCAD SHX Text
EXISTING RETENTION AREA
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING CURB
AutoCAD SHX Text
SETBACK LINE
AutoCAD SHX Text 702.07'
EXISTING STORM INLET RIM: 699.24' INV SW: 689.84'
ALIGNMENT - PHASE 2 OPTION 2
3+15 4+00 5+00 6+00 7+00 7+95
PROPOSED CLEANOUT
STA 6+31
RIM: 707.25
INV = 703.25PROPOSED 6" GRAVITY MAIN
LENGTH = 326.10 L.F
PROPOSED 6" GRAVITY MAIN
LENGTH = 160.04 L.F
PROPOSED CLEANOUT
STA 7+91
RIM: 710.90
INV = 706.00
PROFILE
326 LF ± OF 6" GRAVITY SEWER
PROPOSED CLEANOUT
STA 6+31
RIM: 707.25
INV: 703.25
160 LF ± OF 6" GRAVITY SEWER
PROVIDE 6" CLEANOUT WITH
CAPPED STUB FOR FUTURE
CONNECTION TO WVCC
SEE NOTE 8 REGARDING BID
ALTERNATES NO. 1 AND NO. 2
RIM: 710.90
INV: 706.00
3+00
4+
5+
6+
7+
8+
CLEANOUT
RIM: 702.75
INV: 698.75
(EXISTING SPOT ELEVATION - TYP)
0' 20' 40' 80' z:
\p ro je ct fi le s\ ga -h z\ ha nt w p\
- h an ov er to w ns hi p so ut h m ai n se w er e xt en s\ ca d\ sh ee ts a nd p la ns
\p ha se
\0
_c
0_ re co ve r_ re co ve r.d w g
3/
/2
8:
A
M
PL
A
N
P R
O
FI
LE
(2
O F
2)
1:20
C202
PR
O
JE
C
T N
O
C H
EC
KE
D B
Y
R
EV
IS
IO
N N o.
C
H K'
D B
Y D
AT
E
DATE
SCALE
SHEET
D
ES
IG
N
ED
B
Y
D R
AW
N
B Y z:
\p ro je ct fi le s\ ga -h z\ ha nt w p\
- h an ov er to w ns hi p so ut h m ai n se w er e xt en s\ ca d\ sh ee ts a nd p la ns
\p ha se
\0
_c
0_ re co ve r_ re co ve r.d w g
3/
/2
8:
A
M
HA
NO
VE
R
TO
W
NS
HI
P
SO
UT
H
M
AI
N
ST
RE
ET
S
EW
ER
P
RO
JE
CT
PH
AS
E
H A
N O
VE
R
T O
W N
SH
IP
, L U
ZE
R
N E
C O
U N
TY
, P
EN
N
SY
LV
A N
IA
3/16/2026
ED
T
ED
T
C D
M
ST
AT
E:
P
EN
N
SY
LV
AN
IA
IS
SU
ED
F
O R
B
ID
3/
/2
C D
M
MATCHLINE
0' 20' 40' 80'
NOTES:
1. CONTRACTOR TO AVOID ALL UTILITIES AND PROTECT
EXISTING ELECTRICAL BOXES AND EXISTING WETLAND
AREA.
2. CONTRACTOR TO AVOID ANY DISTURBANCE TO
INFILTRATION BASIN SLOPE AND KEEP DISTURBED AREA
ALONG BASIN WITHIN EXISTING BERM.
3. REMOVAL OF TREES IN WORK AREA IS INCIDENTAL TO
PROJECT. CONTRACTOR TO MINIMIZE REMOVAL OF TREES
TO EXTENT POSSIBLE.
4. STA 0+00 TO STA 0+50 TO BE RESTORED IN KIND WITH
GRAVEL (2A MODIFIED)
5. CONTRACTOR WILL BE PROVIDED TEMPORARY AND
PERMANENT EASEMENT INFORMATION FOR SCHIEL
DEVELOPMENT AND WVCC PROPERTIES.
6. BID ALTERNATE NO. 3 REPLACES MANHOLE WITH
CLEANOUT. IF CLEANOUT IS INSTALLED BEND MUST BE
ACHIEVED WITH MAXIMUM FITTINGS OF 22.5°.
7. ALL WORK ON WVCC PROPERTY TO BE COORDINATED
WITH OWNER REGARDING WORK HOURS/DAYS.
8. BID ALTERNATES NO. 1 AND NO. 2 INCLUDE EXTENDING
SEWER AN ADDITIONAL 100 FEET (EACH) AND ARE NOT
SHOWN ON PLAN. RIM AND INVERT INFORMATION WILL BE
PROVIDED BY ENGINEER. ASSUME 4.5 FEET OF COVER AND
MINIMUM OF 1% SLOPE.
AutoCAD SHX Text
SCHIEL DEVELOPMENT LLC
AutoCAD SHX Text
SCHIEL DEVELOPMENT LLC
AutoCAD SHX Text 704.18'
AutoCAD SHX Text 704.53'
AutoCAD SHX Text 705.19'
AutoCAD SHX Text 703.40'
AutoCAD SHX Text 707.16'
AutoCAD SHX Text 708.56'
AutoCAD SHX Text 709.96'
AutoCAD SHX Text 710.81'
AutoCAD SHX Text 704.94'
AutoCAD SHX Text 702.66'
702.07'
184 LF ± OF
6" GRAVITY
SEWER
326 LF ± OF 6" GRAVITY SEWER
160 LF ± OF 6" GRAVITY SEWER
124 LF ± OF
6" GRAVITY
SEWER
-0 +2
0+
2+00
3+00
4+
5+
6+
7+
8+
40' EASEM
EN
T
ROCK CONSTRUCTION ENTRANCE
PR
O
JE
C
T N
O
C H
EC
KE
D B
Y
R
EV
IS
IO
N N o.
C
H K'
D B
Y D
AT
E
DATE
SCALE
SHEET
D
ES
IG
N
ED
B
Y
D R
AW
N
B Y z:
\p ro je ct fi le s\ ga -h z\ ha nt w p\
- h an ov er to w ns hi p so ut h m ai n se w er e xt en s\ ca d\ sh ee ts a nd p la ns
\p ha se
\0
_c
0.
dw g
3/
/2
8:
A
M
HA
NO
VE
R
TO
W
NS
HI
P
SO
UT
H
M
AI
N
ST
RE
ET
S
EW
ER
P
RO
JE
CT
PH
AS
E
H A
N O
VE
R
T O
W N
SH
IP
, L U
ZE
R
N E
C O
U N
TY
, P
EN
N
SY
LV
A N
IA
3/16/2026
ED
T
ED
T
C D
M
ST
AT
E:
P
EN
N
SY
LV
AN
IA
IS
SU
ED
F
O R
B
ID
3/
/2
C D
M z:
\p ro je ct fi le s\ ga -h z\ ha nt w p\
- h an ov er to w ns hi p so ut h m ai n se w er e xt en s\ ca d\ sh ee ts a nd p la ns
\p ha se
\0
_c
0.
dw g
3/
/2
8:
A
M
E& S
C O
N
TR
O L
PL
A
N
1:60
C400
NOTE:
1. CONTRACTOR RESPONSIBLE TO PROVIDE E&S CONTROLS TO
MEET PA DEP CHAPTER 102 AND LUZERNE COUNTY
CONSERVATION DISTRICT REQUIREMENTS. E&S CONTROLS
SHOWN ARE CONSIDERED THE MINIMUM REQUIREMENT
2. REFER TO C900 AND C901 FOR EROSION AND SEDIMENTATION
CONTROL NOTES AND DETAILS.
