Summary: Request for Quotations (RFQ) 19RS5026Q0014
This is a Request for Quotations issued by the U.S. Embassy Moscow for planned maintenance and inspection services of low voltage diesel standby generator systems. The RFQ was issued September 11, 2026, with quotations due September 25, 2026, at 6:00 p.m. Moscow time. An optional site visit is scheduled for September 17, 2026, at 10:00 a.m. Moscow time at Square of Donetsk People's Republic, bld. 1, Moscow. The acquisition is unrestricted (not set aside for small business), with award to be made to the lowest-priced acceptable, responsible offeror based on initial quotations without discussions, though discussions may occur with offerors in the competitive range if necessary. Payment will be made by the Financial Management Center to the contractor's address, with invoices submitted to MoscowFMCInvoices@state.gov.
The contract is a firm-fixed-price (FFP) agreement payable exclusively in Russian Rubles covering a base year plus two optional one-year periods commencing no later than September 30, 2026. Services include semi-annual and annual preventive maintenance and inspections of four diesel generators (three Caterpillar 3512B units and one Olympian GEP 150 unit), load banks, and automatic transfer switches. The contractor must provide all labor, materials, tools, equipment, and supplies; maintain SAM registration; obtain required commercial licenses and permits; provide OEM certifications; submit strategic plans and maintenance checklists; carry public liability insurance ($50,000 property damage/$100,000 cumulative) and workers' compensation insurance; and comply with environmental regulations for disposal of hazardous materials. Contract performance must include compliance with NFPA standards, manufacturer recommendations, and security protocols requiring contractor personnel to receive U.S. Embassy identification cards and maintain standards of conduct.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF-1449.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SBU - CONTRACTING AND ACQUISITIONS
U.S. Embassy Moscow, Russia
Date: September 11, 2026
Dear Prospective Quoter:
Subject: Request for Quotations number 19RS5026Q0014
The Embassy of the United States of America in Moscow is soliciting quotations for a qualified contractor to provide Low voltage diesel standby generators planned maintenance and inspection services.
The U.S. Government intends to award a contract/purchase order to the responsible company submitting an acceptable offer at the lowest price. We intend to award a contract/purchase order based on initial quotations, without holding discussions, although we may hold discussions with companies in the competitive range if there is a need to do so.
An organized site visit (highly recommended) has been scheduled for September 17, 2026, at
10:00 a.m. (Moscow time) at Square of Donetsk People's Republic, bld. 1, Moscow, Russia
121099, U.S. Embassy in Moscow.
Offerors interested to attend should e-mail a company name and its representative’s name, surname, date of birth, citizenship information to the following e-mail address:
moscowgsoprocurement@state.gov, no later than September 15, at 16:00 p.m. Moscow time.
Quotations are due on or before 6-00 p.m. local Moscow time on September 25, 2026. No quotations will be accepted after this time. Proposals must be in English and incomplete proposals will not be accepted.
Your quotation must be submitted electronically to MoscowGSOProcurement@state.gov. All quotes are to be addressed to the Contracting Officer and marked "Quotation 19RS5026Q0014
Enclosed".
Please make sure the submission is made in specific sizes and formats: MS-Word 2007/2010; MS-
Excel 2007/2010; Adobe Acrobat (pdf); rar or zip formats. The file size must not exceed 30MB.
If it is too large, submit via separate emails, each less than 30MB. Please do NOT send your offer via Cloud storage, DropBox, Google Drive, or other formats. They will not be received.
Please confirm receipt of the invitation and your intention to submit a quote.
In order for a quotation to be considered, you must also complete and submit the following:
1. SF-1449 (Page 4. Blocks 12, 17, 23, 24 & 30, where applicable)
2. Section 1, Pricing (Pages 6-7)
3. Additional information as required in Section 3 (Page 52)
4. Representations and Certifications, Section 5 (Page 57) mailto:moscowgsoprocurement@state.gov mailto:MoscowGSOProcurement@state.gov
5. Proof of SAM Registration
Offerors shall be registered in the SAM (System for Award Management) database at https://www.sam.gov prior to submittal of their offer/proposal as prescribed under FAR 4.1102.
Failure to be registered at time of proposal submission may deem the offeror’s proposal to be considered non-responsible and no further consideration will be given. Therefore, offerors are highly encouraged to register immediately if they are interested in submitting a response to this requirement.
Sincerely, Paul A. Roelle
Contracting Officer
Enclosure: SF1449 and 19RS5026Q0014 solicitation package https://www.sam.gov/
TABLE OF CONTENTS
SECTION 1 - THE SCHEDULE
• SF 1449 cover sheet
• Continuation To SF-1449, RFQ Number 19RS5026Q0014, Prices, Block 23
• Continuation To SF-1449, RFQ Number 19RS5026Q0014, Schedule of
Supplies/Services, Block 20, Description/Specifications/Work statement
SECTION 2 - CONTRACT CLAUSES
• Contract Clauses
• Addendum to Contract Clauses - FAR and DOSAR Clauses not Prescribed in Part 12
SECTION 3 - SOLICITATION PROVISIONS
• Solicitation Provisions
• Addendum to Solicitation Provisions - FAR and DOSAR Provisions not Prescribed in
Part 12
SECTION 4 - EVALUATION FACTORS
• Evaluation Factors
• Addendum to Evaluation Factors - FAR and DOSAR Provisions not Prescribed in
Part 12
SECTION 5 - REPRESENTATIONS AND CERTIFICATIONS
• Offeror Representations and Certifications
Computer Generated Prescribed by GSA - FAR (48 CFR) STANDARD FORM 1449 (REV. 02/2012)
PREVIOUS EDITION IS NOT USABLE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER
