Questions and Answers.pdf
PDF 143 KB Posted
- Attached to
- Mexico City - Rooftop Pergola Installation
- Solicitation number
- 19MX5324Q0009
- Issued by
-
Department of State US Embassy Mexico
About this file
This document contains questions and answers regarding Solicitation Number 19MX5324Q0009 for a Rooftop Pergola Installation project in Mexico City. The solicitation requires a construction contractor to build a pergola structure on a government-owned residence, valued between $25,000-$100,000 USD. Respondents must have an established business in Mexico City with necessary personnel, equipment, licenses and insurance to perform the work. Specialized experience in similar construction efforts is preferred. The questions and answers provide clarification on submitting structural drawings, signature requirements, slab details, applicable design standards, and specifications for manipulable side covers on the pergola structure. Interested contractors should contact the specified email address to request a copy of Solicitation No. 19MX5324Q0009 from the US Embassy Mexico.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 0002-Amendment - extend due date.v2.pdf | ||
| 0001-Amendment.pdf | ||
| 19MX5324Q0009 Rooftop Pergola Installation RFQ.pdf | ||
| RFQ SF-1442 19MX5324Q0009 Cover.docx | DOCX document | |
| JHA 2022 English and Spanish.xlsx | XLSX spreadsheet | |
| Letter to offerors - 19MX5324Q0009.pdf | ||
| Safety Plan - FAC.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Seneca Rooftop 19MX5324Q0009
SBU ‐ CONTRACTING AND ACQUISITIONS
Questions & Answers
Q1‐ Is it likely that you could share the structural drawing of the founda on? to know where to anchor the pergola (find beams and columns in the structure)
A1‐ Structural drawings can be exclusively shared with awarded contractor.
Q2‐ In the project you request structural plans, calcula on reports, renders, do you also need to consider the signature of a DRO (director responsible for construc on)?
A2‐ Yes, a DRO or any en ty or accredited person that assure and be the responsible for the structure construc on.
Q3‐ Do you know if the current slab is concrete or if it is a ribbed or joist‐ and‐bead slab?
A3‐ Concrete slab
Q4‐ What are the OBO design standards? (point 2.1.1 Design standards)
A4‐ Specific applicable standards will be shared with the awarded contractor, once OBO stars with the reviewing of the proposal.
Q5‐ From the quan ty survey, could you please complete the idea of point 8?
A5‐ Supply and installa on of manipulable side covers in 2 of the sides of the pergola structure for provide shade protec on. The side covers must be mountable/dismountable, movable, made of fire‐resistant material and with needed treatment for exterior exposure.
Seneca Rooftop 19MX5324Q0009
SBU ‐ CONTRACTING AND ACQUISITIONS
Q6‐ According to Quan ty Survey point 8 “Supply and installa on of manipulable side covers in 2 of the sides of the pergola structure for provide shade protec on. The side covers must” Could you complete the requirement?
A6‐ See Answer to Q5
File details come from the government source that posted it. Updated .