0' 60' 120' 180'
AutoCAD SHX Text
LANDS N/F KENNETH MITCHELL RB 3003, PG 317999
AutoCAD SHX Text
LANDS N/F CONNIE GUESTO & SAMUEL T. GUESTO JR. DB 2218, PG 738
AutoCAD SHX Text
LANDS N/F DAVID W. BERRYMAN & BONNIE S. BERRYMAN RB 3005, PG 213197
AutoCAD SHX Text
LANDS N/F DONNA PODRAZIK DB 2570, PG 1181
AutoCAD SHX Text
LANDS N/F PAUL P. ZAVADA DB 2706, PG 431
AutoCAD SHX Text
WYOMING VALLEY COUNTRY CLUB 2518 00A84C000
AutoCAD SHX Text
WYOMING VALLEY COUNTRY CLUB 2519 00A21A000
AutoCAD SHX Text
WYOMING VALLEY COUNTRY CLUB 2519 00A21B000
AutoCAD SHX Text
WYOMING VALLEY COUNTRY CLUB 2518 00A006000
AutoCAD SHX Text
18" SLCPP INV: 695.11'
AutoCAD SHX Text
18" SLCPP INV: 686.43'
AutoCAD SHX Text
15" SLCPP INV: 696.89.'
AutoCAD SHX Text
SEPTIC TANK LID 722.78'
AutoCAD SHX Text
CLEAN OUT RIM: 722.89'
AutoCAD SHX Text
EXISTING WOOD FENCE
AutoCAD SHX Text
EXISTING WETLANDS
AutoCAD SHX Text
SCHIEL DEVELOPMENT LLC
AutoCAD SHX Text
SCHIEL DEVELOPMENT LLC
AutoCAD SHX Text
SCHIEL DEVELOPMENT LLC
AutoCAD SHX Text
SCHIEL DEVELOPMENT LLC
AutoCAD SHX Text
SCHIEL DEVELOPMENT LLC
AutoCAD SHX Text
SCHIEL DEVELOPMENT LLC
AutoCAD SHX Text
SCHIEL DEVELOPMENT LLC
AutoCAD SHX Text
SCHIEL DEVELOPMENT LLC
AutoCAD SHX Text
SCHIEL DEVELOPMENT LLC
AutoCAD SHX Text
SCHIEL DEVELOPMENT LLC
AutoCAD SHX Text
SCHIEL DEVELOPMENT LLC
AutoCAD SHX Text
BUNKER DRIVE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 701.38'
AutoCAD SHX Text 701.24'
AutoCAD SHX Text 700.56'
AutoCAD SHX Text 700.73'
AutoCAD SHX Text 704.18'
AutoCAD SHX Text 704.53'
AutoCAD SHX Text 705.19'
AutoCAD SHX Text 703.40'
AutoCAD SHX Text 707.16'
AutoCAD SHX Text 708.56'
AutoCAD SHX Text 709.96'
AutoCAD SHX Text 710.81'
AutoCAD SHX Text 704.94'
AutoCAD SHX Text 702.66'
AutoCAD SHX Text
EXISTING RETENTION AREA
AutoCAD SHX Text
AutoCAD SHX Text
SETBACK LINE
AutoCAD SHX Text 702.07'
701.24'
JE
C
T N
O
C H
EC
KE
D B
Y
R
EV
IS
IO
N N o.
C
H K'
D B
Y D
AT
E
DATE
SCALE
SHEET
D
ES
IG
N
ED
B
Y
D R
AW
N
B Y z:
\p ro je ct fi le s\ ga -h z\ ha nt w p\
- h an ov er to w ns hi p so ut h m ai n se w er e xt en s\ ca d\ sh ee ts a nd p la ns
\p ha se
\0
_c
0.
dw g
3/
/2
8:
A
M
HA
NO
VE
R
TO
W
NS
HI
P
SO
UT
H
M
AI
N
ST
RE
ET
S
EW
ER
P
RO
JE
CT
PH
AS
E
H A
N O
VE
R
T O
W N
SH
IP
, L U
ZE
R
N E
C O
U N
TY
, P
EN
N
SY
LV
A N
IA
3/16/2026
ED
T
ED
T
C D
M
ST
AT
E:
P
EN
N
SY
LV
AN
IA
IS
SU
ED
F
O R
B
ID
3/
/2
C D
M z:
\p ro je ct fi le s\ ga -h z\ ha nt w p\
- h an ov er to w ns hi p so ut h m ai n se w er e xt en s\ ca d\ sh ee ts a nd p la ns
\p ha se
\0
_c
0.
dw g
3/
/2
8:
A
M
E& S
N O
TE
S
C900
GENERAL NOTES:
1. ALL EARTH DISTURBANCES, INCLUDING CLEARING AND GRUBBING AS WELL AS CUTS AND FILLS SHALL BE DONE IN
ACCORDANCE WITH THE APPROVED E&S PLAN AS PREPARED BY CONTRACTOR. PLAN REQUIREMENTS SHOWN HEREIN ARE INTENDED FOR GENERAL GUIDANCE. A COPY OF AN APPROPRIATE PLAN MUST BE AVAILABLE AT THE PROJECT SITE AT ALL TIMES. PROJECT DISTURBANCE IS BASED ON 20 FEET WIDE BY LENGTH OF PIPE AND IS LESS
THAN 1 ACRE.
2. AT LEAST 7 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, INCLUDING CLEARING AND GRUBBING, THE OWNER AND/OR OPERATOR SHALL INVITE ALL CONTRACTORS, THE LANDOWNER, APPROPRIATE MUNICIPAL
OFFICIALS, THE E&S PLAN PREPARER.
3. AT LEAST 3 DAYS PRIOR TO STARTING ANY EARTH DISTURBANCE ACTIVITIES, OR EXPANDING INTO AN AREA PREVIOUSLY UNMARKED, THE PENNSYLVANIA ONE CALL SYSTEM INC. SHALL BE NOTIFIED AT 1-800-242-1776 FOR THE
LOCATION OF EXISTING UNDERGROUND UTILITIES.
4. ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE SEQUENCE PROVIDED ON THE
PLAN DRAWINGS.