PR15691838
2. CONTRACT NO.
3. AWARD/EFFECTIVE
DATE September 30, 2026
4. ORDER NUMBER
5. SOLICITATION #
19RS5026Q0014
6. SOLICITATION ISSUE DATE
September 11, 2026
7. FOR SOLICITATION
INFORMATION CALL
a. NAME Moscow Procurement
MoscowGSOProcurement@state.gov
b. TELEPHONE NUMBER
(No collect calls) n/a
8. OFFER DUE DATE/ LOCAL
September 25, 2026, 6 p.m. Moscow time
9. ISSUED BY CODE 19RS50 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE:__ % FOR:
GSO Contracting SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS
Embassy of the United States of America in Moscow HUBZONE SMALL
BUSINESS
(WOSB) ELLIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM NAICS:
Square of Donetsk People’s Republic, BLD 1, Moscow, Russian Federation, 121099
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
EDWOSB
8 (A) SIZE STANDARD:
11. DELIVERY FOR FOB
DESTINATION UNLESS
BLOCK IS MARKED
SEE SCHEDULE
12. DISCOUNT TERMS 13a. THIS CONTRACT IS
A RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ IFB RFP
15. DELIVER TO CODE 19RS50 16. ADMINISTERED BY CODE 19RS50
Contracting Officer
Embassy of the United States of America in Moscow
Square of Donetsk People's Republic, 1, Moscow, Russian Federation, 121099
Contracting Officer
Embassy of the United States of America in Moscow
Square of Donetsk People's Republic, 1
Moscow, Russian Federation, 121099
17a. CONTRACTOR/
C
O
DE
FACILI
TY
CODE
18a. PAYMENT WILL BE MADE BY
Financial Management Center
Embassy of the United States of America in Moscow, Square of
Donetsk People's Republic, 1.
Moscow, Russian Federation,121099
MoscowFMCInvoices@state.gov
C
O
D
E
19RS50
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
SUCH ADDRESS IN OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
Low voltage diesel standby generators planned maintenance and inspection services (see attached in Section 1)
See Section 1
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
RUB
27a.SOLICITATION INCORPORATES BY REFERENCE FAR 52.204-7, 52.212-1, 52.212-2, 52.212-4 AND 52.240-
90 ARE ATTACHED. ADDENDA
ARE ARE NOT ATTACHED
27b.CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.204-13, 52.212-4 AND 52.240-
91 IS ATTACHED. ADDENDA
ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND
RETURN 1 COPY TO ISSUING OFFICE. CONTRACTOR AGREES TO
FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE
IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT
TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
29. AWARD OF CONTRACT: REF. _________________ OFFER DATED
____________. YOUR OFFER ON SOLICITATION (BLOCK 5), INCLUDING ANY
ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS
TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (Type or print)
30c. DATE SIGNED
31b. NAME OF CONTRACTING OFFICER
(Type or print)
Paul A. Roelle
31c. DATE SIGNED mailto:MoscowGSOProcurement@state.gov mailto:MoscowFMCInvoices@state.gov
SECTION 1 - THE SCHEDULE
CONTINUATION TO SF-1449
RFQ NUMBER 19RS5026Q0014
PRICES, BLOCK 23
I. PERFORMANCE WORK STATEMENT
1. DESCRIPTION
The purpose of this contract is to provide professional services on planned maintenance and inspection of the Low Voltage Diesel Standby Generator systems for the U.S. Embassy in
Moscow. The Contractor shall ensure the entire standby generator systems for this facility are maintained according to manufacturer's recommendations and to ensure the readiness and proper operation of the system.
2. TYPE OF CONTRACT
This is a Firm-Fixed-Price (FFP) contract, payable exclusively in Russian Rubles (RUB).
• Fixed Pricing: The contract price is inclusive of all labor, materials, equipment, taxes, and travel. No additional sums will be payable for any escalation in the cost of materials, equipment or labor, or because of the contractor's failure to properly estimate or accurately predict the cost or difficulty of achieving the results required. The contract price will not be adjusted due to fluctuations in currency exchange rates.
• Environmental Compliance: The Contractor is responsible for proper disposal of toxic/hazardous substances including used oil, fuel, batteries, coolant, and other hazardous materials. All material shall be disposed of according to Government and
Local law. After proper disposal, the Contractor must show proof of authorized disposal of these toxic/hazardous substances.
3. PERIOD OF PERFORMANCE
The contract will be for a period of one-year, with a maximum of two one-year optional periods of performance (Base Year + two Optional Years) and will be expected to commence no later than 30 September 2026.
4. PRICING
The rates below include all costs associated with providing planned maintenance and inspection services in accordance with the Statement of Work, and the manufacturer’s warranty including materials, labor, insurance (see FAR 52.228-4 and 52.228-5), overhead, profit and VAT (if applicable). Cost shall also include up to 2 emergency call outs at no additional cost to the
Government. Emergency Service, with a four-hour response time, must be available 24 hours per day, 365 days a year. The Contractor shall be responsible for all logistics including but not limited to transportation and hotel reservations for their staff if necessary.
https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_228_4 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_228_5
4.1. Base Year. The Contractor shall provide the services shown below for the base period of the contract and continuing for a period of 12 months.
4.2. Option Year 1 (OY1). The Contractor shall provide the services shown below for Option
Year 1 of the contract and continuing for a period of 12 months.
CLIN Description Quantity of
Equipment
Type of services No. of service
Unit price / service, RUB
Total per year, RUB
Caterpillar 3512B
Series
Semi-
Annual
Olympian GEP 150
Series
Semi-
Annual
003 ATS 2
Semi-
Annual
Caterpillar 3512B
Series 3 Annual 3
Olympian GEP 150
Series 1 Annual 1
006 ATS 2 Annual 2
007 Reactive calls N/A Annual 4
Total Base Year
VAT, RUB
TOTAL, Base Year incl. VAT, RUB
Equipment
Type of services No. of service
Unit price / service, RUB
Total per year, RUB
Caterpillar 3512B
Series
Semi-
Annual
Olympian GEP 150
Series
Semi-
Annual
003 ATS 2
Semi-
Annual
Caterpillar 3512B
Series 3 Annual 3
Olympian GEP 150
Series 1 Annual 1
4.3. Option Year 2 (OY2). The Contractor shall provide the services shown below for Option
Year 2 of the contract and continuing for a period of 12 months.
