Attach #9 Mat& Prod Sub Req.doc

DOC document 25 KB Posted

Attached to
Cartagena Containers Federal contract opportunity
Solicitation number
19AQMM19R0336
Issued by
Department of State Office of Acquisition Management

View the file

Other files for this federal contract opportunity

Other files attached to Cartagena Containers, newest first.
File Type Posted
Q& A 19R0336.pdf PDF
Attach # 5 Sub_ reg Rev 1.pdf PDF
19AQMM19R0336 B-M (Changes).pdf PDF
19AQMM19R0336 -A0001.pdf PDF
Attach #1 CTG Containers Specifications Rev 1.pdf PDF
Attach # 2 CTG Containers Drawings Rev 1.pdf PDF
19AQMM19R0336 B-M (A0001).pdf PDF
Attach #10 SAM Reg.pdf PDF
Attach # 1 Specification.pdf PDF
Attach # 4 Insurance.pdf PDF
Attach # 2 Drawings.pdf PDF
Attach #8 Incident Report.docx DOCX document
19AQMM19R0336 B-M.pdf PDF
Synopsis.pdf PDF
SF-1442.pdf PDF
Attach #5 Sub-Reg..pdf PDF
Attach #7 PPQ.docx DOCX document
Attach # 3 Bid_Chart.xlsx XLSX spreadsheet
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MATERIAL/PRODUCT SUBSTITUTION REQUEST

Date: __________________________

Project:_____________________________________________________________________________________

D/B –A/E ___________________________________________________________________________________

Contractor: __________________________________________________________________________________

After the construction NTP, this form shall be used to request consideration of materials for substitution of products specified as a minimum standard.

Specified Material/Product___________________________________________________________________________

Specification Division – Section________________________________________________________________

Specified Manufacturer/Origin ________________________________________________________________

Proposed Substitution ________________________________________________________________________

Proposed Manufacturer/Origin _________________________________________________________________

Proposed Supplier/Source_____________________________________________________________________

Attached hereto are the specification, data, performance documents and standard laboratory test results supporting the product substitution

The following criteria has been taken into consideration

The use of this material/product is applicable to this product in the prescribed location and will be warranted in the same manner as the specified product for a period of ___ years, when applied and used as per the manufacturers’ guidelines.

The substitution of this product will not affect the dimensions shown on the drawing in any way.

This product substitution will not affect the work of other trades working on this product

The advantages of incorporating the proposed substitution into this Project are as follows:_____________

Submitted By: ________________________________________of_______________________________________

This completed form is to be sent to INL COR with the required submittal.

File details come from the government source that posted it. Updated .