5. AREAS TO BE FILLED ARE TO BE CLEARED, GRUBBED, AND STRIPPED OF TOPSOIL TO REMOVE TREES, VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL.
6. CLEARING, GRUBBING, AND TOPSOIL STRIPPING SHALL BE LIMITED TO THOSE AREAS DESCRIBED IN EACH STAGE OF THE CONSTRUCTION SEQUENCE. GENERAL SITE CLEARING, GRUBBING AND TOPSOIL STRIPPING MAY NOT COMMENCE IN ANY STAGE OR PHASE OF THE PROJECT UNTIL THE E&S BMPS SPECIFIED BY THE BMP SEQUENCE FOR THAT STAGE OR PHASE HAVE BEEN INSTALLED AND ARE FUNCTIONING AS DESCRIBED IN THIS E&S PLAN.
7. AT NO TIME SHALL CONSTRUCTION VEHICLES BE ALLOWED TO ENTER AREAS OUTSIDE THE LIMIT OF DISTURBANCE BOUNDARIES SHOWN ON THE PLAN MAPS. THESE AREAS MUST BE CLEARLY MARKED AND FENCED OFF BEFORE
CLEARING AND GRUBBING OPERATIONS BEGIN.
8. TOPSOIL REQUIRED FOR THE ESTABLISHMENT OF VEGETATION SHALL BE STOCKPILED WITHIN PROJECT DISTURBANCE AREA IN THE AMOUNT NECESSARY TO COMPLETE THE FINISH GRADING OF ALL EXPOSED AREAS THAT ARE TO BE STABILIZED BY VEGETATION. EACH STOCKPILE SHALL BE PROTECTED IN THE MANNER SHOWN ON THE PLAN DRAWINGS. STOCKPILE HEIGHTS SHALL NOT EXCEED 35 FEET. STOCKPILE SLOPES SHALL BE 2H:1V OR
FLATTER.
9. IMMEDIATELY UPON DISCOVERING UNFORESEEN CIRCUMSTANCES POSING THE POTENTIAL FOR ACCELERATED EROSION AND/OR SEDIMENT POLLUTION, THE OPERATOR SHALL IMPLEMENT APPROPRIATE BEST MANAGEMENT PRACTICES TO MINIMIZE THE POTENTIAL FOR EROSION AND SEDIMENT POLLUTION AND NOTIFY THE LOCAL
CONSERVATION DISTRICT AND/OR THE ENGINEER.
10. ALL BUILDING MATERIALS AND WASTES SHALL BE REMOVED FROM THE SITE AND RECYCLED OR DISPOSED OF IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1, AND 287.1 ET. SEQ. NO BUILDING MATERIALS OR WASTES OR UNUSED BUILDING MATERIALS SHALL BE BURNED, BURIED, DUMPED, OR DISCHARGED AT THE SITE.
11. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ANY MATERIAL BROUGHT ON SITE IS CLEAN FILL. FORM FP-001 MUST BE RETAINED BY THE PROPERTY OWNER FOR ANY FILL MATERIAL AFFECTED BY A SPILL OR RELEASE
OF A REGULATED SUBSTANCE BUT QUALIFYING AS CLEAN FILL DUE TO ANALYTICAL TESTING.
12. ALL PUMPING OF WATER FROM ANY WORK AREA SHALL BE DONE ACCORDING TO THE PROCEDURE DESCRIBED IN
THIS PLAN, OVER UNDISTURBED VEGETATED AREAS.
13. UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT BMPS SHALL BE MAINTAINED PROPERLY. MAINTENANCE SHALL INCLUDE INSPECTIONS OF ALL EROSION AND SEDIMENT BMPS AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, REGRADING, RESEEDING, REMULCHING, AND RENETTING MUST BE PERFORMED IMMEDIATELY. IF THE E&S BMPS FAIL TO PERFORM AS EXPECTED, REPLACEMENT BMPS, OR MODIFICATIONS OF THOSE INSTALLED
WILL BE REQUIRED.
14. SEDIMENT TRACKED ONTO ANY PUBLIC ROADWAY OR SIDEWALK SHALL BE RETURNED TO THE CONSTRUCTION SITE BY THE END OF EACH WORKDAY AND DISPOSED IN THE MANNER DESCRIBED IN THIS PLAN. IN NO CASE SHALL THE SEDIMENT BE WASHED, SHOVELED, OR SWEPT INTO ANY ROADSIDE DITCH, STORM SEWER, OR SURFACE WATER.
15. ALL SEDIMENT REMOVED FROM BMPS SHALL BE DISPOSED OF IN THE MANNER DESCRIBED ON THE PLAN DRAWINGS.
16. AREAS THAT ARE TO BE TOPSOILED SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 3 TO 5 INCHES -- 6 TO 12 INCHES
ON COMPACTED SOILS -- PRIOR TO PLACEMENT OF TOPSOIL. AREAS TO BE VEGETATED SHALL HAVE A MINIMUM 4 INCHES OF TOPSOIL IN PLACE PRIOR TO SEEDING AND MULCHING. FILL OUTSLOPES SHALL HAVE A MINIMUM OF 2
INCHES OF TOPSOIL.
17. ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE, SETTLEMENT, SUBSIDENCE OR OTHER RELATED PROBLEMS. FILL INTENDED TO SUPPORT BUILDINGS, STRUCTURES, AND CONDUITS, ETC. SHALL BE
COMPACTED IN ACCORDANCE WITH LOCAL REQUIREMENTS OR CODES.
18. ALL EARTHEN FILLS SHALL BE PLACED IN COMPACTED LAYERS NOT TO EXCEED 8 INCHES IN THICKNESS.
19. FILL MATERIALS SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER FOREIGN OR
OBJECTIONABLE MATERIALS THAT WOULD INTERFERE WITH OR PREVENT CONSTRUCTION OF SATISFACTORY FILLS.
20. FROZEN MATERIALS OR SOFT, MUCKY, OR HIGHLY COMPRESSIBLE MATERIALS SHALL NOT BE INCORPORATED INTO
FILLS.
21. FILL SHALL NOT BE PLACED ON SATURATED OR FROZEN SURFACES.
22. SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE HANDLED IN ACCORDANCE WITH THE
STANDARD AND SPECIFICATION FOR SUBSURFACE DRAIN OR OTHER APPROVED METHOD.
23. ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY UPON REACHING FINISHED GRADE. CUT
SLOPES IN COMPETENT BEDROCK AND ROCK FILLS NEED NOT BE VEGETATED. SEEDED AREAS WITHIN 50 FEET OF A SURFACE WATER, OR AS OTHERWISE SHOWN ON THE PLAN DRAWINGS, SHALL BE BLANKETED ACCORDING TO THE
STANDARDS OF THIS PLAN.
24. IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE IN ANY AREA OR SUBAREA OF THE PROJECT, THE OPERATOR SHALL STABILIZE ALL DISTURBED AREAS. DURING NON-GERMINATING MONTHS, MULCH OR PROTECTIVE BLANKETING SHALL BE APPLIED AS DESCRIBED IN THE PLAN. AREAS NOT AT FINISHED GRADE, WHICH WILL BE REACTIVATED WITHIN 1 YEAR, MAY BE STABILIZED IN ACCORDANCE WITH THE TEMPORARY STABILIZATION SPECIFICATIONS. THOSE AREAS WHICH WILL NOT BE REACTIVATED WITHIN 1 YEAR SHALL BE STABILIZED IN
ACCORDANCE WITH THE PERMANENT STABILIZATION SPECIFICATIONS.
25. PERMANENT STABILIZATION IS DEFINED AS A MINIMUM UNIFORM, PERENNIAL 70% VEGETATIVE COVER OR OTHER PERMANENT NON-VEGETATIVE COVER WITH A DENSITY SUFFICIENT TO RESIST ACCELERATED EROSION. CUT AND FILL SLOPES SHALL BE CAPABLE OF RESISTING FAILURE DUE TO SLUMPING, SLIDING, OR OTHER MOVEMENTS.
26. E&S BMPS SHALL REMAIN FUNCTIONAL AS SUCH UNTIL ALL AREAS TRIBUTARY TO THEM ARE PERMANENTLY
STABILIZED OR UNTIL THEY ARE REPLACED BY ANOTHER BMP APPROVED BY THE ENGINEER.
27. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL DISTURBED AREAS, THE OWNER AND/OR OPERATOR SHALL CONTACT THE ENGINEER FOR AN INSPECTION PRIOR TO
REMOVAL/CONVERSION OF THE E&S BMPS.
28. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED, TEMPORARY EROSION AND SEDIMENT BMPS MUST BE REMOVED OR CONVERTED TO PERMANENT POST CONSTRUCTION STORMWATER MANAGEMENT BMPS. AREAS DISTURBED DURING REMOVAL OR CONVERSION OF THE BMPS SHALL BE STABILIZED IMMEDIATELY. IN ORDER TO ENSURE RAPID REVEGETATION OF DISTURBED AREAS, SUCH REMOVAL/CONVERSIONS ARE TO BE DONE ONLY
DURING THE GERMINATING SEASON.
29. UPON COMPLETION OF ALL EARTH DISTURBANCE ACTIVITIES AND PERMANENT STABILIZATION OF ALL DISTURBED
AREAS, THE OWNER AND/OR OPERATOR SHALL CONTACT THE ENGINEER.
30. ALL CHANNELS SHALL BE KEPT FREE OF OBSTRUCTIONS INCLUDING BUT NOT LIMITED TO FILL, ROCKS, LEAVES, WOODY DEBRIS, ACCUMULATED SEDIMENT, EXCESS VEGETATION, AND CONSTRUCTION MATERIAL/WASTES.
31. UNDERGROUND UTILITIES CUTTING THROUGH ANY ACTIVE CHANNEL SHALL BE IMMEDIATELY BACKFILLED AND THE CHANNEL RESTORED TO ITS ORIGINAL CROSS-SECTION AND PROTECTIVE LINING. ANY BASE FLOW WITHIN THE CHANNEL SHALL BE CONVEYED PAST THE WORK AREA IN THE MANNER DESCRIBED IN THIS PLAN UNTIL SUCH
RESTORATION IS COMPLETE.
32. ALL DISTANCES SHOWN ARE IN FEET AND DECIMALS THEREOF.
33. THE PLANS AND THE TYPICAL SECTIONS DEPICT THE GENERAL LAYOUT, LENGTH, SCOPE AND LIMITS OF WORK.
THEY MAY NOT INDICATE ALL THE SITE SPECIFIC CONDITIONS THAT WILL NEED TO BE ADDRESSED ON AN INDIVIDUAL BASIS DURING CONSTRUCTION. CONTRACTOR SHALL BE RESPONSIBLE TO THOROUGHLY EXAMINE ALL EXISTING CONDITIONS OF THE SITE PRIOR TO SUBMITTING A BID SO AS TO IDENTIFY ANY SITE SPECIFIC CONDITIONS THAT
MAY AFFECT HIS BID.
34. THE LOCATIONS OF UNDERGROUND UTILITIES AS SHOWN HEREON ARE BASED ON VISIBLE ABOVE GROUND STRUCTURES AND RECORD DRAWINGS PROVIDED FOR THIS PROJECT. LOCATIONS OF UNDERGROUND UTILITIES/STRUCTURES MAY VARY AND ADDITIONAL BURIED UTILITIES /STRUCTURES MAY BE ENCOUNTERED. NO EXCAVATIONS WERE MADE TO LOCATE BURIED UTILITIES/STRUCTURES. CONTACT THE PENNSYLVANIA ONE-CALL NUMBER AT 1-800-242-1776 NOT LESS THAN THREE (3) WORKING DAYS, NOR MORE THAN TEN (10) WORKING DAYS
PRIOR TO THE START OF WORK TO HAVE ALL UTILITIES MARKED IN THE PROJECT AREA.
35. CONTRACTOR SHALL BRING TO THE ATTENTION OF THE ENGINEER ANY SITE SPECIFIC CONDITION THAT MAY
REQUIRE SPECIAL ATTENTION DURING CONSTRUCTION PRIOR TO THE COMMENCEMENT OF WORK.
36. CONTRACTOR SHALL FIELD VERIFY EXISTING SITE CONDITIONS AND UTILITY LOCATIONS PRIOR TO CONSTRUCTION.
37. ALL NECESSARY TRAFFIC CONTROL IS THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE IN ACCORDANCE
WITH PENNSYLVANIA DEPARTMENT OF TRANSPORTATION PUBLICATIONS 212, 213, AND 236. ALL PARKING LOT AND
ROADWAY LANE CLOSURES SHALL BE COORDINATED WITH OWNER.
38. THE CONTRACTORS WORKING ON THIS PROJECT WILL BE RESPONSIBLE FOR ENSURING THAT ALL CONSTRUCTION ACTIVITIES RELATED TO THIS PROJECT ARE PERFORMED IN ACCORDANCE WITH ALL O.S.H.A. (OCCUPATIONAL
SAFETY AND HEALTH ADMINISTRATION) STANDARDS AND REQUIREMENTS.
39. THIS PLAN HAS BEEN PREPARED WITHOUT THE BENEFIT OF A CERTIFIED TITLE REPORT AND IN NO WAY REPRESENTS A TITLE REPORT. THIS PLAN HAS NOT BEEN REVIEWED TO DETERMINE ITS COMPLIANCE WITH TITLE III OF THE AMERICANS WITH DISABILITIES ACT OF 1990 (ADA) WHICH PROHIBITS DISCRIMINATION ON THE BASIS OF DISABILITY IN PUBLIC ACCOMMODATIONS AND COMMERCIAL FACILITIES. COMPLIANCE WITH TITLE III OF THE ACT WITH REGARD TO PUBLIC ACCOMMODATIONS AND COMMERCIAL FACILITIES IS THE RESPONSIBILITY OF THE
OWNER/APPLICANT.