4.4. Total for all years:
Base Year Rub. (including VAT)
Option Year 1 Rub. (including VAT)
Option Year 2 Rub. (including VAT)
TOTAL Rub. (including VAT)
006 ATS 2 Annual 2
007 Reactive calls N/A Annual 4
Total OY1, RUB
TOTAL, OY1 incl.
Equipment
Type of services No. of service
Unit price / service, RUB
Total per year, RUB
Caterpillar 3512B
Series
Semi-
Annual
Olympian GEP 150
Series
Semi-
Annual
003 ATS 2
Semi-
Annual
Caterpillar 3512B
Series 3 Annual 3
Olympian GEP 150
Series 1 Annual 1
006 ATS 2 Annual 2
007 Reactive calls N/A Annual 4
Total OY2, RUB
TOTAL, OY2 incl.
4.5. Emergency Assistance
The Contractor shall provide emergency assistance for generator support, priced at an hourly rate, within 24 hours of being contacted by the COR. Note: If contractor is not local, this may take the form of remote troubleshooting and support until such time as travel can be initiated.
Emergency Assistance Labor Rate
RUB/hr
5. VALUE ADDED TAX
The Contractor shall include VAT as a separate charge on the Invoice and as a separate line item in the Offer.
6. NOTICE TO PROCEED
After Contract award and submission of acceptable insurance certificates and copies of all applicable licenses and permits, the Contracting Officer will issue a Notice to Proceed. The
Notice to Proceed will establish a date (a minimum of ten (10) days from date of Contract award unless the Contractor agrees to an earlier date) on which performance shall start.
CONTINUATION TO SF-1449,
RFQ NUMBER 19RS5026Q0014
SCHEDULE OF SUPPLIES/SERVICES, BLOCK 20
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
II. STATEMENT OF WORK
1. GENERAL INFORMATION
The United States Embassy in Moscow requires professional services and contractor cost proposals to perform Planned Maintenance and Inspection services of the facility's Low Voltage
Diesel Standby Generator systems.
1.1 CONTRACT SCOPE AND LIMITATIONS
A. Standby Service - Standard Application
This contract is designed for diesel standby generators in emergency/standby service. The standard maintenance schedule assumes:
• Infrequent operation (emergency use and regular testing only)
• Typical annual operating hours less than 200 hours
• Calendar-based maintenance intervals (two visits per year)
B. Service Visit Frequency - Standby Service
For standard standby service, this contract provides TWO (2) scheduled maintenance visits per year:
• One (1) Semi-Annual service (every 6 months ±30 days)
• One (1) Annual service (every 12 months ±30 days)
Additional visits, major repairs, or component replacements require separate purchase orders.
C. Hour-Based Maintenance Triggers
Certain manufacturer-required maintenance is triggered by operating hours regardless of calendar intervals (e.g., valve lash adjustment, oil changes, major services).
The Contractor shall:
• Record operating hours at each service visit
• Notify the COR when generators approach hour-based maintenance intervals
• Follow the more frequent calendar-based or hour-based schedules per manufacturer’s recommendations
• Perform hour-based maintenance at the next scheduled visit if within acceptable range, or coordinate additional service if immediate attention is required
D. Parallel Systems and Complex Automation
Facilities with parallel generator systems, complex load-sharing controls, or advanced automation require additional specialized services beyond standard generator maintenance.
• Synchronization and load-sharing verification – required to be performed as a part of preventative services.
E. Period of Performance
• Base Year plus two option years
2. PROJECT REQUIREMENTS
The Contractor shall perform planned maintenance and inspections as described in this Statement of Work (SOW). The intent of this SOW is to ensure the entire standby generator systems for this facility are maintained according to manufacturer's recommendations and to ensure the readiness and proper operation of the system.
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform professional Planned Maintenance and Inspection services for the facility's Low Voltage Diesel
Standby Generator systems as defined in this Statement of Work.
Objectives:
• Ensure all standby generator systems are maintained according to Original Equipment
Manufacturer (OEM) recommendations
• Ensure readiness and proper operation of generator systems for emergency power supply
• Maintain compliance with NFPA standards for generator installation and grounding
• Prevent equipment failure through regular planned maintenance
• Extend equipment service life through proper maintenance practices
3. DESCRIPTION OF EQUIPMENT
The equipment to be maintained includes:
• EQUIPMENT
DESCRIPTIOP
N
MANUFACTURE
R
MODEL SERIAL NUMBER
1 Power
Generator
Caterpillar 3512B Series CAT3512BKYBB00279
2 Power
Generator
Caterpillar 3512B Series CAT3512BKYBB00277
3 Power
Generator
Caterpillar 3512B Series CAT3512BKYBB00276
4 Power
Generator
Olympian GEP 150 Series OLYOOOOOKLEL042
5 Loadbank Avtron PT# A20712 SN XX
K875A/1013729
6 Loadbank
Switch
Eaton Pow-R-Line PAR40447
7 ATS ASCO 7000
(J07ATBB30400H5X
C)
1084695 WE
8 ATS CAT Switchboard UL1558 SWG36901
9 Day Tanks for each generator
N/A N/A N/A
4. GENERAL REQUIREMENTS
The Contractor shall provide the labor and materials required to carry out regularly planned maintenance and inspections as outlined in this SOW.
NOTE: The intent is for the Contractor to supply labor, fluids, filters and items that can be anticipated on a schedule such as coolants and batteries. Repairs or replacement parts should be separately priced. There should be a plan and oversight to avoid unnecessary maintenance/ charges or not replacing items such as hoses when necessary.
A. Materials and Supplies
The Contractor shall inventory, supply and replace maintenance service items (e.g., filters and fluids).
1. Only fluids and parts which meet or exceed manufacturer's specifications shall be used.
2. All fluids shall be delivered in original sealed containers.
3. Contractor shall supply the parts required in performance of maintenance included in this
SOW (e.g., rocker cover gaskets when performing valve lash, thermostats when performing coolant change).
B. Expendable and Common Parts
The Contractor shall maintain a supply of expendable and common parts so that these are readily available for normal maintenance to include: hoses, belts, oil, chemicals, coolant, filters, generator starting batteries, grease, sealant, thermostats, fuses; in addition to the appropriate tools, testing equipment, safety shoes and apparel for technicians, personal protective equipment
(hands, hearing, eye protection), MSDS, cleaning material and oil spill containment kits.
C. Exclusions
This contract does NOT include repair of equipment and replacement of hardware (e.g., bearings, pistons, piston rings, crankshaft, gears, injectors) except as indicated in the maintenance schedules and equipment list. Hardware replacements will be separately priced out by the Contractor for the Government's approval and acceptance. The Government has the option to accept or reject the Contractor's quote for parts and reserves the right to obtain similar spare parts from other competitive sources. If required by the Government, the Contractor shall utilize
Government-purchased spare parts, if awarded the work. Such repairs/replacements will be accomplished by a separate purchase order. However, this exclusion does not apply if the repair is to correct damage caused by Contractor negligence.
1. Replacement/repair of any electronic or electrical parts must be approved by the COR prior to installation of the part. If the Contractor proceeds to replace any electronic or electrical parts without COR approval, the Contractor shall de-install the parts at no cost to the Government.
D. Checklist Approval
The Contractor shall submit to the COR a schedule and description of planned maintenance tasks which the Contractor plans to provide. The Contractor shall prepare this schedule and task description in a checklist format for the COR's approval prior to contract work commencement.
E. Manufacturer's Recommended Maintenance
It is the responsibility of the Contractor to perform all manufacturers recommended planned maintenance as well as planned maintenance recommended by the manufacturer technical manuals for standby operations of the respective equipment.
1. This does not include major maintenance, planned overhauls, or injector replacements.
F. Personnel, Tools, Consumable Materials and Supplies
The Contractor shall provide trained technicians with the appropriate tools and testing equipment for scheduled maintenance, safety inspection, and safety testing as required by this Contract. The
Contractor shall provide all of the necessary materials and supplies to maintain, service, inspect and test all the systems to be maintained.
G. Safety & Special Instructions
1. Use appropriate personal protective equipment (PPE) when performing work
2. Check all work areas, tools, and equipment to ensure unsafe conditions are eliminated or guarded against
3. Follow site safety procedures
4. Schedule maintenance with operating personnel and affected offices (security)
5. Follow approved lockout/tag out procedures
6. Review and follow the manufacturer's instructions
7. Record results in the equipment history log
8. Remove lockout/tag out in accordance with appropriate procedures
9. Report all incidents and near missed incidents to COR and assist as requested in the investigation and corrective action
H. Disposal of Hazardous Materials
The Contractor is responsible for proper disposal of toxic/hazardous substances including used oil, fuel, batteries, coolant, and other hazardous materials. All material shall be disposed of according to Government and Local law. After proper disposal, the Contractor must show proof of authorized disposal of these toxic/hazardous substances.
I. Chemical Analysis
The Contractor is responsible for conducting laboratory analysis for fuel and oil samples. All charges for such analysis are payable by the Contractor and a report stating the test results shall be submitted to the COR within 30 days of sample collection.
J. Load Bank Testing (option: May not be necessary depending on facility load. Refer to SOW
5.A.10 Load testing and 6 for load bank PM)
The Contractor is responsible for exercising the generator using an appropriately sized load bank.
If prior permission is obtained, building load may be used. The diesel units shall be run at 75-
80% of the rated capacity for a minimum of 2 hours. All charges for such testing are payable by the Contractor, and a report shall be submitted to the COR.
1. The Government will provide load banks for generator testing. Avtron, Model
K875A/1013729, 1200 kW, 380V 3-phase 50Hz (see equipment list, line item 5)
K. Licenses and Permits
The offeror shall address its plan to obtain all commercial licenses and permits required by local law. If offeror already possesses the locally required licenses and permits, a copy shall be provided.
L. OEM Certification
Provide a copy of Original Equipment Manufacturer (OEM) (e.g., CAT, MTU, KOHLER, Cummins, Generac) authorized certificate or equivalent to carry out the necessary level of requested repair/planned maintenance service on post Generators.
M. Strategic Plan
The offeror's strategic plan for generator maintenance services to include but not limited to:
1. A work plan taking into account all work elements in the Statement of Work
2. Identify types and quantities of equipment, supplies and materials required for performance of services under this contract. Identify if the offeror already possesses the listed items and their condition for suitability and if not already possessed or inadequate for use, how and when the items will be obtained
3. Identify and submit the list of parts and materials required for Semi-Annual and Annual maintenance service for all Generators
4. Provide a statement that laboratory analysis report will be provided for oil samples collected
5. Provide a statement that manifest or proof of disposal will be provided for toxic/hazardous substance wastes collected
6. Plan of ensuring quality of services including but not limited to contract administration and oversight
7. If insurance is required by the solicitation, a copy of the Certificate of Insurance(s), or a statement that the Contractor will get the required insurance, and the name of the insurance provider to be used
8. List of spare parts and suppliers of spare parts for generator and proposals shall include a description of the firm's ability to obtain replacement parts and ability to perform specialized tests/diagnostic/programming equipment for doing the planned maintenance
N. Emergency Assistance
The Contractor shall provide emergency assistance for generator support, priced at an hourly rate, within 24 hours of being contacted by the COR. Note: If contractor is not local, this may take the form of remote troubleshooting and support until such time as travel can be initiated.