40. CONTRACTOR SHALL COORDINATE WITH ALL EMERGENCY SERVICE PROVIDERS INCLUDING, BUT NOT LIMITED TO, THE TOWNSHIP OF PLAINS POLICE DEPARTMENT, FIRE DEPARTMENT, AND OTHER TOWNSHIP EMERGENCY SERVICES
TO NOTIFY THEM OF PROJECT WORK SCHEDULE.
E&S MAINTENANCE NOTES:
1. EROSION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICES (BMP'S) MUST BE CONSTRUCTED, STABILIZED, AND FUNCTIONAL BEFORE SITE DISTURBANCE WITHIN THE TRIBUTARY AREAS OF THOSE BMP'S.
UNTIL THE SITE IS STABILIZED, ALL EROSION AND SEDIMENT CONTROL BMP'S MUST BE MAINTAINED PROPERLY. ALL EROSION AND SEDIMENT CONTROL BMP'S SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEANOUT, REPAIR, REPLACEMENT, RE-GRADING, RE-SEEDING, RE-MULCHING, AND RE-NETTING MUST BE PERFORMED IMMEDIATELY. A WRITTEN REPORT DOCUMENTING THE INSPECTIONS AND REPAIRS MADE TO THE EROSION AND SEDIMENT CONTROL BMP'S MUST BE KEPT BY THE PERSON RESPONSIBLE FOR BMP MAINTENANCE.
2. ALL SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO ANY ROADWAY OR ANY PUBLIC RIGHT-OF-WAY SHALL IMMEDIATELY BE REMOVED. WASHING SEDIMENT FROM THE PAVEMENT IS PROHIBITED.
3. ROCK CONSTRUCTION ENTRANCE THICKNESS SHALL BE CONSTANTLY MAINTAINED TO THE SPECIFIED DIMENSIONS BY ADDING ROCK. A STOCKPILE SHALL BE MAINTAINED ON SITE FOR THIS PURPOSE. ANY COMPOST FILTER SOCK OR FILTER FABRIC FENCE SECTION THAT HAS BEEN UNDERMINED OR OVERTOPPED MUST BE IMMEDIATELY REPLACED WITH A ROCK FILTER OUTLET. SEDIMENT SHALL BE REMOVED WHEN ACCUMULATIONS REACH 1/2 THE ABOVE GROUND HEIGHT OF SILT FENCES AND 1/3 THE ABOVE GROUND HEIGHT OF ROCK FILTERS. INLET FILTER BAGS SHOULD BE CLEANED AND/OR REPLACED WHEN THE BAG IS 1/2
FULL. DAMAGED FILTER BAGS SHALL BE REPLACED.
4. ACCUMULATED SEDIMENT MAY BE INCORPORATED INTO THE FILL OR REMOVED FROM THE SITE AND DISPOSED OF IN A LAWFUL MANNER (AN APPROVED EROSION AND SEDIMENT CONTROL PLAN WILL BE
REQUIRED FOR ANY OFFSITE DISPOSAL AREA).
5. SHOULD UNFORESEEN EROSIVE CONDITIONS DEVELOP, IT IS THE CONTRACTOR'S RESPONSIBILITY TO
IMMEDIATELY CORRECT THE PROBLEM.
6. OWNER IS RESPONSIBLE FOR MAINTENANCE OF PERMANENT CONTROLS.
7. THE CONTRACTOR SHALL, PERIODICALLY OR AS DIRECTED DURING THE PROGRESS OF THE WORK, REMOVE AND LEGALLY DISPOSE OF ALL SURPLUS MATERIAL AND DEBRIS AND KEEP THE PROJECT AREA AND PUBLIC RIGHTS-OF-WAY REASONABLY CLEAR. SURPLUS OR DEMOLITION MATERIALS SHALL BE RECYCLED DURING
THE COURSE OF THE WORK, WHENEVER PRACTICAL AND APPROVED BY THE DESIGN ENGINEER.
8. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL REMOVE ALL TEMPORARY CONSTRUCTION FACILITIES, DEBRIS AND UNUSED MATERIALS, PROVIDED FOR THE WORK, AND PUT ALL OF THE SITES OF THE WORK AND PUBLIC RIGHTS-OF-WAY IN A NEAT AND CLEAN CONDITION. TRASH BURNING ON THE SITE OF THE WORK WILL NOT BE PERMITTED. OFF-SITE DISPOSAL OF SOIL OR ROCK WILL REQUIRE AN EROSION AND SEDIMENT CONTROL PLAN SUBMISSION, BY THE CONTRACTOR, TO THE APPROPRIATE CONSERVATION
DISTRICT.
WASTE RECYCLING AND DISPOSAL NOTES:
THE INDIVIDUALS RESPONSIBLE FOR THE EARTH DISTURBANCE ACTIVITIES MUST ENSURE METHODS ARE IN PLACE TO CONTROL SITE WASTE MATERIAL. ALL SUITABLE MATERIAL ACCUMULATED WILL BE INCORPORATED INTO THE FILL AND REUSED ON-SITE. SEDIMENT REMOVED FROM SITE BMP'S SHALL BE DISPOSED OF IN LANDSCAPE AREAS OUTSIDE OF DRAINAGE SWALES, STEEP SLOPES, AND WETLANDS. THE WASTE MATERIAL WHICH INCLUDES BUT IS NOT LIMITED TO DAMAGED CONSTRUCTION MATERIAL, EXISTING BUILDING MATERIAL, GENERAL TRASH, ETC. WILL BE REMOVED FROM THE SITE AND DISPOSED OF IN A LAWFUL MANNER ACCORDING TO THE PA DEPARTMENT OF ENVIRONMENTAL PROTECTION'S SOLID WASTE MANAGEMENT REGULATIONS (PA CODE TITLE 25, CHAPTER 260.1 ET. SEQ, 271.1 ET SEQ. AND 287.1 ET SEQ). THE DISPOSAL SITE MUST HAVE A SEPARATE EROSION CONTROL PLAN AND MUST BE APPROVED BY THE ENGINEER AND THE LUZERNE COUNTY CONSERVATION DISTRICT. ALL EXCESS SOIL FROM THE SITE MUST REMAIN ON THE PROPERTY AND SHALL BE
SPREAD OUT IN THE AREA OF THE SOIL STOCKPILE.
MAINTENANCE PROGRAM:
THE CONTRACTOR IS REQUIRED TO INCORPORATE ALL TEMPORARY AND PERMANENT CONTROL MEASURES AND FACILITIES INDICATED ON THE APPROVED PLAN SET, INTO THE PROJECT AT THE EARLIEST PRACTICABLE TIME.
THE CONTRACTOR IS RESPONSIBLE FOR APPLYING, CLEANING, AND MAINTAINING ALL CONTROL FEATURES DURING CONSTRUCTION. APPROPRIATE EROSION AND SEDIMENT POLLUTION CONTROL FEATURES SHALL BE APPLIED TO SECTIONS SUCH AS BORROW PITS AND MATERIAL STORAGE AREAS UNFORESEEN PRIOR TO CONSTRUCTION. PERMANENT EROSION CONTROL FACILITIES WILL BE MAINTAINED BY THE OWNER.
THE TEMPORARY FACILITIES FOR EROSION AND SEDIMENT POLLUTION CONTROL SHALL BE INSPECTED A MINIMUM OF ONCE PER WEEK AND AFTER EVERY RAINFALL EVENT. SEDIMENT SHALL BE REMOVED WHEN ACCUMULATIONS REACH 1/2 THE ABOVE GROUND HEIGHT OF COMPOST FILTER SOCKS AND 1/3 THE ABOVE GROUND HEIGHT OF THE ROCK FILTERS. ANY COMPOST FILTER SOCK SECTION THAT HAS BEEN UNDERMINED OR OVERTOPPED MUST BE IMMEDIATELY REPLACED WITH A ROCK FILTER. AS CONSTRUCTION PROGRESSES AND DISTURBED AREAS HAVE BEEN STABILIZED, TEMPORARY EROSION CONTROL STRUCTURES ARE TO BE CLEANED AND REMOVED.
RESPONSIBILITIES FOR FILL MATERIALS:
THE IMPLEMENTATION OF FILL MATERIALS WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. UPON FINAL SITE
ACCEPTANCE, THE OWNER SHALL BE RESPONSIBLE FOR FILL MATERIALS.
CLEAN FILL:
* THE CONTRACTOR OF THE SITE WILL PERFORM ENVIRONMENTAL DUE DILIGENCE ON ALL IMPORTED SOILS THAT
WILL BE UTILIZED ON THE PROJECT SITE.
* ENVIRONMENTAL DUE DILIGENCE IS DEFINED AS: INVESTIGATIVE TECHNIQUES, INCLUDING, BUT NOT LIMITED TO, VISUAL PROPERTY INSPECTIONS, ELECTRONIC DATA BASE SEARCHES, REVIEW OF PROPERTY OWNERSHIP, REVIEW OF PROPERTY USE HISTORY, SANBORN MAPS, ENVIRONMENTAL QUESTIONNAIRES, TRANSACTION
SCREENS, ANALYTICAL TESTING, ENVIRONMENTAL ASSESSMENTS OR AUDITS.
* ANALYTICAL TESTING IS REQUIRED FOR FILL MATERIAL SUSPECTED OF BEING SUBJECTED TO A SPILL OR RELEASE OF A REGULATED SUBSTANCE BASED UPON COMPLETION OF VISUAL INSPECTION AND/OR REVIEW OF PAST LAND USES AS PART OF ENVIRONMENTAL DUE DILIGENCE. FILL MATERIAL DETERMINED TO NOT QUALIFY AS CLEAN FILL THROUGH ANALYTICAL TESTING IS CONSIDERED REGULATED FILL AND MUST BE MANAGED AS A WASTE IN ACCORDANCE WITH APPLICABLE MUNICIPAL OR RESIDUAL WASTE REGULATIONS OF THE DEPARTMENT.
* CLEAN FILL IS DEFINED AS: UNCONTAMINATED NON-WATER SOLUBLE, NON-DECOMPOSABLE, INERT SOLID. THE TERM INCLUDES SOIL, ROCK, STONE, DREDGED MATERIALS, USED ASPHALT, AND BRICK, BLOCK OR CONCRETE FROM CONSTRUCTION AND DEMOLITION ACTIVITIES THAT IS SEPARATE FROM OTHER WASTE AND IS RECOGNIZABLE AS SUCH. TERM DOES NOT INCLUDE MATERIALS PLACED IN OR ON THE WATERS OF THE
COMMONWEALTH UNLESS OTHERWISE AUTHORIZED.
SEQUENCE OF CONSTRUCTION ACTIVITIES
NOTES:
1. AT LEAST THREE (3) DAYS BEFORE STARTING ANY EARTH DISTURBANCE ACTIVITIES, ALL CONTRACTORS
INVOLVED IN THOSE ACTIVITIES SHALL NOTIFY THE ONE CALL SYSTEM INCORPORATED AT (800) 242-1776 TO
LOCATED BURIED UTILITIES.
2. ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE WITH THE FOLLOWING SEQUENCE OF CONSTRUCTION ACTIVITIES. WORK AT EACH PROJECT SITE CAN BE STARTED SIMULTANEOUSLY OR IN ANY ORDER HOWEVER EACH STAGE OF THE CONSTRUCTION SEQUENCE FOR EACH SITE MUST BE COMPLETED
PRIOR TO INITIATION OF SUBSEQUENT STAGES.
3. UPON COMPLETION OR TEMPORARY CESSATION OF THE EARTH DISTURBANCE ACTIVITY, OR ANY STAGE THEREOF, THE PROJECT SITE SHALL BE IMMEDIATELY STABILIZED. UPON TEMPORARY CESSATION OF AN EARTH DISTURBANCE ACTIVITY WHERE CESSATION OF AN EARTH DISTURBANCE ACTIVITIES WILL EXCEED 4
DAYS, THE SITE SHALL BE IMMEDIATELY SEEDED, MULCHED OR OTHERWISE PROTECTED FROM
ACCELERATED EROSION AND SEDIMENTATION PENDING FUTURE EARTH DISTURBANCE ACTIVITIES.
4. DEWATER EXCAVATIONS AS NEEDED USING PUMPED WATER FILTER BAGS.
5. SEQUENCE OF CONSTRUCTION:
a. ESTABLISH EROSION AND SEDIMENTATION CONTROLS
b. COMPLETE REQUIRED TEST PITS
c. INSTALL SEWER BEGINNING AT DOWNSTREAM END. TEMPORARY WORK SPACE SHALL BE KEPT TO A
MINIMUM.
d. COMPLETE REQUIRED TESTING OF SEWAGE FACILITIES.
e. COMPLETE PERMANENT RESTORATION.
f. REMOVE EROSION AND SEDIMENT CONTROLS WHEN VEGETATION HAS BEEN ESTABLISHED IN
ACCORDANCE WITH SPECIFICATIONS.
JE
C
T N
O
C H
EC
KE
D B
Y
R
EV
IS
IO
N N o.