O. Pre-Service Coordination
The Contractor shall coordinate all maintenance activities with the COR at least 72 hours in advance. The Contractor shall:
• Confirm date and time of service
• Identify any facility power outages required
• Coordinate access to generator rooms and equipment
• Notify affected personnel of planned maintenance activities
5. SCOPE OF WORK - GENERATOR PLANNED MAINTENANCE AND INSPECTION
The Contractor shall provide all materials, supervision, labor, tools, and equipment to perform planned maintenance and inspections. All personnel working in the vicinity shall wear and/or use appropriate safety protection while work is performed. Any questions or injuries shall be brought to the attention of the Post COR and Occupation Safety and Health Officer (POSHO). Material
Safety Data Sheets (MSDS) shall be provided by the Contractor for all HAZMAT materials.
Copies will be provided to the COR for approval.
The systems and components to be maintained include diesel generator prime mover, AC alternator, fuel, cooling, ventilation and lubrication systems, start and transfer systems, as well as control and monitoring systems.
Planned Maintenance and Inspection Interval Schedule
NOTE: This is a basic template for standby generator systems. Manufacturer's recommendations should be followed and supersede recommendations in this list. Before each consecutive interval is performed, all maintenance from the previous intervals must be performed.
If any discrepancies are found with the generator systems that are not covered under this scope of work, the Contractor shall provide the following:
1. Detailed report noting the discrepancy found
2. Bill of Materials (BOM) to include component name, quantity, part number, and price for any repair material required and material lead time
3. Price quote for repair labor
4. Photographs of deficiency if applicable
At a minimum, the following work shall be completed:
A. SEMI-ANNUAL PMI SCHEDULE (Every 6 months ±30 days)
1. Visual Inspection
Conduct visual inspection around generator:
• Check for evidence of leaks, damage, loose or missing hardware
• Inspect engine and generator wiring harness for wear and damage
• Inspect supports and spring isolators for soundness and stability
• Inspect system for corrosion
• Hoses and Clamps – Inspect and replace if needed
• Belts – Inspect and adjust/replace if needed
• Inspect all fuel, oil, and water piping for secure mounting and leaks
• Inspect exhaust piping and muffler insulation
• Check/service air cleaner
2. Batteries
• Battery charger – Inspect operation and clean
• Battery electrolyte level and specific gravity – Check and adjust. Add distilled water as needed
• Perform battery load/condition test
• Clean battery terminals and lugs (apply grease on terminal connections)
• Note battery age and recommend replacement if 3 years or older
3. Fluids and Filters
• Cooling System Coolant Level - Check and adjust
• Coolant conditioner (DCA/SCA) / Antifreeze protection – Check and adjust to specs
• Jacket Water Heater - Check proper operation
• Water pump - Check
• Engine Oil Level - Check and add if needed
• Fuel/water separators – Drain water
• Engine Air Cleaner Service Indicator – Check, replace filter if needed
• Check fuel filter restriction if applicable. Replace filters if required
4. Generator Room
• Air intake/exhaust – Ensure nothing obstructs airflow; louvers are free and operate properly
5. Control Panel/Generator Cabinet
• Open all cabinets; remove panel covers to clean/inspect
• Clean dust and vacuum all the controls, meters, switching mechanism components, interior buswork, remote start control panel, annunciator, disconnect breaker and connecting lugs
• Inspect/Check buswork and supporting hardware for cracks, corrosion, or any type of deterioration
• Check all control wiring and power cables (especially wiring between or near hinged door) for sign of wear and deterioration. Secure and/or protect wiring and cables as required
• Check the cabinet interior for loose hardware – tighten connections
• Electrical Connections - Check tightness
• Clean and remove dust from panels
• Check for hot spots using non-contact temperature gun or IR camera
6. Grounding System Semi-Annual Inspection: Grounding, Bonding, and Objectionable
Current
• The Contractor shall inspect and verify proper grounding, bonding and neutral configuration of the generator installation per NFPA 70 (National Electrical Code)
Article 250 standards and applicable manufacturer instructions.
o All grounding, bonding, neutral-configuration, and objectionable-current checks shall be performed only within the training and qualifications of a generator technician, in accordance with site safety requirements. Work inside energized switchgear or beyond this scope shall be referred to appropriately qualified electrical personnel.
• Inspect accessible grounding and bonding conductors at the generator, generator-mounted junction boxes, and ATS enclosure exterior for damage, looseness, corrosion, or overheating; confirm generator frame and enclosure bonding is intact.
• Verify external bonding jumpers on the generator (enclosure sections, doors, bases, if provided) and visible ATS grounding/bonding connections and conduit fittings are present, tight, and undamaged.
• With the system energized and following safety procedures, use a clamp-on ammeter to check for objectionable current on accessible grounding/bonding conductors at the generator and ATS; report any sustained current that appears abnormal or any apparent shock hazard.
7. Automatic Transfer Switch (ATS) - Basic Inspection
• Inspect seals
• Note date of last control battery change if applicable (Replace if 2 years or older)
• Check for hot spots using non-contact temp gun or IR camera
• Inspect/Check buswork and supporting hardware for carbon tracking, cracks, corrosion, or any type of deterioration
• Check all control wiring and power cables for sign of wear and deterioration
• Check for evidence of overheating contacts
• Exercise ATS (with prior COR approval):
o Electronic operation from normal source position to alternate source position and return to normal o Check ATS operation, calibrate and record time delays if necessary o Observe and record retransfer/cool down time
NOTE: The primary objective of this "test" is to exercise the moving mechanical parts of the
ATS which will seize if left in one position without regular operation.
8. Engine Control Module (ECM)
• Plug in OEM computer/diagnostic hardware if applicable
• Review fault history
• Download status report or similar depending on manufacturer to be submitted with report
• Clear non-critical fault codes after documentation
NOTE: Most modern engines utilize electronic controls which require proprietary OEM software to access parameters, replace control boards and perform diagnostic tests (e.g., CAT
ET, Cummins InPower).
9. Run Unit – No Load
• Run the generator with no load for 10 minutes
• Remote Start Panel - Inspect and test operation
• Check the generator for unusual conditions, such as: excessive vibration, leaks, smoke
• Verify all meters, gauges and indicators are normal and functioning properly
10. Run Unit – With Load
Start unit and run under load for minimum 2 hours at 75-80% of rated capacity:
• Unit should be run under facility load if COR authorizes to test and exercise entire system
• If facility load is not permissible or is not a minimum of 50% of rated capacity, the unit shall be exercised with a load bank to a minimum 75-80% capacity for 2 hours
NOTES:
• The only way to ensure your system functions and is available in the event of an outage is to perform a real load test with the facility
• Continual low or no-load running results in low pressures in the engine cylinders which do not allow the piston rings to seat resulting in oil entering the combustion chamber and exhaust tract. This is commonly referred to as "wet stacking" and can cause reduced capacity, equipment damage and premature failure
• Loading of the generator will ensure proper performance of cooling and ventilation systems and that unit can run for extended periods under load without overheating
• Performing a load bank test in addition to the facility load will also exercise and verify operation of post load bank
During Load Test:
• Automatic Start/Stop – Inspect
• Check louvers, shutters and room exhaust fans for proper operation
• Generator Set Vibration – Inspect
• Read and record all key performance indicators from gauges/meters/ECM:
o Ambient Temperature o Coolant Temperature o Oil Pressure o DC Voltage o Frequency (HZ) o Amps (A/B/C phases) o Volts (AB/BC/CA) o Volts Phase-Neutral (A/B/C) o Power Factor (PF) o KW output o % of Capacity o Fuel Consumption at this load
• Record Alternator bearing temperatures
• Check exhaust for excessive black or white smoke
• Check turbocharger for vibrations or any abnormal noise during operation
• Check generator bearing for noise and overheating
• Check exhaust manifold, flexible exhaust, muffler, and piping for leaks and secure mountings
• Check Crankcase breather/Blow By
• Check/service air filter
• Record time delays:
o Time delay to start o Time delay to emergency power o Time delay to normal power o Engine cool down time
11. Post-Service Activities
• Ensure system is left in proper position for automatic start and transfer
• Clean generator. Wash radiator if necessary
• Annotate date, hours and maintenance in Generator log, complete maintenance checklist and deficiency report and brief COR
• Perform any additional maintenance tasks as recommended in the manufacturer's operation and maintenance manuals
• Submit Service Inspection and Test Report to COR and email electronic copies to powersupport@state.gov
B. ANNUAL PMI SCHEDULE (Every 12 months)
1. Conduct Semi-Annual PMI Service
Perform all tasks listed in Section 5.A (Semi-Annual PMI Schedule) above.
2. Engine Air System
• Engine Air Cleaner Elements – Replace (do not clean)
• Engine Crankcase Breather – Clean
• Intake louvers and ducts – Inspect
3. Fluid Analysis and Changes
• Engine Oil Sample - Obtain and perform laboratory analysis. Submit report to
COR within 30 days (if applicable)
• Engine Oil and Filter(s) – Replace
• Annotate date and hours on all filters when replaced
• Fuel Filters and Water Separators – Replace o To include filters to day tanks if applicable o Clean any fuel screens if applicable
• Obtain fuel sample at day tank and storage tank for laboratory analysis (if applicable)
• Cooling System Coolant Sample - Test
• Cooling System Supplemental Coolant Additive (SCA/DCA) – Test and add if applicable mailto:powersupport@state.gov
• Coolant filter – Change if applicable
4. Cooling System Maintenance
• Radiator – Clean (follow manufacturer's recommendation)
• Fan bearing – Inspect/Grease per manufacturer schedule
5. Engine Mechanical Systems
• Crankshaft Vibration Damper - Inspect
• Engine Protective Devices - Check
• Turbocharger – Inspect/Check
• Clean and lubricate fuel pump linkages if applicable
• Check injector pump and injectors for flow rate pressure
6. Engine Control Module (ECM) - Comprehensive
• Download status report or similar depending on manufacturer to be submitted with report
• Test unit safety shutdowns
• Provide post an electronic copy of ECM program file (backup)
• Verify all parameters are set correctly per manufacturer specifications
7. AC Alternator Inspection
• Inspect for moisture, dust, oil, grease, and debris on main stator windings, exciter
• Check commutator & slip rings, rotor & stator, bearings, bearing lubrication, voltage regulator
• Measure & record resistance readings of windings with insulation tester (Megger)
• Clean as needed
• Check Rotating Rectifier
• Inspect/Check Varistor
• Grease generator bearing per manufacturer's maintenance schedule
8. Grounding System Annual Inspection: Grounding, Bonding, Neutral Configuration, and
Objectionable Current (In addition to semi-annual tasks above.)
• With the generator de-energized and locked out, inspect accessible internal grounding and bonding connections in the generator terminal box/control cabinet for tightness, integrity, overheating, and corrosion.
• Verify, using nameplate, ATS labeling, and available one-line diagrams, that neutral-to-ground bonding matches the system configuration:
o Separately derived system (typically 4-pole ATS with switched neutral): neutral-to-ground bond only at the designated point.
o Non–separately derived system (typically 3-pole ATS with solid neutral): no additional neutral-to-ground bonds at generator or ATS.
• Do not alter neutral or grounding connections; report any suspected mis-bonding or multiple neutral-ground bonds.
• With the system in normal operation, use a clamp-on ammeter on accessible grounding/bonding conductors at the generator and ATS to identify any objectionable current. Document abnormal readings and recommended follow-up by qualified electrical personnel.
9. Additional Maintenance Per Manufacturer Schedule
A. Generator Bearing
• Inspect/Grease as recommended by manufacturer's maintenance schedule
B. Engine Generator Batteries
• Replace if 3 years old
• Dispose of old batteries in accordance with environmental regulations
C. Cooling System Coolant
• Flush system and replace per manufacturer's maintenance schedule with coolant per manufacturer specifications o Every 3 years since last change o Every 6 years for Extended Life Coolant
• When performing coolant change: flush engine and replace engine thermostats
• Replace hoses if necessary
D. Engine Valve Lash/Injector Height
• Inspect/Adjust per manufacturer's maintenance schedule
• Replace rocker cover gaskets and torque to proper specs
10. Post-Service Activities
• Ensure system is left in proper position for automatic start and transfer
• Clean generator. Wash radiator if necessary
• Annotate date, hours and maintenance in Generator log, complete maintenance checklist and deficiency report and brief COR
• Perform any additional maintenance tasks as recommended in the manufacturer's operation and maintenance manuals
• Submit Service Inspection and Test Report to COR and email electronic copies to powersupport@state.gov
C. INITIAL CONTRACT SERVICE REQUIREMENTS
At the start of this contract, the Contractor shall supply to post:
1. 1 set of engine belts per unit to be kept onsite o Provide labor to replace belts as needed during regular scheduled service based on inspection
2. 1 set of fuel filters and water separators per unit to be kept onsite (in addition to items supplied at annual service)
6. LOAD BANK PLANNED MAINTENANCE AND INSPECTION
A. SEMI-ANNUAL LOAD BANK PMI (Every 6 months ±30 days)
1. Visual and Operational Inspection
• Inspect enclosure for damage, corrosion, or water intrusion
• Check ventilation openings for obstructions
• Inspect power cables and connectors for damage, wear, or overheating
• Check for hot spots using non-contact temperature gun or IR camera
• Verify all switches, controls, and indicator lights function properly
• Inspect cooling fans (if equipped) for proper operation
2. Resistive Elements
• Visually inspect elements for damage, overheating, or discoloration
• Check element mounting hardware for tightness
• Verify proper spacing between elements
3. Operational Test
• Connect load bank to generator per manufacturer's instructions
• Perform load test at various load steps
• Verify accurate load measurement and display
• Check for unusual noise, vibration, or odors
• Document all test results
4. Post-Service Activities
• Clean load bank exterior
• Ensure load bank is properly stored or secured
• Complete maintenance checklist and brief COR
• Submit Service Inspection and Test Report to COR and email to powersupport@state.gov
B. ANNUAL LOAD BANK MAINTENANCE (Every 12 months)
Perform all tasks listed in Section 6.A (Semi-Annual Load Bank Inspection) above, PLUS:
1. Comprehensive Electrical Inspection
• Inspect and tighten all electrical connections
• Perform insulation resistance test (Megger test) on load elements
• Measure and record resistance values of load elements
• Verify proper operation of all protective devices
2. Mechanical Service
• Clean interior of load bank enclosure
• Lubricate fan motors and bearings per manufacturer schedule (if equipped)
• Replace air filters if equipped
• Inspect structural components and mounting hardware
3. Full Capacity Test
• Perform full capacity load test
• Verify load bank achieves rated capacity
• Monitor and record temperatures at various load levels
• Verify accuracy of load measurements
4. Grounding Verification
• Verify load bank frame is properly grounded
• Inspect grounding connections for tightness and corrosion
5. Post-Service Activities
• Update equipment history records
• Provide recommendations for future maintenance if deficiencies noted
• Submit comprehensive Service Inspection and Test Report to COR and email to powersupport@state.gov
7. AUTOMATIC TRANSFER SWITCH PLANNED MAINTENANCE AND
INSPECTION
1. Qualified Personnel
• Contractor shall use technicians qualified and authorized to perform electrical work on
ATS equipment in accordance with Manufacturer requirements, and Applicable national and local electrical safety standards.
• Technicians shall be trained and experienced in ATS maintenance for applicable equipment.
2. Safety and Coordination
• Follow approved lockout/tagout (LOTO) and site safety procedures.
• Obtain Contracting Officer’s Representative (COR) approval before:
o Exercising ATSs that may affect facility loads, and o Any service requiring a power interruption.
• Coordinate outages and testing in advance with facility operations.
A. SEMI-ANNUAL ATS PMI (Every 6 months ±30 days)
1. Visual and Mechanical Inspection
• Inspect ATS enclosure and doors for damage, corrosion, or water ingress.
• Check door gaskets, hinges, and latches; verify doors close and latch properly.
• Verify nameplate data and identification labels are present and legible.
• Inspect ventilation openings for dust buildup or obstructions.
• Visually inspect viewing windows, handles, and operating mechanisms for signs of wear or damage.
2. Electrical and Contact Check (Non-Intrusive)
• Inspect external connections and visible bus/cable terminations for discoloration, overheating, or obvious looseness.
• Use a non-contact temperature meter or IR camera (if available) to check for abnormal hot spots under normal operating conditions.
• Visually inspect main and auxiliary contacts (where viewable) for signs of overheating, pitting, or burning.
• Check control wiring, especially at hinges and moving parts, for abrasion, loose supports, or damaged insulation.
3. Control System Check
• Inspect control panel and interior surfaces for dust accumulation; lightly clean as needed without disturbing energized parts.
• Verify all indicator lights, position/status indicators, and displays function correctly.
• Verify operation of control switches (Auto/Off/Manual, Test, Bypass, etc.).
• Check control power supply voltage (where accessible) and confirm it is within manufacturer limits.
• Check date/age of control batteries (if equipped) and recommend replacement if ≥ 2 years or per manufacturer guidance.
4. Functional/Operational Test
(Only when approved by COR and safe for the facility)
• Perform an ATS exercise or transfer test in accordance with site procedures
• Verify:
o Transfer from normal to emergency and retransfer to normal.
o Proper operation in automatic mode and manual/bypass modes (if provided and safe to operate under load).
o Time delays and cooldown timers are reasonable and match existing settings.
o Position indicators and remote status signals (if used) match actual ATS position.
5. Safety / Interlocks
• Check mechanical and electrical interlocks, including bypass-isolation interlocks where applicable, for proper operation.
• Confirm ATS is left in automatic position after testing.
6. Documentation
• Record date, ATS ID, location, and basic test results.
• Note any abnormal conditions, deficiencies, or recommended corrective actions.
• Provide a brief Semi-Annual ATS Service Report to the COR and send an electronic copy to powersupport@state.gov.
B. ANNUAL ATS PMI (Every 12 months)
NOTE: This service requires a facility power outage and prior COR approval.
Perform all tasks listed in Section 7.A (Semi-Annual ATS PMI) above, PLUS the following additional tasks:
1. De-Energized Cleaning
• De-energize ATS in accordance with approved LOTO procedures and verify absence of voltage.
• Remove covers as necessary to safely access internal components.
• Clean and vacuum interior of ATS.
• Clean arc chutes, barriers, and insulators.
2. Electrical Integrity and Connections
• Inspect and tighten accessible power and ground connections to manufacturer torque values.
• Check for loose hardware, damaged insulation, corrosion, or carbon tracking on bus, lugs, and insulators.
• Inspect all internal wiring for damage, discoloration, or brittle insulation, with special attention to moving/hinged areas.
3. Contact Inspection
• Inspect main power contacts and arc surfaces for erosion, pitting, and overheating.
• Inspect auxiliary contacts associated with position indication, generator start, and interlocks.
• Clean contacts as recommended by the manufacturer; do not file or dress contacts beyond
OEM guidance.
• Recommend contact repair or replacement if wear is excessive or if contact resistance is suspected to be abnormal.
4. Insulation resistance (Megger) testing: When requested
• Perform insulation resistance (Megger) testing on ATS power circuits only where permitted by the manufacturer and when specifically requested by the Government (e.g., periodic detailed testing or investigation of suspected insulation issues).
• Do not perform insulation resistance testing on electronic control circuits or solid-state devices.
5. Mechanical System Service
• Inspect operating mechanisms, linkages, and pivot points for wear, misalignment, or binding.
• Lubricate moving parts per manufacturer’s instructions (only with approved lubricants).
• Verify operation of springs, latches, and interlocks.
• For bypass-isolation ATSs, verify proper operation of bypass and isolation mechanisms.
6. Control and Protective Devices
• Test operation of control circuits, relays, and timers (time delays, cooldown, retransfer, etc.).
• Confirm time delay settings match site requirements and record current settings.
• Check control power supply and battery charger (if present).
• Replace control batteries if 2 years or older or per manufacturer recommendations.
• Functionally test protective devices associated with the ATS (e.g., control-level protective relays, phase loss/phase rotation, ground fault indication if applicable), consistent with OEM and site policy.
7. Operational Test Under Load (When authorized)
• With COR approval and facility coordination, perform a transfer test under typical load conditions:
o Verify transfer from normal to emergency source and retransfer to normal.
o Check that transfer/retransfer times are acceptable and record them.
o Verify proper operation of all modes available (automatic, manual, test, and bypass if equipped).
o Confirm all mechanical and electrical interlocks function as intended.
8. Grounding and Bonding
• Verify ATS frame and enclosure grounding is intact.
• Inspect grounding conductors, ground bar, and any enclosure bonding straps for tightness and corrosion.
• Correct minor deficiencies and report any issues that require additional work.
9. Post-Service and Documentation
• Remove LOTO and return the ATS to normal configuration and automatic mode.
• Verify normal source is supplying the load (or as directed by COR).
• Record:
o All tests performed, settings verified or changed, and any measured values taken.
o All deficiencies found and recommended corrective actions.
• Update equipment maintenance records if provided by the Government.
• Submit a Comprehensive Annual ATS Service Inspection and Test Report to the
COR and email electronic copies to powersupport@state.gov.
8. DAY TANK PLANNED MAINTENANCE AND INSPECTION
A. SEMI-ANNUAL DAY TANK PMI (Every 6 months ±30 days)
The Contractor shall perform the following basic checks at each day tank:
1. Visual Inspection
• Inspect tank exterior for visible damage, corrosion, or leaks
• Check tank mounting and supports appear secure
• Check secondary containment (if present) for cracks or accumulated liquid
• Look for signs of fuel staining or spills around the tank
• Verify tank grounding connection is present and appears intact
2. Fuel Level / Fuel Lines
• Check and record day tank fuel level
• Inspect visible fuel supply line from main tank to day tank for damage or leaks
• Verify fuel return line to main tank is connected and not leaking (for automatic fill systems)
• Check fuel line supports appear secure
• Check visible fuel line supports and hangers for secure condition.
3. Ventilation
• Check tank vent pipe and cap are not blocked by debris, insects, or ice
• Verify vent opening is clear
• Check overflow pipe (if present) is not obviously blocked
4. Basic Fuel Quality Check
• Drain water from bottom of tank
• Visually inspect drained fuel for water, sediment, or contamination
• If water or contamination is present, notify COR
5. Controls and Alarms
• Verify fuel level gauge reads correctly
• Test high and low level alarms using control panel test function
• Verify control panel powers up and shows normal status
6. Autofill/Return System Test
• Test autofill/return operation using normal test procedure
• Verify fuel transfer/return pump(s) starts and stops properly
• Check for unusual noises or leaks during operation
7. Housekeeping
• Ensure area around tank is clean and accessible
• Clean up any minor spills per site procedures
8. Post Service
• Record date, findings, and actions in equipment log
• Notify COR of any leaks, control issues, or fuel quality concerns
• Submit Service Inspection and Test Report to COR and email to powersupport@state.gov
B. ANNUAL DAY TANK INSPECTION (Every 12 months)
Perform all tasks listed in Section 8.A (Semi-Annual Day Tank Inspection) above, PLUS:
1. Detailed Visual Inspection
• Inspect tank exterior, visible welds, and fittings more thoroughly for corrosion or damage
• Check that tank is not settling or shifting on supports
• Inspect tank grounding conductor for damage; verify connection is tight at tank
2. Fuel System Check
• Inspect fuel return line routing back to main tank for damage, kinks, or improper support
• Check all visible fuel line connections for tightness
3. Vent System Check
• Inspect visible vent…
This is the start of the file's text. The full file is on GovTribe.