C
H K'
D B
Y D
AT
E
DATE
SCALE
SHEET
D
ES
IG
N
ED
B
Y
D R
AW
N
B Y z:
\p ro je ct fi le s\ ga -h z\ ha nt w p\
- h an ov er to w ns hi p so ut h m ai n se w er e xt en s\ ca d\ sh ee ts a nd p la ns
\p ha se
\0
_c
0.
dw g
3/
/2
8:
A
M
HA
NO
VE
R
TO
W
NS
HI
P
SO
UT
H
M
AI
N
ST
RE
ET
S
EW
ER
P
RO
JE
CT
PH
AS
E
H A
N O
VE
R
T O
W N
SH
IP
, L U
ZE
R
N E
C O
U N
TY
, P
EN
N
SY
LV
A N
IA
3/16/2026
ED
T
ED
T
C D
M
ST
AT
E:
P
EN
N
SY
LV
AN
IA
IS
SU
ED
F
O R
B
ID
3/
/2
C D
M z:
\p ro je ct fi le s\ ga -h z\ ha nt w p\
- h an ov er to w ns hi p so ut h m ai n se w er e xt en s\ ca d\ sh ee ts a nd p la ns
\p ha se
\0
_c
0.
dw g
3/
/2
8:
A
M
E& S
D
ET
A
IL
S
G
EN
ER
A
L D
ET
A
IL
S
AS NOTED
C901
M
IN
M
IN
10'
MIN
' M
IN
PLAN VIEW
PROFILE
100' MIN
3'
MOUNTABLE
BERM (6" MIN)
EARTH FILL
PIPE AS
NECESSARY
GEOTEXTILE
8" M
IN
AA
SH
TO
NOTES:
1. TOPSOIL SHOULD BE REMOVED PRIOR TO INSTALLATION OF ROCK CONSTRUCTION
ENTRANCE.
2. EXTEND ROCK OVER FULL WIDTH OF ENTRANCE.
3. RUNOFF SHALL BE DIVERTED FROM ROADWAY TO A SUITABLE SEDIMENT REMOVAL BMP
PRIOR TO ENTERING ROCK CONSTRUCTION ENTRANCE.
4. MOUNTABLE BERM SHOULD BE INSTALLED WHEREVER OPTIONAL CULVERT PIPE IS USED.
PIPE TO BE SIZED APPROPRIATELY FOR SIZE OF DITCH BEING CROSSED.
MAINTENANCE:
ROCK CONSTRUCTION ENTRANCE THICKNESS SHALL BE CONSTANTLY MAINTAINED TO THE
SPECIFIED DIMENSIONS BY ADDING ROCK. A STOCKPILE SHALL BE MAINTAINED ON SIDE FOR
THIS PURPOSE, ALL SEDIMENT DEPOSITED ON PAVED ROADWAYS SHALL BE REMOVED AND
RETURNED TO THE CONSTRUCTION SITE IMMEDIATELY. IF EXCESSIVE AMOUNTS OF SEDIMENT
ARE BEING DEPOSITED ON ROADWAY, EXTEND LENGTH OF ROCK CONSTRUCTION ENTRANCE
BY 50 FEET INCREMENTS UNTIL CONDITION IS ALLEVIATED OR INSTALL WASH RACK. WASHING
THE ROADWAY OR SWEEPING THE DEPOSITS INTO ROADWAY DITCHES, SEWER, CULVERTS, OR
OTHER DRAINAGEWAYS IS NOT ACCEPTABLE.
ROCK CONSTRUCTION ENTRANCE DETAIL
NOT TO SCALE
COMPOST SOCK FABRIC MINIMUM SPECIFICATIONS
MATERIAL TYPE 3 mil HDPE 5 mil HDPE 5 mil HDPE
MULTI-FILAMEN
T
POLYPROPYLE
NE
(MFPP)
HEAVY DUTY
MULTI-FILAMEN
T
POLYPROPYLE
NE
(HDMFPP)
MATERIAL
CHARACTERISTICS
PHOTO-
DEGRADABLE
PHOTO-
DEGRADABLE
BIO-
DEGRADABLE
PHOTO-
DEGRADABLE
PHOTO-
DEGRADABLE
SOCK
DIAMETERS
12" 18"
12" 18" 24" 32"
12" 18" 24" 32"
12" 18" 24" 32"
12" 18" 24" 32"
MESH OPENING 3/8" 3/8" 3/8" 3/8" 1/8"
TENSILE STRENGTH 26 PSI 26 PSI 44 PSI 202 PSI
ULTRAVIOLET
STABILITY %
ORIGINAL
STRENGTH
(ASTM G-155)
23% AT
1000 HR
23% AT
1000 HR
100% AT 1000
HR
100% AT 1000
HR
MINIMUM
FUNCTIONAL
LONGEVITY
6 MONTHS 9 MONTHS 6 MONTHS 1 YEAR 2 YEARS
TWO-PLY SYSTEMS
INNER CONTAINMENT NETTING
HDPE BIAXIAL NET
CONTINUOUSLY WOUND
FUSION-WELDED JUNCTURES
3/4" X 3/4" MAX. APERTURE SIZE
OUTER FILTRATION MESH
COMPOSITE POLYPROPYLENE FABRIC
(WOVEN LAYER AND NON-WOVEN FLEECE
MECHANICALLY FUSED VIA NEEDLE PUNCH)
3/16" MAX APERTURE SIZE
SOCK FABRICS COMPOSED OF BURLAP MAY BE USED ON PROJECTS LASTING 6 MONTHS OR LESS
TABLE 4.1
COMPOST STANDARDS
ORGANIC MATTER CONTENT 80% - 100% (DRY WEIGHT BASIS)
ORGANIC PORTION FIBROUS AND ELONGATED
pH 5.5 - 8.0
MOISTURE CONTENT 35% - 55%
PARTICLE SIZE 98% PASS THROUGH 1" SIEVE
SOLUBLE SALT CONCENTRATE 5.0 dS/m (mmhos/cm) MAXIMUM
NOTES:
COMPOST SHOULD BE WELL DECOMPOSED, WEED-FREE ORGANIC MATTER DERIVED FROM AGRICULTURAL
FOOD, STUMP GRINDINGS, AND YARD OR WOOD/BARK ORGANIC MATTER SOURCES. THE COMPOST
SHOULD BE AEROBICALLY COMPOSTED. THE COMPOST SHOULD POSSESS NO OBJECTIONABLE ODORS AND SHOULD BE REASONABLY FREE (<1% DRY WEIGHT) OF MAN-MADE FOREIGN MATTER. THE COMPOST PRODUCT SHOULD NOT RESEMBLE THE RAW MATERIAL FROM WHICH IT WAS DERIVED. WOOD AND BARK CHIPS, GROUND CONSTRUCTION DEBRIS OR REPROCESSED WOOD PRODUCTS ARE NOT ACCEPTABLE AS
THE ORGANIC COMPONENT OF THE MIX.
THE PHYSICAL PARAMETERS OF THE COMPOST SHOULD COMPLY WITH THE STANDARDS IN TABLE 4-2. THE STANDARDS CONTAINED IN THE PENNDOT PUBLICATION 408 ARE AN ACCEPTABLE ALTERNATIVE.
TABLE 4.2
STANDARD CONSTRUCTION DETAIL
COMPOST FILTER SOCK
NOT TO SCALE
2"X2" WOODEN STAKE
PLACED 10' O.C.
18" COMPOST FILTER
SOCK
BLOWN/PLACED
FILTER MEDIA
DISTURBED AREA
M
IN
DISTURBED
AREA
SECTION VIEW
PLAN VIEW
COMPOST FILTER SOCK
2"X2" WOODEN STAKE
PLACED 10' O.C.
FL
O
W
FLO
W
NOTES:
1. SOCK FABRIC SHALL MEET STANDARDS OF TABLE 4.1. COMPOST SHALL MEET THE STANDARDS OF
TABLE 4.2.
2. COMPOST FILTER SOCK SHALL BE PLACED AT EXISTING LEVEL GRADE. BOTH ENDS OF THE SOCK SHALL
BE EXTENDED AT LEAST 8 FEET UP SLOPE AT 45 DEGREES TO THE MAIN SOCK ALIGNMENT (FIGURE 4.1).
MAXIMUM SLOPE LENGTH ABOVE ANY SOCK SHALL NOT EXCEED THAT SHOWN ON FIGURE 4. STAKES MAY BE INSTALLED IMMEDIATELY DOWNSLOPE OF THE SOCK IF SO SPECIFIED BY THE MANUFACTURER.
3. TRAFFIC SHALL NOT BE PERMITTED TO CROSS FILTER SOCKS.
4. ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN IT REACHES HALF THE ABOVE GROUND HEIGHT
OF THE SOCK AND DISPOSED IN THE MANNER DESCRIBED ELSEWHERE IN THE PLAN.
5. SOCKS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT. DAMAGED SOCKS SHALL BE
REPAIRED ACCORDING TO MANUFACTURER'S SPECIFICATIONS OR REPLACED WITHIN 24 HOURS OF
INSPECTION.
6. BIODEGRADABLE FILTER SOCKS SHALL BE REPLACED AFTER 6 MONTHS; PHOTODEGRADABLE SOCKS
AFTER 1 YEAR. POLYPROPYLENE SOCKS SHALL BE REPLACED ACCORDING TO MANUFACTURER'S
RECOMMENDATIONS.
7. UPON STABILIZATION OF THE AREA TRIBUTARY TO THE SOCK , STAKES SHALL BE REMOVED. THE SOCKS MAY BE LEFT IN PLACE AND VEGETATED OR REMOVED. IN THE LATTER CASE, THE MESH SHALL BE CUT
OPEN AND THE MULCH SPREAD AS A SOIL SUPPLEMENT.
45° BEND
LATERAL
WYE
FLOW
PVC CLEANOUT IN GRASS
NOT TO SCALE
REMOVABLE PVC
THREADED PLUG
FINISHED GRADE
FLOW 45° BEND
REMOVABLE PVC
THREADED PLUG
FINISHED GRADE
PAVING OR
FINISHED GRADE
SEE CONTRACT SPECIFICATIONS
FOR MANHOLE FRAME AND COVER
(INSTALLED FLUSH WITH GRADE
UNLESS OTHERWISE NOTED) ADJUST TO GRADE AS REQUIRED, USE
UNIFORM WIDTH RING OF BITUMASTIC
MATERIAL TO BE PLACED BETWEEN
EACH MANHOLE COMPONENT AND
GRADE ADJUSTMENT RISER. TOP MOST
GRADE ADJUSTMENT RISER SHALL BE
SINGLE RUBBER COMPOSITE RISER.
REMAINING GRADE ADJUSTMENT
RISERS SHALL BE PRECAST CEMENT
CONCRETE. BRICK AND MORTAR
MASONRY WILL NOT BE ALLOWED
PRECAST REINFORCED CONCRETE
CONICAL RISER WHERE MANHOLE
DEPTH ALLOWS
PRECAST REINFORCED CONCRETE
VARIABLE HEIGHT MANHOLE
RISER SECTIONS
CEMENT GROUT OR BITUMASTIC
ALL AROUND INSIDE AND
OUTSIDE OF JOINT (TYP)
RUBBER
O-RING (TYP)
" X
6"
P O
LY
-R
EI
N
FO
R
C
ED
M
AN
H O
LE
S
TE
PS
A T
" O
N -C
EN
TE
R
IN
ST
AL
LE
D
B Y
PR
EC
AS
T
M
AN
H O
LE
M
AN
U
FA
C
TU
R
ER
VA
R
IA
BL
E
7.
5"
9"
30" 7"
2" 6"
6" 6"
6" 6"
6"
48" DIA5" 5"
POURED CONCRETE FLOW
TO FIT CURVATURE OF
PIPES AND DIRECT FLOW
6"6"
ID
ID *
PIPE *
4" M
IN
8"
PRECAST REINFORCED
CONCRETE BASE SECTION
" AASHTO NO. 57 OR
PENNDOT NO. 2A
COARSE AGGREGATE
BEDDING
1/
ID
PROVIDE BITUMASTIC ON
EXTERIOR OF MANHOLE
MANHOLE ENCAPSULATION SYSTEM
FLEXIBLE PIPE TO MANHOLE
CONNECTION PER
SPECIFICATIONS
SECTION 33 31 11
SANITARY PRECAST MANHOLE (4' DIAMETER DETAIL)
NOT TO SCALE
SURFACE RESTORATION DETAILS
NOT TO SCALE
AutoCAD SHX Text
EXISTING ROADWAY
AutoCAD SHX Text
EXISTING ROADWAY
AutoCAD SHX Text
EXISTING GROUND
AutoCAD SHX Text
UNDISTURBED AREA
AutoCAD SHX Text
EXISTING CONTOURS
AutoCAD SHX Text
UNDISTURBED AREA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text PROPOSED SANITARY SEWER PIPE* DIRECT BURIED AND BEDDED IN 2A TO 6" ABOVE THE PIPE. BACKFILL WITH NATIVE MATERIAL.
AutoCAD SHX Text
1'-0" MIN.
AutoCAD SHX Text
AutoCAD SHX Text
6" MIN.
AutoCAD SHX Text
BACKFILL WITH NATIVE MATERIAL.
AutoCAD SHX Text
TAMP IN 4" LIFTS
AutoCAD SHX Text
** 6" IN EARTH 3" IN ROCK
AutoCAD SHX Text RESTORE IN ACCORDANCE WITH APPROPRIATE SURFACE RESTORATION DETAILS (SEE DETAILS ON THIS SHEET)
AutoCAD SHX Text TYPICAL TRENCH RESTORATION DETAIL NOT TO SCALE * DIMENSION AS NOTED ON PLANS NOTE: : 1. BACKFILL TO BE TESTED TO 100% COMPACTION.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .